W912QR20R0049Specs-0000.pdf
PDF 4 MB Posted
- Attached to
- Fort Totten, NY Army Reserve Center FFR
- Solicitation number
- W912QR20R0049
About this file
This Request for Proposal (RFP) solicits design/build construction services for a Full Facility Restoration project at the Fort Totten Army Reserve Center in New York. The U.S. Army Corps of Engineers seeks to fully renovate 146,000 square feet of the existing training building to a minimum 40-year life, replacing failing building systems including HVAC, mechanical, electrical and plumbing. Interior and exterior work includes repairing corridors, classrooms, offices, restrooms, roofs, finishes and conducting asbestos abatement. The project also includes new asphalt parking areas, site work, lighting and personal vehicle parking, along with anti-terrorism and force protection measures. Sustainability and energy measures are required. The contract duration is 990 calendar days from notice to proceed. The RFP contains optional items such as roof replacement and additional parking that may be awarded. Pricing will be evaluated for the base proposal plus all options.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Full Facility Restoration at Ft. Totten Army Reserve Center, Queens, NY Phase 1
P2: 447938
Design Build
Specifications Corrected Final Submittal
24 April 2020
W912QR20R0049
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0049-0000
W912QR20R0049
Section 00 10 00 - Solicitation
BLOCK 10 CONTINUATION
The Government is requiring electronic submission of proposals. Please follow the provided instructions precisely.
Please see Section 00 21 00, Proposal Submission Instructions.
Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://projnet.org/projnet. Please see Section 00 21 00, ProjNet Instructions for further guidance.
An organized site visit will be conducted during Phase II. Please see FAR 52.236-27 ALT 1 for Site Visit information with the release of the Phase II amendment.
The term bid and proposal are used interchangeably in industry and may be used interchangeably throughout this solicitation.
Please note, page numbering in this document may not be accurate.
PRICE BREAKOUT SCHEDULE
NOTE: FOR PHASE I, THE PRICE BREAKOUT SCHEDULE IS BEING ISSUED FOR
INFORMATIONAL PURPOSES ONLY. THERE IS NOT A PRICE PROPOSAL ASSOCIATED WITH
PHASE I OF THE SOLICITATION.
FULL FACILITY REVITALIZATION – B200, FORT TOTTEN, NY
DESIGN BUILD REQUEST FOR PROPOSAL
Section 00 10 00 – Solicitation Contract Form
PRICE BREAKOUT SCHEDULE
PROJECT: Design and Construction of the B200 Full Facility Revitalization
LOCATION: Fort Totten, NY
OFEROR’S NAME: _________________________________________________
BASE PROPOSAL
ITEM DESCRIPTION UNIT
NO. AMOUNT AMOUNT
0001 Primary Facilities – Building B200 Renovation JOB $
0002 Project Renovation Sitework JOB $
0003 Project Base Renovation Design Fees JOB $
SUB-TOTAL BASE PROPOSAL – RENOVATION WORK $
0004 Primary Facilities – Third Floor Porch Enclosure JOB $
0005 Project Base New Design Fees JOB $
SUB-TOTAL BASE PROPOSAL – NEW WORK $
SUB-TOTAL BASE PROPOSAL – RENOVATION AND NEW WORK $
OPTION PROPOSAL
ITEM DESCRIPTION UNIT
NO. AMOUNT AMOUNT
0006 Renovation - Replace Existing Roofing JOB $
0007 Roofing Replacement Design Fees JOB $
0008 Renovation – Replace Sewage Lift Station JOB $
0009 Lift Station Design Fees JOB $
0010 Renovation - Window and Storefront Replacement JOB $
0011 Window and Storefront Replacement Design Fees JOB $
0012 Renovation - HAZMAT Floor Abatement JOB $
SUB-TOTAL OPTION PROPOSAL – RENOVATION WORK $
0013 CFCI OMAR Funded Items JOB $
0014 CFCI Bona Fide Need OMAR Funded Items JOB $
SUB-TOTAL OPTION PROPOSAL – NEW WORK $
SUB-TOTAL OPTION PROPOSAL – RENOVATION AND NEW WORK $___________
TOTAL BASE PLUS OPTION PROPOSAL – RENOVATION WORK $
TOTAL BASE PLUS OPTION PROPOSAL – NEW WORK $
TOTAL BASE PLUS OPTION PROPOSAL – RENOVATION AND NEW WORK $
NOTES FOR PRICE BREAKOUT SCHEDULE
1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Price Breakout Schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to proposal items, all offerors shall state their revised prices for each item. The company name must be indicated on the face of the Price Breakout Schedule to preclude being misplaced.
2. Proposers must insert a price on all numbered items of the Price Breakout Schedule. Failure to do so may disqualify the proposal.
3. CONDITIONS GOVERNING TOTAL EVALUATED PRICE:
One contract only will be awarded on this project and total price evaluation will be based on the total proposed price, Base plus all Options.
4. All items (to include design effort) identified as “New Work” items, when combined, SHALL NOT exceed
$1,750,000.00. Any offeror that submits a price in excess of this price ceiling will be ineligible for award.
5. Description of Proposal Items - The general outline of the principal features of each item as listed below does not in any way limit the responsibility of the proposer for making a thorough investigation of the drawings and the specifications to determine the scope of work including each item of the proposal form.
Further descriptions of the Options may be found in the Statement of Work.
Description of Base Proposal Items
Item No. 0001 “Primary Facilities – Building B200 Renovation” includes Base Proposal construction work required within a line five feet outside of the building, except that work covered by Item No. 0002. This is a “Repair” line item
Item No. 0002 “Project Renovation Sitework” includes Base Proposal demolition and construction work required beyond a line five feet outside the buildings. Includes all work required to furnish and install additional replacement pavement, sidewalks and fencing, as indicated on drawings C-101 and C-102 of this solicitation. This is a “Repair” line item. The work in Item No. 0015 below is excluded from this line item.
Item No. 0003 “Project Base Renovation Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Base Proposal Items 0001 and 0003. This is a “Repair” line item
Item No. 0004 “Primary Facilities – Third Floor Porch Enclosure” includes the demolition of existing exterior wall, porch floor finish and railing and the construction of an enclosure above the existing Third
Floor Entry Porch. The addition will require all new exterior wall, vestibule and doors. This is a “New
Work” line item.
Item No. 0005 “Project Base New Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Base Proposal Item 0002. This is a “New Work” line item
Description of Option Proposal Items
Item No. 0006 “Renovation - Replace Existing Roofing” includes work required to replace existing insulation and roofing with new insulation and roofing. This is a “Repair” line item.
** The Contracting Officer may exercise this Option item within 90 calendar days of Notice to Proceed.
Item No. 0007“Roofing Replacement Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Option Proposal Item 0006. This is a “Repair” line item
** The Contracting Officer may exercise this Option item within 90 calendar days of Notice to Proceed, and it will only be exercised if Item 0006 above is also exercised.
Item No. 0008 “Renovation – Replace Sewage Lift Station” includes work and materials to remove and replace existing sewage Lift Station. This is a “Repair” line item.
** The Contracting Officer may exercise this Option item within 90 calendar days of Notice to Proceed.
Item No. 0009 “Lift Station Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Option Proposal Item 0008. This is a “Repair” line item
** The Contracting Officer may exercise this Option item within 90 calendar days of Notice to Proceed and it will only be exercised if Item 0008 above is also exercised.
Item No. 0010 “Renovation - Window and Storefront Replacement” includes all work required to furnish and install new AT/FP - Compliant Exterior Windows and Storefront systems and all associated glazing as described in specification section 01 02 00.11 48, Part 7. This includes removal of blast curtain systems and provision of new window treatments. See specifications for window treatment type. This is a “Repair” line item.
** The Contracting Officer may exercise this Option item within 90 calendar days of Notice to Proceed.
Item No. 0011 “Window and Storefront Replacement Design Fees” includes the fees for the Offerors’ design professionals to complete design and construction documents for Option Proposal Item 0010. This is a “Repair” line item
** The Contracting Officer may exercise this Option item within 90 calendar days of Notice to Proceed and it will only be exercised if Item 0010 above is also exercised.
Item No. 0012 “HAZMAT Floor Abatement” includes demolition of existing VCT and abatement of asbestos mastic beneath VCT flooring as described in specification section 01 02 00.11 48, Part 1. This is a
“Repair” line item.
** The Contracting Officer may exercise this Option item within 90 calendar days of Notice to Proceed.
Item No. 0013 “CFCI OMAR Funded Items” includes work required to furnish and install “CFCI OMAR funded” items. CFCI OMAR funded items are to be contractor provided and installed, unless otherwise noted in this RFP. Refer to publication entitled “Army Reserve OMAR Project Funding Requirements, October 2013” available on the Louisville Design Guide Website. These items include:
Metal lockers
Caging for Storage
** The Contracting Officer may exercise this Option item within 425 calendar days of Notice to Proceed.
Item No. 0014 “CFCI Bona Fide Need OMAR Funded Items” includes work required to furnish and install
“CFCI Bona Fide Need OMAR Items. CFCI Bona Fide Need OMAR Items are to be contractor provided and installed, unless otherwise noted in this RFP. Refer to publication entitled “Army Reserve OMAR
Project Funding Requirements, October 2013” available on the Louisville Design Guide Website. These items include:
Refrigerator and Microwave in Break Room(s)
Metal shelving
Fire extinguishers and window blinds
Food service equipment
** The Contracting Officer may exercise this Option item within 900 calendar days of Notice to Proceed.
*** End of Section ***
Section 00 21 00 - Instructions
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR20R0049
The Bidder Inquiry Key is: DI7EUT-97NHTQ
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry
System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard
Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the solicitation.
PROPOSAL SUBMISSION INSTRUCTIONS
Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED
ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD
SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.
Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started
Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:
1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.
a. Morgan Strong, Contract Specialist at morgan.k.strong@usace.army.mil
b. Emily Moore, Contracting Officer at emily.a.moore@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two (2) business days prior to the proposal due date.
3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter
W912QR20R0049-FIRMNAME.
4. Click Upload button to send documents.
5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).
File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below. Compressed file-types may be used to reduce the size of a file if you have a large number of files.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
W912QR20R0049-FIRMNAME-VOLUME I
W912QR20R0049-FIRMNAME-VOLUME II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above.
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor. The use of hyperlinks in proposals is prohibited.
Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files
(e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft
Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors –
Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The
Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018
52.204-16 Commercial and Government Entity Code Reporting JUL 2016
52.204-18 Commercial and Government Entity Code Maintenance JUL 2016
52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017
52.217-5 Evaluation Of Options JUL 1990
52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997
252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
CLAUSES INCORPORATED BY FULL TEXT
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be a DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15
CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting
Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance
Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
Electricians 9.0 to 10.2
Carpenters 27.6 to 32.0
Steam fitters 12.2 to 13.5
Metal lathers 24.6 to 25.6
Painters 28.6 to 26.0
Operating Engineers 25.6 to
26.0
Plumbers 12.0 to 14.5
Iron workers (struct) 25.9 to
32.0
Elevator constructors 5.5 to
6.5
6.9%
Bricklayers 13.4 to 15.5
Asbestos workers 22.8 to
28.0
Roofers 6.3 to 7.5
Iron workers (ornamental)
22.4 to 23.0
Cement masons 23.0 to 27.0
Glaziers 16.0 to 20.0
Plasterers 15.8 to 18.0
Teamsters 22.0 to 22.5
Boilermakers 13.0 to 15.5
All others 16.4 to 17.5
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract
Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from
Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract
Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Fort Totten, NY in Queens county, in the state of New York.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers
CELRL, Emily Moore
Room 821
600 Dr. Martin Luther King Jr. Place
Louisville, KY 40202
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit will be conducted during Phase II of the solicitation. This clause will be updated to provide the meeting date and time with release of Phase II.
(c) Information regarding meeting location, point of contact, access requirements, etc. will be provided with the release of Phase II.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The full text of FAR clauses and provisions can be found at https://www.acquisition.gov/
The full text of DFARS clauses and provisions can be found at https://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
Section 00 22 00 - Supplementary Instructions
SECTION 00 22 16
SECTION 00 22 16
PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE ONE
1. Overview.
1.1 The intent of this solicitation is to select one contractor for the Design and Construction of a Full Facility
Repair (FFR) of Building 200 at the Fort Totten, NY Army Reserve Center (ARC).
1.2 This is a two-phase procurement and the basis of award is the Best Value Trade-Off Process. Potential offerors are invited to submit the information described in this Section 00 22 16 for review and evaluation by the Government. Following completion of the evaluation of Phase I, up to a maximum of five (5) most highly qualified offerors will be selected to participate in Phase II. A site visit will be held for these selected offerors following the Phase II notification. The selected offerors for Phase II will be invited to submit the information described in Section 00 22 18, Procedures for Submittal of Offers for Phase II, for review and evaluation by the Government. Following completion of the Phase II evaluation, the
Contracting Officer will award a firm-fixed-price contract to the responsible offeror whom the Source
Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
1.3 The target ceiling for contract award is $33,000,000.00 based on the funds made available for this project.
The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling.
2. Submittal of offers.
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.
2.2 Offerors shall submit their proposals electronically in accordance with the Proposal Submission
Instructions in Section 00 21 00 of the solicitation. Please follow the instructions precisely as proposals must complete the upload no later than the time and date specified in Block 13 of Standard Form 1442.
NOTE: The Louisville District is in the Eastern Time Zone.
2.3 The Government is using a two-phase procurement approach for this design/build project. For Phase I, offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be submitted electronically in accordance with the Proposal
Submission Instructions in Section 0 21 00 of the solicitation. Phase I proposal sections should parallel the submission requirements identified herein.
2.4 The complete Volume I shall be submitted electronically in accordance with the Proposal Submission
Instructions in Section 00 21 00 of the solicitation and include the following information:
Volume I – Factor I: Past Performance o Prime Contractor o A/E Designer of Record (DOR)
Volume I – Factor II: Technical Approach for Design/Build
NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit(s) will not be evaluated.
2.5 Volume II shall be submitted electronically in accordance with the Proposal Submission Instructions in
Section 00 21 00 of the solicitation and shall include the following information:
Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule
Volume II – Tab B: Joint Venture Agreements
Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability
Volume II – Tab D: Pre-Award Information
NOTE: Phase I does NOT involve pricing submission.
NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.
3. Proposal Evaluation Process.
3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical (Volume I) proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors.
Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value
Trade-Off, as stated above.
3.2 The evaluation process for Phase I essentially consists of two parts: proposal compliance review and responsibility review, and technical evaluation.
3.2.1 Proposal Compliance / Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance (Table 2), with the final confidence assessment rating based on the extent of recent, relevant past experience (Table 1) and the quality of the offeror’s performance. Factor
II – Technical Approach for Design/Build will be rated using Table 3 below.
4. Proposal Information and Related Evaluation Factors.
4.1 Phase I proposals will be evaluated in accordance with the factors below, listed in relative order of importance. Offerors are reminded to include their best technical proposal in their initial offer. The initial offer and subsequent Government evaluation will be the basis for the Contracting Officer’s selection of up to the five (5) most highly qualified offerors to continue on to Phase II of the procurement.
4.2 Volume I – Factor I: Past Performance 1st
Prime Contractor Equal to A/E DOR
A/E DOR Equal to Prime
4.3 Volume I – Factor II: Technical Approach 2nd
For Design/Build
4.4 Volume II – Pro Forma Information
Tab A Standard Form 1442 and Price Breakout Schedule Not Rated
Tab B Joint Venture Agreement Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated
Proof of Financial Ability
Tab D Pre-Award Information Not Rated
4.5 Ratings
Evaluators will apply the rating for the definition that most closely matches the evaluation.
TABLE 1
Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
TABLE 2
Performance Confidence Assessments
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
TABLE 3
Technical / Risk Assessment Ratings Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
4.6 Definitions
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear
(e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.
5. Volume I – Factor I: Past Performance
5.1 Submission Requirements:
5.1.1 Prime Contractor:
Provide descriptions of up to three (3) projects substantially complete or completed by the Prime
Contractor within the last five (5) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than five (5) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if enough work has been performed such that it demonstrates the ability to successfully complete all phases of the project. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.
5.1.2 Projects considered similar in size shall be a minimum of 65,000 square feet of building renovation.
5.1.3 Projects considered similar in scope to this project include complete renovation of buildings similar to
Army Reserve Centers, Armed Forces Training Centers, National Guard, or other Federal Agency Office
Buildings, Commercial Multi Story Office Buildings, and Education Facilities such as high schools and university buildings. Projects may also include new construction; however, project scope shall be at least
50% complete building renovation, measured in square footage. If replying with projects that are combined new and renovation construction, clearly delineate (based on square feet) the renovation versus new construction portion and percent (%) of the project for each.
Complete building renovation includes but is not limited to experience with architectural, structural, mechanical, electrical, plumbing, and fire protection.
5.1.4 The prime contractor must have self-performed at least twenty (20) percent of the direct contract labor
(including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors to be considered similar.
5.1.5 Additional consideration may be given for projects that contain the following features:
a) Established, working relationship with the proposed DOR on prior Design/Build projects
b) Design/Build projects
c) Complete Building Renovations for USACE
5.1.6 The following information shall be provided for each project:
a) Project Title, Location, and Contract Number/Unique Identifier
b) Current percentage of construction complete and the date it was or will be complete
a. For projects that are not yet complete, provide description of work remaining to be completed.
c) Scope of the project, to include purpose/use of facility
d) Size of the project, differentiate square footage of new construction versus renovation if the project includes both
e) Type and percentage of work that was self-performed
5.1.7 For this factor, also include any ratings, letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past
Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency by the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action.
5.1.8 A/E Designer of Record (DOR):
Provide descriptions of up to three (3) projects that have been constructed (i.e., construction is substantially complete) within the last five (5) years (from the solicitation issue date) that are similar in size and scope
(see paragraphs 5.1.2 and 5.1.3 above). In order to be considered similar, the proposed A/E firm must have been the DOR on the submitted project. The listed design firm must be used on the project. No deviations will be permitted unless approved by the Contracting Officer. Identification of more than one (1) design firm will result in an evaluation based on the least qualified firm. Indicate any previous working relationship with the prime contractor.
The offeror must affirmatively state who their proposed DOR for the project will be, and provide the
DOR’s Unique Entity Identification number, and Cage code.
5.1.9 Additional consideration may be given for the DOR projects that contain the following features:
a) Experience with Federal (e.g., DOD, NASA, USACE) Design/Build Criteria (i.e., AT/FP, UFC, Specs Intact), on design / build projects.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture (JV) agreement. If more than one contractor is listed in Block 14, then a signed JV agreement must be submitted with the proposal and the JV shall be registered as such in the System for Award Management (SAM). However, each party of the JV must submit their own Unique
Entity Identifier Number (formerly known as DUNS) with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV offeror as demonstrated by a signed JV agreement. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).
5.2 Evaluation Criteria:
5.2.1 For both the Prime and DOR, the SSEB will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the
SSEB will determine how relevant a past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.
5.2.2 For both the Prime and DOR, the SSEB will next review how well the offeror performed on those projects.
The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references.
In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. The Government will, at a minimum, review past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all
CAGE/Unique Entity Identifier numbers. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee
Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
5.2.3 The SSEB will review all past performance information collected for both the Prime and DOR. The SSEB will determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table above, based on the SSEB’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience. NOTE: The Past Performance of both the
Prime and A/E DOR will be weighted equally in the establishment of the overall Performance
Confidence rating.
6.0 Volume I – Factor II: Technical Approach for Design/Build
6.1 Submission Requirements:
6.1.1 Provide a narrative that describes the offeror’s philosophy and intended technical approach for executing design-build projects. Clearly and concisely describe the offeror’s Design-Build team, and how the team will work collaboratively to ensure timely, quality completion of the project. The Technical Approach narrative shall address the information described in paragraphs 6.1.2 – 6.1.4 below.
6.1.2 Roles and Responsibilities: Describe the roles and responsibilities of the offeror’s Design-Build team and how their resources will be utilized in order to deliver this design-build project. Describe the proposed management structure for the Design-Build team (i.e., key members), explaining how the design and construction process will be managed throughout the entirety of the project life cycle (e.g., Design, Construction, Close-out).
6.1.3 Communication Plan: Describe interactions and communications both within the Design-Build team and with the Corps of Engineers throughout the entirety of the project life cycle.
6.1.4 Quality Control: Describe the Design-Build team’s quality control approach, corporate systems, and capabilities to maintain quality control of the design and construction.
Provide specific information on how you will manage and track changes/revisions during the design and construction phases of the project.
NOTE: There is a page limit of eight (8) single-sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the Technical Approach for Design/Build Factor
6.2 Evaluation Criteria:
6.2.1 The Government will evaluate the offeror’s understanding of the design process and the roles of the designers of record, construction firm, and the Government reviewers. The evaluation will be based on how well the offeror demonstrates their organizational (i.e., the structure and staffing) ability to successfully execute design/build projects, to include the integration of the design and construction firms during design and construction. Proposals demonstrating that construction personnel will be actively involved in the design process may be viewed more favorably by the SSEB. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including its key roles during construction. Offerors are encouraged to tailor their proposal to demonstrate their approach for successfully completing the solicited Design/Build project.
7. Volume II - Proforma Information
7.1 Tab A - Standard Form 1442.
7.1.1 Submission Requirements:
The offeror shall complete and submit Standard Form 1442 found in Section 00 10 00 of this solicitation.
7.1.2 Evaluation Criteria:
The Standard Form 1442 will not be rated. The form will be reviewed to determine if required information is provided, amendments are acknowledged, and the offer signed.
NOTE: Phase I does NOT involve pricing submission.
7.2 Tab B – Joint Venture Agreements
7.2.1 Submission Requirements:
If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), then a signed JV agreement must be submitted with the proposal and the offeror shall be registered in the
System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (formally DUNS number) with the proposal.
Small business offerors (e.g., 8(a), HUBZone, SDVOSB) submitting a proposal as a JV or Mentor-Protégé shall submit evidence from the offeror’s SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business
Opportunity Specialist. Joint Venture agreements and approved 8(a) Mentor-Protégé agreements must be submitted with the proposal.
7.2.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
Joint Venture Agreements and Mentor-Protégé agreements must comply with the relevant regulations in
Title 13 of the Code of Federal Regulations in order for an offeror to be eligible for any small business-related price preference.
7.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability
7.3.1 Submission Requirements:
A. Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities).