This Request for Proposal (RFP) solicits design/build services for the full facility restoration of an Army Reserve Center (ARC) in Charlotte, NC. The ARC consists of four buildings totaling approximately 78,000 square feet housing training and administrative functions. Required work includes renovation, repair, upgrades, site improvements, and incorporation of antiterrorism and sustainability measures. Offerors must provide a firm-fixed-price for the design/build services. Proposals will be evaluated using a two-phase best value tradeoff process. The RFP includes specifications for the design/build work, deliverables such as as-built drawings and manuals, and terms such as liquidated damages for delays impacting furniture installation. The contracting agency is the U.S. Army Corps of Engineers Louisville District. The response due date is June 15, 2020.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Full Facility Restoration of Army Reserve Center (ARC), Charlotte, NC Phase 2
P2: 473765
Design Build
Specifications Volume 1A of 2 Certified Final Submittal
14 May 2020
W912QR20R0028
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0028-0002
0002 14-May-2020
W912QR20R0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0002 SUMMARY OF CHANGES
Solicitation: W912QR20R0028
Project: Design/Build for a Full Facility Restoration (FFR) of an Army Reserve Center (ARC)
Location: Charlotte, NC
Amendment 0002 Summary of Changes
A. General Information:
1. Only those offerors who have been selected to continue to Phase II of this project are hereby invited to submit Phase II proposals.
2. The due date and time for Phase II proposal submission is 2:00 PM (Eastern) on 15 June 2020. Please review Section 00 21 00 for instructions regarding electronic submission of proposals.
3. The period for Government acceptance of proposals has been revised to 120 days.
B. SF1442 Section 00 10 00:
The Price Breakout Schedule has been deleted and replaced in its entirety.
C. SF1442 Section 00 21 00 – Instructions:
FAR Clause 52.236-27 ALT 1 has been edited to provide Phase II Site Visit information.
D. SF1442 Section 00 22 00 – Supplementary Instructions:
Section 00 22 18 has been replaced in its entirety.
E. The following Specification Sections have been REPLACED in their entirety:
DIVISION 00– PROCUREMENT AND CONTRACTING REQUIREMENTS
00 80 00.00 06 Special Provisions
DIVISION 01 – GENERAL REQUIREMENTS
01 02 00.00 48 Statement of Work 01 02 00.01 48 Part 1 - Design Objectives, and Functional and Area Requirements
F. The following are now included:
Drawings Technical Specifications – Division 03 thru 14 and Division 21 thru 41
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 31-Mar-2020 02:00 PM to 15-Jun-2020 02:00 PM.
The offeror acceptance period has increased by 30 from 90 to 120.
The following have been modified:
PRICE BREAKOUT SCHEDULE
PROJECT : Design and Construction of an Army Reserve Center
LOCATION : Charlotte, North Carolina
PROPOSER’S NAME :
BASE PROPOSAL
Item No. Description Unit Amount
0001 Primary Facilities Training Center Building 1300 JOB $
0002 Primary Facilities AMSA Building 1324 JOB $
0003 Primary Facilities Training Center Building 1330 JOB $
0004 Primary Facilities Training Center Building 1412 JOB $
0005 Project Site Work JOB $
0006 Fire Pump & Enclosure JOB $
0007 Fire Pump Water Storage Tanks JOB $
0008 Project Permit Fees JOB $ 28,125.00
0009 Project Design Fees JOB $
Subtotal $
OPTION ITEMS
0010 Optional Item ‘A’ - Operations and Maintenance – Army Reserve (OMAR) Funded Equipment Items JOB $
0011 Optional Item ‘B’ – “Bona Fide Need” Operations and Maintenance, Army Reserve (OMAR) Funded Equipment Items JOB $
0012 Optional Item ‘C’ – LEED Certified for Building 1330 JOB $
0013 Optional Item ‘D’ – LEED Certified for Building 1412 JOB $
0014 Optional Item ‘E’ – Additional POV Pavement Replacement JOB $
0015 Optional Item ‘F’ – Additional MEP Pavement Replacement JOB $
TOTAL BASE PROPOSAL + OPTION ITEMS $
Description of Base Proposal Items
(a) Item No. 0001 “Primary Facilities – Training Center Building 1300” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0010 and 0011.
(b) Item No. 0002 “Primary Facilities – AMSA Building 1324” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0010 and 0011.
(c) Item No. 0003 “Primary Facilities – Training Center Building 1330” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0010 and 0011.
(d) Item No. 0004 “Primary Facilities – Training Center Building 1412” includes all Base Proposal construction work required within a line five feet outside of the building 1324, except that work covered by Items No. 0010 and 0011.
(e) Item No. 0005 “Project Site Work”, includes all Base Proposal construction work required beyond a line five feet outside the buildings and the work associated with the vehicular circulation associated with the access drives, and privately owned vehicle (POV) parking area except that work covered by Items No. 0001, 0002, 0003, 0004, 0014 and 0015.
(f) Item No. 0006 “Fire Pump & Enclosure”, includes the cost for the Offeror to provide and connect a fire pump and enclosure if required for the project as determined by the Offeror.
(g) Item No. 0007 “Fire Pump Water Storage Tanks”, includes the cost for the Offeror to provide and connect the fire pump water storage tanks along with their associated concrete foundations if required for the project as determined by the Offeror.
(h) Item No. 0008 “Project Permit Fees”, includes the cost for the Offeror to pay fees associated with required permits from the City of Charlotte and the State of North Carolina for sanitary sewer, watermain, driveways, erosion control, and NPDES.
(i) Item No. 0009 “Project Design Fees”, includes the fees for the Offeror’s design professionals to complete the Base Proposal design and construction documents for the project along with Optional Bid Items ‘A’ and ‘B’.
(j) Item No. 0010 “Optional Item ‘A’ - Operations, Maintenance Army Reserve (OMAR) Funded Equipment Items
(Items funded at or shortly after the time of construction award) ” includes all work required to furnish and install “OMAR Funded” equipment items which are considered to be permanently attached to the construction.
OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).
CFCI OMAR Funded Equipment Items for this project consists of:
1. Arms Vault, Portable
2. Metal Lockers at Buildings 1324 and 1412
3. Metal Caging at Building 1412
This option may be exercised within 90 calendar days from Notice to Proceed.
(k) Item No. 0011 “Optional Item ‘B’ “Bona Fide Need” Operations, Maintenance Army Reserve (OMAR) Funded
Equipment Items (To be awarded within six months of BOD)” includes all work required to furnish and install “OMAR Funded Equipment Items” which are considered to not be permanently attached to construction.
OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).
CFCI “Bona Fide Need” OMAR Funded Equipment Items for this project consists of:
1. Freestanding metal shelving as per section 01 02 00.06 48 paragraph 6.5.18
2. Refrigerators at AMSA Building 1324 Break Room; Building 1330 Unit Common 235; Building
1412 Break Room and Lactation Room.
3. Microwave at AMSA Building 1324 Break Room; Building 1330 Unit Common 235; Building
1412 Break Room and Lactation Room.
4. Exterior Ash/Trash at exterior entries to Building 1300 (quantity of 1), Building 1324 (quantity of
1), Building 1330 (quantity of 3) and Building 1412 (quantity of 2).
5. Window treatments as per section 01 02 00.06 48 paragraph 6.5.12
6. Fire extinguishers as per section 01 02 00.06 48 paragraph 6.5.15.
7. Building 1412 Kitchen Equipment:
a. Freezer – Item 7.
b. Refrigerator – Item 8.
c. Worktables, Mobile – Item 12.
d. Food Preparation Table – Item 13A.
e. Slicer – Item 13B.
f. Can Opener – Item 13C.
g. Cold Food Counter, Mobile – Item 14.
h. Hot Food Counter, Mobile – Item 15.
i. Mixer – Item 16A.
j. Mixer Stand – Item 16B.
k. Security Racks – Item 17.
l. Shelving Units – Item 18.
m. Worktables – Item 19A.
n. Ice Dispenser – Item 19B.
o. Coffee Makers – Item 19C.
p. Rubber Floor Mats – Food Service Equipment Item 25.
This option may be exercised within 600 calendar days from Notice to Proceed.
(l) Item No. 0012 “Optional Item ‘C’ LEED Certified for Building 1330”, includes the cost to design, construct, and obtain Certification for measures necessary to achieve LEED Certified for Building 1330. Note that measures taken under this option cannot change the systems described or reduce the minimum requirements described in the RFP.
(m) Item No. 0013 “Optional Item ‘D’ LEED Certified for Building 1412”, includes the cost to design, construct, and obtain Certification for measures necessary to achieve LEED Certified for Building 1412. Note that measures taken under this option cannot change the systems described or reduce the minimum requirements described in the RFP.
(n) Item No. 0014 “Optional Item ‘E’ Additional POV Pavement Replacement”, includes all the work associated with the design and construction of the privately owned vehicle (POV) parking area noted as ‘Optional Bid Item E’ on the RFP drawings.
(o) Item No. 0015 “Optional Item ‘F’ Additional MEP Pavement Replacement”, includes all the work associated with the design and construction of the military equipment parking (MEP) area noted as ‘Optional Bid Item F’ on the RFP drawings.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
PROPOSAL SUBMISSION INSTRUCTIONS
Proposals: ALL SUBMISSIONS TO THIS PROPOSAL ANNOUNCEMENT SHALL BE SUBMITTED ELECTRONICALLY THROUGH DOD SAFE. No paper copies, CD-ROMs or facsimile submissions will be accepted. Electronic Proposal Submission is required through the Army’s Electronic File Sharing Service, DOD SAFE (https://safe.apps.mil). The DOD SAFE Application is used to send large files to individuals that would normally be too large to send via email. There are no user accounts for SAFE. Authentication is handled via email.
Anyone has access to DOD SAFE, and the application is available for use by anyone. The SAFE “Getting Started Guide” has information on how to utilize the system (https://safe.apps.mil/about.php). Instructions for uploading are as follows:
1. Send an email to the Contracting Officer and Contract Specialist to receive the link to drop off your proposal. This will need to be completed five (5) business days prior to proposal due date.
a. Morgan Strong, Contract Specialist at morgan.k.strong@usace.army.mil
b. Emily Moore, Contracting Officer at emily.a.moore@usace.army.mil
2. You will receive an email with the link to submit your drop-off. The link will be provided no later than two
(2) business days prior to the proposal due date.
3. Short Note to the Recipients: Click the Add Files or Drag and Drop your files. For file description, enter
W912QR20R0028-FIRMNAME.
4. Click Upload button to send documents.
5. Guest users will need to check their email to verify their email address before the recipients will be notified. (Government-issued Common Access Cards (CACs) are not required).
File Size Limitations: Offerors are advised to follow the DOD SAFE instructions for uploading files. DOD SAFE supports delivery up to 8GB. If needed, Offerors are advised to break the files down into smaller sections in order to upload it to the system. In such cases, please divide the sections as logically as possible and be sure to clearly name the files as specified below.
File Naming Convention: To ensure your submission is received and processed appropriately, it is important that interested parties CAREFULLY ensure their electronic files adhere to the following naming convention:
• W912QR20R0028-FIRMNAME-VOLUME I
• W912QR20R0028-FIRMNAME-VOLUME II
Each file name shall begin with the solicitation number followed by the firm’s name and a brief file description.
Please see examples above.
File Organization: Although hard copies are not accepted, each file shall be clearly indexed, and logically assembled. Font size shall be 10 or larger. Pages shall be letter sized (larger page sizes (such as 11x17 fold-outs, etc.) will be counted as two pages. Proposals shall be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the factors. Information presented should be organized so as to pertain to only the evaluation factor in the section that the information is presented. Information pertaining to more than one evaluation factor should be repeated in the each section for each factor.
mailto:morgan.k.strong@usace.army.mil mailto:emily.a.moore@usace.army.mil
Upload Completion & Deadline: Interested parties shall submit responses no later than the date specified on the solicitation document. The time & date of proposal receipt will be the upload completion / delivery time & date recorded within DOD SAFE site. Do not assume that electronic submission will occur instantaneously. Large files (e.g. 10MB or more) will take some time to upload. Offerors should time their upload effort with prudence by not waiting until the last few minutes—this will allow for unexpected delays in the transmittal process. Offerors are encouraged to keep a copy of the upload confirmation for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
Electronic Files: Files shall be in their native format (i.e. doc, xls, ppt, etc.), or if in pdf format, shall be in searchable text. Text and graphics portfolios of the electronic copies shall be in a format readable by Microsoft Office or Adobe applications. Data submitted in a spreadsheet format shall be readable by MS Excel (all cells and formulas should be unlocked).
Any information, presented in a proposal that the Offeror wants safeguarded from disclosure to other parties must be identified and labeled in accordance with the requirements of Provision “FAR 52.215-1, Instructions to Offerors – Competitive Acquisition (Jan 2017),” subparagraph (e), which is found in 00 21 00 Instructions of the RFP. The Government will endeavor to honor the restrictions against release requested by Offerors, to the extent permitted under United States law and regulations.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) Due to the impacts of the ongoing COVID-19 pandemic, the site visit for this project will be conducted virtually.
The site and building photos are provided with Amendment 0002.
(c) Site Visit Meeting information is as follows:
The Webex Meeting will be Thursday, 28 May 2020 at 1000 EST (1 hr duration)
Participant Access Information Toll-Free: 844-291-5491 Caller Paid: 409-207-6989 Access Code: 2081134
Web Conference URL: https://www.webmeeting.att.com Meeting Number: 844-291-5491 or 409-207-6989 Access Code: 2081134
(End of provision)
SECTION 00 22 00 - SUPPLEMENTARY INSTRUCTIONS
The following have been modified:
SECTION 00 22 18
PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE TWO
1. Overview.
1.1 The intent of this solicitation is to select one contractor for the Design and Construction of a Full
Facility Restoration (FFR) project to renovate and repair an Army Reserve Center (ARC) located in Charlotte, NC.
1.2 This is a two-phase procurement and the basis of award is the Best Value Trade-Off Process. Following completion of the evaluation of Phase I, up to a maximum of five (5) most highly qualified offerors will be selected to participate in Phase II. The selected offerors for Phase II will be invited to submit the information described in this Section 00 22 18, Procedures for Submittal and Evaluation of Offers for Phase II, for review and evaluation by the Government. Following completion of the Phase II evaluation, the Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers. For Phase II submittals, requirements stated in this RFP are minimums.
NOTE: The rating information from Phase I will not be considered in Phase II or in the final selection.
1.3 The target ceiling for contract award is $18,377,000.00 based on the funds made available for this project.
The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling.
2. Submittal of Offers.
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. For Phase II, requirements stated in this Request for Proposal (RFP) are minimums.
Innovative, creative, or cost-saving proposals that meet or exceed the requirements are encouraged and will be rated accordingly. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.
2.2 Offerors shall submit their proposals electronically in accordance with the Proposal Submission
Instructions in Section 00 21 00 of the solicitation. Please follow the instructions precisely as proposals must complete the upload no later than the time and date specified in Block 13 of Standard Form 1442.
NOTE: The Louisville District is in the Eastern Time Zone.
2.3 The Government is using a two-phase procurement approach for this design/build project. For Phase II, offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be electronically in accordance with the Proposal Submission Instructions in Section 0 21 00 of the solicitation. The sections should parallel the submission requirements identified herein.
2.4 The complete Volume I shall be submitted electronically in accordance with the Proposal Submission Instructions in Section 00 21 00 of the solicitation and include the following information:
• Volume I – Factor I: Design Narrative
• Volume I – Factor II: Schedule Narrative
• Volume I – Factor III: Small Business Participation Plan
*NOTE: Failure to place the required submission information under the appropriate tab (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit(s) will not be evaluated.
2.5 Volume II shall be submitted electronically in accordance with the Proposal Submission Instructions in
Section 00 21 00 of the solicitation and shall include the following information:
• Volume II – Tab A: Standard Form 1442 and Price Breakout Schedule
• Volume II – Tab B: Joint Venture Agreements
• Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability
• Volume II – Tab D: Pre-Award Information
• Volume II – Tab E: Subcontracting Plan
NOTE: Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.
3. Proposal Evaluation Process.
3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical (Volume I) proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors.
Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.
3.2 The evaluation process for Phase II essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and price/technical trade-off analysis.
3.2.1 Proposal Compliance / Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete, that both a technical and price proposal were received, and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Phase II Volume I proposals against the RFP requirements. Factors I and II (Design Narrative, and Schedule Narrative) will be rated using Table 4 below. Factor III – Small Business Participation Plan will be rated using Table 5 below.
3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.
3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The
Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.
4. Proposal Information and Related Evaluation Factors.
4.1 Phase II proposals will be evaluated in accordance with the factors below, listed in relative order of importance. All evaluation factors, other than price, when combined are considered approximately equal to price. The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
4.2 Volume I – Factor I: Design Narrative 1st
4.3 Volume I – Factor II: Schedule Narrative 2nd
4.5 Volume I – Factor III: Small Business 3rd
Participation Plan
4.6 Volume II - Price and Pro Forma Information
Tab A Standard Form 1442 and Price Breakout Schedule Not Rated
Tab B Joint Venture Agreement Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability
Tab D Pre-Award Information Not Rated
Tab E Subcontracting Plan Acceptable / Unacceptable
4.7 Ratings
Evaluators will apply the rating for the definition that most closely matches the evaluation.
TABLE 4
Technical / Risk Assessment Ratings Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
TABLE 5
Small Business Ratings
Rating Description
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.
Unacceptable Proposal does not meet the small business objectives.
4.8 Definitions
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.
5. Volume I – Factor I: Design Narrative
5.1 Submission Requirements:
5.1.1 Provide a clear and concise narrative describing your proposed design process for this project, especially with regard to sequencing of work within a renovation. Proposed narratives shall also address the design process (submittal reviews, fast-track (if utilized), etc.) and logic/rationale for the following building systems:
• Mechanical
• Electrical
• Plumbing
• Fire Protection
NOTE: There is a limit of eight (8) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the Design Narrative factor.
5.2 Evaluation Criteria:
5.2.1 The Design Narrative will be evaluated based on the offeror’s understanding of the USACE design / build process. Projects that demonstrate a complete understanding for the design of this project’s requirements may be viewed more favorably by the Government.
6. Volume I – Factor II: Schedule Narrative
6.1 Submission Requirements:
Based on the project budget and scope, provide a schedule narrative describing the construction sequence / process for successful completion of each phase of the project (Design, Construction, Commissioning and Close-Out) within the duration shown in FAR 52.211-10. Offerors may propose a shorter duration for completion, but Government review times shall not be shortened. The Schedule Narrative shall address the major construction milestones and tasks indicated below:
• Design Phase / Packages
• Construction Phasing
• Fast Tracking (if utilized)
• Pre-Construction Submittals and Review
• Long Lead Items
• Commissioning with critical submittals
• Red Zone Meeting
• As-Builts
• Closeout
NOTE: There is a page limit of ten (10) single sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides for this factor.
6.2 Evaluation Criteria:
The narrative will be evaluated based on the understanding of events identified in paragraph 6.1 above and the offeror’s capability to complete the schedule within the contract duration. Narratives that demonstrate a clear understanding of the schedule impacts of the major milestones and tasks and provide a thorough approach for successfully completing the contract within the contract duration may be rated more favorably by the SSEB. Schedules offering duration less than that shown in 52.211-10 may receive a higher rating if the proposed schedule is shown to be realistic and achievable while still addressing the major milestones and tasks required without reducing Government Review time.
NOTE: The SSEB will evaluate the offeror’s schedule narrative using calendar days, not dates. The Government reserves the right to accept or decline a proposed shorter duration as part of the contract award. Should the Government accept the proposed shorter duration, the contract completion stated in 52.211-10 will be replaced with the offeror’s proposed completion duration.
7.0 Volume I – Factor III: Small Business Participation Plan
7.1 Submission Requirements
ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN. The Small Business Participation Plan shall be based on the offeror’s best effort and is required to address each of the following areas individually:
• The extent to which the small business programs listed in FAR 19 (small business, small disadvantaged business, woman-owned small business, HubZone, service disabled veteran owned small business, etc.) are specifically identified in the Small Business Participation Plan;
• The extent of participation of such firms in terms of the value of the total acquisition in %’s for the base year and for each individual option year; the extent of commitment to use such firms (for example, enforceable commitments, i.e., teaming agreements signed, are to be considered more heavily than non-enforceable ones);
• The complexity and variety of the work small firms are to perform on this acquisition;
• The practicality of the Small Business Participation Plan, i.e., aggressive goals.
The Small Business Participation Plan shall be organized as follows:
(1) Prime Contractor type of business (check all that apply):
( ) Large ( ) Small (also check type of small business) ( ) Small Non-Disadvantaged Business ( ) Small Disadvantaged Business ( ) Woman-Owned Small Business ( ) HUBZone Small Business ( ) Veteran Owned Small Business ( ) Service Disabled, Veteran Owned Small Business
(2) Percentage of your participation as a prime contractor: __________________ %
NOTE: Small Business primes’ self-performance counts as Small Business Participation, and small business primes may achieve small business participation goals through their own performance/participation as a prime and/or through subcontracting to other small businesses.
(3) Percentage of total contract value of subcontracts planned for:
% of Total
Contract Value Large % Total Small % Small Non-Disadvantaged % Small Disadvantaged % Small Woman Owned % Small HUB Zone % Small Veteran Owned % Small Service Disabled Veteran Owned %
Each percentage above shall be accompanied by detailed supporting documentation regarding individual commitments.
NOTE: The sum of the percentages of Small Non-Disadvantaged and Small Disadvantaged should equal the entries for the Total Small; however, the sum of all of the percentages need not equal 100% since the prime is not included and individual subcontractors may be counted towards more than one category.
(4) List principal supplies/services (be specific) to be subcontracted to:
Name of Company
Type of Service/Supply
Large Small Non-Disadvantaged Small Disadvantaged Small Woman Owned Small HUB Zone Small Veteran Owned Small Service Disabled Veteran Owned
(5) Prior Performance Information: Provide any information substantiating the offeror’s track record of utilizing small business on past contracts.
(6) For Large and Small Businesses provide descriptive information for all small business categories. Any information concerning long-term relationships with Small Business subcontractors, such as mentor-protégé relationships, should be provided.
(7) Extent of Commitment: Provide documentation regarding enforceable commitments to utilize any small business category as defined in FAR Part 19 as subcontractors.
(8) Small Business Subcontracting Plan: Each Large Business Offeror shall provide a Small Business Subcontracting Plan that contains all of the elements required by FAR Clause 52.219-9. This Plan shall be submitted separately from the Small Business Participation information required above which applies to both Large and Small Businesses. The Subcontracting Plan is not a requirement for evaluation in source selection but rather a requirement for award to a Large Business. The approved Small Business Subcontracting Plan will be incorporated into any resultant contract(s).
7.2 Evaluation Criteria:
ALL OFFERORS ARE REQUIRED TO SUBMIT A SMALL BUSINESS PARTICIPATION PLAN.
The Small Business Participation Plan will be evaluated based on the offeror’s best efforts, the level of small business commitment that is being demonstrated for the proposed acquisition, and the prior level of commitment to utilizing small businesses in performance of prior contracts. The Small Business Participation Plan must meet the minimum Total Small Business Participation goal of Twenty percent (20%) of the total contract value (through collective small business participation from any type of small business or sub-category small business).
Pursuant to DFARS PGI 215.304(c), the following elements will be considered in evaluating an offeror’s Participation Plan:
• The extent to which such firms, as defined in FAR Part 19, are specifically identified in plans;
• The extent of commitment to use such firms (enforceable commitments will be weighted more heavily than non-enforceable ones);
• The complexity and variety of the work such firms are to perform;
• The realism of the plans;
• Past performance of offerors in complying with the requirements of the Subcontracting Plan Goals for such firms and monetary targets for participation;
• The extent of participation of such firms in terms of the proposed subcontracted value; and
• The extent to which the offeror provides detailed explanations/documentation supporting the proposed participation percentages, or lack thereof. The Department of Defense (DOD) has established small business goals to help ensure small business receives a fair proportion of DOD awards.
8.0 Volume II - Price and Proforma Information
8.1 Tab A - Standard Form 1442 and Proposal Price Breakout Schedule.
8.1.1 Submission Requirements:
The offeror shall complete and submit Standard Form 1442 and Section 00 10 00, Proposal Price Breakout Schedule. Both of these forms are included in Section 00 10 00 of this solicitation.
8.1.2 Evaluation Criteria:
The price will be evaluated on base proposal plus all options. The price will be evaluated for fairness and reasonableness through the use of a price analysis. Price will also be checked for unbalancing of line items.
Offerors are cautioned to distribute costs appropriately.
8.2 Tab B – Joint Venture Agreements
8.2.1 Submission Requirements:
If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), then a signed JV agreement must be submitted with the proposal and the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (formally DUNS number) with the proposal.
Small business offerors (e.g., 8(a), HUBZone, SDVOSB) submitting a proposal as a JV or Mentor-Protégé shall submit evidence from the offeror's SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business
Opportunity Specialist. Joint Venture agreements and approved 8(a) Mentor-Protégé agreements must be submitted with the proposal.
8.2.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
Joint Venture Agreements and Mentor-Protégé agreements must comply with the relevant regulations in Title 13 of the Code of Federal Regulations in order for an offeror to be eligible for any small business-related price preference.
8.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability
8.3.1 Submission Requirements:
A. Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address, and telephone number of offeror's banking institution. If the offeror is a joint venture, submit this information for all joint venture members.
B. Bonding Capability. Submit information showing offeror's ability to be bonded for this project. Include the name, address, and telephone number of the offeror's bonding company.
8.3.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
See FAR Part 28 for information related to bonds.
8.4 Tab D – Pre-Award Information
8.4.1 Submission Requirements:
A. The offeror shall submit one completed copy of Section 00 45 00, Representations and Certification.
B. The offeror shall submit the following information:
a) Number of years the firm has been in business
b) Name, address, and telephone numbers of two credit/trade references
c) A list of present commitments, including the dollar value
If the offeror is a joint venture, submit this information for all joint venture members.
8.4.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
8.5 Tab E - Subcontracting Plan
8.5.1 Submission Requirements:
Large business offerors shall submit a Subcontracting Plan in accordance with FAR Clauses 52.219-8 and 52.219-9 DEV. To be acceptable, plans must adequately address the required statutory elements and provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD, Part 2, AFARS 5119.705. The offeror may use the attached sample sub-contracting plan as a starting point. Percentage goals apply to the total amount being subcontracted.
8.5.2 Evaluation Criteria:
Submitted information will be evaluated for acceptability in accordance with AFARS 5119.705. To be acceptable, subcontracting plans must:
(a) Adequately address the required statutory elements.
(b) Provide sufficient information to enable the Contracting Officer to answer affirmatively questions A through H of Appendix DD (AFARS 5119.705), a copy of which is attached.
(c) To be acceptable, subcontracting plans must meet all of the requirements outlined in Appendix DD, Part 3, AFARS 5119.705. If discussions with offerors are necessary, those areas where the plan is deficient will be reviewed with each offeror with the goal of correcting deficiencies.
AFARS -- Appendix DD Subcontracting Plan Evaluation Guide
Part 1 – Introduction
DD-100 Purpose.
The guide provides a methodology for uniform and consistent evaluation of subcontracting plans within the Army. It is designed to facilitate compliance with the mandates of 15 U.S.C. § 637(d) to increase opportunities for small and small disadvantaged businesses.
DD-101 Applicability.
In accordance with requirements of FAR 19.705-4, DFARS 219.705-4 and AFARS 5119.705-4, the contracting officer shall use this guide to review all subcontracting plans (except those for commercial items), including those submitted in response to the provisions in FAR 19.705-2(d) and (e). When the contract will require subcontracting plans, use the clauses designated by FAR 19.708(b)(1) and (2) and DFARS 219.708(b)(1)(A) in the solicitation. A copy of the completed evaluation shall be included in the contract file.
DD-102 Goals.
Contracting officers must place special emphasis on negotiating subcontracting goals that are realistic, challenging and attainable. The plan must express goals in terms of percentages of total planned subcontracting dollars and must be comparable to the dollar commitments in the small business participation plan. In accordance with FAR 19.705-4(d), the contracting officer must review enough evidence to determine that the:
1. Offeror can meet subcontracting plan goals;
2. Offeror’s goals are consistent with their cost or pricing data or information other than cost or pricing data;
3. Offeror will honor the terms of subcontract agreements (i.e., timely payments of amounts owed, use of firms cited in proposal, etc.); and
4. Offeror’s make or buy policy or program does not conflict with the proposed subcontracting plan and is in the Government’s best interest.
5. Plan includes the contractor’s commitment to adopt and comply with its requirements and goals for small business utilization.
DD-103 Evaluation Rating.
Either the contracting officer, the small business representative, or both, shall evaluate and rate the subcontracting plan as “acceptable” or “unacceptable,” in the context of the particular procurement. For instance, in smaller dollar value contracts, or contracts for uniquely manufactured items, it might be impracticable or not cost effective for offerors to take the type of actions that might be appropriate in contracts for larger dollar values or commercial components.
To receive an “Acceptable” rating, the contractor must satisfy all objectives in Part 2 and meet each statutory subcontracting plan requirement outlined in Part 3. Failure to receive a subcontracting plan rating of acceptable could jeopardize the offeror’s selection for contract award. The contracting officer must document the decisions in the contract file.
DD-104 Modification of Guide.
Pursuant to AFARS 5101.403, only principal assistants responsible for contracting may approve individual deviations to this evaluation guide. This approval authority may not be further delegated.
DD-105 Use of Preaward Surveys.
For contracts administered by the Defense Contract Management Agency, obtain information needed to assess contractor compliance with subcontracting plans in current and previous contracts by requesting a preaward survey in accordance with FAR 9.106, DFARS 209.106 and
DFARS PGI 209.106.
Part 2 – Rating System
DD-201 Acceptable Plans.
Objective: The subcontracting plan meets all of the requirements outlined in Part 3. The offeror has provided details that demonstrate an acceptable approach to assisting, promoting and utilizing small businesses, small disadvantaged businesses, women-owned small businesses, historically underutilized business zone small businesses, veteran-owned small businesses, service disabled veteran-owned small businesses and, for Defense Research Programs, historically black colleges and universities and minority serving institutions. The offeror has demonstrated an ability to meet prior subcontracting plan goals and honor the terms of subcontract agreements. Offeror has outlined an approach utilizing mentor protégé firms, joint venture teams, or other partners. The subcontracting goals are realistic, challenging, and attainable. Clarifications and minor rework of the submission may be required to correct slight omissions that do not prejudice other offers.
DD-202 Unacceptable Plans.
Objective: The subcontracting plan fails to meet a requirement outlined in Part 3. The offeror has not provided an acceptable approach to assisting, promoting, and utilizing small businesses. The offeror has a history of failing to honor subcontract agreements. The offeror did not discuss the establishment of mentor protégé relationships, teaming, or joint venture agreements with other firms. Ensure the proposed subcontracting goals are attainable in light of the contractor’s past performance in meeting subcontracting goals. Proposed subcontracting goals reflect less than a good faith effort. Substantial rework of the document is required to correct omissions and establish realistic, challenging, and attainable goals. Failure to receive a rating of acceptable may jeopardize offeror’s eligibility for contract award. See FAR 19.702(a)(1).
Part 3 – Subcontracting Plan Requirements
DD-301 Requirements.
If any of the following are answered “NO”, the plan is not acceptable, and the offeror must revise it before contract award. Does the plan:
1. Contain a policy statement or evidence of internal guidance to company buyers that commits to complying with the Small Business Act (Public Law 99-661, Section 1207 and Public Law 100-180)?
2. Identify separate percentage goals for utilizing small businesses (including Alaska Native Corporations (ANCs) and Indian tribes), veteran-owned small businesses (VOSB), service-disabled veteran-owned small businesses (SDVOSB), historically underutilized business zone small businesses (HUBZone), small disadvantaged businesses (SDB), women-owned small businesses (WOSB), and, for Defense Research Programs, historically black colleges and universities and minority serving institutions where applicable? Negotiated subcontracting goals must correlate with percentages of small business utilization identified in the contractor’s small business participation plan, see FAR 15.304 and DFARS 215-304, and/or minimum targets identified in the solicitation or contract modification. FAR 19.704(a)(1)
3. Project the total dollars planned to be subcontracted and a separate statement of the total dollars planned to be subcontracted to small business (including ANCs and Indian tribes), VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns? FAR 19.704(a)(2)
4. Describe the principal types of supplies and services to be subcontracted and identify the types planned for subcontracting to small business (including ANCs and Indian tribes), VOSB, SDVOSB, HUBZone, SDB and WOSB concerns?
5. Describe the method to be used to develop the subcontracting goals? FAR 19.704(a)(4)
6. Describe the method for identifying potential sources for solicitation purposes? FAR 19.704(a)(5)
7. State if the offeror included indirect costs in establishing subcontracting goals, and a description of the method used to determine the proportionate share of indirect costs to be incurred with small business, VOSB, SDVOSB, HUBZone, SDB (including ANCs and Indian tribes), and WOSB concerns? FAR 19.704(a)(6)
8. Identify the name of the employee who will administer the offeror’s subcontracting program and describe that person’s duties? FAR 19.704(a)(7)
9. Provide an approach for ensuring that small businesses, VOSB, SDVOSB, HUBZone, SDB, (including ANCs and Indian tribes) and WOSB concerns will have an equitable opportunity to compete for subcontracts?
10. Require the offeror to include the clause at FAR 52.219-8, Utilization of Small Business Concerns in all subcontracts that offer further subcontracting opportunities and require all subcontractors (except small business concerns) that receive subcontracts over $700,000 ($1,500,000 for construction) to adopt a plan that complies with the requirements of the clause at FAR 52.219-9, Small Business Subcontracting Plan?
11. Provide assurances that the offeror will:
a. Cooperate in required studies or surveys;
b. Submit periodic reports so that the Government can determine the extent of offeror’s compliance with the subcontracting plan;
c. Submit semi-annual Individual Subcontract Reports (ISRs) and/or Summary Subcontract Reports (SSR) in the Electronic Subcontracting Reporting System (eSRS) (http://www.esrs.gov) in accordance with FAR 52.219-9 or provide other ancillary reports as requested by the contracting officer or Army Small Business Office;
d. Ensure that its subcontractors with subcontracting plans agree to submit the ISRs and/or SSRs using the eSRS;
e. Provide its prime contract number and its DUNS number and the e-mail address of the Government or contractor employee responsible for acknowledging or rejecting the reports, to all first-tier subcontractors with subcontracting plans so they can enter this information into the eSRS when submitting their reports; and
f. Require each subcontractor with a subcontracting plan to provide the prime contract number and its own DUNS number, and the e-mail address of the Government or contractor official responsible for acknowledging or rejecting the reports, to its subcontractors with subcontracting plans? FAR 19.704(10)
12. Describe the types of records that the contractor will maintain concerning procedures adopted to comply with the requirements and goals in the plan, including establishing source lists; and a description of the offeror’s efforts to locate small business, VOSB, SDVOSB, HUBZone, SDB, and WOSB concerns and to award subcontracts to them? FAR 19.704(11)
13. Does plan, pursuant to FAR 19.704(11)(c), provide a separate goal for the basic contract and, if applicable, each option?
http://www.esrs.gov/
SMALL BUSINESS SUBCONTRACTING PLAN (SAMPLE)
Federal Acquisition Regulation (FAR), paragraph 19.708(b)(1)) prescribes the use of the clause at FAR 52.219-9 entitled "Small Business Subcontracting Plan.” The following is a suggested model for use when formulating such subcontracting plan. While this model plan has been designed to be consistent with FAR 52.219-9, other formats of a subcontracting plan may be acceptable. However, failure to include the essential information as exemplified in this model may be cause for either a delay in acceptance or the rejection of a bid or offer where the clause is applicable. Further, the use of this model is not intended to waive other requirements that may be applicable under FAR 52.219-9. "SUBCONTRACT," as used in this clause, means any agreement (other than one involving an employer-employee relationship) entered into by a federal government prime contractor or subcontractor calling for supplies or services required for performance of the contract or subcontract.
I. IDENTIFICATION DATA:
Company Name:
Address:
Date Prepared:
Solicitation Number:
Description:
Estimated Contract Dollar Value:
II. TYPE OF PLAN (circle one)
A. Individual Plan (All elements developed specifically for this contract and applicable for the full term of this contract, including any option periods.)
B. Master Plan (Goals developed…