This solicitation is for the construction of a regional ISO maintenance hangar at Westover Air Reserve Base in Massachusetts. The solicitation seeks to provide all labor, materials, and equipment necessary for the construction of a high-bay C-5 aircraft maintenance hangar with reinforced concrete foundation and floor slab, masonry exterior walls on the office area and metal sandwich panels on the hangar area, electrically operated hangar doors, structural steel frame, architecturally compatible roof, fire protection and alarm system, utilities, secure and non-secure communications, site improvements, and other necessary support. The solicitation also requires the demolition of Building 2426 and removal of debris from the site upon project completion. The contract duration is estimated at 730 calendar days with an estimated cost range between $25 million and $100 million. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Louisville. This will be an unrestricted, full and open competition solicitation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0059 for the Construction of the Regional ISO Maintenance Hangar located at Westover ARB, MA is hereby amended as follow s:
1. SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 18-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0059
X 9B. DATED (SEE ITEM 11)
21-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
18-Aug-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0059-0002
W912QR20R0059
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0002 - SUMMARY OF CHANGES
Solicitation: W912QR20R0059
Project: Design/Bid/Build for the Construction of the Regional ISO Maintenance Hangar
Location: Westover ARB, MA
Amendment 0002 Summary of Changes
A. SF1442 Section 00 10 00 – Solicitation
The due date and time has been revised from 20 August 2020 at 12:00PM ET to 10 September 2020 at
1:00PM ET.
B. The following Drawings have been replaced in their entirety:
a. S-016 – Updated Note 1.07.A.1.a to clarify that the foundations requiring vibro-compaction are indicated on A2/S-018.
b. S-017 – Updated Note 3.01.A to clarify that the foundations requiring vibro-compaction are indicated on A2/S-018.
c. A-602 – Removed reference to bullet resistant door.
- END OF ‘SUMMARY OF CHANGES –
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 20-Aug-2020 12:10 PM to 10-Sep-2020 01:00 PM.
(End of Summary of Changes)
D E
S
IG
N E
D B
Y
1 432
A
B
C
D
SHEET
IDENTIFICATION
NUMBER
US ARMY CORPS
OF ENGINEERS
LOUISVILLE DISTRICT
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S L O
U
IS
V
IL
L E
K
E N
T U
C K
Y D
W N
B Y
C
K D
B Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
P
L O
T D
A T
E
D A
T E
P R
O J E
C T
N O
P
N
O
A F
D R
A W
IN
G
C O
D E
X
S O
L
IC
IT
A
T
IO
N N
O
A F
-2 -1
-0
CERTIFIED FINAL
S O
L
IC
IT
A
T
IO
N
P
Y
T P
M
B
W E
S T
O V
E R
A
IR
R E
S E
R V
E B
A S
E
M A
S S
A C
H U
S E
T T
S
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y M
O
(8
-9
R E
G
IO
N A
L I
S O
M A
IN
T
E N
A N
C E
H A
N G
A R
/1
/2
:1
:0
P
M
S-016
F O
U N
D A
T
IO
N
G R
O U
N D
I M
P R
O V
E M
E N
T N
O T
E S
S H
T
O F
B B
R E
T T
M A
N N
D M
O R
T O
N T
G
E
IG
E R
/0
/2
Y T
P M
B
S
C e n tr a l.
rv t
PART 1 - GENERAL
1.01 SUMMARY:
A. WORK UNDER THIS SECTION CONSISTS OF FURNISHING ALL NECESSARY DESIGN,
LABOR, MATERIALS, AND EQUIPMENT REQUIRED FOR THE INSTALLATION OF A
VIBRO-COMPACTION SYSTEM FOR THE INCREASE OF BEARING CAPACITY AND
MITIGATION OF SETTLEMENT FOR DESIGNATED FOUNDATIONS IN SUPPORT OF THE
PROPOSED C5 ISO HANGAR AT THE WESTOVER AIR RESERVE BASE.
B. GROUND IMPROVEMENT REFERENCED IN THESE SPECIFICATIONS REFERS TO
VIBRO-COMPACTION. THE VIBRO-COMPACTION METHOD SHALL BE DESIGNED IN
ACCORDANCE TO GENERALLY-ACCEPTED ENGINEERING PRACTICE AND METHODS
AS DESCRIBED HEREIN. THE DESIGN SHALL BE COMPLETED BY A LICENSED
PROFESSIONAL ENGINEER (SUBCONTRACTOR’S PROFESSIONAL ENGINEER).
C. IF AN ALTERNATE FORM OF VIBRO-COMPACTION IS PROPOSED BY THE
CONTRACTOR, CONTRACTOR SHALL PROVIDE DETAILED SUBMITTAL OF METHOD,
DESIGN CALCULATIONS, AND CONSTRUCTION SPECIFICATIONS AS SPECIFIED
WITHIN THE SUBMITTALS SECTION OF THIS SECTION.
D. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO OBSERVE AND REVIEW
SPECIFIC SITE CONDITIONS AND REQUIREMENTS FOR EQUIPMENT, METHODS, AND
COSTS FOR THE DENSIFICATION PROGRAM.
E. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND CONDUITS,
PIPING, DUCT BANKS AND UTILITIES PRIOR TO INSTALLATION.
F. PERFORM THE WORK IN GENERAL CONFORMANCE WITH THE RECOMMENDATIONS
OF FHWA-NHI-16-027, GROUND MODIFICATION METHODS REFERENCE MANUAL.
G. DUE TO THE RELATIVELY SHALLOW GROUNDWATER DEPTH AND CONTAMINATION
OF THE WATER TABLE, THE DRY METHOD SHALL BE USED IN LIEU OF THE WET
METHOD NEAR THE SURFACE TO A DEPTH OF 25 FEET. IF THE DRY METHOD IS NOT
FEASIBLE, THE WET METHOD MAY BE APPLICABLE PROVIDED A PLAN TO ADDRESS
ANY POTENTIAL ENVIRONMENTAL CONCERNS IS DEVELOPED AND APPROVED.
H. COMPLETE ALL VIBRO-COMPACTION WORK PRIOR TO CONSTRUCTING ANY
FOUNDATIONS.
1.02 REFERENCES:
A. STANDARDS LISTED BY REFERENCE, INCLUDING REVISIONS BY ISSUING AUTHORITY,
FORM A PART OF THIS SPECIFICATION SECTION TO THE EXTENT INDICATED.
STANDARDS LISTED ARE IDENTIFIED BY ISSUING AUTHORITY, AUTHORITY
ABBREVIATION, DESIGNATION NUMBER, TITLE OR OTHER DESIGNATION
ESTABLISHED BY ISSUING AUTHORITY.
B. APPLICABLE STANDARDS:
1. AMERICAN SOCIETY FOR TESTING AND MATERIAL (ASTM):
a. C29 - (1991A) UNIT WEIGHT AND VOIDS IN AGGREGATE.
b. C33 - (2003) CONCRETE AGGREGATES.
c. C88 - (2005) SOUNDNESS OF AGGREGATES BY USE OF SODIUM SULFATE
OR MAGNESIUM SULFATE.
d. C117 - (2004) MATERIALS FINER THAN 75 MICROMETER (NO. 200) SIEVE IN
MINERAL AGGREGATES BY WASHING.
e. C127 - (2004) DENSITY, RELATIVE DENSITY (SPECIFIC GRAVITY), AND
ABSORPTION OF COARSE AGGREGATE.
f. C131 - (2003) RESISTANCE TO DEGRADATION OF SMALL-SIZE COARSE
AGGREGATE BY ABRASION AND IMPACT IN THE LOS ANGELES MACHINE.
g. C136 - (2006) SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES.
h. D422 - (1963; R 2007) PARTICLE SIZE ANALYSIS OF SOILS.
i. D 1194 – STANDARD TEST METHOD FOR BEARING CAPACITY OF SOIL FOR
STATIC LOAD AND SPREAD FOOTINGS.
j. D1241 – STANDARD SPECIFICATION FOR MATERIALS FOR SOIL-
AGGREGATE SUBBASE, BASE, AND SURFACE COURSES.
k. D1557 - (2002E1) LABORATORY COMPACTION CHARACTERISTICS OF SOIL
USING MODIFIED EFFORT (56,000 FT-LBF/CU. FT).
l. D2488 - (2000) DESCRIPTION AND IDENTIFICATION OF SOILS (VISUAL-
MANUAL PROCEDURE).
m. D5778 - STANDARD TEST METHOD FOR ELECTRONIC FRICTION CONE AND
PIEZOCONE PENETRATION TESTING OF SOILS AMERICAN SOCIETY OF
CIVIL ENGINEERS (ASCE).
2. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE):
a. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES
(ASCE/SEI 7-16).
3. INTERNATIONAL BUILDING CODE (IBC) 2015.
4. FEDERAL HIGHWAY ADMINISTRATION (FHWA):
a. FHWA-NHI-16-027 GROUND MODIFICATION METHODS REFERENCE
MANUAL.
1.03 DEFINITIONS:
A. QUALITY CONTROL REPRESENTATIVE:
1. THE QUALITY CONTROL REPRESENTATIVE SHALL BE A GRADUATE
GEOTECHNICAL ENGINEER, GRADUATE GEOLOGIST, OR GEOTECHNICAL
TECHNICIAN PROVIDED THE TECHNICIAN HAS AT LEAST FIVE YEARS OF
RELEVANT EXPERIENCE WITH THE OBSERVATION OF DRILLED SHAFT
INSTALLATION. THE QUALITY CONTROL REPRESENTATIVE WILL BE RETAINED
BY THE CONTRACTOR. THE GEOTECHNICAL REPRESENTATIVE IS
RESPONSIBLE FOR OBSERVATION AND RECORDING OF MATERIAL
VERIFICATION, VIBRO-COMPACTION INSTALLATION SEQUENCE AND METHODS,
AND OTHER QUALITY CONTROL DOCUMENTATION.
B. VIBRO-COMPACTION DENSIFICATION:
1. VIBRO-COMPACTION DENSIFICATION METHODS ARE TECHNIQUES USED TO
DENSIFY DEEP DEPOSITS OF SOILS BY INSERTING A LARGE VIBRATORY
PROBE INTO THE SOIL AT A PRE-DETERMINED SPACING, VIBRATING THE
PROBE, AND USING ON SITE OR IMPORTED GRANULAR MATERIALS TO
BACKFILL THE HOLE CREATED BY THE VIBRATORY PROBE. VIBRO-
REPLACEMENT IS USED IN RELATIVELY CLEAN GRANULAR SOILS (TYPICALLY
SILT CONTENT LESS THAN 12% AND CLAY CONTENT LESS THAN 2%).
2. VIBRO-COMPACTION IS INTENDED TO IMPROVE BEARING CAPACITY OF
SHALLOW SPREAD FOOTINGS AND TO REDUCE SETTLEMENT OF THE IN-SITU
MATERIALS.
1.04 EXPERIENCE QUALIFICATIONS:
A. VIBRO-COMPACTION SHALL BE PERFORMED BY A SPECIALTY CONTRACTOR
EXPERIENCED AND COMPETENT IN THE INSTALLATION OF APPROVED
DENSIFICATION TECHNIQUE, OR APPROPRIATE VIBRO-COMPACTION METHOD
SELECTED.
1. ALL WORK SHALL BE PERFORMED UNDER THE DIRECT FIELD SUPERVISION OF
A QUALIFIED FOREMAN.
2. THE FOREMAN SHALL SUPERVISE THE PERFORMANCE OF THE WORK IN
COMPLIANCE WITH THESE SPECIFICATIONS. THE PROPOSED FOREMAN SHALL
HAVE AT LEAST 2 YEARS OF EXPERIENCE INSTALLING VIBRO-COMPACTION
SYSTEMS. A RESUME SHALL BE PROVIDED FOR THE PROPOSED FOREMAN.
3. SUBMIT A QUALIFICATION STATEMENT DESCRIBING THE EXPERIENCE OF THE
SPECIALTY CONTRACTOR, THE FOREMAN, AND THE CONTRACTOR’S
PROFESSIONAL ENGINEER.
B. THE CONTRACTOR PERFORMING VIBRO-COMPACTION SHALL PROVIDE A MINIMUM 5
YEARS' EXPERIENCE RECORD DOCUMENTING 10 SUCCESSFUL PROJECTS
COMPLETED WITH SPECIFIC APPLICATION TO SIMILAR SITE CONDITIONS AND
IMPROVEMENT CRITERIA, INCLUDING THE USE OF MEANS AND METHODS
CONSISTENT WITH THOSE PROPOSED AT THIS SITE.
1. PROVIDE INFORMATION RELATED TO THE SUPERVISOR, AND CREW HAVING
COMPLETED A PROJECT OF COMPARABLE SIZE, DEPTH, AND VOLUME OF
DENSIFICATION TREATMENT WITH APPROVED VIBRO-COMPACTION
TECHNIQUES AS PROPOSED FOR THIS SITE.
2. REFERENCES ASSERTING THIS DOCUMENTATION SHALL BE PROVIDED.
C. THE EXPERIENCE STATEMENT OF PAST WORK AND DESCRIPTION OF EQUIPMENT
AND TECHNIQUES PROPOSED FOR USE SHALL BE SUBMITTED AT TIME OF BID AND
WILL BE CONSIDERED IN THE EVALUATION OF BIDS. GOVERNMENT MAY SUSPEND
THE WORK IF CONTRACTOR SUBSTITUTES UNQUALIFIED PERSONNEL FOR
APPROVED PERSONNEL DURING CONSTRUCTION. IF WORK IS SUSPENDED DUE TO
THE SUBSTITUTION OF UNQUALIFIED PERSONNEL, CONTRACTOR SHALL BE LIABLE
FOR ADDITIONAL COSTS RESULTING FROM THE SUSPENSION OF WORK AND NO
ADJUSTMENT IN CONTRACT TIME RESULTING FROM THE SUSPENSION OF WORK
WILL BE ALLOWED.
D. THE CONTRACTOR SHALL NOT SUBLET THE WHOLE OR ANY PART OF THE
CONTRACT WITHOUT THE EXPRESS PERMISSION IN WRITING OF THE GOVERNMENT.
E. PROVIDE A RESUME OF THE PROPOSED JOB-SITE SUPERVISOR DEMONSTRATING
THAT THE PROPOSED SUPERVISOR HAS AT LEAST 2 YEARS OF EXPERIENCE
INSTALLING VIBRO-COMPACTION SYSTEMS.
1.05 RELATED SITE WORK:
A. UTILITIES:
1. LOCATE ALL UNDERGROUND UTILITIES PRIOR TO THE START OF THE WORK.
2. MOVEMENT OF CONSTRUCTION MACHINERY AND EQUIPMENT OVER PIPES
AND UTILITIES DURING CONSTRUCTION SHALL BE AT THE CONTRACTOR’S
RISK.
3. REPORT DAMAGE TO UTILITY LINES OR SUBSURFACE CONSTRUCTION
IMMEDIATELY TO THE CONTRACTING OFFICER.
B. DAMAGES:
1. CONTRACTOR SHALL PROTECT ALL STRUCTURES AND UTILITIES FROM
DAMAGES RESULTING FROM THE WORK. CONTRACTOR IS RESPONSIBLE FOR
ALL REPAIRS DUE TO THESE DAMAGES.
1.06 SUBMITTALS:
A. PROFESSIONAL LIABILITY INSURANCE:
1. SUBCONTRACTOR’S PROFESSIONAL ENGINEER SHALL HAVE ERRORS AND
OMISSIONS DESIGN INSURANCE FOR THE WORK. THE INSURANCE POLICY
SHOULD PROVIDE A MINIMUM COVERAGE AS SPECIFIED IN CONTRACT
DOCUMENTS. CERTIFICATE EVIDENCING THIS COVERAGE SHALL BE
PROVIDED TO GOVERNMENT PRIOR TO START OF DESIGN.
B. BID SUBMITTALS:
1. SUBMIT SUBCONTRACTOR’S QUALIFICATIONS AT TIME OF BID.
2. SUBMIT NAME AND QUALIFICATIONS OF INDEPENDENT TESTING LABORATORY
PERFORMING VERIFICATION OF DENSITY.
3. CONTRACTOR SHALL SUBMIT PROPOSED MEANS AND METHODS OF
IMPLEMENTING THE SYSTEM OF VIBRO-COMPACTION.
C. DESIGN AND PRE-CONSTRUCTION SUBMITTALS:
1. ALL CALCULATIONS AND DRAWINGS SHALL BE PREPARED AND SEALED BY A
LICENSED PROFESSIONAL ENGINEER. SUBMITTALS SHALL BE TRANSMITTED
ELECTRONICALLY ONLY, UNLESS OTHERWISE REQUIRED BY SPECIFIC
SUBMITTAL INSTRUCTIONS. CONTRACTOR SHALL SUBMIT DETAILED DESIGN
CALCULATIONS FOR REVIEW AND APPROVAL TO THE GOVERNMENT. A
DETAILED EXPLANATION OF THE DESIGN PARAMETERS FOR STATIC
SETTLEMENT CALCULATIONS, WHERE REQUIRED, SHALL BE INCLUDED IN THE
DESIGN SUBMITTAL ALONG WITH CALCULATIONS THAT DEMONSTRATE THAT
THE REQUIRED ALLOWABLE BEARING CAPACITY AND SETTLEMENT
TOLERANCES ARE MET. PROVIDE A DETAILED INSTALLATION SEQUENCE,
PROCEDURE AND PROPOSED SCHEDULE. CONTRACTOR SHALL ALSO
PROVIDE DESIGN DEPTH OF AGGREGATE BASE TO BE PLACED BETWEEN
FOUNDATION SUBGRADE AND THE VIBRO-COMPACTION ZONE FOR UNIFORM
PERFORMANCE OF SHALLOW FOUNDATIONS. FOR A METHOD THAT IS NOT
SPECIFIED HEREIN, CONTRACTOR SHALL ALSO SUPPLY CONSTRUCTION
SPECIFICATIONS FOR MEANS AND METHODS TO BE SUBMITTED AND
APPROVED BY GOVERNMENT.
2. DETAILS OF MACHINES AND TOOLING REQUIRED FOR IMPLEMENTATION OF
VIBRO-COMPACTION SYSTEM.
3. MATERIAL REPORTS INDICATING THAT PROPOSED AGGREGATE FOR USE
MEETS THIS SECTION OR IS IN LINE WITH THOSE AGGREGATES REQUIRED BY
CONTRACTOR’S PROFESSIONAL ENGINEER.
4. DETAILS OF THE PROPOSED TESTING PROGRAM, AS SPECIFIED HEREIN.
5. DENSIFICATION PLAN.
D. TEST REPORTS:
1. RESULTS OF QUALITY CONTROL TESTING AND MONITORING.
2. BACKFILL MATERIAL PROPERTIES AND VERIFICATION OF COMPLIANCE.
3. TEST PAD DENSIFICATION PROGRAM REPORT AND SURVEY.
4. DAILY PROGRESS REPORTS – FURNISH DAILY A COMPLETE AND ACCURATE
RECORD OF VIBRO-COMPACTION COLUMNS TO CONTRACTING OFFICER. THE
RECORD SHALL INCLUDE:
a. FOOTING OR FOUNDATION ELEMENT.
b. COMPACTION POINT NUMBER AND LOCATION.
c. SOIL CONDITIONS DURING INSTALLATION.
d. PROBE PENETRATION DEPTH.
e. RATE OF PENETRATION AND WITHDRAWAL.
f. VOLUME AND GRADATION OF BACKFILL USED.
g. NUMBER OF PENETRATIONS OF THE PROBE.
h. RECORD OF AMMETER READINGS WITH DEPTH.
i. VERIFICATION THAT PROBES ARE OPERATING AT PROPER SPEEDS.
j. THE RECORD SHALL ALSO INDICATE THE TYPE AND SIZE OF THE
INSTALLATION EQUIPMENT USED, AND THE TYPE OF AGGREGATE USED.
5. FINAL REPORT ASSEMBLING ALL QA/QC RECORDS.
1.07 DESCRIPTION OF WORK:
A. GENERAL DESCRIPTION OF THE WORK:
1. PERFORM VIBRO-COMPACTION UNDER THE BUILDING FOUNDATIONS AS
IDENTIFIED ON CONTRACT DRAWINGS.
a. THE DEPTH OF VIBRO-COMPACTION SHALL BE A MINIMUM OF 50 FEET
BELOW THE GROUND SURFACE FOR FOUNDATIONS INDICATED ON
A2/S-018 EXCEPT THOSE DESIGNATED AS F2 AND F13 ON A2/S-018,
WHICH REQUIRE VIBRO-COMPACTION TO A DEPTH OF 35 FEET TO MEET
THE DESIGN CRITERIA AS NOTED HEREIN.
b. APPROVED DENSIFICATION METHOD SHALL BE INSTALLED IN A METHOD
THAT IMPROVES THE SUBSURFACE SOILS AND RESULTS IN THE
ALLOWABLE SETTLEMENT AT THE INDICATED BEARING PRESSURES.
c. THE LATERAL EXTENT OF VIBRO-COMPACTION OUTSIDE THE PLAN AREA
OF THE FOOTINGS SHALL BE DICTATED BY THE ABILITY OF THE VIBRO-
COMPACTION COLUMNS TO PROVIDE SUFFICIENT LATERAL
CONFINEMENT TO SUPPORT THE SUPERSTRUCTURE AND MEETING THE
DESIGN CRITERIA OF THIS SPECIFICATION. AS A MINIMUM, ONE
ADDITIONAL ROW OF COLUMNS SHALL BE PROVIDED AROUND THE
AREA OF REINFORCEMENT TO PROVIDE LATERAL CONFINEMENT.
d. MINIMUM VIBRATORY IMPROVEMENT AREA COVERAGE AND COLUMN
SPACING (FOR SPREAD FOOTINGS): AS SPECIFICALLY DESIGNED BY
CONTRACTOR’S PROFESSIONAL ENGINEER.
e. AT THE START OF ACTIVITIES COMPLETE TEST PADS IN ACCORDANCE
WITH PART 3.
2. PERFORM VERIFICATION FIELD TESTS AT ALL TEST PAD LOCATIONS WITH
CONE PENETRATION TESTS (CPT), IN ACCORDANCE WITH ASTM D5778.
a. VERIFY, EVALUATE AND SELECT COMPACTION GRID SPACING AND
DENSIFICATION INSTALLATION PROCEDURES FOR PRODUCTION WORK.
b. RESULTS OF THE VERIFICATION FIELD TESTS WILL BE SUBMITTED TO
AND APPROVED BY THE GOVERNMENT BEFORE CONTRACTOR CAN
CONTINUE WITH THE WORK.
3. ANY HOLES OR LOOSENED MATERIALS NEAR THE SURFACE SHALL BE FILLED
WITH SAND OR STONE AND RETURNED TO THEIR ORIGINAL DENSIFIED
CONDITION.
B. PRE-CONSTRUCTION AND POST-TEST PAD MEETING:
1. THERE WILL BE A MANDATORY PRE-CONSTRUCTION MEETING, PRIOR TO
STARTING THE WORK, FOR AT LEAST ONE OR MORE REPRESENTATIVES OF
EACH OF THE FOLLOWING GROUPS: CONTRACTOR, GROUND IMPROVEMENT
SUBCONTRACTOR, QUALITY CONTROL REPRESENTATIVE, AND THE
CONTRACTING OFFICER.
a. THE CONTRACTOR SHALL HAVE THE PRE-QUALIFIED SUPERVISOR
PRESENT AT THE PRE-CONSTRUCTION MEETING.
2. AT THE PRE-CONSTRUCTION MEETING, THE CONTRACTOR SHALL PROVIDE A
DENSIFICATION PLAN SHOWING LAYOUT OF THE WORK, UNIQUE
IDENTIFICATION NUMBERS, DEPTH, GPS COORDINATE LOCATION AND
SPACING OF IMPROVEMENT COLUMNS, DENSIFICATION METHODS,
EQUIPMENT, LOCATION OF EXISTING UTILITIES, PHASING OF THE WORK AND
VERIFICATION TEST LAYOUT.
a. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING EXISTING
GEOTECHNICAL INFORMATION, AND FOR PROVIDING ALL LINES AND
GRADES FOR DENSIFICATION PROBES, INCLUDING ALL SURVEYING
MARKERS.
b. APPROVAL OF THE PLAN SHALL NOT REMOVE THE RESPONSIBILITY OF
THE CONTRACTOR FOR THE ACCURACY OF THE DRAWINGS.
c. EACH COMPACTION POINT LOCATION, INCLUDING TEST PAD POINTS, SHALL HAVE A UNIQUE REFERENCE NUMBER FOR RECORD PURPOSES.
3. THE CONTRACTOR SHALL PROVIDE A FIRM WORKING BASE FOR SOIL
IMPROVEMENT OPERATIONS.
a. THE WORKING SURFACE FROM WHICH THE WORK IS PERFORMED
SHALL BE AT OR ABOVE FINISHED GRADE ELEVATION.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LAYOUT OF THE
DENSIFICATION IMPROVEMENT POINTS.
a. IMMEDIATELY BEFORE INSTALLATION, EACH COMPACTION POINT
LOCATION SHALL BE MARKED BY THE CONTRACTOR WITH SUITABLE
IDENTIFICATION PINS OR MARKERS.
b. ALL COMPACTION POINTS SHALL BE LOCATED TO WITHIN 6 INCHES OF
THE PLAN POSITION SHOWN ON THE GROUND TREATMENT DRAWINGS.
c. LOCATIONS OF COMPACTION POINTS SHALL BE BASED ON A SURVEY BY
A REGISTERED SURVEYOR PROVIDED BY THE CONTRACTOR. A PLAN
DRAWING SHOWING ALL THE COMPACTION POINTS, A UNIQUE
IDENTIFICATION REFERENCE NUMBER FOR EACH COMPACTION POINT,
AND GPS COORDINATES ASSOCIATED WITH EACH COMPACTION POINT
WILL BE PROVIDED TO THE CONTRACTING OFFICER UPON COMPLETION.
d. THE CONTRACTOR SHALL PROVIDE INITIAL BENCH MARKS AND
ACCURATELY ESTABLISH THE HORIZONTAL AND VERTICAL BOUNDARIES
OF THE INDICATED SOIL IMPROVEMENT AREA.
GROUND IMPROVEMENT - VIBRO-COMPACTION NOTES:
S Y
M
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
E R
T
IF
IE
D
F
IN
A L
/3 /2
A
M E
N D
M E
N T
/1 /2
D E
S
IG
N E
D B
Y
1 432
A
B
C
D
SHEET
IDENTIFICATION
NUMBER
US ARMY CORPS
OF ENGINEERS
LOUISVILLE DISTRICT
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S L O
U
IS
V
IL
L E
K
E N
T U
C K
Y D
W N
B Y
C
K D
B Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
P
L O
T D
A T
E
D A
T E
P R
O J E
C T
N O
P
N
O
A F
D R
A W
IN
G
C O
D E
X
S O
L
IC
IT
A
T
IO
N N
O
A F
-2 -1
-0
CERTIFIED FINAL
S O
L
IC
IT
A
T
IO
Y
T P
M
W E
S T
O V
E R
A
IR
R E
S E
R V
E B
A S
E
M A
S S
A C
H U
S E
T T
S
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y M
O
(8
-9
R E
G
IO
N A
L I
S O
M A
IN
T
E N
A N
C E
H A
N G
A R
/1
/2
:1
:2
P
M
S-017
F O
U N
D A
T
IO
N
G R
O U
N D
I M
P R
O V
E M
E N
T N
O T
E S
S H
T
O F
B B
R E
T T
M A
N N
D M
O R
T O
N T
G
E
IG
E R
/0
/2
Y T
P M
B
S
C e n tr a l.
rv t
5. THE CONTRACTOR SHALL PROVIDE A DETAILED DENSIFICATION METHOD
STATEMENT INDICATING THE PROCEDURES AND PHASING TO BE FOLLOWED
TO DENSIFY THE SOILS TO ACHIEVE THE PERFORMANCE SPECIFIED HEREIN,
INCLUDING TEST PAD LAYOUT.
a. THE METHOD STATEMENT SHALL INCLUDE A DETAILED DESCRIPTION OF
THE EQUIPMENT AND VERIFICATION METHODS TO BE USED.
b. THE METHOD STATEMENT SHALL ALSO INCLUDE PROCEDURES THAT
SHALL BE USED WHEN DENSIFYING SOILS NEXT TO EXISTING UTILITIES
AND BURIED STRUCTURES SO THAT THE EXISTING UTILITIES AND
STRUCTURES WILL NOT BE DAMAGED.
c. THE METHOD STATEMENT SHALL INCLUDE A SCHEDULE FOR
PERFORMING THE DEMONSTRATION AND PRODUCTION DENSIFICATION
PROGRAMS, INCLUDING VERIFICATION TESTING, ALLOCATING 5 DAYS
FOR EVALUATION OF TEST RESULTS.
6. THERE WILL BE A MANDATORY POST-TEST PAD MEETING, PRIOR TO THE
CONTRACTOR CONTINUING WITH THE WORK, FOR AT LEAST ONE OR MORE
REPRESENTATIVES OF EACH OF THE FOLLOWING GROUPS: SOIL
IMPROVEMENT SUBCONTRACTOR, QUALITY CONTROL REPRESENTATIVE, AND
THE CONTRACTING OFFICER.
a. LOCATION, DESCRIPTION OF CONSTRUCTION AND RESULTS OF
VERIFICATION TESTING SHALL BE PRESENTED FOR REVIEW AND
APPROVAL BY THE GOVERNMENT.
b. ANY CHANGE TO THE ORIGINAL PROCEDURES PRESENTED IN THE PRE-
CONSTRUCTION MEETING BASED ON RESULTS OF THE TEST-PAD
CONSTRUCTION AND VERIFICATION TESTING WILL BE COMMUNICATED
BY THE SUBCONTRACTOR AND WILL BE SUBJECT TO APPROVAL BY THE
GOVERNMENT.
C. MONITORING:
1. MOVEMENT CRITERIA:
a. IF DEEMED NECESSARY BY GOVERNMENT, CONTRACTOR SHALL
MONITOR SETTLEMENT/HEAVE BENCHMARKS AT LOCATIONS APPROVED
BY THE CONTRACTING OFFICER ALONG ROADS, UTILITIES, AND
BUILDINGS ADJACENT TO THE SOIL IMPROVEMENT AREA.
b. MONITOR THE BENCHMARKS CONTINUOUSLY DURING THE SOIL
IMPROVEMENT OPERATION TO DETECT ANY SETTLEMENT, UPLIFT, OR
LATERAL MOVEMENT OF THE EXISTING STRUCTURES/FACILITIES.
c. IF SETTLEMENT, UPLIFT, OR LATERAL MOVEMENT OF THE EXISTING
STRUCTURES/FACILITIES IS IN EXCESS OF 0.5 INCH IS DETECTED, ALL
SOIL IMPROVEMENT WORK SHALL IMMEDIATELY CEASE, AND THE
CONTRACTING OFFICER SHALL BE NOTIFIED.
d. SOIL IMPROVEMENT WORK SHALL NOT RECOMMENCE UNTIL
CORRECTIVE MEASURES TO PREVENT FURTHER SETTLEMENT OR
HEAVE HAVE BEEN DEVELOPED BY THE CONTRACTOR, APPROVED, AND
IMPLEMENTED.
2. VIBRATION MONITORING:
a. IF DEEMED NECESSARY BY CONTRACTING OFFICER, CONTRACTOR
SHALL COMPLETE A VIBRATION MONITORING PLAN. CONTRACTOR
SHALL SUBMIT A PROGRAM FOR MONITORING VIBRATIONS REACHING
ADJACENT UTILITIES AND STRUCTURES FOR APPROVAL BY THE
GOVERNMENT, 15 DAYS PRIOR TO STARTING THE WORK.
1.08 PERFORMANCE CRITERIA:
A. PROPOSED SHALLOW FOUNDATION LAYOUT AND DIMENSIONS ARE SHOWN ON THE
DRAWINGS. SETTLEMENT ATTRIBUTED TO AN ALLOWABLE BEARING PRESSURE OF
3,500 POUNDS PER SQUARE FOOT UNDER STATIC CONDITIONS WITH A FACTOR OF
SAFETY OF 3.0 SHALL NOT EXCEED 1-INCH TOTAL SETTLEMENT AND 0.5-INCHES
DIFFERENTIAL SETTLEMENT.
B. SHALLOW FOUNDATION CONCRETE-SOIL COEFFICIENT OF FRICTION AGAINST
SLIDING SHALL MEET A MINIMUM OF 0.55.
C. STRUCTURAL ELEMENTS TO BE TREATED SHALL MEET THE DENSIFICATION LIMITS
IN PART 3.
D. PERFORM DENSIFICATION COMPLIANCE TESTING WITH CPT IN ACCORDANCE WITH
ASTM D5778 THROUGHOUT THE DURATION OF PROJECT.
E. THE SOILS SHALL BE DENSIFIED TO PROVIDE A MINIMUM RELATIVE DENSITY OF 85%.
1.09 SUBSURFACE INFORMATION:
A. CERTAIN SUBSURFACE INFORMATION HAS BEEN OBTAINED AT, OR IN THE VICINITY
OF, THE SITE OF THE WORK.
B. THERE IS NO EXPRESS OR IMPLIED GUARANTEE AS TO THE ACCURACY OR
COMPLETENESS OF THE SUBSURFACE INFORMATION, NOR OF THE INTERPRETATION
THEREOF BY THE ENGINEER, OR ANY OF THEIR REPRESENTATIVES.
C. THE SUBSURFACE INFORMATION OR COPIES THEREOF DO NOT FORM A PART OF
THIS OR ANY CONTRACT DOCUMENT.
D. IN THE EVENT THAT ADDITIONAL SUBSURFACE INFORMATION IS REQUIRED BY THE
CONTRACTOR, THE CONTRACTOR MAY OBTAIN SUPPLEMENTAL SUBSURFACE
INFORMATION.
PART 2 - PRODUCTS
2.01 EQUIPMENT:
A. ALL EQUIPMENT SHALL BE IN GOOD WORKING ORDER AND CAPABLE OF MEETING
THE REQUIRED LEVEL OF DENSIFICATION.
B. VIBRATORS SHALL OPERATE AT THE FREQUENCY AND ENERGY REQUIRED BY
SUBCONTRACTOR’S PROFESSIONAL ENGINEER AND THAT USED IN INSTALLATION OF
THE TEST PAD AT ALL TIMES.
C. FOLLOWER TUBES SHALL BE MARKED IN 5 FEET INCREMENTS AND SHALL BE
CAPABLE OF PLACING BACKFILL MATERIAL TO THE REQUIRED DEPTH OF
DENSIFICATION.
D. VIBRATORS SHALL BE EQUIPPED WITH METERING DEVICES THAT ALLOW
MONITORING OF THE AMPERAGE DRAW OF THE MOTOR BY THE OPERATOR, QUALITY
CONTROL REPRESENTATIVE AND CONTRACTING OFFICER AS NEEDED.
2.02 BACKFILL MATERIALS:
A. PROCESSED GRAVEL SHALL BE USED TO BACKFILL THE HOLES DEVELOPED FROM
THE VIBRATORY PROBE AND SHALL BE PLACED CONCURRENTLY THROUGHOUT THE
VIBRATORY PROCESS.
B. BACKFILL MATERIALS SHALL CONSIST OF IMPORTED COHESIONLESS MATERIALS
SUITABLE FOR USE IN VIBRO-COMPACTION IN ACCORDANCE WITH ASTM D-1241 AND
ASTM D-422, RECYCLED CONCRETE OR OTHER GRADED AGGREGATE APPROVED BY
CONTRACTING OFFICER.
1. THE PERCENT WEIGHT LOSS OF STONE BY ASTM C88 SHALL NOT EXCEED 12%.
2. THE PERCENT WEIGHT LOSS BY ASTM C131 SHALL NOT EXCEED 40% AT 500
REVOLUTIONS.
C. PROVIDE CERTIFIED TEST REPORTS PER ASTM C33 OF THE SOURCE AND MATERIAL
PROPERTIES TO INCLUDE GRADATION CURVES PER ASTM D422, SPECIFIC GRAVITY
TESTS PER ASTM C127, AND LOOSE AND COMPACTED DENSITY PER ASTM C29.
D. ON SITE COHESIONLESS MATERIALS MAY BE USED WHERE AVAILABLE AND WHERE
CONTRACTOR CAN DEMONSTRATE, THROUGH CPT SOUNDINGS, SUITABLE
PERFORMANCE AND DENSIFICATION.
E. POTABLE WATER OR OTHER SUITABLE SOURCE SHALL BE USED TO INCREASE
AGGREGATE MOISTURE CONTENT WHERE REQUIRED.
PART 3 - EXECUTION
3.01 VIBRO-COMPACTION:
A. DENSIFY ALL LOOSE TO MEDIUM DENSE SOILS TO A MINIMUM DEPTH OF 50 FEET
BELOW EXISTING GRADE FOR FOUNDATIONS INDICATED ON A2/S-018 EXCEPT THOSE
DESIGNATED AS F2 AND F13 ON A2/S-018, WHICH REQUIRE VIBRO-COMPACTION TO A
DEPTH OF 35 FEET TO ACHIEVE CPT CONE VALUES INDICATIVE OF 85% RELATIVE
DENSITY USING APPROVED CORRELATIONS.
B. BACKFILL ALL HOLES RESULTING FROM THE DENSIFICATION PROCESS FOR THEIR
ENTIRE LENGTH AND VOLUME WITH APPROVED BACKFILL MATERIALS DURING AND
AFTER PROBE REMOVAL TO PREVENT VOIDS OF LOW-DENSITY REGIONS AT SITE.
C. COORDINATE WITH CONTRACTING OFFICER TO PROVIDE A MINIMUM OF 5 DAYS’
NOTICE TO BE ON-SITE FOR OBSERVATION OF ALL TESTING, INSTALLATION AND
VERIFICATION PROCESSES.
D. EQUIPMENT AND PROCEDURE:
1. SPECIFIC EQUIPMENT, MEANS AND METHODS, MATERIALS AND PROCEDURES
ARE LEFT TO THE CONTRACTOR TO ACHIEVE THE SPECIFIED CRITERIA.
HOWEVER, THE FOLLOWING MINIMUM REQUIREMENTS SHALL APPLY:
a. DUE TO THE RELATIVELY SHALLOW GROUNDWATER DEPTH AND
CONTAMINATION OF THE GROUNDWATER, THE DRY METHOD SHALL BE
USED IN LIEU OF THE WET METHOD NEAR THE SURFACE TO A DEPTH OF 25
FEET. IF THE DRY METHOD IS NOT FEASIBLE, THE WET METHOD MAY BE
APPLICABLE PROVIDED A PLAN TO ADDRESS ANY POTENTIAL
ENVIRONMENTAL CONCERNS IS DEVELOPED AND APPROVED.
b. CONTRACTOR SHALL USE A DOWN-HOLE VIBRATOR CAPABLE OF MEETING
PERFORMANCE REQUIREMENTS. DEWATERING OF GROUNDWATER IS
PROHIBITED. THE SELECTED METHODOLOGY/EQUIPMENT SHALL PREVENT
GROUNDWATER OR OPERATION WATER FROM REACHING THE GROUND
SURFACE.
c. THE VIBRATOR EXTENSION TUBES SHALL BE MARKED IN 12-INCH
INCREMENTS FOR READILY DETERMINING VIBRATOR WORKING
INCREMENTS AND TIP ELEVATION. NUMERICAL IDENTIFICATION SHOWING
DEPTH SHALL BE PROVIDED AT 5 FEET INTERVALS ON THE EXTENSION TUBE.
d. AFTER PENETRATION TO THE TREATMENT DEPTH, THE VIBRATOR SHALL BE
WITHDRAWN IN INCREMENTS NOT EXCEEDING 4 FEET TO ALLOW BACKFILL
PLACEMENT AND SURROUNDING COMPACTION.
e. THE VIBRATOR SHALL BE RE-PENETRATED THROUGH EACH INCREMENT TO
WITHIN 2 FEET OF A RECENTLY TREATED DEPTH INTERVAL TO OBSERVE
AMPERAGE BUILDUP OR INCREASE.
f. THE AMMETER READING DURING THE RE-PENETRATION PROCESS SHOULD
BE GREATER THAN DEVELOPED WHEN THE VIBRATOR IS OPERATED WHEN IT
IS FREELY SUSPENDED. THE MINIMUM AND MAXIMUM AMMETER READINGS
SHOULD BE CONFIRMED DURING THE TEST PADS.
g. AMPERAGE BUILDUP AND BACKFILL QUANTITIES ARE CONTINGENT ON THE
TYPE OF VIBRATOR, TYPE OF BACKFILL, IN-SITU SOIL CONDITIONS AND
CONTRACTOR'S PROCEDURES.
h. PEAK PARTICLE VELOCITIES DUE TO VIBRATIONS REACHING ADJACENT
EXISTING UTILITIES AND STRUCTURES SHALL NOT EXCEED 1.0 INCH PER
SECOND.
3.02 TEST PAD DENSIFICATION PROGRAM:
A. PREPARE A MINIMUM OF TWO TEST PAD LOCATIONS:
1. TEST PADS SHALL HAVE A MINIMUM PLAN AREA OF 500 SQUARE FEET.
2. TEST PADS MAY BE PERFORMED IN A PRODUCTION LOCATION AS LONG AS FINAL
DENSIFICATION CRITERIA ARE MET UPON COMPLETION.
3. TESTING SHALL BE PERFORMED TO VERIFY DENSIFICATION TO THE SPECIFIED
PERFORMANCE LEVEL AND TO ASSESS OFFSITE VIBRATIONS BEFORE
PROCEEDING WITH THE PRODUCTION DENSIFICATION. UPON COMPLETION OF
TEST PADS, PERFORM CPT VERIFICATION TESTS AT LOCATIONS MIDWAY
BETWEEN COMPACTION POINTS AND APPROVED BY THE CONTRACTING OFFICER.
4. ALL CPTS SHALL BE PERFORMED IN ACCORDANCE WITH ASTM D5778 AND SHALL
BE PERFORMED NEAR THE CENTRAL PORTION OF THE DENSIFIED AREAS WITH AT
LEAST 2 CPT SOUNDINGS PER TEST PAD.
5. CPT SOUNDINGS SHALL BE LOCATED EQUIDISTANT TO THE CENTERS OF THE
VIBRO-COMPACTION ELEMENTS, WITHIN THE REGION RECEIVING THE LEAST
DENSIFICATION IMPROVEMENT.
B. SUBMIT A TEST PAD DENSIFICATION PROGRAM REPORT AND SURVEY, TO INCLUDE THE
TEST RESULTS OF ALL SPECIFIED TESTS AND THEIR IDENTIFYING LOCATION AND
RELATIONSHIPS TO ADJACENT COMPACTION POINTS:
1. IDENTIFY EACH COMPACTION POINT AND ITS DATE AND TIME OF INSTALLATION.
2. INCLUDE RECOMMENDATIONS FOR PRODUCTION SPACING OF COMPACTION
POINTS.
3. ALLOW 5 WORKING DAYS FOR REVIEW BY CONTRACTING OFFICER AFTER THE
SUBMITTAL OF THE TEST PAD DENSIFICATION PROGRAM REPORTS, SURVEYS, AND
PROPOSED DENSIFICATION METHOD STATEMENT FOR PRODUCTION SOIL
DENSIFICATION. NO PRODUCTION SOIL DENSIFICATION SHALL BEGIN UNTIL THE
REPORT HAS BEEN REVIEWED.
C. A POST TEST-PAD MEETING WILL BE REQUIRED TO DISCUSS RESULTS OF THE TEST-PAD
INSTALLATION AND VERIFICATION TESTING AND ANY POSSIBLE CHANGES TO THE
ORIGINAL PROCEDURES.
D. ANY CHANGE IN THE PREDETERMINED DENSIFICATION INSTALLATION PROGRAM SHALL
BE IMMEDIATELY REPORTED AND SUBMITTED TO THE CONTRACTING OFFICER.
E. PROBE HOLES:
1. CONTRACTOR MAY, AT NO ADDITIONAL COST TO THE GOVERNMENT, COMPLETE
PROBE HOLES AT SELECT LOCATIONS WITHIN THE AREA OF EACH FOUNDATION
ELEMENT TO BE DENSIFIED TO DETERMINE REFUSAL DEPTH PRIOR TO
PRODUCTION OF VIBRO-COMPACTION ELEMENTS.
a. BACKFILL PROBE HOLES WITH REPLACEMENT AGGREGATE AS REQUIRED TO
FILL ANY VOID MADE BY THE PROBES.
3.03 TOLERENCES:
A. IN THE PENETRATION STAGE, THE VIBRATOR SHALL BE KEPT AS NEAR VERTICAL AS
POSSIBLE AND SHALL NOT DEVIATE BY MORE THAN 1 FOOT IN 20 FEET.
B. THE LOCATION OF VIBRO-COMPACTION-SUPPORTED FOUNDATIONS FOR THIS PROJECT,
INCLUDING LAYOUT OF INDIVIDUAL COMPACTION POINTS, SHALL BE MARKED IN THE
FIELD USING SURVEY STAKES OR SIMILAR MEANS AT LOCATIONS SHOWN ON THE
DRAWINGS. COMPACTION POINTS SHALL BE INSTALLED TO WITHIN 6 INCHES OF
LOCATIONS SHOWN ON THE DESIGN DRAWINGS.
3.04 VERIFICATION OF DENSIFICATION:
A. VERIFY DEGREE OF DENSIFICATION BY MAKING CONE PENETRATION TESTS (CPT) IN
ACCORDANCE WITH ASTM D5778, AS FOLLOWS:
1. NO LESS THAN 1 CPT SOUNDING PER 750 SQUARE FEET OF IMPROVED AREA. THIS
NUMBER DOES NOT INCLUDE CPT SOUNDINGS PERFORMED FOR TEST PADS.
2. NO LESS THAN 1 CPT SOUNDING FOR 100 FEET OF STRIP FOOTING.
3. EACH SOUNDING SHALL BE PERFORMED IN THE CENTER OF SPECIFIC DESIGN
VIBRO-COMPACTION GROUPINGS, EQUIDISTANT FROM EACH SURROUNDING VIBRO-
COMPACTION POINT. SOUNDING LOCATIONS WILL BE SELECTED BY THE
CONTRACTOR’S PROFESSIONAL ENGINEER AND APPROVED BY THE CONTRACTING
OFFICER.
4. EXTEND EACH CPT SOUNDING TO A MINIMUM OF 5 FEET BELOW THE BASE OF THE
VIBRO-COMPACTION DEPTH.
5. RESULTS OF CPT SOUNDING SHALL DEMONSTRATE DENSIFICATION OF THE SOILS
TO A MINIMUM OF 85% RELATIVE DENSITY WHEN DETERMINED FROM ACCEPTED
CORRELATIONS WITH CPT DATA.
6. A MINIMUM OF 90% OF DATA POINTS SHALL DEMONSTRATE THAT THE MINIMUM
DENSITY IS ACHIEVED.
B. THE CONTRACTOR MAY ELECT TO DELAY DENSIFICATION VERIFICATION TESTING TO
ALLOW FOR TIME-RELATED IMPROVEMENT:
1. THIS DELAY IS AT THE CONTRACTOR'S RISK AND EXPENSE, AND DOES NOT RELIVE
THE CONTRACTOR FROM ANY PROGRESS TESTING REQUIREMENTS REQUIRED
UNDER "PROGRESS VERIFICATION."
2. EXPERIENCE WITH VIBRO-COMPACTION TECHNIQUES IN SOME SATURATED SOILS
INDICATES THAT IMPROVEMENT MEASURED BY IN-SITU TESTS CAN BE TIME
DEPENDENT. HOWEVER, FOR THE PURPOSE OF THIS PROJECT, THE REQUIREMENT
FOR MINIMUM CPT TARGET VALUES SHALL BE CONSIDERED SATISFIED, IF THE
VALUES ARE MET OR EXCEEDED BY TESTING WITHIN 200 HOURS AFTER SOIL
IMPROVEMENT HAS BEEN COMPLETED FOR THE AREA BEING TESTED.
3. DENSIFICATION VERIFICATION TESTS OUTLINED HEREIN ARE INTENDED TO BE
ACCOMPLISHED ITEM BY ITEM, UNIFORMLY OVER THE EXTENT OF SITE, IN A
SEQUENTIAL MANNER.
a. SHOULD THE CONTRACTOR PROPOSE TO COMBINE CERTAIN OF THESE
SEQUENCES TO SAVE TIME AND THE RESULTS PROVE TO BE UNACCEPTABLE,
THE DEFICIENCIES SHALL BE CORRECTED AT NO ADDITIONAL EXPENSE TO
THE GOVERNMENT.
b. PRODUCTION DENSIFICATION WORK COMMENCING PRIOR TO APPROVAL OF
THE TEST RESULTS SHALL BE CONSIDERED DONE AT THE CONTRACTOR'S
RISK, REMEDIAL MEASURES DEEMED NECESSARY BY THE ENGINEER TO
CORRECT DEFICIENCIES IN SUCH AREAS SHALL BE ACCOMPLISHED AT NO
ADDITIONAL COST TO THE GOVERNMENT.
c. SHOULD THE MINIMUM ACCEPTANCE VALUES NOT BE MET, THE CONTRACTOR
SHALL INSTALL ADDITIONAL COMPACTION POINTS TO ATTAIN THE SOIL
IMPROVEMENT CRITERIA AT NO ADDITIONAL COST TO THE GOVERNMENT.
C. VIBRO-COMPACTION VERIFICATION TESTING SHALL BE PERFORMED BY AN INDEPENDENT
TESTING LABORATORY, RETAINED BY THE CONTRACTOR, AND APPROVED BY THE
GOVERNMENT.
1. SUBMIT QUALIFICATION OF INDEPENDENT TESTING LABORATORY.
2. THE QUALITY CONTROL REPRESENTATIVE SHALL BE PRESENT TO OBSERVE ALL
DENSIFICATION VERIFICATION TESTING.
D. NOTIFY CONTRACTING OFFICER A MINIMUM OF 72 HOURS PRIOR TO PERFORMING
VERIFICATION TESTING.
E. SUBMIT RESULTS OF DENSIFICATION VERIFICATION TESTS.
F. PROGRESS VERIFICATION:
1. AS THE SOIL DENSIFICATION WORK PROGRESSES, CONDUCT TESTS AT
INTERVALS DESCRIBED IN "VERIFICATION OF DENSIFICATION" TO VERIFY
THAT NO LESS THAN THE SPECIFIED MINIMUM DEGREE OF DENSIFICATION IS
BEING ACHIEVED:
a. IF TESTING INDICATES THAT THE MINIMUM DEGREE OF DENSIFICATION
IS NOT BEING MET, DISCONTINUE ADVANCEMENT INTO NEW AREAS AND
REPEAT THE DENSIFICATION PROCESS IN THE FAILED AREA(S), AT NO
COST TO THE GOVERNMENT, MAKING MODIFICATIONS IN THE PROCESS
AS NECESSARY TO PROVIDE NO LESS THAN THE SPECIFIED MINIMUM
DEGREE OF DENSIFICATION.
b. REPEAT THIS CYCLE OF DENSIFICATION AND TESTING UNTIL ALL
SPECIFIED REQUIREMENTS FOR SOIL DENSIFICATION ARE MET IN ALL
REQUIRED AREAS.
c. THE CONTRACTING OFFICER MAY REQUIRE ADDITIONAL TESTS AS
DEEMED NECESSARY AT NO ADDITIONAL COST TO THE GOVERNMENT.
G. REJECTED DENSIFICATION CONDITIONS:
1. SHOULD THESE MINIMUM VALUES NOT BE MET, THE CONTRACTOR SHALL
CONSTRUCT ADDITIONAL DENSIFICATION POINTS ADJACENT TO THE FAILING
COMPACTION POINTS TO ATTAIN THE SOIL IMPROVEMENT CRITERIA.
a. ALL WORK TO ACHIEVE THE SPECIFIED CRITERIA, INCLUDING
INSTALLING ADDITIONAL VIBRO-COMPACTION AND PERFORMING
ADDITIONAL VERIFICATION TESTING SHALL BE PROVIDED BY THE
CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
GROUND IMPROVEMENT: VIBRO-COMPACTION NOTES - (Continued):
S Y
M
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
E R
T
IF
IE
D
F
IN
A L
/3 /2
A
M E
N D
M E
N T
/1 /2
NL
A
SCHEDULE
DOOR PER A
B
S C
H E
D U
L E
D O
O R
P E
R
D O
O R
P E
R S
C H
E D
U L E
SCHEDULE
DOOR PER
D O
O R
P E
R S
C H
E D
U L E
A D
B C
SCHEDULE
DOOR PER
OH
D O
O R
P E
R S
C H
E D
U L E
DOOR PER SCHEDULE
F1
HL
GLASS TYPES:
REFERENCE SPECIFICATION FOR GLASS TYPES
1 TYPE-1 FIRE/SAFETY GLASS (45 MIN)
2 TYPE-2 CLEAR LAMINATED GLASS
3 TYPE-3 TINTED / INSULATED GLASS,
LAMINATED INNER PANE
4 TYPE-4 TINTED / SAFETY GLASS
5 TYPE-5 CLEAR / SAFETY GLASS
6 TYPE-6 FIRE/SAFETY GLASS (90 MIN)
24"
D E
S
IG
N E
D B
Y
1 432
A
B
C
D
SHEET
IDENTIFICATION
NUMBER
US ARMY CORPS
OF ENGINEERS
LOUISVILLE DISTRICT
U .S
A
R M
Y E
N G
IN
E
E R
D
IS
T R
IC
T
C O
R P
S O
F E
N G
IN
E
E R
S L O
U
IS
V
IL
L E
K
E N
T U
C K
Y D
W N
B Y
C
K D
B Y
F
IL
E N
A M
E
S
IZ
E
P L O
T S
C A
L E
P
L O
T D
A T
E
D A
T E
P R
O J E
C T
N O
P
N
O
A F
D R
A W
IN
G
C O
D E
X
S O
L
IC
IT
A
T
IO
N N
O
A F
-2 -1
-0
CERTIFIED FINAL
S O
L
IC
IT
A
T
IO
Y
T P
M
W E
S T
O V
E R
A
IR
R E
S E
R V
E B
A S
E
M A
S S
A C
H U
S E
T T
S
W
A R
D P
A R
K W
A Y
K A
N S
A S
C
IT
Y M
O
(8
-9
R E
G
IO
N A
L I
S O
M A
IN
T
E N
A N
C E
H A
N G
A R
/1
/2
:5
:5
A
M
/4
A-602
D O
O R
S C
H E
D U
L E
B
ID
O
P T
IO
N
S
M T
O L B
E R
T
E .T
O R
N E
D C
S
P R
IN
K
/0
/2
Y T
P M
B
A
C e n tr a l.
rv t
DOOR SCHEDULE - BID OPTION 1A & 1B
DOOR FRAME
ASSEMBLY
RATING STC
DETAIL
HARDWARE
SET REMARKS
SIZE
TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL
PAIR
DOOR WIDTH HEIGHT
101A - 3' - 0" 7' - 0" HL-IN HM PE-1 1.1 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 1.0
101B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 9.0
102A PR. 3' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 27.0
103A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 26.0
104A PR. 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 15.0
105A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0
106A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 21.0
107A - 3' - 0" 7' - 0" NL-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 2.0
107B - 8' - 0" 10' - 0" OH-C STL FF-1 0 STL FF-1 - - B2 / A-613 A2 / A-612 A1 / A-612 32.0
107C PR. 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 12.0
107D - 4' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 17.0
108A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 14.0
108B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 16.0
110A - 12' - 0" 6' - 0" OH-C STL FF-1 0 STL FF-1 3/4 HR - C4 / A-613 B4 / A-613 A4 / A-613 32.0
110B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 16.0
110C - 4' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 18.0
112A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0
112A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 29.0
113A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 29.0
114A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0
114B PR. 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 13.0
115A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0
115B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 25.0
116A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 23.0
DOOR SCHEDULE - BID OPTION 2A & 2B
DOOR FRAME
ASSEMBLY
RATING STC
DETAIL
HARDWARE
SET REMARKS
SIZE
TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL
PAIR
DOOR WIDTH HEIGHT
201A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 20.0
202A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 19.0
203A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 22.0
205A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 31.0
206A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0
206B - 3' - 0" 7' - 0" HL-IN HM PE-1 1.1 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 1.0
207A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 10.0
208A - 3' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 31.0
209A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 19.0
209B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 20.0
210A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0
213A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0
213B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 14.0
214A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 19.0
216A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0
217A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 24.0
218A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 3.0
219A - 3' - 0" 7' - 0" HL-IN HM PE-1 1.1 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 1.0
219B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0
DOOR SCHEDULE - BID OPTION 3A
DOOR FRAME
ASSEMBLY
RATING STC
DETAIL
HARDWARE
SET REMARKS
SIZE
TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL
PAIR
DOOR WIDTH HEIGHT
301A - 3' - 0" 7' - 0" NL-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 2.0
301B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 14.0
301C 8' - 0" 8' - 0" OH-C STL FF-1 0 STL FF-1 3/4 HR - C4 / A-612 B4 / A-612 A4 / A-612 32.0
DOOR AND FRAME LEGEND
FINISH
FA** FIELD APPLIED COATING
FF* FACTORY FINISHED
MATERIAL
AL ALUMINUM
HM HOLLOW METAL
STL STEEL
SIZE
- SINGLE DOOR
PR PAIR OF DOORS
*REFERENCE DOOR OR FRAME SPECIFICATION
**FIELD APPLY PER PAINT SPECIFICATION FOR
APPLICABLE SUBSTRATE AND EXPOSURE.
(DOOR FRAME)
TYPE A B
1.1 2" 2"
1.2 2" 4"
(FLUSH PANEL)
TYPE DESCRIPTION
F-IN FLUSH PANEL INSULATED
F FLUSH PANEL
(NARROW LIGHT)
TYPE DESCRIPTION A B C D #
NL NARROW LITE 6" 43" 24" 4" 1
NL NARROW LITE 6" 43" 24" 4" 4
NL-IN NARROW LITE INSULATED 6" 43" 24" 4" 4
(OVERHEAD)
TYPE DESCRIPTION
OH-C COILING DOOR
OH-IN
(HALF LIGHT/TRAFFIC)
TYPE DESCRIPTION A B C #
HL-IN HALF LITE INSULATED 6" 43" 35" 1
HL-IN HALF LITE INSULATED 6" 43" 35" 4
S Y
M
D E
S C
R
IP
T
IO
N D
A T
E A
P P
R
C
E R
T
IF
IE
D
F
IN
A L
/3 /2
A
M E
N D
M E
N T
/1
/2
| SF30 |
| SUMMARY OF CHANGES |
| 00 10 00 |
| S-016 AMD 02 |
| S-016 - FOUNDATION - GROUND IMPROVEMENT NOTES SHT 1 OF 3 |
| S-017 AMD 02 |
| S-017 - FOUNDATION - GROUND IMPROVEMENT NOTES SHT 2 OF 3 |
109519_A-602 AMD 02
File details come from the government source that posted it. Updated .