This Request for Proposal (RFP) solicits proposals for the design/build full facility restoration of an Army Reserve Center in Charlotte, North Carolina. The project includes renovating three training buildings totaling approximately 70,000 square feet and an Area Maintenance Support Activity building of 8,000 square feet. The scope of work involves building alterations, repairs, upgrades, and improvements to mechanical, electrical, and plumbing systems. Sustainability and antiterrorism/force protection measures must also be incorporated. Proposals will be evaluated using a two-phase best value tradeoff process, with the contract to be awarded on a firm-fixed-price basis to the responsible offeror providing the best overall value to the government. The closing date for phase one proposals is listed on the SF 1442 included with the RFP.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Full Facility Renovation of Army Reserve Center (ARC), Charlotte, NC Phase 1
P2: 473765
Design Build
Specifications Corrected Final Submittal
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
24 February 2020
W912QR20R0028
W912QR20R0028-0000
Section 00 10 00 - Solicitation
BLOCK 10 CONTINUATION
Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://projnet.org/projnet. Please see Section 00 21 00, ProjNet Instructions for further guidance.
An organized site visit will be conducted during Phase II. Please see FAR 52.236-27 ALT 1 for Site Visit information with the release of the Phase II amendment.
The term bid and proposal are used interchangeably in industry and may be used interchangeably throughout this solicitation.
Please note, page numbering in this document may not be accurate.
PRICE BREAKOUT SCHEDULE
***FOR PHASE I, THIS IS PROVIDED FOR INFORMATIONAL
PURPOSES ONLY. THERE IS NOT A PRICE PROPOSAL REQUIRED IN
RESPONSE TO PHASE I OF THIS SOLICITATION.***
PROJECT : Design and Construction of an Army Reserve Center
LOCATION : Charlotte, North Carolina
PROPOSER’S NAME :
BASE PROPOSAL
Item No. Description Unit Amount
0001 Primary Facilities Training Center Building 1300 JOB $
0002 Primary Facilities AMSA Building 1324 JOB $
0003 Primary Facilities Training Center Building 1330 JOB $
0004 Primary Facilities Training Center Building 1412 JOB $
0005 Project Site Work JOB $
0006 Fire Pump & Enclosure JOB $
0007 Fire Pump Water Storage Tanks JOB $
0008 Project Permit Fees JOB $ 28,125.00
0009 Project Design Fees JOB $
Subtotal $
OPTION ITEMS
0010 Optional Item ‘A’ - Operations and Maintenance – Army Reserve (OMAR) Funded Equipment Items JOB $
0011 Optional Item ‘B’ – “Bona Fide Need” Operations and Maintenance, Army Reserve (OMAR) Funded Equipment Items JOB $
0012 Optional Item ‘C’ – LEED Certified for Building 1330 JOB $
0013 Optional Item ‘D’ – LEED Certified for Building 1412 JOB $
0014 Optional Item ‘E’ – Additional POV Pavement Replacement JOB $
0015 Optional Item ‘F’ – Additional MEP Pavement Replacement JOB $
TOTAL BASE PROPOSAL + OPTION ITEMS $
Description of Base Proposal Items
(a) Item No. 0001 “Primary Facilities – Training Center Building 1300” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0010 and 0011.
(b) Item No. 0002 “Primary Facilities – AMSA Building 1324” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0010 and 0011.
(c) Item No. 0003 “Primary Facilities – Training Center Building 1330” includes all Base Proposal construction work required within a line five feet outside of the building, except that work covered by Items No. 0010 and 0011.
(d) Item No. 0004 “Primary Facilities – Training Center Building 1412” includes all Base Proposal construction work required within a line five feet outside of the building 1324, except that work covered by Items No. 0010 and 0011.
(e) Item No. 0005 “Project Site Work”, includes all Base Proposal construction work required beyond a line five feet outside the buildings and the work associated with the vehicular circulation associated with the access drives, and privately owned vehicle (POV) parking area except that work covered by Items No. 0001, 0002, 0003, 0004, 0014 and 0015.
(f) Item No. 0006 “Fire Pump & Enclosure”, includes the cost for the Offeror to provide and connect a fire pump and enclosure if required for the project as determined by the Offeror.
(g) Item No. 0007 “Fire Pump Water Storage Tanks”, includes the cost for the Offeror to provide and connect the fire pump water storage tanks along with their associated concrete foundations if required for the project as determined by the Offeror.
(h) Item No. 0008 “Project Permit Fees”, includes the cost for the Offeror to pay fees associated with required permits from the City of Charlotte and the State of North Carolina for sanitary sewer, watermain, driveways, erosion control, and NPDES.
(i) Item No. 0009 “Project Design Fees”, includes the fees for the Offeror’s design professionals to complete the Base Proposal design and construction documents for the project along with Optional Bid Items ‘A’ and ‘B’.
(j) Item No. 0010 “Optional Item ‘A’ - Operations, Maintenance Army Reserve (OMAR) Funded Equipment Items
(Items funded at or shortly after the time of construction award) ” includes all work required to furnish and install “OMAR Funded” equipment items which are considered to be permanently attached to the construction.
OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).
CFCI OMAR Funded Equipment Items for this project consists of:
1. Arms Vault, Portable
2. Metal Lockers at Buildings 1324 and 1412
3. Metal Caging at Building 1412
This option may be exercised within 90 calendar days from Notice to Proceed.
(k) Item No. 0011 “Optional Item ‘B’ “Bona Fide Need” Operations, Maintenance Army Reserve (OMAR) Funded
Equipment Items (To be awarded within six months of BOD)” includes all work required to furnish and install “OMAR Funded Equipment Items” which are considered to not be permanently attached to construction.
OMAR funded equipment is to be Contractor provided and Contractor installed (CFCI).
CFCI “Bona Fide Need” OMAR Funded Equipment Items for this project consists of:
1. Freestanding metal shelving as per section 01 02 00.06 48 paragraph 6.5.18
2. Refrigerators at AMSA Building 1324 Break Room; Building 1330 Unit Common 235; Building
1412 Break Room and Lactation Room.
3. Microwave at AMSA Building 1324 Break Room; Building 1330 Unit Common 235; Building
1412 Break Room and Lactation Room.
4. Exterior Ash/Trash at exterior entries to Building 1300 (quantity of 1), Building 1324 (quantity of
1), Building 1330 (quantity of 3) and Building 1412 (quantity of 2).
5. Window treatments as per section 01 02 00.06 48 paragraph 6.5.12
6. Fire extinguishers as per section 01 02 00.06 48 paragraph 6.5.15.
7. Building 1412 Kitchen Equipment:
a. Freezer – Item 7.
b. Refrigerator – Item 8.
c. Worktables, Mobile – Item 12.
d. Food Preparation Table – Item 13A.
e. Slicer – Item 13B.
f. Can Opener – Item 13C.
g. Cold Food Counter, Mobile – Item 14.
h. Hot Food Counter, Mobile – Item 15.
i. Mixer – Item 16A.
j. Mixer Stand – Item 16B.
k. Security Racks – Item 17.
l. Shelving Units – Item 18.
m. Worktables – Item 19A.
n. Ice Dispenser – Item 19B.
o. Coffee Makers – Item 19C.
p. Rubber Floor Mats – Food Service Equipment Item 25.
This option may be exercised within 600 calendar days from Notice to Proceed.
(l) Item No. 0012 “Optional Item ‘C’ LEED Certified for Building 1330”, includes the cost to design, construct, and obtain Certification for measures necessary to achieve LEED Certified for Building 1330. Note that measures taken under this option cannot change the systems described or reduce the minimum requirements described in the RFP.
(m) Item No. 0013 “Optional Item ‘D’ LEED Certified for Building 1412”, includes the cost to design, construct, and obtain Certification for measures necessary to achieve LEED Certified for Building 1412. Note that measures taken under this option cannot change the systems described or reduce the minimum requirements described in the RFP.
(n) Item No. 0014 “Optional Item ‘E’ Additional POV Pavement Replacement”, includes all the work associated with the design and construction of the privately owned vehicle (POV) parking area noted as ‘Optional Bid Item E’ on the RFP drawings.
(o) Item No. 0015 “Optional Item ‘F’ Additional MEP Pavement Replacement”, includes all the work associated with the design and construction of the military equipment parking (MEP) area noted as ‘Optional Bid Item F’ on the RFP drawings.
Section 00 21 00 - Instructions
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet. Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR20R0028 The Bidder Inquiry Key is: DRBXSR-8WGUWV Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret
Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry.
Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled ten (10) calendar days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the solicitation.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 52.225-12 Notice of Buy American Requirement - Construction
Materials Under Trade Agreements
MAY 2014
52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
CLAUSES INCORPORATED BY FULL TEXT
52.211-1 AVAILABILITY OF SPECIFICATIONS LISTED IN THE GSA INDEX OF FEDERAL
SPECIFICATIONS, STANDARDS AND COMMERCIAL ITEM DESCRIPTIONS, FPMR PART 101-29 (AUG 1998)
(a) The GSA Index of Federal Specifications, Standards and Commercial Item Descriptions, FPMR Part 101-29, and copies of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained for a fee by submitting a request to--GSA Federal Supply Service, Specifications Section, Suite 8100, 470 East L'Enfant Plaza, SW, Washington, DC 20407, Telephone (202) 619-8925, Facsimile (202) 619-8978.
(b) If the General Services Administration, Department of Agriculture, or Department of Veterans Affairs issued this solicitation, a single copy of specifications, standards, and commercial item descriptions cited in this solicitation may be obtained free of charge by submitting a request to the addressee in paragraph (a) of this provision.
Additional copies will be issued for a fee.
52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)
Any contract awarded as a result of this solicitation will be a DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation.
(End of provision)
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price (FFP) contract resulting from this solicitation.
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
18.5% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Charlotte, NC in Mecklenburg County.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers CELRL, Emily Moore Room 821 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit will be conducted during Phase II of the solicitation. This clause will be updated to provide the meeting date and time with the release of Phase II.
(c) Information regarding meeting location, point of contact, access requirements, etc. will be provided with the release of Phase II.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The full text of FAR clauses and provisions can be found at https://www.acquisition.gov/
The full text of DFARS clauses and provisions can be found at https://www.acq.osd.mil/dpap/
Section 00 22 00 - Supplementary Instructions
00 22 16
SECTION 00 22 16
PROCEDURES FOR SUBMITTAL AND EVALUATION OF OFFERS FOR PHASE ONE
1. Overview.
1.1 The intent of this solicitation is to select one contractor for the Design and Construction of a Full
Facility Restoration (FFR) project to renovate and repair an Army Reserve Center (ARC) located in Charlotte, NC.
1.2 This is a two-phase procurement and the basis of award is the Best Value Trade-Off Process. Potential offerors are invited to submit the information described in this Section 00 22 16 for review and evaluation by the Government. Following completion of the evaluation of Phase I, up to a maximum of five (5) most highly qualified offerors will be selected to participate in Phase II. A site visit will be held for these selected offerors following the Phase II notification. The selected offerors for Phase II will be invited to submit the information described in Section 00 22 18, Procedures for Submittal of Offers for Phase II, for review and evaluation by the Government. Following completion of the Phase II evaluation, the Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
1.3 The target ceiling for contract award is $18,377,000.00 based on the funds made available for this project.
The Government cannot guarantee that additional funds will be available for award. Offerors are under no obligation to approach this ceiling.
1.4 This project is subject to availability of funds; funds are not presently available. No award will be made under this solicitation until funds are available.
2. Submittal of offers.
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the offeror’s disqualification from award.
2.2 Offerors shall submit their proposals to the US Army Corps of Engineers, 600 Dr. Martin Luther King, Jr.
Place, Room 821, Louisville, KY 40202-2267 no later than the time and date specified in Block 13 of Standard Form 1442. Mark your proposal submission to the attention of Morgan Strong. NOTE: The Louisville District is in the Eastern Time Zone.
2.3 The Government is using a two-phase procurement approach for this design/build project. For Phase I, offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 and 2.5 below. All proposal materials shall be submitted in binders with a table of contents and tabbed section dividers. Phase I proposal sections should parallel the submission requirements identified herein.
2.4 Volume I for Phase I shall be submitted in a three-ring binder and include the following information:
• Volume I – Factor I: Past Performance o Prime Contractor o A/E Designer of Record (DOR)
• Volume I – Factor II: Technical Approach for Design/Build
*NOTE: The complete Volume I shall be submitted in original and six (6) paper copies and one (1) electronic copy on CD/DVD. The paper version of the proposal shall be used for evaluation and will control any conflicts or discrepancies between the two media. Offeror is responsible for ensuring the paper copy is consistent with the electronic copy of the proposal. Failure to place the required submission information under the appropriate tab (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced. Information submitted that exceeds the specified limit(s) will not be evaluated.
2.5 Volume II for Phase I shall be submitted in a three-ring binder (placed in a separate envelope) and shall include the following information:
• Volume II – Tab A: Standard Form 1442
• Volume II – Tab B: Joint Venture Agreements
• Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability
• Volume II – Tab D: Pre-Award Information
NOTE: Phase I does NOT involve pricing submission. Volume II shall be submitted in original and one
(1) electronic copy on CD/DVD. The paper version of the proposal shall be used for evaluation and will control any conflicts or discrepancies between the two media. Offeror is responsible for ensuring the paper copy is consistent with the electronic copy of the proposal. Failure to place the required submission information under the appropriate tab (factor or sub factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.
3. Proposal Evaluation Process.
3.1 A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical (Volume I) proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone not involved in the evaluation and award process or to other offerors.
Proposals will be evaluated based on the factors described herein, and the basis of award is a Best Value Trade-Off, as stated above.
3.2 The evaluation process for Phase I essentially consists of two parts: proposal compliance review and responsibility review, and technical evaluation.
3.2.1 Proposal Compliance / Responsibility Review: This is an initial review to ensure that all required forms and certifications are complete and that the offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance (Table 2), with the final confidence assessment rating based on the extent of recent, relevant past experience (Table 1) and the quality of the offeror’s performance. Factor II – Technical Approach for Design/Build will be rated using Table 3 below.
4. Proposal Information and Related Evaluation Factors.
4.1 Phase I proposals will be evaluated in accordance with the factors below, listed in relative order of importance. Offerors are reminded to include their best technical proposal in their initial offer. The initial offer and subsequent Government evaluation will be the basis for the Contracting Officer’s selection of up to five (5) most highly qualified offerors to continue on to Phase II of the procurement.
4.2 Volume I – Factor I: Past Performance 1st
• Prime Contractor Equal to A/E DOR
• A/E DOR Equal to Prime
4.3 Volume I – Factor II: Technical Approach 2nd
For Design/Build
4.4 Volume II – Pro Forma Information
Tab A Standard Form 1442 Not Rated
Tab B Joint Venture Agreement Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability
Tab D Pre-Award Information Not Rated
4.5 Ratings
Evaluators will apply the rating for the definition that most closely matches the evaluation.
TABLE 1
Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
TABLE 2
Performance Confidence Assessments
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Neutral Confidence No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
TABLE 3
Technical / Risk Assessment Ratings Adjectival Rating Description
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
4.6 Definitions
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).
7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.
5. Volume I – Factor I: Past Performance
5.1 Submission Requirements:
5.1.1 Prime Contractor:
Provide descriptions of up to three (3) projects substantially complete or completed by the Prime Contractor within the last seven (7) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than seven (7) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if enough work has been performed such that it demonstrates the ability to successfully complete all phases of the project. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.
NOTE: Projects that include exclusively new construction will NOT be considered similar in size or scope to the solicited project.
5.1.2 Projects considered similar in size shall include a minimum of 50,000 square feet of building renovation.
5.1.3 Projects considered similar in scope to this project include complete renovation of buildings similar to
Army Reserve Centers, Armed Forces Training Centers, National Guard Armories, Vehicle Maintenance Shops, office complexes, or education facilities. Projects may also include new construction; however, project scope shall be at least 75% complete building renovation, measured in square footage. If replying with projects that are combined new and renovation construction, clearly delineate (based on square feet) the renovation versus new construction portion and percent (%) of the project.
5.1.4 The prime contractor must have self-performed at least fifteen (15) percent of the direct contract labor
(including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors to be considered similar.
5.1.5 Additional consideration may be given for projects that contain the following features:
a) Established, working relationship with the proposed DOR on prior Design/Build projects;
5.1.6 The following information shall be provided for each project:
a) Project Title, Location, and Contract Number/Unique Identifier;
b) Current percentage of construction complete and the date it was or will be complete
a. For projects that are not yet complete, provide description of work remaining to be completed;
c) Scope of the project, to include purpose/use of facility;
d) Size of the project, differentiate square footage of new construction versus renovation if the project includes both;
e) Type and percentage of work that was self-performed.
5.1.7 For this factor, also include any ratings, letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency by the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action.
5.1.8 A/E Designer of Record (DOR):
Provide descriptions of up to three (3) projects that have been constructed (i.e., construction is substantially complete) within the last seven (7) years (from the solicitation issue date) that are similar in size and scope (see paragraphs 5.1.2 and 5.1.3 above). In order to be considered similar, the proposed A/E firm must have been the DOR on the submitted project. The listed design firm must be used on the project. No deviations will be permitted unless approved by the Contracting Officer. Identification of more than one (1) design firm will result in an evaluation based on the least qualified firm. Indicate any previous working relationship with the prime contractor.
5.1.9 Additional consideration may be given for the DOR projects that contain the following features:
a) Experience with Federal (e.g., DOD, NAVFAC, USACE) Design/Build Criteria (i.e., AT/FP, UFC, Specs Intact)
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. Projects performed by contractors other than the offeror, including, but not limited to, teaming partners, subcontractors, sister or parent companies, and affiliates will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture (JV) agreement. If more than one contractor is listed in Block 14, then a signed JV agreement must be submitted with the proposal and the JV shall be registered as such in the System for Award Management (SAM). However, each party of the JV must submit their own Unique Entity Identifier Number (formerly known as DUNS) with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV offeror as demonstrated by a signed JV agreement. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).
5.2 Evaluation Criteria:
5.2.1 For both the Prime and DOR, the SSEB will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant a past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.
5.2.2 For both the Prime and DOR, the SSEB will next review how well the offeror performed on those projects.
The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references.
In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. The Government will, at a minimum, review past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier numbers. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
5.2.3 The SSEB will review all past performance information collected for both the Prime and DOR. The SSEB will determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table above, based on the SSEB’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience. NOTE: The Past Performance of both the Prime and A/E DOR will be weighted equally in the establishment of the overall Performance Confidence rating.
6.0 Volume I – Factor II: Technical Approach for Design/Build
6.1 Submission Requirements:
6.1.1 Provide a narrative that describes the offeror’s philosophy and intended technical approach for executing design-build projects. Clearly and concisely describe the offeror’s Design-Build team, and how the team will work collaboratively to ensure timely, quality completion of the project. The Technical Approach narrative shall address the information described in paragraphs 6.1.2 – 6.1.4 below.
6.1.2 Roles and Responsibilities: Describe the roles and responsibilities of the offeror’s Design-Build team and how their resources will be utilized in order to deliver this design-build project. Describe the proposed management structure for the Design-Build team (i.e., key members), explaining how the design and construction process will be managed throughout the entirety of the project life cycle (e.g., Design -
Review Process, Fast Track), (Construction – Subcontractor Management, Commissioning, etc.), (Close-out – As Built, O&M Manuals, etc.).
6.1.3 Communication Plan: Describe interactions and communications both within the Design-Build team and with the Corps of Engineers throughout the entirety of the project life cycle.
6.1.4 Quality Control: Describe the Design-Build team’s quality control approach, corporate systems, and capabilities to maintain quality control of the design and construction.
• Provide specific information on how you will manage and track changes/revisions both during the design phase and construction phase of the project.
NOTE: There is a page limit of eight (8) single-sided, 8.5” x 11” pages, using a minimum font size of 11 and a minimum margin of one-half inch on all sides, for the Technical Approach for Design/Build Factor.
6.2 Evaluation Criteria:
6.2.1 The Government will review and identify the strengths, weaknesses, and any deficiencies in the proposal.
The Government will evaluate the proposal based on the offeror’s understanding of the USACE Design/Build process and how well it has demonstrated its ability to successfully execute design-build projects. Offerors are encouraged to tailor their proposal to demonstrate their approach for successfully completing the solicited Design/Build project.
The Government will evaluate the offeror’s understanding of the design process and the roles of the designers of record, construction firm, and the Government reviewers. The evaluation will be based on how well the offeror demonstrates their organizational (i.e., the structure and staffing) ability to execute design/build projects, to include the integration of the design and construction firms during design and construction. Proposals demonstrating that construction personnel will be actively involved in the design process may be viewed more favorably by the SSEB. The Government will evaluate the role of the designer in maintaining design integrity throughout the process, including its key roles during construction.
The Government will evaluate the offeror’s capabilities and understanding of the contractually required quality control processes for both design and construction, as well as the strength of the offeror’s proposed approach to control and track revisions to the design. The Government places value upon continued participation by the designers of record during the construction quality control process.
7. Volume II - Proforma Information
7.1 Tab A - Standard Form 1442.
7.1.1 Submission Requirements:
The offeror shall complete and submit Standard Form 1442 found in Section 00 10 00 of this solicitation.
7.1.2 Evaluation Criteria:
The Standard Form 1442 will not be rated. The form will be reviewed to determine if required information is provided, amendments are acknowledged, and the offer signed.
NOTE: Phase I does NOT involve pricing submission.
7.2 Tab B – Joint Venture Agreements
7.2.1 Submission Requirements:
If more than one contractor is listed in Block 14, or the offeror listed in Block 14 is a joint venture (JV), then a signed JV agreement must be submitted with the proposal and the offeror shall be registered in the System for Award Management (SAM) as a legal entity separate from the individual joint venture members. However, each member of the JV must submit its own Unique Entity Identifier (formally DUNS number) with the proposal.
Small business offerors (e.g., 8(a), HUBZone, SDVOSB) submitting a proposal as a JV or Mentor-Protégé shall submit evidence from the offeror's SBA Servicing Agency that the offeror has notified and discussed the proposed joint venture for this specific project with the appropriate SBA Representative or Business Opportunity Specialist. Joint Venture agreements and approved 8(a) Mentor-Protégé agreements must be submitted with the proposal.
7.2.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
Joint Venture Agreements and Mentor-Protégé agreements must comply with the relevant regulations in Title 13 of the Code of Federal Regulations in order for an offeror to be eligible for any small business-related price preference.
7.3 Tab C – Evidence of Ability to Obtain Bonding and Proof of Financial Ability
7.3.1 Submission Requirements:
A. Financial Capability. Submit Proof of Financial Ability (Most recent financial statement covering assets and liabilities). Include the name, address, and telephone number of offeror's banking institution. If the offeror is a joint venture, submit this information for all joint venture members.
B. Bonding Capability. Submit information showing offeror's ability to be bonded for this project. Include the name, address, and telephone number of the offeror's bonding company.
7.3.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
See FAR Part 28 for information related to bonds.
If the offeror is a joint venture, submit this information for all joint venture members.
7.4 Tab D – Pre-Award Information
7.4.1 Submission Requirements:
A. The offeror shall submit one completed copy of Section 00 45 00, Representations and Certification.
B. The offeror shall submit the following information:
a) Number of years the firm has been in business
b) Name, address, and telephone numbers of two credit/trade references
c) A list of present commitments, including the dollar value
7.4.2 Evaluation Criteria:
This information will be used for the purpose of completing the Pre-Award Survey and will not be rated.
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS. THE
GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the Contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the Contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the Contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that Contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements.