This solicitation is for the design/build construction of transient training barracks at Fort McCoy, Wisconsin with an estimated construction cost between $10-25 million. The Corps of Engineers District Louisville is the contracting agency. Responses are due through the ProjNet system by the date specified in the solicitation. The procurement is full and open to all business sizes determined by the NAICS code, with HUBZone price evaluation preferences required. Funds are presently unavailable so no award will be made until appropriated. Technical questions must be submitted through ProjNet, while CCR/ORCA registration in SAM is required to comply with various FAR provisions referenced. A site visit process is outlined. The terms bid and proposal may be used interchangeably.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: LEVI SPETH
600 DR M L KING JR PL
LOUISVILLE KY 40202-2236
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Solicitation W912QR20R0027 for the Design/Bid/Build for the Construction of Transient Training Barracks at Ft McCoy, WI is hereby amended as follow s:
See Continuation Sheet.
1. CONTRACT ID CODE PAGE OF PAGES
1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0027
X 9B. DATED (SEE ITEM 11)
07-Aug-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO.
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
14-Sep-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE 964860
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0027_Specs-0003
W912QR20R0027
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0003
Transient Training Barracks P2 476377 FY20 Ft McCoy WI
W912QR20R0027
AMDT0003
SUMMARY OF CHANGES
The due date for proposals has been extended to 2:00 pm ET on 18 September 2020.
1. The following SPECIFICATION SECTIONS have been revised and replaced in their entirety:
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR
HVAC
23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND
OTHER
BUILDING CONTROL SYSTEMS
08 11 16 ALUMINUM DOORS AND FRAMES (ALUMINUM
STOREFRONTS)
07 41 13 METAL ROOF PANELS, UNDERLAYMENTS, AND BUILT-
UP INSULATED ROOF
2. The following SPECIFICATION SECTIONS have been added in their entirety:
32 12 13 BITUMINOUS TACK COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
3. The following SPECIFICATION SECTIONS have been deleted in their entirety:
NONE FOR AMDT0003
4. The following PLAN SHEETS have been revised and replaced in their entirety:
A-111 FIRST FLOOR PLAN – ENLARGED
A-121 SECOND FLOOR PLAN – ENLARGED
A-131 THIRD FLOOR PLAN – ENLARGED
A-141 FOURTH FLOOR PLAN – ENLARGED
W912QR20R0027
A-311 WALL SECTIONS
A-405 ENLARGED ELEVATOR AND ELEVATOR MACHINE
ROOM
A-521 ROOF DETAILS
A-610 DOOR SCHEDULE AND FRAME TYPES 1ST AND 2ND
FLOORS
A-611 DOOR SCHEDULE AND FRAME TYPES 3RD AND 4TH
FLOORS
M-702 CONTROL SYSTEM NETWORK
S-112 SECOND FLOOR FRAMING PLAN
S-122 THIRD FLOOR FRAMING PLAN
S-132 FOURTH FLOOR FRAMING PLAN
5. The following PLAN SHEETS have been added new:
NONE FOR AMDT0003
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 15-Sep-2020 10:00 AM to 18-Sep-2020 02:00 PM.
(End of Summary of Changes)
P2 476377 TRANSIENT TRAINING BARRACKS
Ft. McCoy, WI
SECTION TABLE OF CONTENTS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
SECTION 07 41 13
AMDT0003***************************************************************
METAL ROOF PANELS, UNDERLAYMENTS, AND BUILT-UP INSULATED ROOF
******************************************************************AMDT0003
PART 1 GENERAL
1.1 REFERENCES
1.2 DESCRIPTION OF METAL ROOF SYSTEM
1.2.1 Performance Requirements
1.2.1.1 Hydrostatic Head Resistance
1.2.1.2 Wind Uplift Resistance
1.3 SUBMITTALS
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
1.4.1.1 Manufacturer's Technical Representative
1.4.1.2 Single Source
1.4.2 Qualification of Applicator
1.4.3 Field Verification
1.4.4 Qualifications for Welding Work
1.4.5 Pre-roofing Conference
1.5 DELIVERY, HANDLING, AND STORAGE
1.5.1 Delivery
1.5.2 Handling
1.5.3 Storage
1.6 PROJECT CONDITIONS
1.7 FABRICATION
1.7.1 Finishes
1.7.2 Accessories
1.8 WARRANTIES
1.8.1 Metal Roof Panel Manufacturer Warranty
1.8.2 Manufacturer's Finish Warranty
1.8.3 Metal Roof System Installer Warranty
1.8.4 Continuance of Warranty
1.9 CONFORMANCE AND COMPATIBILITY
PART 2 PRODUCTS
2.1 ROOF PANELS
2.1.1 Steel Sheet Panels
2.2 FACTORY FINISH AND COLOR PERFORMANCE REQUIREMENTS
2.2.1 Specular Gloss
2.3 MISCELLANEOUS METAL FRAMING
2.3.1 General
2.3.2 Fasteners and Miscellaneous Metal Framing
2.3.2.1 Exposed Fasteners
2.3.2.2 Screws
2.3.2.3 Rivets
2.3.2.4 Attachment Clips
2.3.3 Electrodes for Manual, Shielded Metal Arc Welding
SECTION 07 41 13 Page 1
CERTIFIED FINAL AMDT0003
05/11
2.4 ACCESSORIES
2.4.1 Pre-manufactured Accessories
2.4.2 Metal Closure Strips
2.4.3 Rubber Closure Strips
2.5 JOINT SEALANTS
2.5.1 Sealants
2.5.1.1 Shop Applied Sealants
2.5.1.2 Field Applied Sealants
2.5.1.3 Tape Sealants
2.5.2 Sheet Metal Flashing and Trim
2.5.2.1 Fabrication, General
2.5.2.2 Roof Drainage Sheet Metal Fabrications
2.6 ROOF INSULATION PANELS
2.7 UNDERLAYMENTS
2.7.1 Felt Underlayment
2.7.2 Self-Adhering Modified Bitumen Underlayment
2.7.3 Air Barrier Transition Material
2.8 GASKETS AND SEALING/INSULATING COMPOUNDS
2.9 FINISH REPAIR MATERIAL
PART 3 EXECUTION
3.1 EXAMINATION
3.2 INSTALLATION
3.2.1 Preparation
3.2.2 Underlayment
3.2.2.1 Single Layer Felt Underlayment for a Standard Slope Roof
Deck
3.2.2.2 Self-Adhering Sheet Underlayment
3.3 INSULATION INSTALLATION
3.4 PROTECTION OF APPLIED MATERIALS
3.5 FASTENER INSTALLATION
3.5.1 Welding
3.6 FLASHING, TRIM, AND CLOSURE INSTALLATION
3.6.1 General Requirements
3.6.2 Metal Flashing
3.7 ROOF PANEL INSTALLATION
3.7.1 Handling and Erection
3.7.2 Closure Strips
3.7.3 Workmanship
3.8 ACCEPTANCE PROVISIONS
3.8.1 Erection Tolerances
3.8.2 Leakage Tests
3.8.3 Repairs to Finish
3.8.4 Paint Finished Metal Roofing
3.9 CLEAN UP AND DISPOSAL
3.10 FIELD QUALITY CONTROL
3.10.1 Manufacturer's Inspection
3.11 INFORMATION CARD
3.12 USACE WARRANTY
-- End of Section Table of Contents --
SECTION 07 41 13 Page 2
CERTIFIED FINAL AMDT0003
SECTION 07 41 13
AMDT0003***************************************************************
METAL ROOF PANELS, UNDERLAYMENTS, AND BUILT-UP INSULATED ROOF
05/11
***************************************************************AMDT0003
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN IRON AND STEEL INSTITUTE (AISI)
AISI S100 (2012) North American Specification for the Design of Cold-Formed Steel Structural Members
AISI SG03-3 (2002; Suppl 2001-2004; R 2008) Cold-Formed Steel Design Manual Set
AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE)
ASCE 7 (2017) Minimum Design Loads for Buildings and Other Structures
AMERICAN WELDING SOCIETY (AWS)
AWS A5.1/A5.1M (2012) Specification for Carbon Steel Electrodes for Shielded Metal Arc Welding
AWS D1.1/D1.1M (2015; Errata 1 2015; Errata 2 2016) Structural Welding Code - Steel
AWS D1.2/D1.2M (2014) Structural Welding Code - Aluminum
ASTM INTERNATIONAL (ASTM)
ASTM A1008/A1008M (2016) Standard Specification for Steel, Sheet, Cold-Rolled, Carbon, Structural, High-Strength Low-Alloy, High-Strength Low-Alloy with Improved Formability, Solution Hardened, and Bake Hardenable
ASTM A123/A123M (2015) Standard Specification for Zinc (Hot-Dip Galvanized) Coatings on Iron and Steel Products
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM A653/A653M (2015; E 2016) Standard Specification for Steel Sheet, Zinc-Coated (Galvanized) or
SECTION 07 41 13 Page 3
Zinc-Iron Alloy-Coated (Galvannealed) by the Hot-Dip Process
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM C792 (2004; R 2008) Effects of Heat Aging on Weight Loss, Cracking, and Chalking of Elastomeric Sealants
ASTM C920 (2014a) Standard Specification for Elastomeric Joint Sealants
ASTM D1056 (2014) Standard Specification for Flexible Cellular Materials - Sponge or Expanded Rubber
ASTM D1308 (2013) Effect of Household Chemicals on Clear and Pigmented Organic Finishes
ASTM D1654 (2008; R 2016; E 2017) Standard Test Method for Evaluation of Painted or Coated Specimens Subjected to Corrosive Environments
ASTM D1667 (2017) Standard Specification for Flexible Cellular Materials - Poly (Vinyl Chloride) Foam (Closed-Cell)
ASTM D1970/D1970M (2017) Standard Specification for Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection
ASTM D2244 (2016) Standard Practice for Calculation of Color Tolerances and Color Differences from Instrumentally Measured Color Coordinates
ASTM D2247 (2015) Testing Water Resistance of Coatings in 100% Relative Humidity
ASTM D226/D226M (2017) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM D2794 (1993; R 2010) Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
ASTM D3359 (2017) Standard Test Methods for Rating Adhesion by Tape Test
ASTM D3363 (2005; E 2011; R 2011; E 2012) Film Hardness by Pencil Test
ASTM D4214 (2007; R 2015) Standard Test Method for Evaluating the Degree of Chalking of Exterior Paint Films
SECTION 07 41 13 Page 4
ASTM D4587 (2011) Standard Practice for Fluorescent UV-Condensation Exposures of Paint and Related Coatings
ASTM D4869/D4869M (2016a) Standard Specification for Asphalt-Saturated Organic Felt Underlayment Used in Steep Slope Roofing
ASTM D522/D522M (2014) Mandrel Bend Test of Attached Organic Coatings
ASTM D523 (2014) Standard Test Method for Specular Gloss
ASTM D5894 (2016) Standard Practice for Cyclic Salt Fog/UV Exposure of Painted Metal, (Alternating Exposures in a Fog/Dry Cabinet and a UV/Condensation Cabinet)
ASTM D610 (2008; R 2012) Evaluating Degree of Rusting on Painted Steel Surfaces
ASTM D714 (2002; R 2009) Evaluating Degree of Blistering of Paints
ASTM D822 (2013) Filtered Open-Flame Carbon-Arc Exposures of Paint and Related Coatings
ASTM D968 (2017) Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive
ASTM E1592 (2005; R 2012) Structural Performance of Sheet Metal Roof and Siding Systems by Uniform Static Air Pressure Difference
ASTM E2140 (2001; R 2017) Standard Test Method for Water Penetration of Metal Roof Panel Systems by Static Water Pressure Head
ASTM E84 (2017) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM G152 (2013) Operating Open Flame Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials
ASTM G153 (2013) Operating Enclosed Carbon Arc Light Apparatus for Exposure of Nonmetallic Materials
FM GLOBAL (FM)
FM 4471 (2010) Class I Panel Roofs
SECTION 07 41 13 Page 5
METAL BUILDING MANUFACTURERS ASSOCIATION (MBMA)
MBMA RSDM (2000) Metal Roofing Systems Design Manual
NATIONAL ROOFING CONTRACTORS ASSOCIATION (NRCA)
NRCA 0420 (2010) Architectural Metal Flashing, Condensation Control and Reroofing
NRCA RoofMan (2011 thru 2014) The NRCA Roofing Manual
SHEET METAL AND AIR CONDITIONING CONTRACTORS' NATIONAL ASSOCIATION
(SMACNA)
SMACNA 1793 (2012) Architectural Sheet Metal Manual, 7th Edition
UNDERWRITERS LABORATORIES (UL)
UL 580 (2006; Reprint Oct 2013) Tests for Uplift Resistance of Roof Assemblies
UL Bld Mat Dir (updated continuously online) Building Materials Directory
1.2 DESCRIPTION OF METAL ROOF SYSTEM
1.2.1 Performance Requirements
Steel panels and accessory components must conform to the following standards:
ASTM A1008/A1008M
ASTM A123/A123M
ASTM A36/A36M
ASTM D522/D522M for applied coatings UL Bld Mat Dir
1.2.1.1 Hydrostatic Head Resistance
No water penetration when tested according to ASTM E2140. Submit leakage test report upon completion of installation.
1.2.1.2 Wind Uplift Resistance
Provide metal roof panel system that conform to the requirements of ASTM E1592 and UL 580 . Uplift force due to wind action governs the design for panels. Submit wind uplift test report prior to commencing installation.
Roof system and attachments must resist the wind loads as determined by ASCE 7, in pounds per square foot. Metal roof panels and component materials must also comply with the requirements in FM 4471 as part of a panel roofing system as listed in Factory Mutual Guide (FMG) "Approval Guide" for class 1 or noncombustible construction, as applicable. Identify all materials with FMG markings.
SECTION 07 41 13 Page 6
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Roofing Panels; G , DO
Flashing and Accessories; G , DO
Gutter/Downspout Assembly; G , DO
SD-03 Product Data
Submit manufacturer's catalog data for the following items:
Roof Panels; G , DO
Factory-Applied Color Finish; G , DO
Accessories; G
Fasteners; G , DO
Pressure Sensitive Tape;
Underlayments; G , DO
Gaskets and Sealing/Insulating Compounds; G , Aluminized Steel Repair Paint; G
Enamel Repair Paint; G
Galvanizing Repair Paint; G
SD-04 Samples
Roof Panels; G , DO, RO
Factory-applied Color Finish, Samples, 9 inch lengths, full width;
G, DO and RO
Accessories; G
Fasteners; G
Gaskets and Sealant/Insulating Compounds; G
SD-05 Design Data
Wind Uplift Resistance; G , DO
SECTION 07 41 13 Page 7
SD-06 Test Reports
Leakage Test Report; G , RO
Wind Uplift Test Report; G , DO
Factory Finish and Color Performance Requirements; G , DO
SD-07 Certificates
Roof Panels; G
Coil Stock Compatibility; G
Self-Adhering Modified Bitumen Underlayment; G
Qualification of Manufacturer; G , RO
Qualification of Applicator; G , RO
SD-08 Manufacturer's Instructions
Installation Manual; G , RO
Ventilated Nail Base Insulation Panel; G, DO and RO
SD-09 Manufacturer's Field Reports
Manufacturer's Field Inspection Reports; G , RO
SD-11 Closeout Submittals
Warranties; G , RO
Information Card; G
1.4 QUALITY ASSURANCE
1.4.1 Qualification of Manufacturer
Submit documentation verifying metal roof panel manufacturer has been in the business of manufacturing metal roof panels for a period of not less than 5 years.
Manufacturer must also provide engineering services by an authorized engineer, currently licensed in the geographic area of the project, with a minimum of five (5) years experience as an engineer knowledgeable in roof wind design analysis, protocols and procedures for MBMA RSDM, ASCE 7, UL 580 , and FM 4471 . Engineer must provide certified engineering calculations for the project conforming to the stated references.
1.4.1.1 Manufacturer's Technical Representative
The manufacturer's technical representative must be thoroughly familiar with the products to be installed, installation requirements and practices, and with any special considerations in the geographical area of the project. The representative must perform field inspections and attend
SECTION 07 41 13 Page 8 meetings as specified.
1.4.1.2 Single Source
Roofing panels, clips, closures, and other accessories must be standard products of the same manufacturer, and the most recent design of the manufacturer to operate as a complete system for the intended use.
1.4.2 Qualification of Applicator
Metal roof system applicator must be approved, authorized, or licensed in writing by the roof panel manufacturer and have a minimum of three years experience as an approved, authorized, or licensed applicator with that manufacturer, approved at a level capable of providing the specified warranty. Supply the names, locations and client contact information of 5 projects of similar size and scope constructed by applicator using the manufacturer's roofing products submitted for this project within the previous three years.
1.4.3 Field Verification
Prior to the preparation of drawings and fabrication, verify location of roof framing, roof openings and penetrations, and any other special conditions. Indicate all special conditions and measurements on final shop drawings.
1.4.4 Qualifications for Welding Work
Welding procedures must conform to AWS D1.1/D1.1M for steel or AWS D1.2/D1.2M for aluminum.
Operators are permitted to make only those types of weldments for which each is specifically qualified.
1.4.5 Pre-roofing Conference
After approval of submittals and before performing roofing system installation work, hold a pre-roofing conference to review the following:
a. Drawings, specifications, and submittals related to the roof work.
Submit, as a minimum; sample profiles of roofing panels, with factory-applied color finish samples, flashing and accessories, gutter/downspout assembly samples, typical fasteners and pressure sensitive tape, sample gaskets and sealant/insulating compounds. Also include data and of repair paint, and manufacturer's installation manual.
b. Roof system components installation;
c. Procedure for the roof manufacturer's technical representative's onsite inspection and acceptance of the roofing substrate, the name of the manufacturer's technical representatives, the frequency of the onsite visits, distribution of copies of the inspection reports from the manufacturer's technical representative;
d. Contractor's plan for coordination of the work of the various trades involved in providing the roofing system and other components secured to the roofing; and
e. Quality control plan for the roof system installation;
SECTION 07 41 13 Page 9
f. Safety requirements.
Coordinate pre-roofing conference scheduling with the Contracting Officer.
Attendance is mandatory for the Contractor, the Contracting Officer's designated personnel, personnel directly responsible for the installation of metal roof system, flashing and sheet metal work, ventilated nail base insulation panels, other trades interfacing with the roof work, and representative of the metal roofing manufacturer. Before beginning roofing work, provide a copy of meeting notes and action items to all attending parties. Note action items requiring resolution prior to start of roof work.
1.5 DELIVERY, HANDLING, AND STORAGE
Deliver, store, and handle panel materials, bulk roofing products, accessories, and other manufactured items in a manner to prevent damage and deformation, as recommended by the manufacturer, and as specified.
1.5.1 Delivery
Package and deliver materials to the site in undamaged condition. Provide adequate packaging to protect materials during shipment. Do not uncrate materials until ready for use, except for inspection. Immediately upon arrival of materials at jobsite, inspect materials for damage, deformation, dampness, and staining. Remove affected materials from the site and immediately replace. Remove moisture from wet materials not otherwise affected, restack and protect from further moisture exposure.
1.5.2 Handling
Handle materials in a manner to avoid damage. Select and operate material handling equipment so as not to damage materials or applied roofing.
1.5.3 Storage
Stack materials stored on site on platforms or pallets, and cover with tarpaulins or other weathertight covering which prevents trapping of water or condensation under the covering. Store roof panels so that water which may have accumulated during transit or storage will drain off. Do not store panels in contact with materials that might cause staining. Secure coverings and stored items to protect from wind displacement.
1.6 PROJECT CONDITIONS
Weather Limitations: Proceed with installation only when existing and forecast weather conditions permit metal roof panel work to be performed according to manufacturer's written instructions and warranty requirements, and specified safety requirements.
1.7 FABRICATION
Fabricate and finish metal roof panels and accessories on a factory stationary industrial type rolling mill to the greatest extent possible, per manufacturer's standard procedures and processes, and as necessary to fulfill indicated performance requirements. Comply with indicated profiles, dimensional and structural requirements.
Provide panel profile, as indicated on drawings and standard for the
SECTION 07 41 13 Page 10 manufacturer for full length of panel. Fabricate panel side laps with factory installed captive gaskets providing a weather tight seal and preventing metal-to metal contact, and minimizing noise from movements within the panel assembly.
1.7.1 Finishes
Finish quality and application processes must conform to the related standards specified within this section. Noticeable variations within the same piece are not acceptable. Variations in appearance of adjoining components are acceptable if they are within the range of approved samples and are assembled or installed to minimize any contrasting variations.
1.7.2 Accessories
Fabricate flashing and trim to comply with recommendations in SMACNA 1793 as applicable to the design, dimensions, metal, and other characteristics of the item indicated.
a. Form exposed sheet metal accessories which are free from excessive oil canning, buckling, and tool marks, and are true to line and levels indicated, with exposed edges folded back to form hems.
b. End Seams: Fabricate nonmoving seams with flat-lock seams. Form seams and seal with epoxy seam sealer.
c. Sealed Joints: Form non-expansion, but movable joints in metal to accommodate elastomeric sealant to comply with SMACNA 1793.
d. Conceal fasteners and expansion provisions where possible. Exposed fasteners are not allowed on faces of accessories exposed to view.
e. Fabricate cleats and attachments devices of size and metal thickness recommended by SMACNA or by metal roof panel manufacturer for application, but not less than the thickness of the metal being secured.
1.8 WARRANTIES
Provide metal roof system material and workmanship warranties meeting specified requirements. Provide revision or amendment to manufacturer's standard warranty as required to comply with the specified requirements.
1.8.1 Metal Roof Panel Manufacturer Warranty
Furnish the metal roof panel manufacturer's 20-year no dollar limit roof system materials and installation workmanship warranty, including flashing, components, trim, and accessories necessary for a watertight roof system construction. Make warranty directly to the Government, commencing at time of Government's acceptance of the roof work. The warranty must state that:
a. If within the warranty period, the metal roof system, as installed for its intended use in the normal climatic and environmental conditions of the facility, becomes non-watertight, shows evidence of moisture intrusion within the assembly, displaces, corrodes, perforates, separates at the seams, or shows evidence of excessive weathering due to defective materials or installation workmanship, the repair or replacement of the defective and damaged materials of the metal roof system and correction of defective workmanship is the responsibility of
SECTION 07 41 13 Page 11 the metal roof panel manufacturer. All costs associated with the repair or replacement work are the responsibility of the metal roof panel manufacturer.
b. If the manufacturer or his approved applicator fail to perform the repairs within 48 hours of notification, emergency temporary repairs performed by others does not void the warranty.
1.8.2 Manufacturer's Finish Warranty
Provide a manufacturer's no-dollar-limit 20 year warranty for the roofing system. Issue the warranty directly to the Government at the date of Government acceptance.warranting that the factory color finish, under normal atmospheric conditions at the site, will not crack, peel, or delaminate; chalk in excess of a numerical rating of 8 when measured in accordance with ASTM D4214; or fade or change colors in excess of 5 NBS units as measured in accordance with ASTM D2244.
1.8.3 Metal Roof System Installer Warranty
Provide the "Contractors 20) Year No Penal Sum Warranty for Non-Structural Metal Roof System" attached at the end of this section. Provide a separate bond in an amount equal to the installed total material and installation roofing system cost in favor of the Government covering the installer's warranty responsibilities effective throughout the twenty ) year warranty period.
1.8.4 Continuance of Warranty
Repair or replacement work that becomes necessary within the warranty period must be approved, as required, and accomplished in a manner so as to restore the integrity of the roof system assembly and validity of the metal roof system manufacturer warranty for the remainder of the manufacturer warranty period.
1.9 CONFORMANCE AND COMPATIBILITY
The entire metal roofing and flashing system must be in accordance with specified and indicated requirements, including wind resistance requirements. Work not specifically addressed and any deviation from specified requirements must be in general accordance with recommendations of the MBMA RSDM, NRCA RoofMan, the metal panel manufacturer's published recommendations and details, and compatible with surrounding components and construction. Submit any deviation from specified or indicated requirements to the Contracting Officer for approval prior to installation.
PART 2 PRODUCTS
2.1 ROOF PANELS
2.1.1 Steel Sheet Panels
Roll-form steel sheet roof panels to the specified profile, with 24 gauge and depth as indicated.
Material must be plumb and true, and within the tolerances listed:
a. Galvanized steel sheet conforming to ASTM A653/A653M and AISI SG03-3 .
c. Individual panels to have continuous length sufficient to cover the
SECTION 07 41 13 Page 12 entire length of any unbroken roof slope with no joints or seams and formed without warping, waviness, or ripples that are not a part of the panel profile and free from damage to the finish coating system.
d. Provide panels with thermal expansion and contraction consistent with the type of system specified. Profile shall be a 2 inch high standing seam, 12 inch coverage with mechanical crimping or snap-together seams with concealed clips and fasteners, having smooth, flat surface.
2.2 FACTORY FINISH AND COLOR PERFORMANCE REQUIREMENTS
All panels are to receive a factory applied Kynar 500/Hylar 5000 finish consisting of a baked topcoat with a manufacturer's recommended prime coat conforming to the following:
a. Metal Preparation: All metal is to have the surfaces carefully prepared for painting on a continuous process coil coating line by alkali cleaning, hot water rinsing, application of chemical conversion coating, cold water rinsing, sealing with an acid rinse, and thorough drying.
b. Prime Coating: A base coat of epoxy paint, specifically formulated to interact with the top-coat, is to be applied to the prepared surfaces by roll coating to a dry film thickness of 0.20 plus 0.05 mils. The prime coat must be oven cured prior to application of the finish coat.
c. Exterior Finish Coating: Apply the exterior finish coating over the primer by roll coating to a dry film thickness of 0.80 plus 0.05 mils (3.80 plus 0.05 mils for Vinyl Plastisol) for a total dry film thickness of 1.00 plus 0.10 mils (4.00 plus 0.10 mils for Vinyl Plastisol). This exterior finish coat must be oven-cured.
d. Interior finish coating: Apply a wash coat on the reverse side over primer by roll coating to a dry film thickness of 0.30 plus 0.05 mils for a total dry fill thickness of 0.50 plus 0.10 mils. The wash coat must be oven cured.
e. Color: The exterior finish chosen from the manufacturer's standard color chart.
f. Physical Properties: Coating must conform to the industry and manufacturer's standard performance criteria as listed by the following certified test reports:
General: ASTM D5894 and ASTM D4587
Abrasion: ASTM D968
Adhesion: ASTM D3359
Chalking: ASTM D4214
Chemical Pollution: ASTM D1308
SECTION 07 41 13 Page 13
Color Change and Conformity: ASTM D2244
Creepage: ASTM D1654
Cyclic Corrosion Test: ASTM D5894
Flame Spread: ASTM E84
Flexibility: ASTM D522/D522M
Formability: ASTM D522/D522M
Gloss at 60 and 85 degrees: ASTM D523
Humidity: ASTM D2247 and ASTM D714
Oxidation: ASTM D610
Pencil Hardness: ASTM D3363
Reverse Impact: ASTM D2794
Salt Spray: ASTM B117
Weatherometer: ASTM G152, ASTM G153 and ASTM D822
2.2.1 Specular Gloss
Finished roof surfaces to have a specular gloss value of 10 or less at an angle of 85 degrees when measured in accordance with ASTM D523.
2.3 MISCELLANEOUS METAL FRAMING
2.3.1 General
Provide cold formed metallic-coated steel sheet conforming to ASTM A653/A653M , AISI S100 , and as specified in 05 40 00 COLD-FORMED METAL FRAMING unless otherwise indicated.
2.3.2 Fasteners and Miscellaneous Metal Framing
Provide compatible type, corrosion resistant, of sufficient size and length to penetrate the supporting element a minimum of one inch with other required properties to fasten miscellaneous metal framing members to substrates in accordance with the roof panel manufacturer's and ASCE 7 requirements.
2.3.2.1 Exposed Fasteners
Fasteners for roof panels must be corrosion resistant , compatible with the sheet panel or flashing material and of the type and size recommended by the manufacturer to meet the performance requirements and design loads.
Fasteners for accessories must be the manufacturer's standard. Provide an integral metal washer, matching the color of attached material with compressible sealing EPDM gasket approximately 3/32 inch thick for exposed fasteners.
SECTION 07 41 13 Page 14
2.3.2.2 Screws
Provide corrosion resistant screws, of the type and size recommended by the manufacturer to meet the performance requirements.
2.3.2.3 Rivets
Provide closed-end type rivets, corrosion resistant where watertight connections are required.
2.3.2.4 Attachment Clips
Provide hot-dip galvanized, conforming to ASTM A653/A653M , clips. Size, shape, thickness and capacity must meet the thickness and design load criteria specified.
2.3.3 Electrodes for Manual, Shielded Metal Arc Welding
Electrodes for manual, shielded metal arc welding must meet the requirements of AWS D1.1/D1.1M , and be covered, mild-steel electrodes conforming to AWS A5.1/A5.1M .
2.4 ACCESSORIES
Accessories must be compatible with the metal roof panels. Sheet metal flashing, trim, metal closure strips, caps, and similar metal accessories must be not less than the minimum thicknesses specified for roof panels.
Provide exposed metal accessories to match the panels furnished, unless otherwise indicated. Molded foam rib, ridge and other closure strips must be closed-cell or solid-cell synthetic rubber or neoprene premolded to match configuration of the panels and not absorb or retain water.
2.4.1 Pre-manufactured Accessories
Pre-manufactured accessories must be manufacturer's standard for intended purpose, comply with applicable specification section, compatible with the metal roof system and approved for use by the metal roof panel manufacturer. Construct curbs to match roof slope.
2.4.2 Metal Closure Strips
Provide factory fabricated of the same gauge, color, finish and profile as the specified roof panel.
2.4.3 Rubber Closure Strips
Provide closed-cell, expanded cellular rubber closure strips conforming to ASTM D1056 and ASTM D1667, extruded or molded to the configuration of the specified roof panel profile and in lengths supplied by roof panel manufacturer.
2.5 JOINT SEALANTS
2.5.1 Sealants
Sealants are to be an approved gun type for use in hand or air pressure caulking guns at temperatures above 40 degrees F (or frost-free application at temperatures above 10 degrees F) with a minimum solid content of 85
SECTION 07 41 13 Page 15 percent of the total volume. Sealant must dry with a tough, durable surface skin which permits it to remain soft and pliable underneath, providing a weather tight joint. No migratory staining, in conformance with to ASTM C792, is permitted on painted or unpainted metal, stone, glass, vinyl or wood.
Prime all joints to receive sealants with a compatible one-component or two-component primer as recommended by the roof panel manufacturer.
2.5.1.1 Shop Applied Sealants
Sealant for shop-applied caulking must be an approved gun grade, non-sag one-component polysulfide or silicone conforming to ASTM C792 and ASTM C920, Type II, with a curing time which ensures the sealants plasticity at the time of field erection. Color to match panel color.
2.5.1.2 Field Applied Sealants
Sealants for field-applied caulking must be an approved gun grade, non-sag on-component polysulfide or two component polyurethane with an initial maximum Shore A durometer hardness of 25, conforming to ASTM C920, Type II. Color to match panel color.
2.5.1.3 Tape Sealants
Provide pressure sensitive, 100 percent solid tape sealant with a release paper backing; permanently elastic, non-sagging, non-toxic and non-staining as approved by the roof panel manufacturer.
2.5.2 Sheet Metal Flashing and Trim
2.5.2.1 Fabrication, General
Custom fabricate sheet metal flashing and trim to comply with recommendations within the SMACNA 1793 that apply to design, dimensions, metal type, and other characteristics of design indicated. Shop fabricate items to the greatest extent possible. Obtain and verify field measurements for accurate fit prior to shop fabrication. Fabricate flashing and trim without excessive oil canning, buckling, and tool marks, true to line and levels indicated, with exposed edges folded back to form hems.
2.5.2.2 Roof Drainage Sheet Metal Fabrications
Gutters: Fabricate to cross section indicated, with riveted and soldered joints, complete with end pieces, outlet tubes, and other special accessories as required. Fabricate in minimum 96 inch long sections.
Fabricate expansion joints and accessories from the same metal as gutters, unless otherwise indicated.
Downspouts: Fabricate rectangular downspouts complete with mitered elbows and open slotted fronts to match other open front downspouts on the installation. Furnish with metal hangars of same material as downspouts and anchors.
AMDT0003***************************************************************
2.6 ROOF INSULATION PANELS
Polyisocyanurate insulation panels and attachments must be compatible with
SECTION 07 41 13 Page 16 metal roof system specified to achieve the indicated wind uplift requirements, as approved by the roof panel manufacturer. Polyiso rigid insulation panels shall be fastened to steel deck. The overall panel thickness shown on the drawings is 6 inches which consists of (2) 3 inch panels of insulation. The overall R value shall be minimum R-34.8.
************************************************************AMDT0003
2.7 UNDERLAYMENTS
2.7.1 Felt Underlayment
Provide No. 40 asphalt-saturated organic , non-perforated felt underlayment in compliance with ASTM D226/D226M, Type II, or
ASTM D4869/D4869M .
2.7.2 Self-Adhering Modified Bitumen Underlayment
Provide self-adhering modified bitumen membrane underlayment material in compliance with ASTM D1970/D1970M , suitable for use as underlayment for metal roofing and for use as an ice dam protection at edges of roof, ridges, hips, valleys, and sidewall areas. Use membrane resistant to cyclical elevated temperatures for extended period of time in high heat service conditions. Provide membrane with integral non-tacking top surface of polyethylene film or other surface material to serve as separator between bituminous material and metal products to be applied above.
2.7.3 Air Barrier Transition Material
The same or similar material used for the self-adhering roof underlayment shall be used as an adhered air barrier transition material at air barrier penetrations such as those through the roof air barrier underlayment and at the exterior wall to roof transition as the intended air barrier material.
Contractor shall test the transition material on the various surfaces where it is intended to adhere to assure a tight air barrier transition.
2.8 GASKETS AND SEALING/INSULATING COMPOUNDS
Gaskets and sealing/insulating compounds must be nonabsorptive and suitable for insulating contact points of incompatible materials.
Sealing/insulating compounds must be non-running after drying.
2.9 FINISH REPAIR MATERIAL
Only use repair and touch-up paint supplied by the roof panel manufacturer and is compatible with the specified system.
PART 3 EXECUTION
3.1 EXAMINATION
Examine substrates, areas, and conditions, with installer present, for compliance with requirements for installation tolerances, metal roof panel supports, and other conditions affecting performance of the work. Ensure surfaces are suitable, dry and free of defects and projections which might affect the installation.
Examine primary and secondary roof framing to verify that rafters, purlins, angels, channels, and other structural support members for panels and
SECTION 07 41 13 Page 17 anchorages have been installed within alignment tolerances required by metal roof panel manufacturer, UL, ASTM, and ASCE 7 requirements.
Examine solid roof sheathing to verify that sheathing joints are supported by framing or blocking; and that installation is within flatness tolerances required by metal roof panel manufacturer.
Examine rough-in for components and systems penetrating metal roof panels to verify actual locations of penetrations relative to seam locations of panels prior to installation.
Submit a written report to the Contracting Officer, endorsed by the installer, listing conditions detrimental to the performance of the work.
Proceed with installation only after defects have been corrected.
3.2 INSTALLATION
Installation must meet specified requirements and be in accordance with the manufacturer's installation instructions and approved shop drawings. Do not install damaged materials. Dissimilar materials which are not compatible when contacting each other must be insulated by means of gaskets or sealing/insulating compounds. Keep all exposed surfaces and edges clean and free from sealant, metal cuttings, hazardous burrs, and other foreign material. Remove stained, discolored, or damaged materials from the site.
3.2.1 Preparation
Clean all substrate substances which may be harmful to underlayments, ventilated nail base insulation panel, and roof panels including removing projections capable of interfering with with ventilated nail base insulation panel, felt underlayment, and roof panel attachment.
Install sub-purlins, eave angles, furring, and other miscellaneous roof panel support members and anchorage according to metal roof panel manufacturer's written instructions.
3.2.2 Underlayment
Install underlayment according to roof panel manufacturer's written recommendations and recommendation in NRCA "The NRCA Roofing and Waterproofing Manual".
3.2.2.1 Single Layer Felt Underlayment for a Standard Slope Roof Deck
Install single layer of felt underlayment on ventilated nail base insulation panel surface, perpendicular to roof slope in parallel courses.
Lap sides a minimum of 2 inches over underlying course. Lap ends a minimum of 4 inches. Stagger end laps between succeeding courses a minimum of 72 inches. Fasten with felt underlayment roofing nails. Also, over the overall single layer of underlayment, install a second layer of felt underlayment that only extends 3 feet on either side of each hip and valley and 3 feet up the roof from the guttered edges (none needed at rakes).
3.2.2.2 Self-Adhering Sheet Underlayment
Install self-adhering sheet underlayment; wrinkle free on roof deck.
Comply with low-temperature installation restrictions of manufacturer where applicable. Install at locations indicated on project drawings, lapped in a direction to shed water. Lap sides not less than 3-1/2 inches. Lap ends
SECTION 07 41 13 Page 18 not less than 6 inches staggered 24 inches between courses. Roll laps with roller. Cover underlayment within seven days. 3.3 INSULATION INSTALLATION
Install insulation concurrently with metal roof panel installation, in thickness indicated, to cover entire roof, according to manufacturer's written instructions.
3.4 PROTECTION OF APPLIED MATERIALS
Do not permit storing, walking, wheeling, and trucking directly on applied roofing/insulation materials. Provide temporary walkways, runways, and platforms of smooth clean boards or planks as necessary to avoid damage to applied roofing/insulation materials, and to distribute weight to conform to indicated live load limits of roof construction.
3.5 FASTENER INSTALLATION
Anchor metal roof panels and other components of the Work securely in place, using approved fasteners according to manufacturer's written instructions.
3.5.1 Welding
Procedures for manual, shielded metal-arc welding, the appearance and quality of welds made, and the methods used in correcting welding work must be in accordance with AWS D1.1/D1.1M .
3.6 FLASHING, TRIM, AND CLOSURE INSTALLATION
3.6.1 General Requirements
Comply with performance requirements, manufacturer's written installation instructions, and SMACNA 1793. Provide concealed fasteners where possible. Set units true to line and level as indicated. Install work with laps, joints, and seams that will be permanently water tight and weather resistant. Work is to be accomplished to form weather tight construction without waves, warps, buckles, fastening stresses or distortion, and to allow for expansion and contraction. Cutting, fitting, drilling, and other operations in connection with sheet metal required to accomplish the work must conform to the manufacturers written instructions.
3.6.2 Metal Flashing
Install exposed metal flashing at building corners, rakes, eaves, junctions between metal siding and roofing, valleys and changes off slope or direction in metal roofing, building expansion joints and gutters.
Exposed metal flashing must be the same material, color, and finish as the specified metal roofing panels. Furnish flashing in minimum 8 foot lengths. Exposed flashing must have 1 inch locked and blind soldered end joints, with expansion joints at intervals of no greater than 16 feet.
Fasten flashing at not more than 8 inches on center for roofs, except where flashing is held in place by the same screws used to secure panels.
Exposed flashing and flashing subject to rain penetration must be bedded in specified joint sealant. Flashing which is contact with dissimilar metals must be isolated by means of the specified asphalt mastic material to prevent electrolytic deterioration.
SECTION 07 41 13 Page 19
Form drips to the profile indicated, with the edge folded back 1/2 inch to form a reinforced drip edge.
3.7 ROOF PANEL INSTALLATION
Provide metal roof panels of full length from eave to ridge or eave to wall as indicated, unless otherwise indicated or restricted by shipping limitations. Anchor metal roof panels or other components of the Work securely in place, with provisions for thermal and structural movement in accordance with NRCA 0420.
Steel Roof Panels: Use stainless steel fasteners for exterior surfaces and galvanized fasteners for unexposed surfaces.
Anchor Clips: Anchor metal roof panels and other components of the Work securely in place, using approved fasteners according to manufacturer's written instructions. Provide all blocking and nailers as required.
Metal Protection: Where dissimilar metals contact each other or possibly corrosive substrates, protect against galvanic action by the metal roof panel manufacturer.
Joint Sealers: Install gaskets, joint fillers, and sealants where indicated and required for weatherproof performance of metal roof panel system. Provide types of gaskets, fillers, and sealants indicated or, if not indicated, types recommended by metal roof panel manufacturer.
3.7.1 Handling and Erection
Erect roofing system in accordance with the approved erection drawings, printed instructions and safety precautions of the manufacturer.
Do not subject panels to overloading, abuse, or undue impact. Do not apply bent, chipped, or defective panels. Damaged panels must be replaced and removed from the site at the contractors expense. Erect panels true, plumb, and in exact alignment with the horizontal and vertical edges of the building, securely anchored, and with indicated rake, eave, and curb overhang. Allow for thermal movement of the roofing, movement of the building structure, and provide permanent freedom from noise due to wind pressure.
Do not permit storage, walking, wheeling or trucking directly on applied roofing materials. Provide temporary walkways, runways, and platforms of smooth clean boards or planks as necessary to avoid damage to the installed roofing materials, and to distribute weight to conform to the indicated live load limits of the roof construction.
Roof panels must be laid with corrugations in the direction of the roof slope. End laps of exterior roofing must not be less than 8 inches; side laps of standard exterior corrugated panels must not be less than 2-1/2 corrugations.
Field cutting of metal roof panels by torch is not permitted. Field cut only as recommended by manufacturer's written instructions.
3.7.2 Closure Strips
Install metal closure strips at open ends of metal ridge rolls; open ends of corrugated or ribbed pattern roofs, and at intersection of wall and
SECTION 07 41 13 Page 20 roof, unless open ends are concealed with formed eave flashing; rake of metal roof unless open end has a formed flashing member; and in other required areas.
Install closure strips at intersection of the wall with metal roofing; top and bottom of metal siding; heads of wall openings; and in other required locations.
3.7.3 Workmanship
Make lines, arises, and angles sharp and true. Free exposed surfaces from any visible wave, warp, buckle and tool marks. Fold back exposed edges neatly to form a 1/2 inch hem on the concealed side. Make sheet metal exposed to the weather watertight with provisions for expansion and contraction.
Make surfaces to receive sheet metal plumb and true, clean, even, smooth, dry, and free of defects and projections which might affect the application. For installation of items not shown in detail or not covered by specifications conform to the applicable requirements of SMACNA 1793.
Provide sheet metal flashing in the angles formed where roof decks abut walls, curbs, ventilators, pipes, or other vertical surfaces and wherever indicated and as necessary to make the work watertight.
3.8 ACCEPTANCE PROVISIONS
3.8.1 Erection Tolerances
Erect metal roofing straight and true with plumb vertical lines correctly lapped and secured in accordance with the manufacturer's written instructions. Horizontal lines must not vary more than 1/8 inch in 40 feet.
3.8.2 Leakage Tests
Finished application of metal roofing is to be subject to inspection and test for leakage by the Contracting Officer or his designated representative, and Architect/Engineer. Inspection and tests will be conducted without cost to the Government.
Inspection and testing is to be made promptly after erection to permit correction of defects and removal/replacement of defective materials.
3.8.3 Repairs to Finish
Scratches, abrasions, and minor surface defects of finish may be repaired with the specified repair materials and as recommended by the metal roof panel manufacturer. Finished repaired surfaces must be uniform and free from variations of color and surface texture. Repaired metal surfaces that are not acceptable to the project requirements are to be immediately removed and replaced with new material.
3.8.4 Paint Finished Metal Roofing
Paint finished metal roofing will be tested for color stability by the Contracting Officer during the manufacturer's specified guarantee period.
Panels that indicate color changes, fading, or surface degradation, determined by visual examination, must be removed and replaced with new panels at no expense to the Government. New panels will be subject to the specified tests for an additional year from the date of their installation.
SECTION 07 41 13 Page 21
3.9 CLEAN UP AND DISPOSAL
Clean exposed sheet metal work at completion of installation. Remove metal shavings, filings, nails, bolts, and wires from roofs. Remove grease and oil films, excess sealants, handling marks, contamination from steel wool, fittings and drilling debris and scrub the work clean.