This is a Request for Proposal (RFP) from the U.S. Army Corps of Engineers Louisville District to conduct a full facility restoration on an Army Reserve Center located in Fort Totten, New York. The project scope includes fully renovating 146,000 square feet of an existing 2,000-member Army Reserve Center training building, as well as new construction of asphalt parking areas and associated site work. Facilities will be designed according to the Army Reserve Design Guide and Unified Facilities Criteria, and will include repairing failing building systems such as HVAC, mechanical, electrical and plumbing. Interior work includes repairing corridors, classrooms, offices, and restrooms. Exterior work includes site work, lighting and new parking. Anti-terrorism and force protection measures will be incorporated. The contract duration is 990 calendar days from notice to proceed. The RFP contains optional items such as roof replacement and additional parking areas.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W22W9K00275560

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20R0049 for the Design/Build Full Facility Restoration of an Army Reserve Center located at Fort Totten, NY is hereby amended as follow s:

1. PLEASE SEE SUMMRY OF CHANGES

1. CONTRACT ID CODE PAGE OF PAGES

1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Jul-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0049

X 9B. DATED (SEE ITEM 11)

27-Apr-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Jul-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20R0049_Specs-0002

W912QR20R0049

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY OF CHANGES AMDT 0002

Solicitation: W912QR20R0049

Project: Design/Build for a Full Facility Restoration (FFR) of an Army Reserve Center (ARC)

Location: Fort Totten, NY

Amendment 0002 Summary of Changes

A. The following Specification Sections have been replaced in their entirety:

DIVISION 01 – GENERAL REQUIREMENTS

01 02 00.01 48 Part 1 - Design Objectives, and Functional and Area Requirements 01 02 00.03 48 Part 3 - Site Civil Engineering 01 02 00.06 48 Part 6 - Design - Architectural and Interior Design 01 02 00.09 48 Part 9 - Design - Plumbing 01 02 00.10 48 Part 10 - Design – Electrical 01 02 00.13 48 Part 13 - Design - Fire Protection 01 33 29.00 06 Sustainability Reporting

ATTACHMENTS TO THE STATEMENT OF WORK

Attachment G - Room by Room Supplemental Instructions Attachment M - Preliminary LEED Checklist

B. The following Drawings have been replaced in their entirety:

G-002 Site Vicinity Maps V-100 Existing Conditions Plan C-100 Site Plan

(End of Summary of Changes)

*** SAFETY PAYS ***

Building 200 Full Facility Revitalization P2# 447938 Fort Totten, NY CERTIFIED FINAL

September 2009 version 01 02 00.00 48 Part 1 - 1 of 15

PART 1

DESIGN OBJECTIVES, AND FUNCTIONAL AND AREA REQUIREMENTS

1.1 SCOPE OF WORK. The objective of this solicitation is to obtain a facility in which the Using Units are able to effectively implement their Army Reserve support and training missions. These activities require sufficient space with up-to-date furnishings and equipment to support the Units’ full-time and Army Reserve personnel. The facility will consist of the renovation of one building and associated site improvements, complete and adequate for assignment as an Army Reserve Training Center.

1.1.1 Requirements stated in this RFP are minimums; design and construction shall meet or exceed the requirements. The design and technical criteria contained and cited in this RFP establish minimum standards for design and construction quality. This project has been determined to be a Best Value (BV) project: innovative, creative, and life cycle cost effective solutions which meet or exceed these requirements are encouraged.

1.1.2 This project shall consist of the design and renovation of portions of Building B200 for the Army Reserve Training Center on Government-owned land at Fort Totten New York, and a Porch Enclosure addition at the Third Floor. This project also includes modifications to required utilities, storm drainage, communications, electrical, HVAC, fire protection/alarm systems, paving, walks, curbs, parking, access roads, exterior lighting, site improvements, grading and landscaping. All building and room signage shall be new.

1.1.2.1 Most of the project consists of interior renovation to the existing building.

Varying levels of renovation are as described below and as indicated at associated plans and Room by Room Supplemental Instructions.

1.1.2.2 Some areas of the building are existing-to-remain as-is. Some utility distribution for other areas may be required through these spaces. Some of these spaces require renovation under options described at Section 1.9.

1.1.2.3 Renovations had been performed to Building B200 circa 2010 (BRAC Renovations). BRAC renovation finishes shall be used as the design template for all proposed interior ceiling, wall, floor and door finishes. See Attachment C RST Color Board and Attachment P 2009 BRAC Renovations.

1.1.2.4 Light Renovation Level 1: BRAC renovation area. Partitions at these areas shall remain as-is. Revitalization of finishes will be necessary. Paint all partitions.

Replace all carpeting. Provide new signage. See Part 6 of this document for further description. Provide new lighting and controls. Provide additional receptacles to meet UFC (4-171-05 & 3-520-01) requirements. Receptacles to be controlled per the requirements of ASHRAE 90.1.

Part 1 - 2 of 15

1.1.2.5 Light Renovation Level 2: Ceilings and lighting at central public corridors were replaced under BRAC. These areas maintain existing partitions and ceilings.

Provide new flooring and wall finishes, including door frame painting. Replace doors and hardware. Provide new lighting and controls. Provide receptacles in addition to existing as needed to meet UFC (4-171-05 & 3-520-01) requirements. Receptacles to be controlled per the requirements of ASHRAE 90.1.

1.1.2.6 Light Renovation Level 3: Spaces adjacent to BRAC renovation require light renovation, maintaining existing partitions, and replacing existing ceilings including lighting, wall and floor finishes. Existing door frames shall remain, painted. Replace existing doors and hardware to match BRAC design template. Some upgrade of communications and fire alarm devices and distribution may be required. As part of this work, upgrade and replace finishes at existing Main and Auxiliary entry lobbies, and within existing exit stairs. Provide with new lighting and controls. Provide receptacles in addition to existing to meet UFC (4-171-05 & 3-520-01) requirements. Receptacles to be controlled per the requirements of ASHRAE 90.1.

Amendment. #0002

1.1.2.7 Full Renovation Level 4: Full Renovation includes removal of all existing partitions, ceilings, doors and finishes. Renovations include replacement of ceilings including lighting, partitions including doors and frames, and all wall and floor finishes.

Renovation scope includes reconfiguration of electrical, communications, HVAC and fire suppression systems and devices. Provide with new lighting and controls. Provide base and wall cabinets and sink at Break Rooms as indicated at plans. Provide receptacles to meet UFC (4-171-05 & 3-520-01) requirements. Receptacles to be controlled per the requirements of ASHRAE 90.1.

1.1.2.8 Medium Renovation Level 5: Public Toilets - Remove existing flooring and base. Provide ceramic tile wall and floor cover. Remove and store existing toilet partitions, water closets, countertops and accessories and reinstall following tile installation. Replace existing faucets and other fittings and trim as may be damaged during removal and reinstallation per part 9. Provide water closet and lavatory at First Floor Public Toilet with all respective fittings and trim as described at part 9. Replace ceilings, lighting and controls.

Amendment. #0002

1.1.2.9 Full Renovation Level 6: Kitchen Area – Similar to Full Renovation Level 4 above. Renovate existing kitchen as shown and described. Replace existing finishes with new finishes. Replace connections for kitchen appliances as needed. Replace kitchen lighting. Modify and / or replace fire suppression sprinkler system and fire alarm system. Replace kitchen exhaust hoods and associated make up air, ductwork and controls associated with kitchen renovation to be fully compliant with codes.

1.1.2.10 Full Renovation Level 7: Acoustically sensitive spaces - Similar to Full Renovation Level 4 above. Provide pre-engineered sound isolation rooms at Individual Practice rooms and Group Practice rooms. Provide acoustic instrument lockers at Locker Rooms.

Part 1 - 3 of 15

1.1.2.11 Building Addition: Construct Porch Enclosure at location of existing Third Floor Entry Porch. Addition will require a new exterior wall, AT/FP - compliant vestibule, doors, and windows, interior finishes, and demolition of existing exterior wall and vestibule, porch floor finish and a portion of railing. Modify and expand existing bridge structure, deck and railing as indicated. Repairs and modifications to exterior pedestrian bridge may require additional mitigation effort.

1.1.2.12 Replace and upgrade exterior and interior vestibule entry doors and hardware at existing First and Second Floor entries. Match door and frame replacements to existing frame color and finish. Prepare doors and frames for electronic access control hardware. Replacement doors shall meet all program requirements for thermal resistance and resistance to normal loads. Interior vestibule doors at First Floor and single-entry door at Second Floor shall meet all program requirements including AT/FP standards. Base Proposal includes work at doors and immediate frames only.

Replacement of existing storefront and balance of existing vestibules with AT/FP-compliant construction shall be included by Option - see section 1.9 below regarding Options for AT/FP Upgrades.

1.1.2.13 Remove and replace existing exterior hollow metal doors and frames and associated hardware at exit stairs including doors providing roof access and mechanical and electrical utility rooms with similar doors, frames and hardware. Doors shall be AT/FP compliant.

1.1.2.14 Remove and replace sealant at existing masonry control and expansion joints at building exterior walls.

1.1.2.15 Provide minor repair work at existing steel framed pedestrian bridge structure at third floor entry and concrete framed second floor entry structure as described in Part 7 Structural Design.

1.1.2.16 Provide site demolition and construction work as indicated. This work includes minor grading and parking lot restriping.

1.1.2.16 Provide additional pavement, new sidewalks and fencing as indicated.

1.1.2.17 Some existing furniture will remain at B200 at the commencement of renovation. Contractor shall remove and dispose of furniture as indicated at attached document. Coordinate with government.

1.1.2.18 Existing Fire Protection/Life Safety measures at Building 200 include full fire suppression sprinkler system and fire alarm to conform to existing occupancy. Proposed renovations shall require extensions and modifications to existing sprinkler systems.

Renovations shall require major modifications of fire alarm system. Designer of Record to fully evaluate systems for conformance to relevant guidance documents and governing codes during Design After Award. See Part 13 for further discussion.

1.1.2.19 Hard flooring: Hard flooring is required at public corridors as indicated at drawings. For description of known Asbestos Containing Materials (ACM) see paragraph

1.7.3.4. Hard flooring finishes may be porcelain tile, rubber tile or Luxury Vinyl Tile (LVT) which may be installed directly above existing VCT flooring without removal of

Part 1 - 4 of 15

ACM. Epoxy based poured resin flooring may be acceptable as a flooring alternative, but this flooring would require removal of existing VCT and abatement of ACM mastic beneath VCT. If epoxy resin flooring is proposed, then the proposal shall clearly indicate that ACM abatement is considered and included in the bid proposal amount as a Bid Option. Potential abatement including estimated quantities is further described in Section

1.9 Proposal Options. No proposed abatement of ACM shall be included in Base Bid.

1.1.3 Provide design for furniture and some equipment to be purchased and installed by the Government. See Section 1.3.3.1. See Louisville Army Reserve Customer Website https://www.lrl.usace.army.mil/Missions/Engineering/Design- Guide/Military-Programs/Army-Reserve-Customers/Furniture/

1.1.4 Refer to Section 1.9 for additional proposal options.

1.2 DESIGN OBJECTIVES.

1.2.1 Applicable Criteria. Applicable design and construction criteria references are listed in this Statement of Work and in the Outline Technical Specifications. Criteria shall be taken from the most current references as of the date of issue of the RFP, unless noted otherwise. Referenced codes and standards are minimum acceptable criteria.

1.2.1.1 This RFP and its referenced documents define the necessary criteria to plan and design the Fort Totten Building 200 Full Facility Revitalization. Functional space requirements, including general lighting, communications, power, tempered air requirements and finishes, are contained in the Design Guide for US Army Reserve (UFC 4-171-05), which also provides general criteria and guidance for the design of Army Reserve facilities. Typical functional space furniture layouts are provided in the RFP drawings; Contractor’s designers shall adapt these to the final floor plans.

1.2.1.2 Project drawings and other documents describe Renovation Levels 1,2,3 and 5 which may be characterized as Repair, and Renovation Levels 4, 6 and 7 which may be characterized as Modification / Reconfiguration. While the total Modification / Reconfiguration area comprises less than 50% of the total building area, the Second and Third floors include Modification / Reconfiguration areas which exceed 50% of the total area at these floors. Therefore per UFC 3-600-01 Section 34-1.5.4 the entire building must be characterized as Reconstruction and the entire building must meet the UFC 3- 600-01 and NFPA 101 requirements for new construction. This includes the fire sprinkler system, fire alarm system, means of egress and components, emergency lighting, interior finishes, and protection for vertical openings and from hazards / interior wall ratings. Based on the analysis performed for the Technical Assessment attached to this document, the existing building as currently configured meets occupancy standards.

As components are modified during Design After Award the Designers of Record and the Contractor shall analyze, design and construct the proposed renovation per UFC 3- 600-01 and relevant sections of NFPA 101.

1.2.1.3 Where manufacturer or vendor names are called out, the intention is generally to provide guidance on desired quality and features for the system or material.

Unless the manufacturer or vendor is identified as “sole-source,” or with similar

W912QR20R0049_Specs-0002 https://www.lrl.usace.army.mil/Missions/Engineering/Design-Guide/Military-Programs/Army-Reserve-Customers/Furniture/ https://www.lrl.usace.army.mil/Missions/Engineering/Design-Guide/Military-Programs/Army-Reserve-Customers/Furniture/

Part 1 - 5 of 15 language, the Contractor may provide the equivalent or better system or material of another vendor or manufacturer.

1.2.1.4 The project shall be designed and constructed using English (inch-pound) units of measurement.

1.2.2 Primary Consideration. The primary consideration of this solicitation is to obtain the renovation to an existing Army Reserve Training Center within funds available, and to maximize design quality. Offerors are encouraged to review the RFP to familiarize themselves with all RFP requirements.

1.2.3 Design Quality. Design quality is achieved through the optimization of interior planning, integration of the building with the site, sustainability, selection of building materials and systems for low-cost maintenance and operation, and an overall balance of esthetics and functionality.

1.2.4 Design Freedom. Requirements stated in this RFP are minimums.

Innovative, creative, or cost-saving proposals, which meet or exceed these requirements are encouraged, and will be considered more favorably.

1.2.4.1 The project conceptual design was developed by the Army Reserve, the Corps of Engineers, and an A/E design team; this conceptual design is accepted by the Government.

1.2.4.2 The Conceptual Design Drawings, this Statement of Work, and the Outline Technical Specifications, along with the other information and requirements in this RFP, serve as requirements for Contractor building design and construction completion, along with other code, regulatory and professional practice requirements. The extent of development of these RFP documents in no way relieves the successful offeror from responsibility for completing the design, construction documentation, and construction of the facility in conformance with Applicable Criteria and codes.

1.2.4.3 The conceptual design illustrates desired general arrangements, orientation, and adjacencies which are acceptable to the Government – it is not intended to dictate the final layout and image for the project. The Contractor’s designers shall develop and refine the conceptual site and building design in their completion of the design and construction documents. Such development shall be consistent with the criteria and acceptable to the Government.

1.2.4.3.1 Conceptual exterior images - not used

1.2.4.4 The Contractor shall accommodate minor site and building plan changes by the Government in the early stages of the design process, as a normal part of the design development process. The Contractor may adjust spaces, within the overall and specific functional area guidelines, as required to accommodate structural layout, and as necessary to provide adequate space for mechanical, electrical and communication spaces. The mechanical and electrical rooms must provide adequate space to safely and efficiently accommodate equipment operation and maintenance. The spatial relationships and adjacencies in the RFP drawings, however, must be maintained, Part 1 - 6 of 15 unless the Contractor recommends changes to the Government, and the Government accepts such changes.

1.2.4.6 The Contractor’s architect or interior designer shall select the final palette of colors and materials for building interior and exterior to produce a pleasing appearance, coordinated throughout. Coordinate with the requirements of paragraph 6.5 of Part 6 – Interior Design.

1.2.5 Installation Design Guidance.

1.2.5.1 Installation Real Property Master Plan – not used.

1.2.5.2 Installation Design Guide – not used

1.2.6 Energy and Resources Conserving Features. Public Laws 102-486 and 109-58, Executive Order 13423, and Federal Regulations 10 CFR 435, require federal buildings to be designed and constructed to reduce energy consumption in a life-cycle, cost-effective manner using renewable energy sources when economical. Products designed to conserve energy and resources by controlling the amounts of consumed energy or by operating at increased efficiencies should be considered. Minimum requirements for this project are listed in this Statement of Work.

1.2.6.1 Energy conservation techniques shall be considered as they relate to site design, site engineering, building design, and building engineering. Techniques which conserve energy, improve functionality, and can be justified by life cycle cost analysis as cost-effective are encouraged. Integration of energy conservation systems with the building design (lighting, structure, mechanical systems, and esthetics) is essential to facilitate functionality and maximum energy savings. If an alternative energy generation method is proposed for use as the project's primary energy source, documentation shall be submitted to the Contracting Officer, verifying the system’s reliability, life-cycle cost effectiveness, and ability to meet the project’s peak demand.

1.2.7 Sustainable Design. Incorporate sustainable design principles in accordance with the requirements of Part 14 of this Section and Section 01 33 29.00 06.

1.2.8 Antiterrorism and Force Protection Considerations. The site and building have been evaluated with AT requirements. Based on the expected renovation cost of less than 50% of the Project Replacement Value (PRV) for the facility, the criterion cited below does not apply for the defined project scope, except bid options as identified.

Per UFC 4-010-01 Section 1-2, no identified threat or level of protection has been determined in accordance with UFC 4-020-01. Contractor shall continue to coordinate AT design with the Government throughout design and construction.

If the renovation costs exceed 50% of the PRV for the facility, then the project shall comply with the Department of Defense Antiterrorism (AT) Standards for Buildings, UFC 4-010-01, supplemental Army Reserve Implementing Guidance, and other AT criteria listed in Part 2 of this Statement of Work.

Part 1 - 7 of 15

1.2.8.1 The Porch Enclosure will be subject to AT/FP guidance. Note: It is not possible to structurally separate this addition from the existing B200 envelope and structure.

1.3 CONTRACTOR RESPONSIBILITY.

1.3.1 The Contractor shall provide all labor, materials, equipment, supplies, permits, fees, and consultant services to design and renovate this Training Center complex. The complex shall be a complete and usable facility, meeting the requirements of this RFP. The Contractor shall develop a complete site, building and interior design package.

1.3.2 Throughout the RFP, references are made to MCAR and OMAR funds. For clarification, this refers to the funding source – either Construction funds or Operations and Maintenance funds – for the Project. The funding source has no bearing on the Scope of the Work.

1.3.3 For purposes of clarification, this RFP identifies parts of the Project for which some responsibility is borne by the Government. The responsibility for some work items addressed elsewhere in the RFP is brought to the Contractor’s attention in the following table. If not identified as Government-furnished in the table below, or elsewhere, all work required by the RFP is the responsibility of the Contractor.

Amendment. #0002

1.3.3.1 For items noted with an asterisk (*) below, Contractor is responsible for design of power, data, and other necessary mechanical or electrical provisions for the item. Contractor is responsible for design and provision of hidden or exposed fixture structural support blocking and/or apparatus for some items.

Item Designed by Furnished by

Installed by

Makes final connection

Freestanding furniture Cont Govt Govt Systems furniture * Cont Govt Govt Cont Office equipment, portable * Govt Govt Govt Office equipment, permanently installed * Govt Govt Govt Workbenches * Cont Govt Govt Cont Break area and GO refrigerator(s) * Cont Cont Cont Break area and GO microwaves * Cont Cont Cont Security caging Cont Cont Cont Metal utility storage shelving Cont Cont Cont TV Monitors * Govt Govt Govt Bulletin and marker boards, tack strips Cont Cont Cont Window treatments Cont Cont Cont Physical Fitness equipment * Cont Govt Govt Vending machines * Govt Govt Govt Food Service Equipment Cont Cont Cont Cont Equipment racks in IT rooms * Cont Cont Cont Govt Fire extinguishers Cont Cont Cont

Part 1 - 8 of 15

Recessed walk-off mats Cont Cont Cont Secure Telephone instruments (STEs) * Govt Govt Cont Legend Govt = Government Cont = Contractor

Amendment. #0002

Part 1 - 9 of 15

1.4 SURVEY AND GEOTECHNICAL INFORMATION.

1.4.1 The survey information was provided by a site survey that was performed in 2009. The Contractor shall, at its own expense, obtain any additional information required to provide a complete and useable design. Do not contact the surveyor during the preparation of proposals for the solicitation.

1.4.2 A preliminary Subsurface Characterization report has been performed by a professional engineer and is provided in Attachment A to this Statement of Work. Do not contact the engineer during the preparation of proposals for the solicitation. The Contractor shall perform its own geotechnical investigation to establish soil characteristics for site earthwork, foundation, paving and cathodic protection design and construction.

1.5 RFP DRAWINGS. The conceptual drawings are included as a part of this RFP to provide information and criteria for the Contractor’s completion of the design.

1.6 SPECIFICATIONS.

1.6.1 The Outline Technical Specifications are provided primarily in outline format.

They shall be utilized as design and submittal criteria, and minimum standards for the corresponding construction work, and shall be met or exceeded unless Contractor obtains specific Government approval for proposed reductions. These outline specifications shall not be considered complete and suitable for final construction specifications. Contractor’s designers shall expand the outline specifications to provide comprehensive, three-part, CSI-format Specifications and shall edit the Specifications to indicate actual products to be used in the construction. Final specifications shall include as a minimum, a description of the technical requirements, criteria for determining whether the criteria are met, and quality control requirements and procedures. The standards referenced in the outline specifications establish minimum requirements for the final construction specifications.

1.6.2 All Outline Technical Specification sections provided in this RFP may not be required for this project, and designers shall provide additional Specification Sections or items if necessitated by their final design or RFP requirements.

1.6.3 Some Outline Technical Specification Sections are more detailed and extensive than the majority; these represent the Government’s required specification approach to this project. Contractor’s designers must take complete responsibility for the design and specification of the project and shall satisfy themselves that these Sections are complete and suitable for the final design. Most of the outline specification sections are adapted from typical Government Unified Facility Guides Specifications (UFGS) and reflect Army Reserve-approved approaches and products. The outline specification requirements shall be used as the basis for selection of construction materials, products, and systems. Contractor’s final specifications shall be developed from UFGS. Use of UFGS is required.

1.6.3.1 The following order of priority applies with the use of UFGS Specifications:

Part 1 - 10 of 15

1.6.3.1.1 First select Sections specifically developed for Army Reserve facilities. Such Sections have “48” as the fifth level of their MasterFormat 2004 numbering, such as Section 07 31 13.00 48. These Army Reserve-specific (RST) Sections can be accessed from the following website:

https://www.lrl.usace.army.mil/Missions/Engineering/Specs.aspx

1.6.3.1.2 If no RST Section exists, select a Louisville District-specific Section (LRL), accessible from the same website. Such Sections have a “06” as the fifth level of their MasterFormat 2004 numbering.

1.6.3.1.3 If no Section described above exists, select an Army Section. Such Sections have a “10” as the fourth level of their MasterFormat 2004 numbering.

1.6.3.1.4 If none of the above Section exist, select a unified Section. Such Sections have no fourth or fifth level in their numbering.

1.6.4 In case of conflicts between the project-specific requirements in Section 01 02 00.00 48 or 01 03 00.00 48, and the requirements in the Outline Technical Specifications, Section 01 02 00.00 48 or 01 03 00.00 48 governs. This is true for all Outline Technical Specification Sections, including the more extensive and detailed Sections.

1.7 SITE. The project area is described on the RFP drawings included as part of this solicitation and consists of approximately 2.5 acres. Site work includes all design and construction of site features described in the RFP, including but not limited to, site planning, clearing, grading, erosion control, site drainage, pavements, pedestrian and vehicular circulation systems, signage, site lighting, landscaping, physical security measures, fencing, and site furnishings.

1.7.1 Special Utilities and Supplementary Construction. Not used.

1.7.2 Demolition Considerations and Requirements. Some exterior project work may require demolition of existing site features. See part 3 for description. Building renovation of Building B200 shall require selective demolition of existing interior construction, requiring establishment of safety and dust barriers and coordination with the Government.

1.7.3 Environmental Considerations and Mitigation Requirements. Should any suspected hazardous materials be encountered during site investigations or construction, the Contractor shall immediately stop work in the affected area, notify the Contracting Officer, and await Contracting Officer’s direction before proceeding with additional work in the area.

1.7.3.1 Radon The site has been identified as being in an area where the average indoor radon concentration is not likely to exceed 2 picoCuries per liter. Due to the limitations in project scope no mitigation for radon is expected to be required.

1.7.3.2 Mold Prevention. Buildings must be designed and constructed to maintain space humidity at reasonable levels.

https://www.lrl.usace.army.mil/Missions/Engineering/Specs.aspx

Part 1 - 11 of 15

1.7.3.4 Building B200 has been inspected for asbestos by the Government; limited quantities of asbestos containing materials (ACM) were identified. Refer to Attachment H for the 2009 HAZMAT Report. Potential abatement of ACM is described at paragraph

1.1.2.5 and paragraph 1.9.1.5. Prior to any building demolition, the Contractor shall perform a thorough demolition-level asbestos inspection in accordance with applicable Federal, State, and local regulations. The goal of the inspection is to identify ACM, including that which may be located inside walls, above ceilings, under floors, and other inaccessible areas. The inspection shall be conducted by an accredited asbestos building inspector. Any ACM identified as a result of this inspection in excess of that identified in the attached HAZMAT report shall be treated as a changed condition.

1.7.3.5 The attached HAZMAT report assumes that some lead-based paint (LBP) may be present. Encapsulation of previously painted surfaces via new paint is an acceptable mitigation strategy for building elements which are not otherwise modified.

The Contractor shall comply with the requirements of OSHA 29 CFR 1926.62 - Lead Exposure in Construction during building and structure demolition.

The hazardous waste criterion for lead wastes is established under the federal Resource Conservation and Recovery Act (RCRA), Subtitle C, as 5.0 mg/L measured with the Toxicity Characteristic Leaching Procedure (TCLP). In addition, the crushing or recycling of materials with LBP is strictly prohibited.

1.7.4 Site Development Constraints. The Contractor shall understand that the project area is located with a coastal area and flood hazard area and need to take the necessary measure to perform work within this area. The Contractor shall comply with the Environmental Assessment Report to minimize the impact to the items identified in the report.

1.7.5 Contractor’s Use of the Site. The project site and Building B200 are currently occupied by the Government and shall be partially occupied during the full period of construction. During construction the Contractor shall have relatively free use of the site and building within limits of work coordinated by the Contractor and the Government, but certain areas of the building will remain completely operational and occupied. Arms vaults and drill hall shall remain operable during construction. Existing SIPR room shall be inaccessible to the Contractor. Proposed sealing and restriping of POV lots may affect Government access to MEP lots and OMS and other site functions.

Potential shutdown and switchover of electrical or telecommunications facilities must be coordinated and scheduled with the Government. Refer to attached drawings for construction access limits. Contractor staging and partial demolition and construction of project site and renovation components must be performed according to a detailed project schedule prepared by the Contractor and coordinated and approved by the Government. The Contractor will not be allowed access to the building for construction and demolition purposes until 180 days after NTP unless otherwise specifically approved by the Government. Building surveys shall be permitted as coordinated with the Government.

1.7.5.1 Security and Identification Requirements.

Building B200 and the parking lot serving this building are within a controlled perimeter.

Contractor personnel working on this project must obtain security clearance to work at this facility and shall be limited to designated project areas. Coordinate with specification section 00 80 00.00 06 paragraph 1.19.

Part 1 - 12 of 15

1.7.6 Verification of Conditions. The Contractor shall field verify existing conditions prior to beginning work. The Contractor and the designers of record shall be responsible for investigating all differing site conditions, discrepancies, and field related issues that are encountered during the design and construction process. The designers of record shall be responsible for providing guidance to the Contractor for the resolution of all such issues. The Contractor shall provide notice to the Government of any such issues prior to proceeding and with sufficient time to avoid cost or schedule impacts.

1.7.7 Verification of Utilities. The Contractor and the designers of record shall be responsible for verifying the condition, location, and capacity for all utilities necessary for the project. The Contractor and designers of record shall further verify that all utilities will meet the requirements of this project.

1.7.8 Regulatory Compliance. The Contractor shall assure that the site development complies with all applicable local, State and Federal regulations. A list of known regulations is located in Part 2 of this Statement of Work. Timely acquisition of the necessary design and construction related permits shall be the responsibility of the Contractor. The Contractor, upon notice to proceed, shall immediately begin working on the permits so as not to delay completion of the project. The Contractor shall prepare permits, associated drawings, public notices, and other related documentation as necessary to successfully meet permit approval status. The Contractor shall pay for associated permit fees.

The Government shall be responsible for any permissions or approvals needed for site-related archeological conditions. Any limitations or requirements arising from these approvals shall be brought to the attention of the Contractor prior to associated work.

1.8 FUNCTIONAL AND AREA REQUIREMENTS.

1.8.1 Renovation area of Building B200 and newly constructed area of Porch Enclosure Addition have been established by Conceptual planning. The building designs shall provide gross renovation areas similar to the areas identified.

1.8.1.1 Building B200 total renovation area is estimated at 115,274 SF, and an addition of 568 SF. The total building area including unrenovated areas, structure etc. is approximately 145,075 SF. See attached Area Summary for areas of various levels of renovation. Refer to individual areas as indicated in attached Room by Room Supplemental Requirements table.

1.8.1.2 See section 1.9 below for Optional Renovations and Additions.

1.8.2 Individual spaces shall meet the functional and environmental requirements based on UFC 4-171-05 paragraph listed in the Room by Room Supplemental Requirements table at the Attachments, as well as any applicable code requirements and additional requirements noted in this Section and all technical specifications Sections.

1.8.2.1 The areas shown in the “SF SHOWN” column of the attached table typically allow minor variation. It is acceptable for the actual clear area of any space to vary from

Part 1 - 13 of 15 the values in the table by plus or minus 5%, except as noted below or in the Room by Room Supplemental Requirements. Areas have been listed for newly installed spaces only - areas of existing spaces have not been listed. UNIT COMMONS areas have not been listed since these may vary based on definition of boundaries and potential re-planning. If sizes of subsequently re-planned spaces vary from those shown, functionality and furniture requirements shall be maintained.

1.8.2.1.1 Kitchen Area – renovate as noted above. The Kitchen shall meet the requirements for the Large Kitchen as described in the attached USARC Standard Kitchens.

1.8.2.1.3 Information Technology - EF, TER, and TR spaces are shown at the attached plans. Per Army Reserve Network Enterprise Center Infrastructure Technical Criteria (ARNEC), the areas for these spaces may possibly be decreased during Design After Award. Designer of Record shall coordinate final sizes and locations of these spaces with Government G6 representatives.

1.8.2.1.4 Minimum width of offices shall be 9’-6” to accommodate furniture.

1.8.2.1.6 Spaces with caging such as Unit Storage shall have the number and size of cages shown on the RFP drawings or noted in the Room by Room Supplemental requirements as a minimum. Aisle widths shall be as shown on RFP drawings; aisle widths in Unit Storage shall be 7’-0” minimum in width to accommodate movement of materials on pallet jacks.

1.8.3 Project requirements not covered by UFC 4-171-05 for individual areas or rooms are described in the “Notes” column in the attached Room by Room Supplemental requirements and elsewhere in this RFP.

1.9 OPTIONS AND BETTERMENTS.

1.9.1 Options. The Government has identified Option Items that they wish included in the project if available funds allow. The Option Items are identified in the RFP, listed individually on the Bidding Schedule, and described briefly below.

Amendment. #0002

1.9.1.1 New Work - furnish and install “CFCI OMAR funded” items, which includes work required to furnish and install said items. CFCI OMAR funded items are to be contractor provided and installed, unless otherwise noted in this RFP. Refer to publication entitled “Army Reserve OMAR Project Funding Requirements, October 2013” available on the Louisville Design Guide Website. These items include Metal Lockers and Caging for Storage.

1.9.1.2 New Work - furnish and install “CFCI Bona Fide Need OMAR funded” items, which includes work required to furnish and install said Items. CFCI Bona Fide Need OMAR Items are to be contractor provided and installed, unless otherwise noted in this RFP. Refer to publication entitled “Army Reserve OMAR Project Funding Requirements, October 2013” available on the Louisville Design Guide Website. These items include

Part 1 - 14 of 15

Refrigerator and Microwave in Break Room(s), Metal Shelving, Fire Extinguishers, Window Blinds and Food Service Equipment.

Amendment. #0002

1.9.1.3 Repair – Provide AT/FP compliant windows at existing window openings.

Fully replace existing storefront, curtainwall and vestibules at First and Second Floor entry locations with AT/FP Compliant systems. Remove existing blast curtains and provide new window treatments.

1.9.1.4 Repair – replace existing roofing and insulation with new insulation and roofing. This work also includes demolition and removal of existing roofing and temporary removal, storage and reinstallation of existing roof-mounted solar array.

1.9.1.5 Repair – If epoxy based poured resin flooring is selected as a flooring alternative at high-traffic corridors and lobbies, this flooring would require removal of existing VCT and abatement of ACM mastic beneath.this VCT. If proposed, then the proposal shall clearly include ACM abatement in the bid proposal amount. It is estimated that approximately 10,800 square feet of abatement would be required.

1.9.2 Betterments. Betterments are features, materials or systems that exceed the requirements of this RFP. The Contractor is encouraged to provide betterments to the design, while staying within the Project cost limitations. Such betterments may be Contractor suggested or respond to Government desires listed below. The offeror shall provide sufficient information on proposed betterments for the Government to determine quality and quantity.

1.10 USER BACKGROUND INFORMATION.

1.10.1 The Ernie Pyle USARC facility located at Ft Totten, NY, has ownership of existing Building B200 Training Center, which is presently occupied. As part of the installation program, this building is to be provided with interior renovations.

1.10.1.1 The Army Reserve Units which occupy the Training Center consist of approximately 2,000 Soldiers conducting training using classroom facilities and storing equipment needed for operations and training. A 200-person subset of that group uses the training center to perform administrative functions to support training and operations

1.10.1.2 Building B200 is staffed by the elements of the 99th Regional Support Command, out of Joint Base McGuire-Dix-Lakehurst, NJ.

1.10.1.3 Refer to SUPPLEMENTAL SITE PHOTOS Attachment for photos of existing site and facility feastures.

1.11 CONSTRUCTION LOGISTICS

1.11.1 The successful bidder will submit as part of their Design Charrette documentation a phasing plan with key milestone dates including, but not limited to, Interim Design Submission, Final Design Submission, Anticipated Release for

Part 1 - 15 of 15

Construction, Red Zone Meeting, Start for TAB, Start for Commissioning, Start for Furniture Installation (by Others), Construction Complete.

01 02 00.00 48 Part 3 - 1 of 10

PART 3

SITE CIVIL ENGINEERING

3.1 GRADING.

3.1.1 The difference in grade between the finished floor elevation FFE and the surface of the ground immediately adjacent to the building shall be a minimum of 6 inches, except at personnel and overhead doors. The ground outside the building shall have a minimum of 5% slope away from all exterior walls for the first 10 feet and positive drainage thereafter. The Contractor’s geotechnical engineer shall identify if steeper grades are necessary based on shrink/swell soil characteristics. Since this is a restoration project modifying existing buildings the existing FFE and ground elevations will not be altered except where required for accessibility needs. Refer to Part 2 for Applicable Criteria.

3.1.2 Design grades to provide required sight lines related to traffic and roadway design in the area of the new parking lot.

3.1.3 Design grades to meet accessibility requirements where required.

3.1.4 The Contractor shall be responsible for dewatering necessary for grading and other subsurface works for the construction of the Project. If temporary construction dewatering is required due to a high water table the Contractor shall prepare and present a dewatering plan. The Contractor is responsible for securing all the required information necessary for the design of the system.

3.1.5 A balance of the quantity of cut and fill soils which would create a smooth transition of graded areas into the existing natural site is desired. Site specific conditions such as flood and drainage protection, slopes and access reasons may cause unbalanced earthwork operations and are to be identified by the Contractor in the first Site/Utility Design submittal.

3.1.6 The plan shall reflect selective site clearing that preserves groups of trees.

3.1.7 Erosion and Sediment Control Facilities shall comply with Federal, New York State and New York City regulations. The Contractor is responsible for compliance with stormwater NPDES Permit, Stormwater Pollution Prevention Plan, and NOI/NOT requirements, and for any associated fees and permits. See Section 01 57 19.00 06.

3.1.8 The Contractor shall obtain and pay fees required for any grading, excavation or earthwork permit as required by New York City.

3.1.9 The Contractor shall notify utilities and obtain marked utility locations prior to start of construction. State “One Call” utility location programs are to be used where available. New York complies with the Dig Safe (811) program; information in New York City and Long Island can be obtained by calling 1-800-272-4480.

Part 3 - 2 of 10

3.2 GEOTECHNICAL STUDIES

3.2.1 Subsurface Characterization Report. It is possible that site specific subsurface conditions encountered by the Contractor will differ from those appended herein. The Geotechnical Report included with this document was prepared for the recent renovation of the Army Reserve Training Center at Fort Totten, Building 200, and surrounding site improvements and not specifically for this project. Therefore, it is the responsibility of the Contractor to establish a meeting with the Contracting Officer subsequent to completion and evaluation of his site specific geotechnical exploration to outline any differences encountered that are not consistent with the information provided herein. The geotechnical exploration shall be performed under the direction of a licensed professional engineer with at least 10 years of experience specializing in geotechnical engineering. This exploration shall be the full responsibility of the Contractor and detailed requirements are outlined herein. Should those differences require changes in the foundation type, pavement and earthwork requirements proposed with the bid that result in more cost, these differences shall be clearly outlined for the meeting.

3.2.2 Contractor’s Geotechnical Report: Refer to 01 03 00.00 48, Section 1.6.1, Geotechnical Requirements and Responsibilities

3.2.3 Soil Compaction and Foundation Excavations.

3.2.3.1 Basic soil compaction requirements are to be given in the Contractor’s Geotechnical Report. The Outline Technical Specifications requirements shall be verified or modifications recommended by the Contractor’s geotechnical engineer in the report whenever engineering, soils or climatic factors indicate the necessity. Any modifications to the stated compaction requirements shall require approval from the Contracting Officer.

3.2.3.2 Subgrade suitability (by proof rolling operations), fill placement and compaction operations shall be observed and tested on a full time basis by a qualified independent testing agency as directed by the Contractor’s licensed professional geotechnical engineer. Field in-place density shall be determined and checked in accordance with the appropriate ASTM methodologies. The rate of in-place density testing shall be specified in the earthwork specifications. Representative Optimum Moisture and Laboratory Maximum Density Tests shall be made for each type of material or source of material. Upon completion of all earthwork, the Contractor’s geotechnical engineer shall certify in writing that the fill was placed in accordance with the requirements and provide the backup data including but not limited to: Proctor curves (moisture/density relationship), moisture contents, Atterberg limits, field density checks, sieve analysis, etc. Testing locations and elevations for all results shall be documented so that their position can be substantiated and relocated if necessary.

3.2.3.3 During construction, foundation excavations shall be inspected and approved by the Contractor’s licensed professional geotechnical engineer prior to placing concrete.

Part 3 - 3 of 10

3.2.4 Capillary Water Barrier. A capillary water barrier is required for all interior slabs on grade, including garages, carports and storage rooms.

3.3 UTILITIES. See Part 2 and site drawings for additional utility information.

3.3.1 Gas Distribution System. Not used. The natural gas service will not be altered as part of this restoration and renovation project.

3.3.1.1 Materials. Not Used.

3.3.1.2 Testing. Not Used.

3.3.1.3 Mains and Service Lines. Not Used.

3.3.2 Water Distribution System. Not Used.