W912QR20R0059-0002.pdf

PDF 1 MB Posted

Attached to
Westover, MA Regional ISO Maintenance Hangar
Solicitation number
W912QR20R0059
Issued by

About this file

This solicitation is for the construction of a regional ISO maintenance hangar at Westover Air Reserve Base in Massachusetts. The solicitation seeks to provide all labor, materials, and equipment necessary for the construction of a high-bay C-5 aircraft maintenance hangar with reinforced concrete foundation and floor slab, masonry exterior walls on the office area and metal sandwich panels on the hangar area, electrically operated hangar doors, structural steel frame, architecturally compatible roof, fire protection and alarm system, utilities, secure and non-secure communications, site improvements, and other necessary support. The solicitation also requires the demolition of Building 2426 and removal of debris from the site upon project completion. The contract duration is estimated at 730 calendar days with an estimated cost range between $25 million and $100 million. The soliciting agency is the Department of the Army Corps of Engineers Engineering District Louisville. This will be an unrestricted, full and open competition solicitation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0059 for the Construction of the Regional ISO Maintenance Hangar located at Westover ARB, MA is hereby amended as follow s:

1. SEE SUMMARY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0059

X 9B. DATED (SEE ITEM 11)

21-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0059-0002

W912QR20R0059

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0002 - SUMMARY OF CHANGES

Solicitation: W912QR20R0059

Project: Design/Bid/Build for the Construction of the Regional ISO Maintenance Hangar

Location: Westover ARB, MA

Amendment 0002 Summary of Changes

A. SF1442 Section 00 10 00 – Solicitation

The due date and time has been revised from 20 August 2020 at 12:00PM ET to 10 September 2020 at

1:00PM ET.

B. The following Drawings have been replaced in their entirety:

a. S-016 – Updated Note 1.07.A.1.a to clarify that the foundations requiring vibro-compaction are indicated on A2/S-018.

b. S-017 – Updated Note 3.01.A to clarify that the foundations requiring vibro-compaction are indicated on A2/S-018.

c. A-602 – Removed reference to bullet resistant door.

- END OF ‘SUMMARY OF CHANGES –

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 20-Aug-2020 12:10 PM to 10-Sep-2020 01:00 PM.

(End of Summary of Changes)

D E

S

IG

N E

D B

Y

1 432

A

B

C

D

SHEET

IDENTIFICATION

NUMBER

US ARMY CORPS

OF ENGINEERS

LOUISVILLE DISTRICT

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E

E R

S L O

U

IS

V

IL

L E

K

E N

T U

C K

Y D

W N

B Y

C

K D

B Y

F

IL

E N

A M

E

S

IZ

E

P L O

T S

C A

L E

P

L O

T D

A T

E

D A

T E

P R

O J E

C T

N O

P

N

O

A F

D R

A W

IN

G

C O

D E

X

S O

L

IC

IT

A

T

IO

N N

O

A F

-2 -1

-0

CERTIFIED FINAL

S O

L

IC

IT

A

T

IO

N

P

Y

T P

M

B

W E

S T

O V

E R

A

IR

R E

S E

R V

E B

A S

E

M A

S S

A C

H U

S E

T T

S

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y M

O

(8

-9

R E

G

IO

N A

L I

S O

M A

IN

T

E N

A N

C E

H A

N G

A R

/1

/2

:1

:0

P

M

S-016

F O

U N

D A

T

IO

N

G R

O U

N D

I M

P R

O V

E M

E N

T N

O T

E S

S H

T

O F

B B

R E

T T

M A

N N

D M

O R

T O

N T

G

E

IG

E R

/0

/2

Y T

P M

B

S

C e n tr a l.

rv t

PART 1 - GENERAL

1.01 SUMMARY:

A. WORK UNDER THIS SECTION CONSISTS OF FURNISHING ALL NECESSARY DESIGN,

LABOR, MATERIALS, AND EQUIPMENT REQUIRED FOR THE INSTALLATION OF A

VIBRO-COMPACTION SYSTEM FOR THE INCREASE OF BEARING CAPACITY AND

MITIGATION OF SETTLEMENT FOR DESIGNATED FOUNDATIONS IN SUPPORT OF THE

PROPOSED C5 ISO HANGAR AT THE WESTOVER AIR RESERVE BASE.

B. GROUND IMPROVEMENT REFERENCED IN THESE SPECIFICATIONS REFERS TO

VIBRO-COMPACTION. THE VIBRO-COMPACTION METHOD SHALL BE DESIGNED IN

ACCORDANCE TO GENERALLY-ACCEPTED ENGINEERING PRACTICE AND METHODS

AS DESCRIBED HEREIN. THE DESIGN SHALL BE COMPLETED BY A LICENSED

PROFESSIONAL ENGINEER (SUBCONTRACTOR’S PROFESSIONAL ENGINEER).

C. IF AN ALTERNATE FORM OF VIBRO-COMPACTION IS PROPOSED BY THE

CONTRACTOR, CONTRACTOR SHALL PROVIDE DETAILED SUBMITTAL OF METHOD,

DESIGN CALCULATIONS, AND CONSTRUCTION SPECIFICATIONS AS SPECIFIED

WITHIN THE SUBMITTALS SECTION OF THIS SECTION.

D. CONTRACTOR SHALL VISIT THE SITE PRIOR TO BIDDING TO OBSERVE AND REVIEW

SPECIFIC SITE CONDITIONS AND REQUIREMENTS FOR EQUIPMENT, METHODS, AND

COSTS FOR THE DENSIFICATION PROGRAM.

E. CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UNDERGROUND CONDUITS,

PIPING, DUCT BANKS AND UTILITIES PRIOR TO INSTALLATION.

F. PERFORM THE WORK IN GENERAL CONFORMANCE WITH THE RECOMMENDATIONS

OF FHWA-NHI-16-027, GROUND MODIFICATION METHODS REFERENCE MANUAL.

G. DUE TO THE RELATIVELY SHALLOW GROUNDWATER DEPTH AND CONTAMINATION

OF THE WATER TABLE, THE DRY METHOD SHALL BE USED IN LIEU OF THE WET

METHOD NEAR THE SURFACE TO A DEPTH OF 25 FEET. IF THE DRY METHOD IS NOT

FEASIBLE, THE WET METHOD MAY BE APPLICABLE PROVIDED A PLAN TO ADDRESS

ANY POTENTIAL ENVIRONMENTAL CONCERNS IS DEVELOPED AND APPROVED.

H. COMPLETE ALL VIBRO-COMPACTION WORK PRIOR TO CONSTRUCTING ANY

FOUNDATIONS.

1.02 REFERENCES:

A. STANDARDS LISTED BY REFERENCE, INCLUDING REVISIONS BY ISSUING AUTHORITY,

FORM A PART OF THIS SPECIFICATION SECTION TO THE EXTENT INDICATED.

STANDARDS LISTED ARE IDENTIFIED BY ISSUING AUTHORITY, AUTHORITY

ABBREVIATION, DESIGNATION NUMBER, TITLE OR OTHER DESIGNATION

ESTABLISHED BY ISSUING AUTHORITY.

B. APPLICABLE STANDARDS:

1. AMERICAN SOCIETY FOR TESTING AND MATERIAL (ASTM):

a. C29 - (1991A) UNIT WEIGHT AND VOIDS IN AGGREGATE.

b. C33 - (2003) CONCRETE AGGREGATES.

c. C88 - (2005) SOUNDNESS OF AGGREGATES BY USE OF SODIUM SULFATE

OR MAGNESIUM SULFATE.

d. C117 - (2004) MATERIALS FINER THAN 75 MICROMETER (NO. 200) SIEVE IN

MINERAL AGGREGATES BY WASHING.

e. C127 - (2004) DENSITY, RELATIVE DENSITY (SPECIFIC GRAVITY), AND

ABSORPTION OF COARSE AGGREGATE.

f. C131 - (2003) RESISTANCE TO DEGRADATION OF SMALL-SIZE COARSE

AGGREGATE BY ABRASION AND IMPACT IN THE LOS ANGELES MACHINE.

g. C136 - (2006) SIEVE ANALYSIS OF FINE AND COARSE AGGREGATES.

h. D422 - (1963; R 2007) PARTICLE SIZE ANALYSIS OF SOILS.

i. D 1194 – STANDARD TEST METHOD FOR BEARING CAPACITY OF SOIL FOR

STATIC LOAD AND SPREAD FOOTINGS.

j. D1241 – STANDARD SPECIFICATION FOR MATERIALS FOR SOIL-

AGGREGATE SUBBASE, BASE, AND SURFACE COURSES.

k. D1557 - (2002E1) LABORATORY COMPACTION CHARACTERISTICS OF SOIL

USING MODIFIED EFFORT (56,000 FT-LBF/CU. FT).

l. D2488 - (2000) DESCRIPTION AND IDENTIFICATION OF SOILS (VISUAL-

MANUAL PROCEDURE).

m. D5778 - STANDARD TEST METHOD FOR ELECTRONIC FRICTION CONE AND

PIEZOCONE PENETRATION TESTING OF SOILS AMERICAN SOCIETY OF

CIVIL ENGINEERS (ASCE).

2. AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE):

a. MINIMUM DESIGN LOADS FOR BUILDINGS AND OTHER STRUCTURES

(ASCE/SEI 7-16).

3. INTERNATIONAL BUILDING CODE (IBC) 2015.

4. FEDERAL HIGHWAY ADMINISTRATION (FHWA):

a. FHWA-NHI-16-027 GROUND MODIFICATION METHODS REFERENCE

MANUAL.

1.03 DEFINITIONS:

A. QUALITY CONTROL REPRESENTATIVE:

1. THE QUALITY CONTROL REPRESENTATIVE SHALL BE A GRADUATE

GEOTECHNICAL ENGINEER, GRADUATE GEOLOGIST, OR GEOTECHNICAL

TECHNICIAN PROVIDED THE TECHNICIAN HAS AT LEAST FIVE YEARS OF

RELEVANT EXPERIENCE WITH THE OBSERVATION OF DRILLED SHAFT

INSTALLATION. THE QUALITY CONTROL REPRESENTATIVE WILL BE RETAINED

BY THE CONTRACTOR. THE GEOTECHNICAL REPRESENTATIVE IS

RESPONSIBLE FOR OBSERVATION AND RECORDING OF MATERIAL

VERIFICATION, VIBRO-COMPACTION INSTALLATION SEQUENCE AND METHODS,

AND OTHER QUALITY CONTROL DOCUMENTATION.

B. VIBRO-COMPACTION DENSIFICATION:

1. VIBRO-COMPACTION DENSIFICATION METHODS ARE TECHNIQUES USED TO

DENSIFY DEEP DEPOSITS OF SOILS BY INSERTING A LARGE VIBRATORY

PROBE INTO THE SOIL AT A PRE-DETERMINED SPACING, VIBRATING THE

PROBE, AND USING ON SITE OR IMPORTED GRANULAR MATERIALS TO

BACKFILL THE HOLE CREATED BY THE VIBRATORY PROBE. VIBRO-

REPLACEMENT IS USED IN RELATIVELY CLEAN GRANULAR SOILS (TYPICALLY

SILT CONTENT LESS THAN 12% AND CLAY CONTENT LESS THAN 2%).

2. VIBRO-COMPACTION IS INTENDED TO IMPROVE BEARING CAPACITY OF

SHALLOW SPREAD FOOTINGS AND TO REDUCE SETTLEMENT OF THE IN-SITU

MATERIALS.

1.04 EXPERIENCE QUALIFICATIONS:

A. VIBRO-COMPACTION SHALL BE PERFORMED BY A SPECIALTY CONTRACTOR

EXPERIENCED AND COMPETENT IN THE INSTALLATION OF APPROVED

DENSIFICATION TECHNIQUE, OR APPROPRIATE VIBRO-COMPACTION METHOD

SELECTED.

1. ALL WORK SHALL BE PERFORMED UNDER THE DIRECT FIELD SUPERVISION OF

A QUALIFIED FOREMAN.

2. THE FOREMAN SHALL SUPERVISE THE PERFORMANCE OF THE WORK IN

COMPLIANCE WITH THESE SPECIFICATIONS. THE PROPOSED FOREMAN SHALL

HAVE AT LEAST 2 YEARS OF EXPERIENCE INSTALLING VIBRO-COMPACTION

SYSTEMS. A RESUME SHALL BE PROVIDED FOR THE PROPOSED FOREMAN.

3. SUBMIT A QUALIFICATION STATEMENT DESCRIBING THE EXPERIENCE OF THE

SPECIALTY CONTRACTOR, THE FOREMAN, AND THE CONTRACTOR’S

PROFESSIONAL ENGINEER.

B. THE CONTRACTOR PERFORMING VIBRO-COMPACTION SHALL PROVIDE A MINIMUM 5

YEARS' EXPERIENCE RECORD DOCUMENTING 10 SUCCESSFUL PROJECTS

COMPLETED WITH SPECIFIC APPLICATION TO SIMILAR SITE CONDITIONS AND

IMPROVEMENT CRITERIA, INCLUDING THE USE OF MEANS AND METHODS

CONSISTENT WITH THOSE PROPOSED AT THIS SITE.

1. PROVIDE INFORMATION RELATED TO THE SUPERVISOR, AND CREW HAVING

COMPLETED A PROJECT OF COMPARABLE SIZE, DEPTH, AND VOLUME OF

DENSIFICATION TREATMENT WITH APPROVED VIBRO-COMPACTION

TECHNIQUES AS PROPOSED FOR THIS SITE.

2. REFERENCES ASSERTING THIS DOCUMENTATION SHALL BE PROVIDED.

C. THE EXPERIENCE STATEMENT OF PAST WORK AND DESCRIPTION OF EQUIPMENT

AND TECHNIQUES PROPOSED FOR USE SHALL BE SUBMITTED AT TIME OF BID AND

WILL BE CONSIDERED IN THE EVALUATION OF BIDS. GOVERNMENT MAY SUSPEND

THE WORK IF CONTRACTOR SUBSTITUTES UNQUALIFIED PERSONNEL FOR

APPROVED PERSONNEL DURING CONSTRUCTION. IF WORK IS SUSPENDED DUE TO

THE SUBSTITUTION OF UNQUALIFIED PERSONNEL, CONTRACTOR SHALL BE LIABLE

FOR ADDITIONAL COSTS RESULTING FROM THE SUSPENSION OF WORK AND NO

ADJUSTMENT IN CONTRACT TIME RESULTING FROM THE SUSPENSION OF WORK

WILL BE ALLOWED.

D. THE CONTRACTOR SHALL NOT SUBLET THE WHOLE OR ANY PART OF THE

CONTRACT WITHOUT THE EXPRESS PERMISSION IN WRITING OF THE GOVERNMENT.

E. PROVIDE A RESUME OF THE PROPOSED JOB-SITE SUPERVISOR DEMONSTRATING

THAT THE PROPOSED SUPERVISOR HAS AT LEAST 2 YEARS OF EXPERIENCE

INSTALLING VIBRO-COMPACTION SYSTEMS.

1.05 RELATED SITE WORK:

A. UTILITIES:

1. LOCATE ALL UNDERGROUND UTILITIES PRIOR TO THE START OF THE WORK.

2. MOVEMENT OF CONSTRUCTION MACHINERY AND EQUIPMENT OVER PIPES

AND UTILITIES DURING CONSTRUCTION SHALL BE AT THE CONTRACTOR’S

RISK.

3. REPORT DAMAGE TO UTILITY LINES OR SUBSURFACE CONSTRUCTION

IMMEDIATELY TO THE CONTRACTING OFFICER.

B. DAMAGES:

1. CONTRACTOR SHALL PROTECT ALL STRUCTURES AND UTILITIES FROM

DAMAGES RESULTING FROM THE WORK. CONTRACTOR IS RESPONSIBLE FOR

ALL REPAIRS DUE TO THESE DAMAGES.

1.06 SUBMITTALS:

A. PROFESSIONAL LIABILITY INSURANCE:

1. SUBCONTRACTOR’S PROFESSIONAL ENGINEER SHALL HAVE ERRORS AND

OMISSIONS DESIGN INSURANCE FOR THE WORK. THE INSURANCE POLICY

SHOULD PROVIDE A MINIMUM COVERAGE AS SPECIFIED IN CONTRACT

DOCUMENTS. CERTIFICATE EVIDENCING THIS COVERAGE SHALL BE

PROVIDED TO GOVERNMENT PRIOR TO START OF DESIGN.

B. BID SUBMITTALS:

1. SUBMIT SUBCONTRACTOR’S QUALIFICATIONS AT TIME OF BID.

2. SUBMIT NAME AND QUALIFICATIONS OF INDEPENDENT TESTING LABORATORY

PERFORMING VERIFICATION OF DENSITY.

3. CONTRACTOR SHALL SUBMIT PROPOSED MEANS AND METHODS OF

IMPLEMENTING THE SYSTEM OF VIBRO-COMPACTION.

C. DESIGN AND PRE-CONSTRUCTION SUBMITTALS:

1. ALL CALCULATIONS AND DRAWINGS SHALL BE PREPARED AND SEALED BY A

LICENSED PROFESSIONAL ENGINEER. SUBMITTALS SHALL BE TRANSMITTED

ELECTRONICALLY ONLY, UNLESS OTHERWISE REQUIRED BY SPECIFIC

SUBMITTAL INSTRUCTIONS. CONTRACTOR SHALL SUBMIT DETAILED DESIGN

CALCULATIONS FOR REVIEW AND APPROVAL TO THE GOVERNMENT. A

DETAILED EXPLANATION OF THE DESIGN PARAMETERS FOR STATIC

SETTLEMENT CALCULATIONS, WHERE REQUIRED, SHALL BE INCLUDED IN THE

DESIGN SUBMITTAL ALONG WITH CALCULATIONS THAT DEMONSTRATE THAT

THE REQUIRED ALLOWABLE BEARING CAPACITY AND SETTLEMENT

TOLERANCES ARE MET. PROVIDE A DETAILED INSTALLATION SEQUENCE,

PROCEDURE AND PROPOSED SCHEDULE. CONTRACTOR SHALL ALSO

PROVIDE DESIGN DEPTH OF AGGREGATE BASE TO BE PLACED BETWEEN

FOUNDATION SUBGRADE AND THE VIBRO-COMPACTION ZONE FOR UNIFORM

PERFORMANCE OF SHALLOW FOUNDATIONS. FOR A METHOD THAT IS NOT

SPECIFIED HEREIN, CONTRACTOR SHALL ALSO SUPPLY CONSTRUCTION

SPECIFICATIONS FOR MEANS AND METHODS TO BE SUBMITTED AND

APPROVED BY GOVERNMENT.

2. DETAILS OF MACHINES AND TOOLING REQUIRED FOR IMPLEMENTATION OF

VIBRO-COMPACTION SYSTEM.

3. MATERIAL REPORTS INDICATING THAT PROPOSED AGGREGATE FOR USE

MEETS THIS SECTION OR IS IN LINE WITH THOSE AGGREGATES REQUIRED BY

CONTRACTOR’S PROFESSIONAL ENGINEER.

4. DETAILS OF THE PROPOSED TESTING PROGRAM, AS SPECIFIED HEREIN.

5. DENSIFICATION PLAN.

D. TEST REPORTS:

1. RESULTS OF QUALITY CONTROL TESTING AND MONITORING.

2. BACKFILL MATERIAL PROPERTIES AND VERIFICATION OF COMPLIANCE.

3. TEST PAD DENSIFICATION PROGRAM REPORT AND SURVEY.

4. DAILY PROGRESS REPORTS – FURNISH DAILY A COMPLETE AND ACCURATE

RECORD OF VIBRO-COMPACTION COLUMNS TO CONTRACTING OFFICER. THE

RECORD SHALL INCLUDE:

a. FOOTING OR FOUNDATION ELEMENT.

b. COMPACTION POINT NUMBER AND LOCATION.

c. SOIL CONDITIONS DURING INSTALLATION.

d. PROBE PENETRATION DEPTH.

e. RATE OF PENETRATION AND WITHDRAWAL.

f. VOLUME AND GRADATION OF BACKFILL USED.

g. NUMBER OF PENETRATIONS OF THE PROBE.

h. RECORD OF AMMETER READINGS WITH DEPTH.

i. VERIFICATION THAT PROBES ARE OPERATING AT PROPER SPEEDS.

j. THE RECORD SHALL ALSO INDICATE THE TYPE AND SIZE OF THE

INSTALLATION EQUIPMENT USED, AND THE TYPE OF AGGREGATE USED.

5. FINAL REPORT ASSEMBLING ALL QA/QC RECORDS.

1.07 DESCRIPTION OF WORK:

A. GENERAL DESCRIPTION OF THE WORK:

1. PERFORM VIBRO-COMPACTION UNDER THE BUILDING FOUNDATIONS AS

IDENTIFIED ON CONTRACT DRAWINGS.

a. THE DEPTH OF VIBRO-COMPACTION SHALL BE A MINIMUM OF 50 FEET

BELOW THE GROUND SURFACE FOR FOUNDATIONS INDICATED ON

A2/S-018 EXCEPT THOSE DESIGNATED AS F2 AND F13 ON A2/S-018,

WHICH REQUIRE VIBRO-COMPACTION TO A DEPTH OF 35 FEET TO MEET

THE DESIGN CRITERIA AS NOTED HEREIN.

b. APPROVED DENSIFICATION METHOD SHALL BE INSTALLED IN A METHOD

THAT IMPROVES THE SUBSURFACE SOILS AND RESULTS IN THE

ALLOWABLE SETTLEMENT AT THE INDICATED BEARING PRESSURES.

c. THE LATERAL EXTENT OF VIBRO-COMPACTION OUTSIDE THE PLAN AREA

OF THE FOOTINGS SHALL BE DICTATED BY THE ABILITY OF THE VIBRO-

COMPACTION COLUMNS TO PROVIDE SUFFICIENT LATERAL

CONFINEMENT TO SUPPORT THE SUPERSTRUCTURE AND MEETING THE

DESIGN CRITERIA OF THIS SPECIFICATION. AS A MINIMUM, ONE

ADDITIONAL ROW OF COLUMNS SHALL BE PROVIDED AROUND THE

AREA OF REINFORCEMENT TO PROVIDE LATERAL CONFINEMENT.

d. MINIMUM VIBRATORY IMPROVEMENT AREA COVERAGE AND COLUMN

SPACING (FOR SPREAD FOOTINGS): AS SPECIFICALLY DESIGNED BY

CONTRACTOR’S PROFESSIONAL ENGINEER.

e. AT THE START OF ACTIVITIES COMPLETE TEST PADS IN ACCORDANCE

WITH PART 3.

2. PERFORM VERIFICATION FIELD TESTS AT ALL TEST PAD LOCATIONS WITH

CONE PENETRATION TESTS (CPT), IN ACCORDANCE WITH ASTM D5778.

a. VERIFY, EVALUATE AND SELECT COMPACTION GRID SPACING AND

DENSIFICATION INSTALLATION PROCEDURES FOR PRODUCTION WORK.

b. RESULTS OF THE VERIFICATION FIELD TESTS WILL BE SUBMITTED TO

AND APPROVED BY THE GOVERNMENT BEFORE CONTRACTOR CAN

CONTINUE WITH THE WORK.

3. ANY HOLES OR LOOSENED MATERIALS NEAR THE SURFACE SHALL BE FILLED

WITH SAND OR STONE AND RETURNED TO THEIR ORIGINAL DENSIFIED

CONDITION.

B. PRE-CONSTRUCTION AND POST-TEST PAD MEETING:

1. THERE WILL BE A MANDATORY PRE-CONSTRUCTION MEETING, PRIOR TO

STARTING THE WORK, FOR AT LEAST ONE OR MORE REPRESENTATIVES OF

EACH OF THE FOLLOWING GROUPS: CONTRACTOR, GROUND IMPROVEMENT

SUBCONTRACTOR, QUALITY CONTROL REPRESENTATIVE, AND THE

CONTRACTING OFFICER.

a. THE CONTRACTOR SHALL HAVE THE PRE-QUALIFIED SUPERVISOR

PRESENT AT THE PRE-CONSTRUCTION MEETING.

2. AT THE PRE-CONSTRUCTION MEETING, THE CONTRACTOR SHALL PROVIDE A

DENSIFICATION PLAN SHOWING LAYOUT OF THE WORK, UNIQUE

IDENTIFICATION NUMBERS, DEPTH, GPS COORDINATE LOCATION AND

SPACING OF IMPROVEMENT COLUMNS, DENSIFICATION METHODS,

EQUIPMENT, LOCATION OF EXISTING UTILITIES, PHASING OF THE WORK AND

VERIFICATION TEST LAYOUT.

a. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING EXISTING

GEOTECHNICAL INFORMATION, AND FOR PROVIDING ALL LINES AND

GRADES FOR DENSIFICATION PROBES, INCLUDING ALL SURVEYING

MARKERS.

b. APPROVAL OF THE PLAN SHALL NOT REMOVE THE RESPONSIBILITY OF

THE CONTRACTOR FOR THE ACCURACY OF THE DRAWINGS.

c. EACH COMPACTION POINT LOCATION, INCLUDING TEST PAD POINTS, SHALL HAVE A UNIQUE REFERENCE NUMBER FOR RECORD PURPOSES.

3. THE CONTRACTOR SHALL PROVIDE A FIRM WORKING BASE FOR SOIL

IMPROVEMENT OPERATIONS.

a. THE WORKING SURFACE FROM WHICH THE WORK IS PERFORMED

SHALL BE AT OR ABOVE FINISHED GRADE ELEVATION.

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LAYOUT OF THE

DENSIFICATION IMPROVEMENT POINTS.

a. IMMEDIATELY BEFORE INSTALLATION, EACH COMPACTION POINT

LOCATION SHALL BE MARKED BY THE CONTRACTOR WITH SUITABLE

IDENTIFICATION PINS OR MARKERS.

b. ALL COMPACTION POINTS SHALL BE LOCATED TO WITHIN 6 INCHES OF

THE PLAN POSITION SHOWN ON THE GROUND TREATMENT DRAWINGS.

c. LOCATIONS OF COMPACTION POINTS SHALL BE BASED ON A SURVEY BY

A REGISTERED SURVEYOR PROVIDED BY THE CONTRACTOR. A PLAN

DRAWING SHOWING ALL THE COMPACTION POINTS, A UNIQUE

IDENTIFICATION REFERENCE NUMBER FOR EACH COMPACTION POINT,

AND GPS COORDINATES ASSOCIATED WITH EACH COMPACTION POINT

WILL BE PROVIDED TO THE CONTRACTING OFFICER UPON COMPLETION.

d. THE CONTRACTOR SHALL PROVIDE INITIAL BENCH MARKS AND

ACCURATELY ESTABLISH THE HORIZONTAL AND VERTICAL BOUNDARIES

OF THE INDICATED SOIL IMPROVEMENT AREA.

GROUND IMPROVEMENT - VIBRO-COMPACTION NOTES:

S Y

M

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

C

E R

T

IF

IE

D

F

IN

A L

/3 /2

A

M E

N D

M E

N T

/1 /2

D E

S

IG

N E

D B

Y

1 432

A

B

C

D

SHEET

IDENTIFICATION

NUMBER

US ARMY CORPS

OF ENGINEERS

LOUISVILLE DISTRICT

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E

E R

S L O

U

IS

V

IL

L E

K

E N

T U

C K

Y D

W N

B Y

C

K D

B Y

F

IL

E N

A M

E

S

IZ

E

P L O

T S

C A

L E

P

L O

T D

A T

E

D A

T E

P R

O J E

C T

N O

P

N

O

A F

D R

A W

IN

G

C O

D E

X

S O

L

IC

IT

A

T

IO

N N

O

A F

-2 -1

-0

CERTIFIED FINAL

S O

L

IC

IT

A

T

IO

Y

T P

M

W E

S T

O V

E R

A

IR

R E

S E

R V

E B

A S

E

M A

S S

A C

H U

S E

T T

S

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y M

O

(8

-9

R E

G

IO

N A

L I

S O

M A

IN

T

E N

A N

C E

H A

N G

A R

/1

/2

:1

:2

P

M

S-017

F O

U N

D A

T

IO

N

G R

O U

N D

I M

P R

O V

E M

E N

T N

O T

E S

S H

T

O F

B B

R E

T T

M A

N N

D M

O R

T O

N T

G

E

IG

E R

/0

/2

Y T

P M

B

S

C e n tr a l.

rv t

5. THE CONTRACTOR SHALL PROVIDE A DETAILED DENSIFICATION METHOD

STATEMENT INDICATING THE PROCEDURES AND PHASING TO BE FOLLOWED

TO DENSIFY THE SOILS TO ACHIEVE THE PERFORMANCE SPECIFIED HEREIN,

INCLUDING TEST PAD LAYOUT.

a. THE METHOD STATEMENT SHALL INCLUDE A DETAILED DESCRIPTION OF

THE EQUIPMENT AND VERIFICATION METHODS TO BE USED.

b. THE METHOD STATEMENT SHALL ALSO INCLUDE PROCEDURES THAT

SHALL BE USED WHEN DENSIFYING SOILS NEXT TO EXISTING UTILITIES

AND BURIED STRUCTURES SO THAT THE EXISTING UTILITIES AND

STRUCTURES WILL NOT BE DAMAGED.

c. THE METHOD STATEMENT SHALL INCLUDE A SCHEDULE FOR

PERFORMING THE DEMONSTRATION AND PRODUCTION DENSIFICATION

PROGRAMS, INCLUDING VERIFICATION TESTING, ALLOCATING 5 DAYS

FOR EVALUATION OF TEST RESULTS.

6. THERE WILL BE A MANDATORY POST-TEST PAD MEETING, PRIOR TO THE

CONTRACTOR CONTINUING WITH THE WORK, FOR AT LEAST ONE OR MORE

REPRESENTATIVES OF EACH OF THE FOLLOWING GROUPS: SOIL

IMPROVEMENT SUBCONTRACTOR, QUALITY CONTROL REPRESENTATIVE, AND

THE CONTRACTING OFFICER.

a. LOCATION, DESCRIPTION OF CONSTRUCTION AND RESULTS OF

VERIFICATION TESTING SHALL BE PRESENTED FOR REVIEW AND

APPROVAL BY THE GOVERNMENT.

b. ANY CHANGE TO THE ORIGINAL PROCEDURES PRESENTED IN THE PRE-

CONSTRUCTION MEETING BASED ON RESULTS OF THE TEST-PAD

CONSTRUCTION AND VERIFICATION TESTING WILL BE COMMUNICATED

BY THE SUBCONTRACTOR AND WILL BE SUBJECT TO APPROVAL BY THE

GOVERNMENT.

C. MONITORING:

1. MOVEMENT CRITERIA:

a. IF DEEMED NECESSARY BY GOVERNMENT, CONTRACTOR SHALL

MONITOR SETTLEMENT/HEAVE BENCHMARKS AT LOCATIONS APPROVED

BY THE CONTRACTING OFFICER ALONG ROADS, UTILITIES, AND

BUILDINGS ADJACENT TO THE SOIL IMPROVEMENT AREA.

b. MONITOR THE BENCHMARKS CONTINUOUSLY DURING THE SOIL

IMPROVEMENT OPERATION TO DETECT ANY SETTLEMENT, UPLIFT, OR

LATERAL MOVEMENT OF THE EXISTING STRUCTURES/FACILITIES.

c. IF SETTLEMENT, UPLIFT, OR LATERAL MOVEMENT OF THE EXISTING

STRUCTURES/FACILITIES IS IN EXCESS OF 0.5 INCH IS DETECTED, ALL

SOIL IMPROVEMENT WORK SHALL IMMEDIATELY CEASE, AND THE

CONTRACTING OFFICER SHALL BE NOTIFIED.

d. SOIL IMPROVEMENT WORK SHALL NOT RECOMMENCE UNTIL

CORRECTIVE MEASURES TO PREVENT FURTHER SETTLEMENT OR

HEAVE HAVE BEEN DEVELOPED BY THE CONTRACTOR, APPROVED, AND

IMPLEMENTED.

2. VIBRATION MONITORING:

a. IF DEEMED NECESSARY BY CONTRACTING OFFICER, CONTRACTOR

SHALL COMPLETE A VIBRATION MONITORING PLAN. CONTRACTOR

SHALL SUBMIT A PROGRAM FOR MONITORING VIBRATIONS REACHING

ADJACENT UTILITIES AND STRUCTURES FOR APPROVAL BY THE

GOVERNMENT, 15 DAYS PRIOR TO STARTING THE WORK.

1.08 PERFORMANCE CRITERIA:

A. PROPOSED SHALLOW FOUNDATION LAYOUT AND DIMENSIONS ARE SHOWN ON THE

DRAWINGS. SETTLEMENT ATTRIBUTED TO AN ALLOWABLE BEARING PRESSURE OF

3,500 POUNDS PER SQUARE FOOT UNDER STATIC CONDITIONS WITH A FACTOR OF

SAFETY OF 3.0 SHALL NOT EXCEED 1-INCH TOTAL SETTLEMENT AND 0.5-INCHES

DIFFERENTIAL SETTLEMENT.

B. SHALLOW FOUNDATION CONCRETE-SOIL COEFFICIENT OF FRICTION AGAINST

SLIDING SHALL MEET A MINIMUM OF 0.55.

C. STRUCTURAL ELEMENTS TO BE TREATED SHALL MEET THE DENSIFICATION LIMITS

IN PART 3.

D. PERFORM DENSIFICATION COMPLIANCE TESTING WITH CPT IN ACCORDANCE WITH

ASTM D5778 THROUGHOUT THE DURATION OF PROJECT.

E. THE SOILS SHALL BE DENSIFIED TO PROVIDE A MINIMUM RELATIVE DENSITY OF 85%.

1.09 SUBSURFACE INFORMATION:

A. CERTAIN SUBSURFACE INFORMATION HAS BEEN OBTAINED AT, OR IN THE VICINITY

OF, THE SITE OF THE WORK.

B. THERE IS NO EXPRESS OR IMPLIED GUARANTEE AS TO THE ACCURACY OR

COMPLETENESS OF THE SUBSURFACE INFORMATION, NOR OF THE INTERPRETATION

THEREOF BY THE ENGINEER, OR ANY OF THEIR REPRESENTATIVES.

C. THE SUBSURFACE INFORMATION OR COPIES THEREOF DO NOT FORM A PART OF

THIS OR ANY CONTRACT DOCUMENT.

D. IN THE EVENT THAT ADDITIONAL SUBSURFACE INFORMATION IS REQUIRED BY THE

CONTRACTOR, THE CONTRACTOR MAY OBTAIN SUPPLEMENTAL SUBSURFACE

INFORMATION.

PART 2 - PRODUCTS

2.01 EQUIPMENT:

A. ALL EQUIPMENT SHALL BE IN GOOD WORKING ORDER AND CAPABLE OF MEETING

THE REQUIRED LEVEL OF DENSIFICATION.

B. VIBRATORS SHALL OPERATE AT THE FREQUENCY AND ENERGY REQUIRED BY

SUBCONTRACTOR’S PROFESSIONAL ENGINEER AND THAT USED IN INSTALLATION OF

THE TEST PAD AT ALL TIMES.

C. FOLLOWER TUBES SHALL BE MARKED IN 5 FEET INCREMENTS AND SHALL BE

CAPABLE OF PLACING BACKFILL MATERIAL TO THE REQUIRED DEPTH OF

DENSIFICATION.

D. VIBRATORS SHALL BE EQUIPPED WITH METERING DEVICES THAT ALLOW

MONITORING OF THE AMPERAGE DRAW OF THE MOTOR BY THE OPERATOR, QUALITY

CONTROL REPRESENTATIVE AND CONTRACTING OFFICER AS NEEDED.

2.02 BACKFILL MATERIALS:

A. PROCESSED GRAVEL SHALL BE USED TO BACKFILL THE HOLES DEVELOPED FROM

THE VIBRATORY PROBE AND SHALL BE PLACED CONCURRENTLY THROUGHOUT THE

VIBRATORY PROCESS.

B. BACKFILL MATERIALS SHALL CONSIST OF IMPORTED COHESIONLESS MATERIALS

SUITABLE FOR USE IN VIBRO-COMPACTION IN ACCORDANCE WITH ASTM D-1241 AND

ASTM D-422, RECYCLED CONCRETE OR OTHER GRADED AGGREGATE APPROVED BY

CONTRACTING OFFICER.

1. THE PERCENT WEIGHT LOSS OF STONE BY ASTM C88 SHALL NOT EXCEED 12%.

2. THE PERCENT WEIGHT LOSS BY ASTM C131 SHALL NOT EXCEED 40% AT 500

REVOLUTIONS.

C. PROVIDE CERTIFIED TEST REPORTS PER ASTM C33 OF THE SOURCE AND MATERIAL

PROPERTIES TO INCLUDE GRADATION CURVES PER ASTM D422, SPECIFIC GRAVITY

TESTS PER ASTM C127, AND LOOSE AND COMPACTED DENSITY PER ASTM C29.

D. ON SITE COHESIONLESS MATERIALS MAY BE USED WHERE AVAILABLE AND WHERE

CONTRACTOR CAN DEMONSTRATE, THROUGH CPT SOUNDINGS, SUITABLE

PERFORMANCE AND DENSIFICATION.

E. POTABLE WATER OR OTHER SUITABLE SOURCE SHALL BE USED TO INCREASE

AGGREGATE MOISTURE CONTENT WHERE REQUIRED.

PART 3 - EXECUTION

3.01 VIBRO-COMPACTION:

A. DENSIFY ALL LOOSE TO MEDIUM DENSE SOILS TO A MINIMUM DEPTH OF 50 FEET

BELOW EXISTING GRADE FOR FOUNDATIONS INDICATED ON A2/S-018 EXCEPT THOSE

DESIGNATED AS F2 AND F13 ON A2/S-018, WHICH REQUIRE VIBRO-COMPACTION TO A

DEPTH OF 35 FEET TO ACHIEVE CPT CONE VALUES INDICATIVE OF 85% RELATIVE

DENSITY USING APPROVED CORRELATIONS.

B. BACKFILL ALL HOLES RESULTING FROM THE DENSIFICATION PROCESS FOR THEIR

ENTIRE LENGTH AND VOLUME WITH APPROVED BACKFILL MATERIALS DURING AND

AFTER PROBE REMOVAL TO PREVENT VOIDS OF LOW-DENSITY REGIONS AT SITE.

C. COORDINATE WITH CONTRACTING OFFICER TO PROVIDE A MINIMUM OF 5 DAYS’

NOTICE TO BE ON-SITE FOR OBSERVATION OF ALL TESTING, INSTALLATION AND

VERIFICATION PROCESSES.

D. EQUIPMENT AND PROCEDURE:

1. SPECIFIC EQUIPMENT, MEANS AND METHODS, MATERIALS AND PROCEDURES

ARE LEFT TO THE CONTRACTOR TO ACHIEVE THE SPECIFIED CRITERIA.

HOWEVER, THE FOLLOWING MINIMUM REQUIREMENTS SHALL APPLY:

a. DUE TO THE RELATIVELY SHALLOW GROUNDWATER DEPTH AND

CONTAMINATION OF THE GROUNDWATER, THE DRY METHOD SHALL BE

USED IN LIEU OF THE WET METHOD NEAR THE SURFACE TO A DEPTH OF 25

FEET. IF THE DRY METHOD IS NOT FEASIBLE, THE WET METHOD MAY BE

APPLICABLE PROVIDED A PLAN TO ADDRESS ANY POTENTIAL

ENVIRONMENTAL CONCERNS IS DEVELOPED AND APPROVED.

b. CONTRACTOR SHALL USE A DOWN-HOLE VIBRATOR CAPABLE OF MEETING

PERFORMANCE REQUIREMENTS. DEWATERING OF GROUNDWATER IS

PROHIBITED. THE SELECTED METHODOLOGY/EQUIPMENT SHALL PREVENT

GROUNDWATER OR OPERATION WATER FROM REACHING THE GROUND

SURFACE.

c. THE VIBRATOR EXTENSION TUBES SHALL BE MARKED IN 12-INCH

INCREMENTS FOR READILY DETERMINING VIBRATOR WORKING

INCREMENTS AND TIP ELEVATION. NUMERICAL IDENTIFICATION SHOWING

DEPTH SHALL BE PROVIDED AT 5 FEET INTERVALS ON THE EXTENSION TUBE.

d. AFTER PENETRATION TO THE TREATMENT DEPTH, THE VIBRATOR SHALL BE

WITHDRAWN IN INCREMENTS NOT EXCEEDING 4 FEET TO ALLOW BACKFILL

PLACEMENT AND SURROUNDING COMPACTION.

e. THE VIBRATOR SHALL BE RE-PENETRATED THROUGH EACH INCREMENT TO

WITHIN 2 FEET OF A RECENTLY TREATED DEPTH INTERVAL TO OBSERVE

AMPERAGE BUILDUP OR INCREASE.

f. THE AMMETER READING DURING THE RE-PENETRATION PROCESS SHOULD

BE GREATER THAN DEVELOPED WHEN THE VIBRATOR IS OPERATED WHEN IT

IS FREELY SUSPENDED. THE MINIMUM AND MAXIMUM AMMETER READINGS

SHOULD BE CONFIRMED DURING THE TEST PADS.

g. AMPERAGE BUILDUP AND BACKFILL QUANTITIES ARE CONTINGENT ON THE

TYPE OF VIBRATOR, TYPE OF BACKFILL, IN-SITU SOIL CONDITIONS AND

CONTRACTOR'S PROCEDURES.

h. PEAK PARTICLE VELOCITIES DUE TO VIBRATIONS REACHING ADJACENT

EXISTING UTILITIES AND STRUCTURES SHALL NOT EXCEED 1.0 INCH PER

SECOND.

3.02 TEST PAD DENSIFICATION PROGRAM:

A. PREPARE A MINIMUM OF TWO TEST PAD LOCATIONS:

1. TEST PADS SHALL HAVE A MINIMUM PLAN AREA OF 500 SQUARE FEET.

2. TEST PADS MAY BE PERFORMED IN A PRODUCTION LOCATION AS LONG AS FINAL

DENSIFICATION CRITERIA ARE MET UPON COMPLETION.

3. TESTING SHALL BE PERFORMED TO VERIFY DENSIFICATION TO THE SPECIFIED

PERFORMANCE LEVEL AND TO ASSESS OFFSITE VIBRATIONS BEFORE

PROCEEDING WITH THE PRODUCTION DENSIFICATION. UPON COMPLETION OF

TEST PADS, PERFORM CPT VERIFICATION TESTS AT LOCATIONS MIDWAY

BETWEEN COMPACTION POINTS AND APPROVED BY THE CONTRACTING OFFICER.

4. ALL CPTS SHALL BE PERFORMED IN ACCORDANCE WITH ASTM D5778 AND SHALL

BE PERFORMED NEAR THE CENTRAL PORTION OF THE DENSIFIED AREAS WITH AT

LEAST 2 CPT SOUNDINGS PER TEST PAD.

5. CPT SOUNDINGS SHALL BE LOCATED EQUIDISTANT TO THE CENTERS OF THE

VIBRO-COMPACTION ELEMENTS, WITHIN THE REGION RECEIVING THE LEAST

DENSIFICATION IMPROVEMENT.

B. SUBMIT A TEST PAD DENSIFICATION PROGRAM REPORT AND SURVEY, TO INCLUDE THE

TEST RESULTS OF ALL SPECIFIED TESTS AND THEIR IDENTIFYING LOCATION AND

RELATIONSHIPS TO ADJACENT COMPACTION POINTS:

1. IDENTIFY EACH COMPACTION POINT AND ITS DATE AND TIME OF INSTALLATION.

2. INCLUDE RECOMMENDATIONS FOR PRODUCTION SPACING OF COMPACTION

POINTS.

3. ALLOW 5 WORKING DAYS FOR REVIEW BY CONTRACTING OFFICER AFTER THE

SUBMITTAL OF THE TEST PAD DENSIFICATION PROGRAM REPORTS, SURVEYS, AND

PROPOSED DENSIFICATION METHOD STATEMENT FOR PRODUCTION SOIL

DENSIFICATION. NO PRODUCTION SOIL DENSIFICATION SHALL BEGIN UNTIL THE

REPORT HAS BEEN REVIEWED.

C. A POST TEST-PAD MEETING WILL BE REQUIRED TO DISCUSS RESULTS OF THE TEST-PAD

INSTALLATION AND VERIFICATION TESTING AND ANY POSSIBLE CHANGES TO THE

ORIGINAL PROCEDURES.

D. ANY CHANGE IN THE PREDETERMINED DENSIFICATION INSTALLATION PROGRAM SHALL

BE IMMEDIATELY REPORTED AND SUBMITTED TO THE CONTRACTING OFFICER.

E. PROBE HOLES:

1. CONTRACTOR MAY, AT NO ADDITIONAL COST TO THE GOVERNMENT, COMPLETE

PROBE HOLES AT SELECT LOCATIONS WITHIN THE AREA OF EACH FOUNDATION

ELEMENT TO BE DENSIFIED TO DETERMINE REFUSAL DEPTH PRIOR TO

PRODUCTION OF VIBRO-COMPACTION ELEMENTS.

a. BACKFILL PROBE HOLES WITH REPLACEMENT AGGREGATE AS REQUIRED TO

FILL ANY VOID MADE BY THE PROBES.

3.03 TOLERENCES:

A. IN THE PENETRATION STAGE, THE VIBRATOR SHALL BE KEPT AS NEAR VERTICAL AS

POSSIBLE AND SHALL NOT DEVIATE BY MORE THAN 1 FOOT IN 20 FEET.

B. THE LOCATION OF VIBRO-COMPACTION-SUPPORTED FOUNDATIONS FOR THIS PROJECT,

INCLUDING LAYOUT OF INDIVIDUAL COMPACTION POINTS, SHALL BE MARKED IN THE

FIELD USING SURVEY STAKES OR SIMILAR MEANS AT LOCATIONS SHOWN ON THE

DRAWINGS. COMPACTION POINTS SHALL BE INSTALLED TO WITHIN 6 INCHES OF

LOCATIONS SHOWN ON THE DESIGN DRAWINGS.

3.04 VERIFICATION OF DENSIFICATION:

A. VERIFY DEGREE OF DENSIFICATION BY MAKING CONE PENETRATION TESTS (CPT) IN

ACCORDANCE WITH ASTM D5778, AS FOLLOWS:

1. NO LESS THAN 1 CPT SOUNDING PER 750 SQUARE FEET OF IMPROVED AREA. THIS

NUMBER DOES NOT INCLUDE CPT SOUNDINGS PERFORMED FOR TEST PADS.

2. NO LESS THAN 1 CPT SOUNDING FOR 100 FEET OF STRIP FOOTING.

3. EACH SOUNDING SHALL BE PERFORMED IN THE CENTER OF SPECIFIC DESIGN

VIBRO-COMPACTION GROUPINGS, EQUIDISTANT FROM EACH SURROUNDING VIBRO-

COMPACTION POINT. SOUNDING LOCATIONS WILL BE SELECTED BY THE

CONTRACTOR’S PROFESSIONAL ENGINEER AND APPROVED BY THE CONTRACTING

OFFICER.

4. EXTEND EACH CPT SOUNDING TO A MINIMUM OF 5 FEET BELOW THE BASE OF THE

VIBRO-COMPACTION DEPTH.

5. RESULTS OF CPT SOUNDING SHALL DEMONSTRATE DENSIFICATION OF THE SOILS

TO A MINIMUM OF 85% RELATIVE DENSITY WHEN DETERMINED FROM ACCEPTED

CORRELATIONS WITH CPT DATA.

6. A MINIMUM OF 90% OF DATA POINTS SHALL DEMONSTRATE THAT THE MINIMUM

DENSITY IS ACHIEVED.

B. THE CONTRACTOR MAY ELECT TO DELAY DENSIFICATION VERIFICATION TESTING TO

ALLOW FOR TIME-RELATED IMPROVEMENT:

1. THIS DELAY IS AT THE CONTRACTOR'S RISK AND EXPENSE, AND DOES NOT RELIVE

THE CONTRACTOR FROM ANY PROGRESS TESTING REQUIREMENTS REQUIRED

UNDER "PROGRESS VERIFICATION."

2. EXPERIENCE WITH VIBRO-COMPACTION TECHNIQUES IN SOME SATURATED SOILS

INDICATES THAT IMPROVEMENT MEASURED BY IN-SITU TESTS CAN BE TIME

DEPENDENT. HOWEVER, FOR THE PURPOSE OF THIS PROJECT, THE REQUIREMENT

FOR MINIMUM CPT TARGET VALUES SHALL BE CONSIDERED SATISFIED, IF THE

VALUES ARE MET OR EXCEEDED BY TESTING WITHIN 200 HOURS AFTER SOIL

IMPROVEMENT HAS BEEN COMPLETED FOR THE AREA BEING TESTED.

3. DENSIFICATION VERIFICATION TESTS OUTLINED HEREIN ARE INTENDED TO BE

ACCOMPLISHED ITEM BY ITEM, UNIFORMLY OVER THE EXTENT OF SITE, IN A

SEQUENTIAL MANNER.

a. SHOULD THE CONTRACTOR PROPOSE TO COMBINE CERTAIN OF THESE

SEQUENCES TO SAVE TIME AND THE RESULTS PROVE TO BE UNACCEPTABLE,

THE DEFICIENCIES SHALL BE CORRECTED AT NO ADDITIONAL EXPENSE TO

THE GOVERNMENT.

b. PRODUCTION DENSIFICATION WORK COMMENCING PRIOR TO APPROVAL OF

THE TEST RESULTS SHALL BE CONSIDERED DONE AT THE CONTRACTOR'S

RISK, REMEDIAL MEASURES DEEMED NECESSARY BY THE ENGINEER TO

CORRECT DEFICIENCIES IN SUCH AREAS SHALL BE ACCOMPLISHED AT NO

ADDITIONAL COST TO THE GOVERNMENT.

c. SHOULD THE MINIMUM ACCEPTANCE VALUES NOT BE MET, THE CONTRACTOR

SHALL INSTALL ADDITIONAL COMPACTION POINTS TO ATTAIN THE SOIL

IMPROVEMENT CRITERIA AT NO ADDITIONAL COST TO THE GOVERNMENT.

C. VIBRO-COMPACTION VERIFICATION TESTING SHALL BE PERFORMED BY AN INDEPENDENT

TESTING LABORATORY, RETAINED BY THE CONTRACTOR, AND APPROVED BY THE

GOVERNMENT.

1. SUBMIT QUALIFICATION OF INDEPENDENT TESTING LABORATORY.

2. THE QUALITY CONTROL REPRESENTATIVE SHALL BE PRESENT TO OBSERVE ALL

DENSIFICATION VERIFICATION TESTING.

D. NOTIFY CONTRACTING OFFICER A MINIMUM OF 72 HOURS PRIOR TO PERFORMING

VERIFICATION TESTING.

E. SUBMIT RESULTS OF DENSIFICATION VERIFICATION TESTS.

F. PROGRESS VERIFICATION:

1. AS THE SOIL DENSIFICATION WORK PROGRESSES, CONDUCT TESTS AT

INTERVALS DESCRIBED IN "VERIFICATION OF DENSIFICATION" TO VERIFY

THAT NO LESS THAN THE SPECIFIED MINIMUM DEGREE OF DENSIFICATION IS

BEING ACHIEVED:

a. IF TESTING INDICATES THAT THE MINIMUM DEGREE OF DENSIFICATION

IS NOT BEING MET, DISCONTINUE ADVANCEMENT INTO NEW AREAS AND

REPEAT THE DENSIFICATION PROCESS IN THE FAILED AREA(S), AT NO

COST TO THE GOVERNMENT, MAKING MODIFICATIONS IN THE PROCESS

AS NECESSARY TO PROVIDE NO LESS THAN THE SPECIFIED MINIMUM

DEGREE OF DENSIFICATION.

b. REPEAT THIS CYCLE OF DENSIFICATION AND TESTING UNTIL ALL

SPECIFIED REQUIREMENTS FOR SOIL DENSIFICATION ARE MET IN ALL

REQUIRED AREAS.

c. THE CONTRACTING OFFICER MAY REQUIRE ADDITIONAL TESTS AS

DEEMED NECESSARY AT NO ADDITIONAL COST TO THE GOVERNMENT.

G. REJECTED DENSIFICATION CONDITIONS:

1. SHOULD THESE MINIMUM VALUES NOT BE MET, THE CONTRACTOR SHALL

CONSTRUCT ADDITIONAL DENSIFICATION POINTS ADJACENT TO THE FAILING

COMPACTION POINTS TO ATTAIN THE SOIL IMPROVEMENT CRITERIA.

a. ALL WORK TO ACHIEVE THE SPECIFIED CRITERIA, INCLUDING

INSTALLING ADDITIONAL VIBRO-COMPACTION AND PERFORMING

ADDITIONAL VERIFICATION TESTING SHALL BE PROVIDED BY THE

CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.

GROUND IMPROVEMENT: VIBRO-COMPACTION NOTES - (Continued):

S Y

M

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

C

E R

T

IF

IE

D

F

IN

A L

/3 /2

A

M E

N D

M E

N T

/1 /2

NL

A

SCHEDULE

DOOR PER A

B

S C

H E

D U

L E

D O

O R

P E

R

D O

O R

P E

R S

C H

E D

U L E

SCHEDULE

DOOR PER

D O

O R

P E

R S

C H

E D

U L E

A D

B C

SCHEDULE

DOOR PER

OH

D O

O R

P E

R S

C H

E D

U L E

DOOR PER SCHEDULE

F1

HL

GLASS TYPES:

REFERENCE SPECIFICATION FOR GLASS TYPES

1 TYPE-1 FIRE/SAFETY GLASS (45 MIN)

2 TYPE-2 CLEAR LAMINATED GLASS

3 TYPE-3 TINTED / INSULATED GLASS,

LAMINATED INNER PANE

4 TYPE-4 TINTED / SAFETY GLASS

5 TYPE-5 CLEAR / SAFETY GLASS

6 TYPE-6 FIRE/SAFETY GLASS (90 MIN)

24"

D E

S

IG

N E

D B

Y

1 432

A

B

C

D

SHEET

IDENTIFICATION

NUMBER

US ARMY CORPS

OF ENGINEERS

LOUISVILLE DISTRICT

U .S

A

R M

Y E

N G

IN

E

E R

D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E

E R

S L O

U

IS

V

IL

L E

K

E N

T U

C K

Y D

W N

B Y

C

K D

B Y

F

IL

E N

A M

E

S

IZ

E

P L O

T S

C A

L E

P

L O

T D

A T

E

D A

T E

P R

O J E

C T

N O

P

N

O

A F

D R

A W

IN

G

C O

D E

X

S O

L

IC

IT

A

T

IO

N N

O

A F

-2 -1

-0

CERTIFIED FINAL

S O

L

IC

IT

A

T

IO

Y

T P

M

W E

S T

O V

E R

A

IR

R E

S E

R V

E B

A S

E

M A

S S

A C

H U

S E

T T

S

W

A R

D P

A R

K W

A Y

K A

N S

A S

C

IT

Y M

O

(8

-9

R E

G

IO

N A

L I

S O

M A

IN

T

E N

A N

C E

H A

N G

A R

/1

/2

:5

:5

A

M

/4

A-602

D O

O R

S C

H E

D U

L E

B

ID

O

P T

IO

N

S

M T

O L B

E R

T

E .T

O R

N E

D C

S

P R

IN

K

/0

/2

Y T

P M

B

A

C e n tr a l.

rv t

DOOR SCHEDULE - BID OPTION 1A & 1B

DOOR FRAME

ASSEMBLY

RATING STC

DETAIL

HARDWARE

SET REMARKS

SIZE

TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL

PAIR

DOOR WIDTH HEIGHT

101A - 3' - 0" 7' - 0" HL-IN HM PE-1 1.1 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 1.0

101B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 9.0

102A PR. 3' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 27.0

103A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 26.0

104A PR. 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 15.0

105A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0

106A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 21.0

107A - 3' - 0" 7' - 0" NL-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 2.0

107B - 8' - 0" 10' - 0" OH-C STL FF-1 0 STL FF-1 - - B2 / A-613 A2 / A-612 A1 / A-612 32.0

107C PR. 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 12.0

107D - 4' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 17.0

108A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 14.0

108B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 16.0

110A - 12' - 0" 6' - 0" OH-C STL FF-1 0 STL FF-1 3/4 HR - C4 / A-613 B4 / A-613 A4 / A-613 32.0

110B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 16.0

110C - 4' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 18.0

112A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0

112A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 29.0

113A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 29.0

114A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0

114B PR. 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 13.0

115A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0

115B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 25.0

116A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 23.0

DOOR SCHEDULE - BID OPTION 2A & 2B

DOOR FRAME

ASSEMBLY

RATING STC

DETAIL

HARDWARE

SET REMARKS

SIZE

TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL

PAIR

DOOR WIDTH HEIGHT

201A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 20.0

202A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 19.0

203A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 22.0

205A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 31.0

206A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0

206B - 3' - 0" 7' - 0" HL-IN HM PE-1 1.1 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 1.0

207A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 10.0

208A - 3' - 0" 7' - 0" F HM PE-1 1.1 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 31.0

209A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 19.0

209B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 20.0

210A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0

213A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0

213B - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 14.0

214A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 19.0

216A PR. 3' - 0" 7' - 0" F-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 4.0

217A - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 24.0

218A - 3' - 0" 7' - 0" F HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 3.0

219A - 3' - 0" 7' - 0" HL-IN HM PE-1 1.1 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 1.0

219B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 - - C2 / A-611 B2 / A-611 A2 / A-611 8.0

DOOR SCHEDULE - BID OPTION 3A

DOOR FRAME

ASSEMBLY

RATING STC

DETAIL

HARDWARE

SET REMARKS

SIZE

TYPE MATERIAL FINISH TYPE MATERIAL FINISH HEAD JAMB SILL

PAIR

DOOR WIDTH HEIGHT

301A - 3' - 0" 7' - 0" NL-IN HM PE-1 1.2 HM PE-1 - - C4 / A-611 B1 / A-611 A1 / A-611 2.0

301B - 3' - 0" 7' - 0" NL HM PE-1 1.2 HM PE-1 3/4 HR - C3 / A-611 B3 / A-611 A3 / A-611 14.0

301C 8' - 0" 8' - 0" OH-C STL FF-1 0 STL FF-1 3/4 HR - C4 / A-612 B4 / A-612 A4 / A-612 32.0

DOOR AND FRAME LEGEND

FINISH

FA** FIELD APPLIED COATING

FF* FACTORY FINISHED

MATERIAL

AL ALUMINUM

HM HOLLOW METAL

STL STEEL

SIZE

- SINGLE DOOR

PR PAIR OF DOORS

*REFERENCE DOOR OR FRAME SPECIFICATION

**FIELD APPLY PER PAINT SPECIFICATION FOR

APPLICABLE SUBSTRATE AND EXPOSURE.

(DOOR FRAME)

TYPE A B

1.1 2" 2"

1.2 2" 4"

(FLUSH PANEL)

TYPE DESCRIPTION

F-IN FLUSH PANEL INSULATED

F FLUSH PANEL

(NARROW LIGHT)

TYPE DESCRIPTION A B C D #

NL NARROW LITE 6" 43" 24" 4" 1

NL NARROW LITE 6" 43" 24" 4" 4

NL-IN NARROW LITE INSULATED 6" 43" 24" 4" 4

(OVERHEAD)

TYPE DESCRIPTION

OH-C COILING DOOR

OH-IN

(HALF LIGHT/TRAFFIC)

TYPE DESCRIPTION A B C #

HL-IN HALF LITE INSULATED 6" 43" 35" 1

HL-IN HALF LITE INSULATED 6" 43" 35" 4

S Y

M

D E

S C

R

IP

T

IO

N D

A T

E A

P P

R

C

E R

T

IF

IE

D

F

IN

A L

/3 /2

A

M E

N D

M E

N T

/1

/2

SF30
SUMMARY OF CHANGES
00 10 00
S-016 AMD 02
S-016 - FOUNDATION - GROUND IMPROVEMENT NOTES SHT 1 OF 3
S-017 AMD 02
S-017 - FOUNDATION - GROUND IMPROVEMENT NOTES SHT 2 OF 3

109519_A-602 AMD 02

File details come from the government source that posted it. Updated .