This Request for Proposal (RFP) solicits design/build services for the full facility restoration of an Army Reserve Center in Charlotte, North Carolina. The scope includes alteration, repair, and upgrade of three training buildings totaling approximately 70,000 square feet and an Area Maintenance Support Activity building of approximately 8,000 square feet. Requirements include HVAC, plumbing, mechanical and electrical systems work as well as site improvements such as land clearing, paving, and utility connections. Proposals will be evaluated using a two-phase best value tradeoff process. The contract will be a firm-fixed-price design/build contract awarded by the U.S. Army Corps of Engineers Louisville District.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0003 02-Jun-2020
W912QR20R0028-0003
W912QR20R0028
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMDT 0003 SUMMARY OF CHANGES
SUMMARY OF CHANGES
Army Reserve Center Charlotte, North Carolina
W912QR-20-R-0028
Amendment No. 0003
A. The following SPECIFICATION SECTIONS have been revised and reissued:
01 02 00.00 48 Statement of Work Part 2 – Applicable Criteria and Coordination with Local Authorities Part 3 – Site Civil Design Part 7 – Structural Design
01 46 00.00 06 Total Building Commissioning (Contractor CxA)
B. Native CAD Files are added
C. Site & Building Photographs are added.
D. The virtual site visit attendee list is provided via this amendment.
- END OF SUMMARY OF CHANGES -
(End of Summary of Changes)
W912QR20R0028 Charlotte, NC ARC FFR – Virtual Site Visit
28 May 2020
Attendee List
NAME:
Michael (No last Name) Daniel Pupura Natalie House John Miller Jeff Diekemper Lauren Sajek Judd Presley Brett Rossomano Richard Boston Justin Luitjonan Peter Leggio Grayson McGee Emily Wilson David Guseman David Culcasi Kay Lantrip Brandon Davis Courtney Gibbs Dale Adams Paul Pinigis Dustin Scheller Evan Sanders Mark Kuhlman
Army Reserve Center Amdt. #0003 Charlotte, North Carolina P2# 473765 D/B RFP Certified Final
Corrected Final Submittal-July 2019 01 02 00.00 48 Part 2 - 1 of 10
PART 2
APPLICABLE CRITERIA AND COORDINATION WITH LOCAL AUTHORITIES
2.1 APPLICABLE CRITERIA. Applicable design and construction criteria references are listed in this Statement of Work and in the Specifications of this RFP.
Criteria shall be taken from the most current references as of the date of issue of the RFP, unless otherwise noted. However, following contract award, Contractor shall bring any criteria updates to the attention of the Contracting Officer. Referenced codes and standards are minimum acceptable criteria. Administrative, contractual, and procedural features of the contract shall be as described in other sections of the RFP. Sources for criteria documents are listed below.
2.1.1 In order for a facility to be occupied by Department of Defense personnel, the design and construction must meet specific requirements. The Government’s primary guidance on fire protection is UFC 3-600-01, Design – Fire Protection Engineering for Facilities. Design and construction of Army Reserve real property improvements shall comply with UFC 3-600-01, and shall comply with the specific applicable requirements of IBC, NFPA 101, and other commercial codes and standards that are referenced in UFC 3-600-01. The Contractor shall complete a Fire Protection/Life Safety Code Submittal form, for the project to demonstrate compliance. The form is available on the Corps of Engineers, Louisville District, Army Reserve Customer Website.
2.1.2 Design and construction of Army Reserve real property improvements shall also comply with the requirements of this document and with the current edition of the industry and Federal Government standards listed in this RFP. Where UFC 3-600-01 or any other Federal Government standard refers to other Federal Government standards not listed in this RFP, the standards not listed in this RFP do not apply
2.1.3 Some State and local code and regulatory agencies may not have jurisdiction over Federal Government construction on Federal property. However, the Army Reserve wishes to comply with State and local codes and regulations, and the Contractor remains responsible for such compliance. Therefore, design and construction of Army Reserve real property improvements shall also comply with all current and applicable State and local codes, and with all other applicable laws and regulations governing development, design and construction at the site. If certain of such requirements appear particularly onerous, or hamper required functionality of the project, the Contractor may recommend the Government waive the requirement or implement a lesser requirement. The Government’s acceptance of such recommendations is not assured.
2.1.4 Where any of the applicable requirements conflict, the most stringent shall govern. In no case shall building code, fire protection and life safety requirements be reduced below those required in UFC 3-600-01 and this RFP.
2.1.5 The requirements of the International Mechanical Code (IMC) and International Plumbing Code (IPC) shall apply except as follows. Where conflicts exist between the IMC and IPC, and the requirements of this document, this document shall govern. Where the IMC or IPC references the ICC Electrical Code, the NEC National
Corrected Final Submittal-July 2019 01 02 00.00 48 Part 2 - 2 of 10
Electrical Code shall be the applicable code. Where the IMC references the International Fuel Gas Code, the NFPA 54 National Fuel Gas Code shall be the applicable code. Where the IMC or IPC references the International Fire Code, the National Fire Codes published by the National Fire Protection Association (NFPA) shall be the applicable code. Where the IMC or IPC references the International Energy Conservation Code, the ASHRAE Standard 90.1 Energy Standard for Buildings – Except Low Rise Residential Buildings shall be the applicable reference. The requirements of ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality shall be used in lieu of the ventilation requirement contained in the IMC.
2.1.6 The primary criteria and guidance for detailed design of Army Reserve Training Centers is UFC 4-171-05, Army Reserve Facilities (Design Guide or DG). The Contractor shall follow the guidance of the DG in developing the project design, unless this RFP directs otherwise. For the purposes of this RFP, when the word “should” is used in the DG, it indicates a mandatory requirement for this project. When the DG references Government criteria documents not referenced in this RFP, those criteria do not apply to this project.
2.1.6.1 The DG is considered the primary criteria, if conflicting with the UFC's and other criteria, and shall be followed as first precedence.
2.1.6.2 The requirements of the Army Reserve Design Process and Submittal Requirements (DPSR), shall take precedence over any conflicting UFC requirements regarding Predesign, Design, Post Design Services, and Submission Requirements.
2.1.7 Best Practices (Chapters or Appendices) listed in any UFCs shall be considered recommendations and are not contract requirements, unless otherwise noted in this RFP.
2.1.8 Accessibility – Design and construction must comply with ADA-ABA Accessibility Standard for Department of Defense Facilities and UFAS, whichever is most stringent. Buildings shall be considered to be “commercial facilities” under ADA-
ABA.
2.1.9 Design and construction shall comply with applicable Federal laws and regulations, such as EPA Clean Water and Clean Air Act and OSHA requirements.
2.2 LOCAL AND STATE CODES OR STANDARDS. The following
specifications, codes, standards, bulletins and handbooks form a part of this RFP.
2.2.1 State and Local.
North Carolina Department of Transportation Standard Specifications for
Roads and Structures City of Charlotte & Mecklenburg County Soil Erosion and Sedimentation
Control Ordinance North Carolina Department of Environmental Quality Stormwater Design
Manual Charlotte-Mecklenburg Stormwater Design Manual Elevator Code
Part 2 - 3 of 10
2.2.2 National.
IBC – International Building Code IEBC – International Existing Building Code IPC – International Plumbing Code IMC – International Mechanical Code
2.3 MILITARY CRITERIA. The following publications form a part of this document.
AR 190-11 Physical Security of Weapons, Ammunition and Explosives (for design and construction of arms vaults only)
AR 380-5 Department of the Army Information Security Program -
Chapter 7, Section III
CR-200010 Joint Service Oil/Water Separator Guidance Document
MIL HDBK 1013/1A Military Handbook: Design Guide for Physical Security of Facilities - for protection of openings into secure areas such as SIPRNET Café, and COMSEC
I3A Technical Criteria for The Installation Information
Infrastructure Architecture (I3A) (for outside plant design criteria only)
ECB 2018-11 Control System Cybersecurity Coordination
Requirement
UFC 1-200-01 DoD Building Code UFC 1-200-02 High Performance and Sustainable Building
Requirements UFC 3-101-01 Architecture UFC 3-110-03 Roofing UFC 3-120-01 Air Force Sign Standard UFC 3-120-10 Interior Design UFC 3-201-01 Civil Engineering UFC 3-201-02 Landscape Architecture UFC 3-210-10 Low Impact Development UFC 3-220-01 Geotechnical Engineering UFC 3-250-01 Pavement Design for Roads and Parking UFC 3-301-01 Structural Engineering
Amdt. #0003
DELETED
Amdt. #0003
UFC 3-401-01 Mechanical Engineering UFC 3-410-01 Heating, Ventilating, and Air Conditioning Systems
Part 2 - 4 of 10
UFC 3-410-02 Direct Digital Control for HVAC and Other Building Control Systems
UFC 3-420-01 Plumbing Systems UFC 3-501-01 Electrical Engineering UFC 3-520-01 Interior Electrical Systems UFC 3-530-01 Interior and Exterior Lighting Systems and Controls UFC 3-580-01 Telecommunications Building Cabling Systems
Planning and Design UFC 3-600-01 Fire Protection Engineering for Facilities UFC 3-490-06 Elevators UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings UFC 4-010-06 Cybersecurity of Facility-Related Control Systems UFC 4-021-01 Design and O&M: Mass Notification Systems UFC 4-171-05 Design Guide for US Army Reserve Facilities
No number Army Reserve Network Enterprise Center
Infrastructure Technical Criteria (ARNEC ITC)
No number USAR Design Process and Submittal Requirements
(DPSR)
No number ADA-ABA Accessibility Standard for Department of Defense Facilities
No number 2017 Implementing Guidance, Army Stormwater
Management Using Low Impact Development
No number MEMORANDUM FOR PPMD titled “Implementation of
UFC 4-010-01 revision 12 Dec 2018” dated 22 January 2019.
No number Department of the Army Sustainable Design and
Development (SDD) Policy memo dated January 17, 2017
No number IDS Responsibilities memo; Arms Vault IDS system
No number Caging Details; Unit Storage and Arms Vault, and other rooms with caging.
No number US Army Reserve Color Board
No number SIPRNET Technical Implementation Criteria (STIC)
SDDCTEA Pamphlet 55-17 Better Military Traffic Engineering
Part 2 - 5 of 10
2.4 OTHER APPLICABLE CRITERIA. Applicable design and construction criteria references are listed below. This list is not intended to include all criteria that may apply or to restrict design and construction to only those references listed.
Air Conditioning and Refrigeration Institute (ARI)
ARI 310/380 Packaged Terminal Air-Conditioners and Heat Pumps ARI 440 Room Fan-Coil and Unit Ventilator ARI 445 Room Air-Induction Units ARI 880 Air Terminals
Air Movement and Control Association (AMCA) AMCA 210 Laboratory Methods of Testing Fans for Rating
American Architectural Manufacturers Association (AAMA) AAMA 605 Voluntary Specification Performance Requirements and Test
Procedures for High Performance Organic Coatings on Aluminum Extrusions and Panels
AAMA 607.1 Voluntary Guide Specifications and Inspection Methods for Clear Anodic Finishes for Architectural Aluminum
AAMA 1503 Voluntary Test Method for Thermal Transmittance and Condensation Resistance of Windows, Doors, and Glazed Wall Sections
American Association of State Highway and Transportation Officials
(AASHTO)
Roadside Design Guide [guardrails, roadside safety devices] Standard Specifications for Transportation Materials and Methods of
Sampling and Testing [Road Construction Materials] Standard Specifications for Structural Supports for Highway Signs, Luminaries and Traffic Signals A Policy of Geometric Design of Highways and Streets Guide for Design of Pavement Structures, Volumes 1 and 2 [pavement design guide] American Bearing Manufacturers Association (AFBMA)
AFBMA Std. 9 Load Ratings and Fatigue Life for Ball Bearings AFBMA Std. 11 Load Ratings and Fatigue Life for Roller Bearings
American Boiler Manufacturers Association (ABMA) ABMA ISEI Industry Standards and Engineering Information
American Concrete Institute ACI 318, Building Code Requirements for Structural Concrete ACI SP-66, Details Manual ACI 530/530.1, Building Code Requirements and Specification for
Masonry Structures American Concrete Pipe Association
Design Manual Installation Manual
American Institute of Steel Construction (AISC) Steel Construction Manual and all standards and specification therein Seismic Design Manual and all standards and specification therein Steel Design Guide 11, Floor Vibrations due to Human Activity
American Iron and Steel Institute (AISI) AISI, S100, North American Specification for the Design of Cold-Formed
Steel Structural Members AISI D100, Cold-Formed Steel Design Manual
Part 2 - 6 of 10
AISI S400, North American Standard for Seismic Design of Cold-Formed Steel Structural Systems
American National Standards Institute 11 (ANSI) ANSI Z21.10.1 Gas Water Heaters Vol. 1, Storage water Heaters with
Input Ratings of 75,000 Btu per Hour or less ANSI Z124.3 American National Standard for Plastic Lavatories ANSI Z124.6 Plastic Sinks ANSI Z21.45 Flexible Connectors of Other Than All-Metal Construction for Gas Appliances ANSI Z358.1 Emergency Eyewash and Shower Equipment ANSI C2 National Electrical Safety Code ANSI/AF&PA NDS National Design Specification for Wood Construction
American Society of Civil Engineers (ASCE) Minimum Design Loads and Associated Criteria for Buildings and Other
Structures – ASCE 7 Design and Construction of Sanitary and Storm Sewers, Manuals and
Reports on Engineering Practice – No. 37 [sanitary sewer and storm drain design criteria]
American Society of Heating, Refrigerating and Air Conditioning Engineers
(ASHRAE)
ASHRAE Hdbk-IP Handbook, Fundamentals I-P Edition ASHRAE HVAC Applications Hdbk – Handbook, HVAC Applications ASHRAE Standard 15 Safety Standard for Refrigeration Systems ASHRAE Standard 55 Thermal Environmental Conditions for Human
Occupancy ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality.
Edition year and to the extent as referenced in UFC 3-410- 01.ASHRAE 90.1 Energy Standard for Buildings Except Low-Rise Residential Buildings. Edition year and to the extent as referenced in
UFC 1-200-02.
ASHRAE 189.1 Standard for the Design of High-Performance Green Buildings. Edition year and to the extent as referenced in UFC 1-200- 02, and to the extent indicated in the RFP.
American Society of Mechanical Engineers International (ASME) ASME BPVC SEC VII Boiler and Pressure Vessel Code: Section VII
Recommended Guidelines for the Care of Power Boilers ASME A17.1 Safety Code for Elevators and Escalators
American Society for Testing and Materials (ASTM) E1592 Standard Test Method for Structural Performance of Sheet Metal
Roof and Siding Systems by Uniform Static Air Pressure Difference American Water Works Association (AWWA)
AWWA Standards [standards for water line materials and construction] American Welding Society (AWS)
D1.X Standards Architectural Woodwork Institute (AWI)
AWI Quality Standards Associated Air Balance Council (AABC)
AABC MN-1 National Standards for Testing and Balancing Heating, Ventilating, and Air Conditioning Systems
AABC Commissioning Group Commissioning Guidelines Builders Hardware Manufacturers Association (BHMA)
Part 2 - 7 of 10
ANSI/BHMA A156.4 American National Standards for Door Controls – Closers…
Cast Iron Soil Pipe Institute (CISPI) Code of Federal Regulations (CFR)
49 CFR 192 Transportation of Natural and Other Gas by Pipeline:
Minimum Federal Safety Standards
10 CFR 430 Energy Conservation Program for Consumer Products Ductile Iron Pipe Research Association (DIPRA), Design of Ductile Iron Pipe Environmental Protection Agency
EPA 625-R-92-016 Radon Prevention in the Design and Construction of Schools and Other Large Buildings
Federal Highway Administration (FHWA) Manual on Uniform Traffic Control Devices for Streets and Highways
[signage for streets and highways] Illuminating Engineering Society (IES)
The Lighting Handbook, Reference and Application Institute of Electrical and Electronics Engineers Inc. (IEEE)
Standard for Use of the International System of Units (SI): the Modern Metric System
National Electrical Safety Code ANSI C2 Institute of Traffic Engineers (ITE)
Trip Generation Transportation Planning Handbook
LEED: Leadership in Energy and Environmental Design Green Building Rating System, [ Version 4 ], as developed by the U.S. Green Building Council (USGBC)
Metal Building Manufacturer’s Association (MBMA) MBMA Metal Building Systems Manual, with latest Supplement MBMA Seismic Design Guide for Metal Building Systems National Association of Corrosion Engineers International (NACE) NACE SP0169 Control of External Corrosion on Underground or Submerged
Metallic Piping Systems NACE SP0185 Extruded, Polyolefin Resin Coating Systems with Soft
Adhesives for Underground or Submerged Pipe NACE SP0285 Corrosion Control of Underground Storage Tank Systems by Cathodic Protection NACE SP0286 Electrical Isolation of Cathodically Protected Pipelines
National Electrical Manufacturers Association (NEMA) National Environmental Balancing Bureau (NEBB)
NEBB Procedural Standards for Testing Adjusting Balancing of Environmental Systems
NEBB Procedural Standards for Building Systems Commissioning National Fire Protection Association (NFPA)
NFPA 1 Fire Code Handbook NFPA 10 Standard for Portable Fire Extinguishers NFPA 13 Installation of Sprinkler Systems NFPA 13R Residential Occupancies up to and Including Four Stories in
Height Sprinkler Systems NFPA 20 Installation of Centrifugal Fire Pumps NFPA 24 Standard for the Installation of Private Fire Service Mains and
Their Appurtenances (underground fire protection system design)
Part 2 - 8 of 10
NFPA 30 Flammable and Combustible Liquids Code NFPA 30A Motor Fuel Dispensing Facilities and Repair Garages NFPA 31 Installation of Oil Burning Equipment NFPA 54 National Fuel Gas Code NFPA 58 Liquefied Petroleum Gas Code NFPA 70 National Electrical Code NFPA 70E Standard for Electrical Safety in the Workplace NFPA 72 National Fire Alarm Code NFPA 80 Standard for Fire Doors and Fire Windows NFPA 90a Installation of Air Conditioning and Ventilating Systems NFPA 96 Standard for Ventilation Control and Fire Protection of
Commercial Cooking Operations NFPA 101 Life Safety Code NFPA 291 Recommended Practice for Fire Flow testing and Marking of
Hydrants NFPA 780 Standard for the Installation of Lightning Protection Systems
National Food Code FDA Model Food Code
National Institute of Standards and Technology (NIST) RP8 - Standards of Seismic Safety for Existing Federally Owned and
Leased Buildings – ICSSC Recommended Practice 8 (RP8). NIST
GCR 11-917-12.
National Roofing Contractor’s Association NRCA Roofing and Waterproofing Manual
Occupational Safety and Health Administration (OSHA) OSHA Construction Industry Standards, Title 29, Code of Federal
Regulations, Part 1926, Safety and Health Regulations for Construction
Plumbing and Drainage Institute (PDI) PDI G 101 Testing and Rating Procedure for Grease Interceptors with
Appendix of Sizing and Installation Data PDI WH201 Water Hammer Arrestors
Precast Concrete Institute PCI Design Handbook – Precast and Prestressed Concrete
Sheet Metal and Air Conditioning Contractor’s National Association
(SMACNA)
SMACNA HVAC Duct Construction Standards HVAC Duct Construction
Standards - Metal and Flexible SMACNA Architectural Manual Architectural Sheet Metal Manual
Steel Door Institute (SDI) ANSI A250.8/SDI 100 Standard Steel Doors and Frames
Steel Deck Institute (SDI) Floor Deck Design Manual Roof Deck Design Manual Diaphragm Design Manual
Steel Joist Institute (SJI) Standard Specifications for K-Series, LH-Series, and DLH-Series Open
Web Steel Joist, and for Joist Girders.
Load Tables and Weights for K-Series, LH-Series, and DLH-Series Open
Web Steel Joists and Joist Girders SJI Tech Digest #5 Vibration of Steel-Joist Concrete Slab Floors
Part 2 - 9 of 10
Telecommunications Industries Association (TIA) TIA 568 Generic Telecommunications Cabling For Customer Premises TIA 569 Telecommunications Pathways and Spaces TIA-758 Customer-Owned Outside Plant Telecommunications
Infrastructure TIA 606 Administration Standard for Telecommunications Infrastructure TIA 607 Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises Underwriters Laboratories (UL)
UL 96A Installation Requirements for Lightning Protection Systems UL 300 Standard for Safety for Fire Testing of Fire Extinguishing Systems for Protection of Restaurant Cooking Areas Uni-Bell PVC Pipe Association, Handbook of PVC Pipe: Design and
Construction Recommended Standards for Wastewater Facilities, by Health Research, Inc.
2.5 SOURCES FOR GOVERNMENT PUBLICATIONS.
2.5.1 AR (Army Regulations) may be found at http://www.apd.army.mil
2.5.2 ADA-ABA is available at http://www.access-board.gov/guidelines-and-standards/buildings-and-sites
2.5.3 References to the Corps of Engineers, Louisville District, Army Reserve Customer Website shall utilize the following website link:
https://www.lrl.usace.army.mil/Missions/Engineering/Design-Guide/Military- Programs/Army-Reserve-Customers/
2.5.4 The Design Guide, I3A, ARNEC ITC, USAR Design Process and Submittal Requirements, and 2017 Implementing Guidance, Army Stormwater Management Using Low Impact Development are available at the Corps of Engineers, Louisville District, Army Reserve Customer Website.
2.5.5 The Joint Service Oil/Water Separator Guidance Document is available from the U.S. Army Environmental Center, and can be ordered on CD-ROM by calling 1-800-
USA-3845.
2.5.6 I3A document is available at the Corps of Engineers, Louisville District, Army Reserve Customer Website
2.6 PERMITS AND COORDINATION WITH LOCAL AUTHORITIES.
2.6.1 General. The Contractor is responsible for making all applications and obtaining required municipal, utility, and regulatory agency coordination, reviews, permits, inspections and approvals, and is responsible for payment of any associated fees or charges. The Contractor shall not contact agencies and individuals listed below during the preparation of his proposal, unless noted otherwise. If Government information, signatures, names or addresses are required for applications, approvals or permits, the Contractor is responsible for obtaining same. This is a Federal Government project; therefore, some reviews, permits, inspections and approvals are not required.
The Contractor is responsible for identifying such requirements for a commercial project
Part 2 - 10 of 10 and verifying with the Government which of these will be waived. Permit requirements which have been identified are listed below. This list is not all-inclusive, and Contractor is responsible for verifying that information below remains accurate.
2.6.2 Jurisdiction. By Federal and State of North Carolina law, most State and local governmental agencies do not have jurisdiction over Federal construction on Federal land. It is the intention of the Army Reserve to be a “good neighbor” to the State and local governmental agencies, and to comply with applicable State and local codes and regulations. The Contractor is required to comply with local codes and regulations, as noted in Section 2.1.3. The Contractor shall strive to keep local governmental agencies informed of the design and construction progress of the project.
2.6.3 Streets, Rights of Way, and Street Access. Point of contact is Shad Spencer, Mecklenburg County Zoning Administrator. Phone 704-353-1132 or sspencer@ci.charlotte.nc.us
2.6.4 Planning and Zoning. Point of contact is Shad Spencer, Mecklenburg County Zoning Administrator. Phone 704-353-1132 or sspencer@ci.charlotte.nc.us
2.6.5 Building Code. The Contractor is responsible for compliance with applicable building codes. The Government’s review of Contractor’s design and construction will include review for project code compliance, but does not relieve Contractor of compliance responsibility. Coordinate with Sections 2.1 and 2.2.
2.6.6 Fire Protection. The Contractor is responsible for compliance with applicable fire protection and life safety codes. The Government’s review of Contractor’s design and construction will include review for project compliance with requirements, but does not relieve Contractor of compliance responsibility. Point of contact is City of Charlotte Fire Administration Office 704-336-4174
2.6.7 Water. See Part 3 of this Section for additional information.
2.6.8 Sanitary Sewer. See Part 3 of this Section for additional information.
2.6.9 Natural Gas. See Part 3 of this Section for additional information.
2.6.10 Electric. See Part 4 of this Section for additional information.
2.6.11 Telecommunications. See Part 4 of this Section for additional information.
2.6.12 Cable Television. See Part 4 of this Section for additional information.
2.6.13 Storm Drainage, and Soil and Water Conservation. See Part 3 of this
Section for additional information.
Part 3 - 1 of 13
PART 3
SITE CIVIL DESIGN
3.1 GRADING.
3.1.1 Refer to the work shown and noted on RFP drawings sheet CG101 for additional project requirements.
3.1.2 Design any new grades to provide required sight lines related to traffic and roadway design.
3.1.3 Design grades to meet accessibility requirements where required.
3.1.4 The Contractor shall be responsible for dewatering necessary for grading and other subsurface works for the construction of the Project. If temporary construction dewatering is required due to a high water table, the Contractor shall prepare and present a dewatering plan. The Contractor is responsible for securing all the required information necessary for the design of the system.
3.1.5 A balance of the quantity of cut and fill soils which would create a smooth transition of graded areas into the existing natural site is desired. Site specific conditions such as pavement repairs, flood and drainage protection, slopes and access reasons may cause unbalanced earthwork operations and are to be identified by the Contractor in the first Site/Utility Design submittal.
3.1.6 The plan shall reflect selective site clearing that preserves existing trees.
3.1.7 Erosion and Sediment Control Facilities shall comply with Federal, State and local regulations. The Contractor is responsible for compliance with stormwater NPDES Permit, Stormwater Pollution Prevention Plan, and NOI/NOT requirements, and for any associated fees and permits. See Section 01 57 19.00 06.
3.1.8 The Contractor shall notify utilities and obtain marked utility locations prior to start of construction. State “One Call” utility location programs are to be used where available.
3.2 SURVEY, GEOTECHNICAL, AND EARTHWORK
3.2.1 Survey. A survey has not been performed for this project. Information shown was obtained from available record drawings and GIS mapping. Refer to the RFP Drawings. The Contractor shall, at its own expense, verify existing conditions and obtain any additional information required to provide a complete and useable design.
3.2.2 Subsurface Characterization Report. A preliminary report was prepared to characterize the subsurface conditions at the project site for the previous RPX AMSA project and is appended to these specifications. The report provides a general overview of the soil and geologic conditions with detailed descriptions at discrete boring locations.
Part 3 - 2 of 13
The Contractor’s team shall include a licensed geotechnical engineer to interpret the subsurface conditions (assuming they are consistent with the site subsurface conditions) and develop earthwork and foundation requirements and design parameters on which to base the Contractor’s proposal. Foundation type, pavement and earthwork requirements on which the Contractor’s bid is based shall be presented in his proposal along with the resume of the geotechnical engineer. Refer to Attachment A of this section. Refer to Section 01 03 00.00 48 for additional geotechnical requirements.
3.2.3 Soil Compaction and Foundation Excavations.
3.2.3.1 Soil Compaction shall be achieved by equipment approved by a professional geotechnical engineer. Material shall be moistened or aerated as necessary to provide the moisture content that shall readily facilitate obtaining the compaction specified with the equipment used. Each layer of fill placement shall be no greater than 8 inches thick.
Compact each layer to not less than the percent of maximum density specified in Table 3-1, determined in accordance with ASTM D-1557.
Table 3-1 Soil Compaction
Foundations 95%
Concrete Work and Pavements 95%
Landscaping 85%
Retaining Wall Backfill 85%*
*at non-structural or pavement locations
The requirements shall be verified or modifications recommended by the Contractor’s geotechnical engineer in the report whenever engineering, soils or climatic factors indicate the necessity. Any modifications to the stated compaction requirements shall require approval from the USACE ACO.
3.2.3.2 Subgrade suitability (by proof rolling operations), fill placement and compaction operations shall be observed and tested on a full-time basis by a qualified independent testing agency as directed by the Contractor’s licensed professional geotechnical engineer. Field in-place density shall be determined and checked in accordance with the appropriate ASTM methodologies. The rate of in-place density testing shall be specified in the earthwork specifications. Representative Optimum Moisture and Laboratory Maximum Density Tests shall be made for each type of material or source of material. Upon completion of all earthwork, the Contractor’s geotechnical engineer shall certify in writing that the fill was placed in accordance with the requirements and provide the backup data including but not limited to: Proctor curves (moisture/density relationship), moisture contents, Atterberg limits, field density checks, sieve analysis, etc. Testing locations and elevations for all results shall be documented so that their position can be substantiated and relocated if necessary. The Contractor’s QC Plan shall detail these testing requirements and outline the plan to the report the testing results.
3.2.3.3 During construction, foundation excavations shall be inspected and approved by the Contractor’s licensed professional geotechnical engineer prior to placing concrete.
Part 3 - 3 of 13
3.2.4 Capillary Water Barrier. A capillary water barrier is required for all new interior slabs on grade, including garages, carports and storage rooms.
3.3 UTILITIES. See site drawings for existing conditions and additional utility information. The contractor shall confirm the topographic and utility information after award and prior to their final design phase. The intent is to use the existing water, sanitary sewer, and gas service building penetrations where feasible, however, the contractor must determine their adequacy based on the proposed use of each building.
A new domestic water loop and fire protection system is required for the proposed sprinkler systems. A new sanitary sewer system shall be provided onsite. See Attachments E and F for record plans.
3.3.1 Gas Distribution System. The contractor shall determine if any modifications are required for the existing gas service and include all costs in their bid.
An additional meter is required regardless of whether other modifications are needed.
See paragraph 3.3.1.4 for meter requirements.
3.3.1.1 Materials. Piping, valves, regulators and vaults shall be that required or utilized by the local gas company and State agencies. Contractor to coordinate with the gas company and State agencies for this information.
3.3.1.2 Testing. Prove that the entire system of gas mains and service lines is gas-tight by an air test, in accordance with ANSI B31.8. The test shall continue for at least 24 hours between initial and final readings of pressure and temperature. Contractor to ensure that this test is performed.
3.3.1.3 Mains and Service Lines. Lines shall not be placed under any buildings.
Lines shall be placed with a minimum of 36 inches of earth cover. Protective casings shall be provided to protect lines from superimposed street or heavy traffic loads.
3.3.1.4 Metering. Meters shall be purchased from the gas utility where available or be supplied by the Contractor meeting the approval of the gas distribution utility.
Additional, redundant metering may be required to meet the Army Reserve’s smart meter specification. See Technical Outline Specifications section 33 51 16.00 48 for additional information.
3.3.2 Water Distribution System. The design of the water distribution system shall be in accordance with the requirements as noted herein and in the American Water Works Association (AWWA) Standards and Manuals of Water Supply Practices. Also, conform to State and Municipal water supply standards. Where standards disagree, the most stringent shall apply. The system shall be installed with the piping at least 36 inches below ground or deeper as needed for frost protection. The Contractor shall determine the domestic and the fire demands for the facilities and shall verify the design of all components of the domestic and fire protection supply systems. Design of a water distribution system requires both domestic and fire flow demands be considered concurrently. No building shall be placed over existing water pipes.
3.3.2.1 Analysis of Existing System Capacity. Existing flow characteristics shown in Attachment B are for information only. The Contractor shall perform, or have performed
Part 3 - 4 of 13 by a qualified fire protection designer, a flow test to verify the results noted in this RFP.
See Part 13 of this RFP for detailed fire protection requirements including timing of the contractor’s flow test.
3.3.2.2 Connections to Water Mains and Building Service Lines. Connection to the existing water mains shall be where shown on drawings.
3.3.2.3 Connections to Water Mains. Design the connections to the water distribution system including the meter assemblies and the necessary backflow-preventing devices. Fire protection system shall be considered as that part of the distribution system supplying fire hydrants, or fire hydrant laterals. Mains that are incorporated into a larger distribution system shall be looped with no dead ends and be of adequate size to satisfy both domestic and fire flow requirements. Minimum main size is 6 inches. Sufficient sectional control valves shall be provided so that no more than two fire hydrants will be out of service in the event of a single break in a water main.
The pipe, valves, and all other materials shall meet the requirements of a 150-psi working pressure system or as required by the utility service provider.
3.3.2.4 Building Connections. Contractor shall provide the necessary transition fittings, adaptors, or reducers need between site piping and building piping.
3.3.2.5 Trenches. Water and gas mains shall not to be installed in the same trench.
Water mains shall have a minimum earth cover as required by the water distribution utility and State agencies. Where frost penetrates to a depth greater than the minimum above, greater cover will be required. Sufficient cover must also be provided to protect the pipe against structural damage due to superimposed surface loads. Lines installed with less cover than the minimums stated shall be concrete encased with a minimum concrete thickness of 6 inches and insulated to prevent freezing.
3.3.2.6 Fire Hydrants. Hydrants and valves shall conform to AWWA C500. Post Indicator valves shall conform to the requirements of NFPA 24. Fire hydrants shall be compatible with those presently in use at the installation, with similar pump and hose connections. Hydrants shall be dry barrel type. The maximum amount of flow that can be permitted shall be determined. Fire hydrant spacing shall be no greater than 500 feet apart by paved road. In addition, a hydrant shall be provided so that all parts of the facilities can be reached by hose lines not over 350 feet long. All distances shall be calculated along the closest route that the fire apparatus must travel (i.e., along the curb or access lane). Each hydrant may account for a maximum of 1250 gpm of fire protection regardless of existing pressures or water line capacity. A fire hydrant shall be located within 150 feet from any fire department connection provided. Hydrant laterals shall be 6 inches minimum size and shall not exceed 50 feet in length where possible and shall have an underground shutoff valve. Valve box, at each lateral, shall be located within 10 feet of the hydrant, and shall not be located where obstructed by parked vehicles, shrubbery, etc. Bollards shall be provided where hydrant locations are subject to vehicle damage. Provide minimum 4-ft height, 6-in diameter bollards in areas subject to POV traffic only. Provide minimum 5-ft height, 8-in diameter bollards in areas subject to large truck traffic.
3.3.2.7 Shutoff Valve. Each building shall be provided with a separate service and main shutoff valve, readily accessible to maintenance and emergency personnel.
Part 3 - 5 of 13
Shutoff valves in walks are prohibited. Valves shall have valve boxes or manholes extending to the surface with the word “water” cast in the lid pattern.
3.3.2.8 Metering. Meters shall be purchased from the water utility where available or be supplied by the Contractor meeting the approval of the water distribution utility.
Additional, redundant metering may be required to meet the Army Reserve’s smart meter specification. See Technical Outline Specifications section 33 11 01.00 48 for additional information.
3.3.2.9 Materials. Materials for the water distribution system shall be in accordance with the attached water distribution specification in the Outline Technical Specifications.
For ductile iron piping systems (except for ductile iron piping under floor in soil) conduct an analysis to determine if cathodic protection and/or bonded or unbonded coatings are required.
3.3.2.10 Field Quality Control for Water Distribution. The Contracting Officer will witness field inspections and field tests specified. The Contractor shall perform field tests. Water needed for field tests will be furnished by the Contractor. Water needed for field tests and its disposal be furnished by the Contractor. Do not begin testing on any section of a pipeline where concrete thrust blocks have been provided until at least 5 days after placing of the concrete. The Contractor shall coordinate with water distribution utility for utility inspection and pay associated fees.
3.3.3 Sanitary Sewer System. The Contractor shall determine the sewage contribution for the facilities and shall verify the design of all components of the sanitary sewer system. The Contractor shall use sewage flow determination methods of the American Society of Civil Engineers, Water Pollution Control Federation method or methods required by the local wastewater collection and treatment authority. No structures shall be placed over existing sanitary sewer pipes. Refer to RFP drawings sheet CU101 for additional project requirements.
3.3.3.1 Analysis of Existing System Capacity. Refer to Attachment C for results from the sewer televising study. The existing sewer system onsite is in poor condition and in need of replacement. All existing sewer structures shall be removed and backfilled. The existing pipe network onsite shall be removed or abandoned in place by filling pipes with flowable fill. Abandoned pipes leaving the site shall be capped near the property line.
3.3.3.2 Connections to Sewage Collection Mains and Building Service Lines. The Contractor shall connect to the existing sewer system as shown on the plans. The City of Charlotte will replace the existing 6” sewer pipe in McClintock right of way with a new 8” pipe from the manhole in the street to the property line. The contractor shall connect to the 8” line at the property line and provide a new manhole on Army Reserve property which will be the point of connection for the entire project.
3.3.3.3 Building Sewer Laterals and Connections. Laterals and building connections shall be designed and constructed in accordance with UFC, State agency and wastewater utility standards. Minimum diameter for laterals shall be 6 inches while maintaining a minimum velocity of 2.5 feet per second.
Part 3 - 6 of 13
3.3.3.4 Collection Trunks and Laterals. Pipe sizes and slopes shall be calculated using Manning’s Formula. Manholes are required at all changes of direction and spaced not more than 400 feet apart. Curved sewers are prohibited except where approved by the municipal sewers utility for large diameter trunks or interceptors. Pipes shall be designed to flow full and maintain a minimum velocity of 2.5 fps. Minimum size 8 inches.
3.3.3.5 Trenches. Sewer and water lines, mains or laterals, shall be placed in separate trenches.
3.3.3.6 Minimum Sewer and Water Distribution Pipe Separation Requirements.
Parallel water and sewer pipe and crossings between water and sewer pipe shall conform to Paragraph 38.3 of the Recommended Standards for Wastewater Facilities, published by Health Research, Inc.
3.3.3.7 Cover. Sewer lines shall be located at a depth greater than the frost penetration. Coordinate with building connection requirements. To prevent the pipe from being crushed by construction vehicles and the design vehicle, the minimum cover above the top of pipes shall be 30 inches unless pipe sleeve materials are used and/or unless the pipe is concrete encased with a minimum of 6-inch thickness of concrete.
3.3.3.8 Sewage Pump Station and Force Main. Pump stations and force mains shall only be used when absolutely necessary. If required, pump stations and force mains shall conform to Paragraph 40 of the Recommended Standards for Wastewater Facilities, published by Health Research, Inc.
3.3.3.9 Field Quality Control for Sanitary Sewer Distribution System. The Contracting Officer will witness field inspections and field tests specified. The Contractor shall perform field tests. Water needed for field tests and its disposal shall be furnished by the Contractor. For force mains, do not begin testing on any section of a pipeline where concrete thrust blocks have been provided until at least 5 days after placing of the concrete. The Contractor shall coordinate with the sewer utility for utility inspections and pay associated fees.
3.3.3.10 Oil/Water Separators. Oil/water separators, if required, shall be designed and sized in accordance with the Applicable Criteria in Part 2 and comply with State and Local regulatory authority requirements. Oil/water separators located beneath pavements shall have the oil/water separator components designed for the applied soil and vehicle loads. Storm drainage and wastewater flow from sanitary and kitchen facilities shall be prevented from entering wash bay drainage to the OWS.
3.3.3.11 Manholes. Manholes shall be located at intersections and changes in alignment or grade. Intermediate manhole maximum spacing shall be 400 feet.
Manholes and manhole appurtenances shall be precast concrete. Shape manhole inverts to the shape of the pipe with cast-in-place concrete after installing pipes. The manhole lid shall have a 24-inch minimum opening as measured from the face of the wall or rungs where applicable. Manhole lids shall have “Sanitary Sewer” cast in the lid pattern.
3.3.4 Storm Drainage Collection Systems and Grading. Maintain existing drainage conveyances. New drainage conveyances shall be designed as follows.
Part 3 - 7 of 13
3.3.4.1 Location of Connections to Existing Systems. The Contractor shall connect to the existing storm sewer system or drainage conveyance with a manhole or appropriate drainage control structure.
3.3.4.2 Building Connections. If used, connections to building roof or area drain lines shall be designed and constructed in accordance with the International Building Code 2018 or latest edition.
3.3.4.3 Storm Sewer System. The storm sewer system shall be designed for a minimum of a 10-year return frequency or the design storm required by the local authority, whichever is greater, and pipes shall be sized for full flow. The minimum velocity of flow in conduits during a design storm shall be 3 fps. The pipe capacity shall be determined so that the calculated hydraulic grade line of the storm sewer drainage system(s) shall not exceed the curb flow line grade in pavements and the finished site grades. Overland drainage outlets shall be provided so that on-site stormwater levels at the buildings are a minimum of one foot below the first floor elevation and building openings for the 100-year return frequency. No buildings shall be placed over existing storm sewer pipes.
3.3.4.4 Manholes. Manholes shall be located at intersections and changes in alignment or grade. Intermediate manhole maximum spacing shall be 250 feet for pipes 36 inches or less in diameter or box drains with the smallest dimension less than 36 inches. Maximum spacing for intermediate manholes on larger pipes and drain boxes shall be 500 feet. Manholes and manhole appurtenances shall be precast concrete.
Shape manhole inverts to the shape of the pipe with cast-in-place concrete after installing pipes. The manhole lid shall have a 24-inch minimum opening as measured from the face of the wall or ladder where applicable. Manhole lids shall have “Storm Sewer” cast in the lid pattern.
3.3.4.5 Drainage of Grass Areas. Minimum slopes across grass surfaces shall be one percent. In grass areas, overland sheet flow shall be held to a maximum length of 100 feet or the length that can be shown not to erode the surface vegetation; then, a ditch, a swale or an inlet must be used. Minimum slopes in ditch or swale centerlines shall be 0.5 percent. Field inlets and an underground collection system shall drain open areas. Ditch or swale side slopes shall not be steeper than 1V: 4H and maximum swale depth shall be 24 inches. Storm drain pipe, sheet flow surfaces, and swales shall be designed to prevent standing water under normal conditions. Surface drainage conveyances with parameters greater than outlined here shall be designed as channels, see 3.4.7 below. Minimize the amount of grassed area drained overland across sidewalks, parking areas or roads.
3.3.4.6 Drainage of Roads and Pavements. Provide a positive crown in all streets and roads. Minimum transverse slopes in streets and roads shall 2.0% and the maximum cross slope shall be 3.0%. The preferred roadway cross section is a crowned roadway section with 2.0% transverse cross slopes. Minimum sheet flow slopes across parking area and other paved areas shall be 1.0%. Concrete valley gutters shall be provided where sheet flows come together resulting in a paved swale with less than 1.0% slope. Curbs and gutters shall be installed at a minimum longitudinal slope of 0.30% or steeper as recommended by the geotechnical engineer. Pavement collectors
Part 3 - 8 of 13 for stormwater shall be by curb inlets and gutters, or drop inlets. Gutter spread (or inlet approach spread) in roads shall not exceed 10 feet when measured from the face of curb. The amount of runoff to any one inlet in roads and parking areas shall not exceed the capacity of that inlet. The maximum spread allowable for determining inlet capacity shall equal that allowed for gutter spread in roads. The maximum spread allowable for determining inlet capacity in parking areas shall be height of curb or a depth of 6 inches, whichever is less. Coordinate drainage at and along public or installation roadways with the governing roadway authority.
3.3.4.7 Materials. All materials shall be in accordance with the State Department of Transportation (DOT) Specifications and local drainage authority standards. Pipe for culverts and storm drains shall be of reinforced concrete.
3.3.4.8 Field Quality Control for Storm Drainage System. The Contracting Officer will witness field inspections. Testing procedures and requirements shall comply with State DOT and local drainage authority requirements. The Contractor shall coordinate with the local drainage authority for required inspections and pay associated fees.
3.4 STORMWATER. Maintain existing drainage conveyances. The existing site complies with the City of Charlotte stormwater management policies. New drainage conveyances shall be designed as follows.
3.4.1 Design storm sewer and surface conveyance of storm water runoff from areas within the site. Grading should manage site runoff to maintain rate of flow and quantity to pre-construction levels or reduce site runoff where possible.
3.4.2 Site contours and drainage features shall ensure reasonable runoff volumes and travel times into individual catch basins and ditches, etc. Sewers shall be sized and sloped to adequately convey these flows with a minimum velocity of 3 fps.
3.4.3 Federal, State and local regulations regarding the design of stormwater management systems shall be considered the minimum design criteria and should apply. Additionally, minimize the impact of construction activities on drainage and prevent loss of soils by water and wind erosion. In accordance with the requirements of the Energy Independency and Security Act of 2007, this project shall utilize site planning, design, and construction strategies to maintain or restore the predevelopment hydrology of the property regarding the temperature, rate, volume, and duration of storm water runoff flow. Low impact development strategies can be used to meet the requirements of the law. Low impact development (LID) is a storm water management strategy concerned with maintaining or restoring the natural hydrologic functions of a site. Implementing Guidance memo for Army Stormwater Management Using Low Impact Development and UFC 3-210-10, Low Impact Development, provides guidance for the development of LID strategies. Stormwater retention and detention ponds take up valuable space, are not considered LID BMPs and are highly discouraged.
Traditional retention and detention ponds do not provide for maintaining pre-development hydrology, allow for minimal infiltration,…