About this file
This is a solicitation for design/build construction services for Transient Training Barracks at Fort McCoy, Wisconsin. The estimated construction cost is between $10-25 million. The NAICS code is 236220 and size determination is $39.5 million. This is a full and open procurement requiring a 10% HUBZone price evaluation. No contract award will be made until funds are appropriated. Technical inquiries must be submitted through ProjNet. Bids are due by the response date listed in ProjNet. The Army Corps of Engineers is the contracting agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BEARING ELEV.
48'-0"
4.8 5 5.2 6 7
A-311
3 4
1ST FLOOR
0"
2ND FLOOR
12'-0"
3RD FLOOR
24'-0"
4TH FLOOR
36'-0"
BEARING ELEV.
48'-0"
4.8 5 5.2 6 7 82 3 4
1ST FLOOR
0"
2ND FLOOR
12'-0"
3RD FLOOR
24'-0"
4TH FLOOR
36'-0"
BEARING ELEV.
48'-0"
14.855.267
A-312
A-312
A-511
A-521
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/4/2020 9:11:23 AM
C:\Users\h2eddrah\Documents\476377_Revit2018_A_TTB_h2eddrah.rvt
A-302
TTB
BU
IL
D
IN
G C
R O
SS
S
EC
TI
O N
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
M . B
AR
R
Y
R . H
O O
E
J.
SC
H
EN
KE
N
FE
LD
ER1/8" = 1'-0"A-111
1 BUILDING CROSS SECTION 1
1/8" = 1'-0"A-111
2 BUILDING CROSS SECTION 2
1/8" = 1'-0"A-111
3 BUILDING CROSS SECTION 3
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
W
2Q R
R
_P la ns -0
ARIMS: 200A Disposition: Maintain for 15yrs after construction
TOF
-4'-0"
PREFINISHED
OPEN-FACED METAL
DOWNSPOUT (X4) TO
CONCRETE SPLASH
BLOCK
CONCRETE
SPLASH BLOCK
6" CAPILARY WATER BREAK
REINFORCED CONCRETE
SLAB, COORDINATE WITH
STRUCTURAL
15 MIL VAPOR BARRIER
FOAM SILL SEAL
RUBBER BASE BOARD
GYPSUM BOARD, TYPE-X,
5/8"
6" METAL STUD
SOLID SURFACE SILL
COORDINATE WITH
INTERIOR DRAWINGS
5/8 GYP. BOARD BEYOND
THROUGH WALL FLASHING
WITH WEEP VENTS @ 24" O.C.
RIGID INSULATION
GROUT SOLID AS SHOWN
WINDOW UNIT
SILL FLASHING
CAST STONE SILL
3" RIGID INSULATION
4" SPRAY POLYURETHANE
FOAM (SPF) ALL EXTERIOR
WALLS, TYP.
TWO (2) COURSES OF 4"
CMU, GROUTED SOLID
MASONRY TIE
2" RIGID INSULATION ( MIN. R-10 )
2" RIGID INSULATION ( MIN. R-10 )
MASONRY VENEER GLASS MAT
GYPSUM
SHEATHING, 1/2"
AIR SPACE
MINIMUM, TYP.
GRAVEL BACK FILL
REINFORCED CONCRETE FOOTING &
STEM WALL FOUNDATION,
CORRDINATE WITH STRUCT.
FLUID-APPLIED OR
SELF-ADHERING IN WALL
ON SHEATING
(AIR/VAPOR BARRIER)
MORTAR NET
MININUM OF 4" BETWEEN
BOTTOM OF WEEP AND
FINISHED GRADE
BEARING ELEV.
48'-0"
WEEP
THROUGH WALL FLASHING
WITH WEEP VENTS @ 24" O.C.
ACOUSTICAL CEILING
TILE (A.C.T.)
4" SPRAY POLYURETHANE
FOAM (SPF) ALL EXTERIOR
WALLS, TYP
PREFINISHED
OPEN-FACED METAL
DOWNSPOUT (X4) TO
CONCRETE SPLASH
BLOCK
UTILITY BRICK SOLDIER
COURSE (X2)
WINDOW UNIT
MASONRY TIE
MASONRY VENEER
AIR SPACE
MINIMUM, TYP.
3" RIGID
INSULATION
GYPSUM BOARD,
TYPE-X, 5/8"
6" METAL STUD
GLASS MAT
GYPSUM
SHEATHING, 1/2"
2 1/2" METAL STUD @ 24" O.C.
SPRAY POLYURETHANE FOAM
(SPF) ALL EXTERIOR BEAMS, TYP
METAL DECK, COORDINATE
WITH STRUCT. DWGS.
STEEL STRUCTURE,
SEE STRUCT. DWGS.
GLASS MAT
GYPSUM
SHEATHING, 1/2"
STEEL 'C' BRAKE METAL SHAPE / BENT
PLATE. COORDINATE WITH STRUCT.
DWGS.
STEEL STRUCTURE,
SEE STRUCT. DWGS.
A-521
METAL DECK, SEE STRUCT. DWGS
6" RIGID INSULATION
SHEATHING
STANDING SEAM METAL
ROOFING
SIM.
OPPS HAND
FLUID-APPLIED OR
SELF-ADHERING IN WALL
ON SHEATING
(AIR/VAPOR BARRIER)
SNOW GUARDS3
CONT. BENT METAL
PLATE
HEAVY DASHED LINE INDICATES SELF-HEALING
AND SELF-ADHERING MEMBRANE OR BUILDING
WRAP ON METAL DECK AS AIR/VAPOR BARRIER
LT. GA. MTL. SOFFIT
FRAMING
GLASS MAT GYPSUM
SHEATHING, 1/2"
STEEL BEAM, COORDINATE
WITH STRUCTURAL
FLOOR DECK, COORDINATE
WITH STRUCTURAL
4" SPRAY POLYURETHANE
FOAM (SPF) ALL EXTERIOR
WALLS, TYP
BASE BOARD, COORDINATE
WITH INTERIOR DRAWINGS
AIR SPACE
CAST STONE SILL
CONTINUOUS STEEL RELIEVING
ANGLE. COORDINATE WITH
STRUCTURAL OCCURS AT 3RD
AND 4TH FLOORS ONLY
WINDOW UNIT
5/8" GYP. BOARD BEYOND
REINFORCED CONCRETE
SLAB, COORDINATE WITH
STRUCTURAL
SOLID SURFACE SILL
COORDINATE WITH
INTERIOR DRAWINGS
MASONRY TIE
MASONRY VENEER
PREFINISHED
OPEN-FACED METAL
DOWNSPOUT (X4) TO
CONCRETE SPLASH
BLOCK
SPRAY POLYURETHANE
FOAM (SPF) ALL EXTERIOR
BEAMS, TYP
2 1/2" METAL STUD @ 24" O.C.
UTILITY BRICK
SOLDIER COURSE
GYPSUM BOARD,
TYPE-X, 5/8"
6" METAL STUD
GLASS MAT GYPSUM
SHEATHING, 1/2"
3" RIGID INSULATION
THROUGH WALL FLASHING
WITH WEEP VENTS @ 24" O.C.
FLUID-APPLIED OR
SELF-ADHERING IN WALL
ON SHEATING
(AIR/VAPOR BARRIER)
MIN. 4" SPRAY POLYURETHANE FOAM INSULATION INSIDE 6" STEEL STUD R - 24
(CLOSED-CELL SPRAY POLYURETHANE FOAM MIN. OF 6.0 PER INCH)
1/2" EXTERIOR WALL SHEATHING R - .56
GLASS-MATT GYPSUM
FLUID-APPLIED OR SELF-ADHERING IN WALL ON SHEATING (AIR/VAPOR BARRIER)
3" RIGID INSULATION PANEL EXTERIOR WALL R - 15
EXTRUDED POLYSTYRENE (XPS) (R-5 / INCH)
AIR SPACE MINIMUM 1 7/8" (NOM. 2")
MASONRY VENEER R - .92
11 5/8" x 3 5/8" x 3 5/8" UTILITY BRICK
WALL W/ MASONRY VENEER TOTAL R - 40.48
BUILDING ENVELOPE
MATERIAL DESCRIPTIONS ARE INDICATED ON ALL BUILDING WALL SECTIONS AND DETAILS. THIS DRAWING SHEET AND LEGEND PROVIDES BASIS OF DESIGN FOR MATERIAL R-VALUES, AIR/VAPOR BARRIER FOR THE BUILDING ENVELOPE.
COORDINATE THIS INFORMATION WITH ALL OTHER WALL SECTIONS AND SPECIFICATIONS.
EXTERIOR MASONRY VENEER WALL ASSEMBLY MIN. R-VALUES
ROOF ASSEMBLY MINIMUM R-VALUES
STANDING SEAM METAL ROOF N / A
SELF ADHERING WATER AND ICE GUARD OVER ENTIRE ROOF SURFACE N / A
6" OF RIGID PANEL INSULATION R-36
SELF ADHERING / SELF HEALING AIR BARRIER MEMBRANE ON TOP OF METAL DECK N / A
METAL DECK N / A
MIN. ROOF TOTAL R-VALUE R - 36
AIR BARRIER MATERIALS
• VENTILATED INSULATED NAIL BASE OVER SELF ADHERING / SELF HEALING AIR
BARRIER MEMBRANE OVER METAL DECK
• FLUID APPLIED OR SELF-ADHERING AIR/VAPOR BARRIER IN WALL ON SHEATHING
• CONCRETE FOUNDATION
• CONCRETE SLAB
TOF
-4'-0"
BEARING ELEV.
48'-0"
UTILITY BRICK
SOLDIER
COURSE (X1)
A-311
A-311
A-311
T.O. FIN. FLR.
T.O. FIN. FLR.
T.O. FIN. FLR.
T.O. FIN. FLR.
T.O. BEAM
THROUGH WALL
FLASHING WITH WEEP
VENTS @ 24" O.C.
WEEP
UTILITY BRICK SOLDIER
COURSE (X1)
WINDOW UNIT
UTILITY BRICK SOLDIER
COURSE (X1)
THROUGH WALL
FLASHING WITH WEEP
VENTS @ 24" O.C.
WEEP
THROUGH WALL
FLASHING WITH WEEP
VENTS @ 24" O.C.
WEEP
THROUGH WALL
FLASHING WITH WEEP
VENTS @ 24" O.C.
WEEP
WINDOW UNIT
CAST STONE SILL
WINDOW UNIT
CAST STONE SILL
CONT. STEEL RELIEVING
ANGLE AT 3RD AND 4TH
FLOORS ONLY.
COORDINATE WITH
STRUCTURAL
CONT. STEEL RELIEVING
ANGLE AT 3RD AND 4TH
FLOORS ONLY.
COORDINATE WITH
STRUCTURAL
SNOW GUARDS
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/4/2020 9:13:04 AM
C:\Users\h2eddrah\Documents\476377_Revit2018_A_TTB_h2eddrah.rvt
A-311
TTB
W
AL
L
SE
C
TI
O N
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
M . B
AR
R
Y
R . H
O O
E
J.
SC
H
EN
KE
N
FE
LD
ER
3/4" = 1'-0"A-311
4 TYP. WALL SECTION DETAIL #4
3/4" = 1'-0"A-311
2 TYP. WALL SECTION DETAIL #2
3/4" = 1'-0"A-311
3 TYP. WALL SECTION DETAIL #3
3/8" = 1'-0"A-302
1 TYPICAL WALL SECTION
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
W
2Q R
R
_P la ns -0
1ST FLOOR
0"
2ND FLOOR
12'-0"
TOF
-4'-0"
3RD FLOOR
24'-0"
4TH FLOOR
36'-0"
BEARING ELEV.
48'-0"
3" RIGID INSULATION
UTILITY BRICK SOLDIER
COURSE (X1)
UTILITY BRICK SOLDIER
COURSE (X1)
UTILITY BRICK SOLDIER
COURSE (X1)
A-313
STONE SILL
WINDOW UNIT
WINDOW UNIT
STONE SILL
UTILITY BRICK SOLDIER
COURSE (X1)
A-311
1'-0"
TOF
-4'-0"
BEARING ELEV.
48'-0"
A-313
1'-11 243/256"
THROUGH WALL
FLASHING WITH WEEP
VENTS @ 24" O.C.
WEEP
CONT. STEEL RELIEVING
ANGLE AT 3RD AND 4TH
FLOORS ONLY.
COORDINATE WITH
STRUCTURAL
WEEP
THROUGH WALL
FLASHING WITH WEEP
VENTS @ 24" O.C.
UTILITY BRICK
SOLDIER
COURSE (X1)
UTILITY BRICK
SOLDIER
COURSE (X1)
CONT. STEEL
RELIEVING ANGLE AT
3RD AND 4TH FLOORS
ONLY. COORDINATE
WITH STRUCTURAL
THROUGH WALL
FLASHING WITH WEEP
VENTS @ 24" O.C.
WEEP
UTILITY BRICK
SOLDIER
COURSE (X1)
A-521
MECH. EQUIP.,
SEE MECH. DWGS
MECH. EQUIP.,
SEE MECH. DWGS
MECH. EQUIP.,
SEE MECH. DWGS
MECH. EQUIP.,
SEE MECH. DWGS
MECH. EQUIP.,
SEE MECH. DWGS
MECH. EQUIP.,
SEE MECH. DWGS
1'-0"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/4/2020 9:13:18 AM
C:\Users\h2eddrah\Documents\476377_Revit2018_A_TTB_h2eddrah.rvt
A-312
TTB
W
AL
L
SE
C
TI
O N
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
M . B
AR
R
Y
R . H
O O
E
J.
SC
H
EN
KE
N
FE
LD
ER
3/8" = 1'-0"A-302
1 WALL SECTION 1
3/8" = 1'-0"A-302
2 WALL SECTION 2
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
W
2Q R
R
_P la ns -0
GF
CI
GF
CI
W
OS
D R
D
R
D R
D
R
D R
D
R
D R
GF
CI
GF
CI
GF
CI
GF
CI
GFCI
DDC
GFCI
LAUNDRY
N
5.2
EDGE OF
SOFFIT5
A-507
A-4041
ELEV. EQUIP
100C
2K6.E
2A6.E
1H3.A
1A62A3.E
2K6.E
'-6
5' -0
/8
1A3
TABLE, SEE
INTERIOR
DWGS
STAINLESS STEEL
SINK, SEE PLUMBING
DWGS
1H3.A
1H3.A
1A6
1'-2 1/8" 3'-0" 5'-5"
126B
ELEVATOR ACCESS DOOR
ONLY ON FIRST FLOOR,
SEE DOOR SCHEDULES
1A3.AT
1H3.A
5"
2H3.E
2H6.E
6' -3
'-1 0"
ALL WASHERS AND
DRYERS OPTION
"A", OMAR FUNDED.
REFER TO PRICE
BREAKOUT
SCHEDULE.
3' -0
1'
-5
1' -0
1'-3 5/8"
FD
W A1
W A1
W A1
W A1
W A1
W A1
W A1
W A1
SEE SHEET A-404
FOR WASHER/DRYER
LEGEND.
J
A-403 3
MG-1
PTD
PTD
2' -2
/8
TP
'-0
0H3.BCT 0H3.BCT
0A3.CG
1A3.AT 1A3.AT
0H3.BT
0A3.CG
0H3.BT
3' -5
1"
3' -5
1"
3' -5
/2
5/ 8"
3' -0
1"
3' -0
1"
3' -0
1"
3' -0
SC
TP
SC
TP
SC
TP
SC
TP
SC
TP
SC
TILED CURB,
4" W x 2" H
15'-2"
'-3
/4
"5'-10" 3'-6" 5'-10"
A-403
10 1/8" 4 3/4"
1H6.A
1H3.A
1H3.A 1H3.A
1H3.A
1H3.A
1A6.A
FD
SC
SC
SC
'-1
1/
8"
'-4
/8
TYP.
3'-0"
TTD
TTD
TTD
TTD
FD
FD
FD
FD FD
FD
FD
SOLID SURFACE
THRESHOLD TO
PROVIDE DEPTH FOR
ACHIEVING SLOPE TO
DRAIN. DO NOT
RECESS THE SLABS
IN ORDER TO
ACHIEVE SLOPE TO
DRAIN
K
4.8
A-4035
MH
0A3
1A3
1A3
1' -3
/8
5'
-1 "1H3.A 1H3.A
1A6
0A3
1A6
1A3.AT
8 3/8" 12'-8"
1H6.A
1H3.A
MOP SINK
4'-4" 3'-0" 6 5/8" 5'-1"
K
4.8
JANITOR
2140A3
0A3
1A3
1A6
1H3.A1H3.A
1A3.AT
MH
1A6
3'-0" 10 1/4" 5'-1"4'-0 3/8"
1'-0" 12'-11 5/8"
5' -1
1'
-3
/8
10"
1H6.A
1H3.A
6 5/8"
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/4/2020 9:25:20 AM
C:\Users\h2eddrah\Documents\476377_Revit2018_A_TTB_h2eddrah.rvt
A-402
TTB
EN
LA
R G
ED
L
AT
R
IN
E, L
AU
N D
R Y, A N
D J
AN
IT
O R
S R
O O
M
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
M . B
AR
R
Y
R . H
O O
E
J.
SC
H
EN
KE
N
FE
LD
ER
TOILET ACCESSORY SCHEDULE
MARK DESCRIPTION COMMENTS
MG-1 MIRROR GLASS (120"x48") MG-2 MIRROR GLASS (24"x36")
MH MOP AND BROOM HOLDER
PTD PAPER TOWEL DISPENSER
SC SHOWER CURTAIN AND ROD
TP TOWEL PIN
TTD SURFACE MOUNTED DOUBLE ROLL TOILET TISSUE DISPENSER
WITH SHELF
GENERAL NOTES - ENLARGED PLANS
1 REFERENCE ELEVATION 0'-0" = 868'-0" ABOVE MEAN SEA LEVEL, COORDINATE WITH
CIVIL DRAWINGS.
2 SEE SHEET A-001, A-002 FOR STANDARD INFORMATION, INCLUDING
ABBREVIATIONS, LEGENDS, SYMBOLS AND DETAILS.
3 ALL DIMENSIONS ARE FACE OF MASONRY / STEEL STUD OR CENTER LINE OF
COLUMN GRIDS. REFER TO ENLARGED OR PARTIAL PLANS FOR ADDITIONAL
INFORMATION, INCLUDING WALL TYPES AND ADDITIONAL DIMENSIONS.
4 REFER TO STRUCTURAL DRAWINGS FOR COLUMN GRID LINES AND LOCATION.
5 REFER TO INTERIOR FINISH PLANS, SCHEDULES AND DETAILS FOR ADDITIONAL
INFORMATION. INTERIOR DESIGN SHEETS INDICATED BY "I" PREFIX.
6 SLOPE FLOOR FINISH TO DRAIN MIN. 1/8" PER FOOT. PROVIDE TOPPING AS
REQUIRED.
7 REFER TO DRAWINGS AND SPECS FOR ADDITIONAL INFORMATION FOR OPTIONS.
8 REFER TO FURNITURE PLANS FOR FURNITURE LAYOUT. PROVIDE BLOCKING IN
WALLS AS REQUIRED FOR ALL SYSTEM FURNITURE ITEMS.
9 CONTRACTOR SHALL ENSURE THAT RATED WALL CONSTRUCTION IS
CONSTRUCTED TIGHT TO THE UNDERSIDE OF ROOF STRUCTURE ABOVE AND ALL
WALL, FLOOR/CEILING, AND ROOF PENETRATIONS ARE FIRESTOPPED. MAINTAIN
WALL RATINGS TO ROOF DECK FOR ALL PENETRATIONS AND RECESSED FIXTURES.
SUBMIT FIRESTOPPING DETAILS IN ACCORDANCE WITH SPECIFICATION SECTION 07
84 00
10 THE CONTRACTOR SHALL PROVIDE CONTINUOUS 2x6 WOOD BLOCKING FOR
MOUNTING OF HANDRAIL, MOUNTING OF ALL TOILET ACCESSORIES, CASEWORK,
PANELS, DRY ERASE BOARDS, AND ALL WALL MOUNTED TELEVISIONS, TYP.
11 TOILET ACCESSORIES SHALL BE MOUNTED AT HEIGHTS ACCORDING TO
ELEVATIONS ON SHEET A-003.
12 REFER TO FLOOR PLANS FOR ARCHITECTURAL LEGEND - SYMBOLS, TYP.
13 STAIRS SHALL BE DESIGNED BY THE CONTRACTOR, ALL STEEL DESIGNATIONS AND
DIMENSIONS ARE FOR REFERENCE ONLY.
14 EXPOSED METAL SURFACES SHALL BE PRIMED BY FABRICATOR AND FIELD PAINTED
IN ACCORDANCE WITH SPECIFICATION 09 90 00.
15 SECOND, THIRD, AND FOURTH FLOORS ARE ALL 1 HOUR RATED AND REQUIRE ALL
PENETRATIONS THROUGH THESE FLOORS TO BE FIRESTOPPED.
1/2" = 1'-0"A-111
1 ENLARGED TYP. LAUNDRY PLANS
1/2" = 1'-0"A-111
2 ENLARGED TYP. LATRINES
1/2" = 1'-0"A-111
3 ENLARGED JANITOR ROOM PLAN (1ST FLOOR)
1/2" = 1'-0"A-121
4 ENLARGED JANITOR PLAN (2ND, 3RD & 4TH FLS.)
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
W
2Q R
R
_P la ns -0
ELEVATOR ACCESS DOOR
ONLY ON FIRST FLOOR,
SEE DOOR SCHEUDLES
ELECTRICAL BOX,
COORDINATE WITH
ELECTRICAL
6B
ALL WASHERS
AND DRYERS
OPTION "A", OMAR
FUNDED. REFER
TO PRICE
BREAKOUT
SCHEDULE.
LAUNRY ROOM WALL BEYOND
GOES TO UNDERSIDE OF
DECK. REFER TO PARTITION
TYPES AND REQUIRED FIRE
RATING.
DR1 DR1 DR1 DR1
DR2 DR2 DR2
1ST FLOOR
0"
2ND FLOOR
12'-0"
ELECTRICAL BOX,
COORDINATE WITH
ELECTRICAL
ALL WASHERS
AND DRYERS
OPTION "A", OMAR
FUNDED. REFER
TO PRICE
BREAKOUT
SCHEDULE.
DR2
WA1
B2
STAINLESS STEEL SINK,
SEE PLUMBING DWGS
TABLE,
SEE INTERIOR DWGS
ALL WASHERS
AND DRYERS
OPTION "A", OMAR
FUNDED. REFER
TO PRICE
BREAKOUT
SCHEDULE.
WA1 WA1 WA1 WA1 WA1 WA1 WA1 WA1
1ST FLOOR
0"
2ND FLOOR
12'-0"
B2
ALL WASHERS
AND DRYERS
OPTION "A", OMAR
FUNDED. REFER
TO PRICE
BREAKOUT
SCHEDULE.
DR2
WA1
WASHER/DRYER LEGEND
29" WIDE X 28.25"DEEP X 43"
TALL
CAPACITY: 7 CU. FT.
29 INCH ELECTRIC DRYER
WITH AUTODRY™
DRYING SYSTEM, WRINKLE
SHIELD™
OPTION, 14 DRYER CYCLES, 3
DRYING
TEMPERATURES, HAMPER
DOOR, TIMED
DRY, END-OF-CYCLE SIGNAL,
INTERIOR
LIGHT AND 7.0 CU. FT.
CAPACITY
CYCLES: 14
DR1
27" WIDE X 28.5" DEEP X 76.375"
TALL
27" ELECTRIC STACK DRYER
WITH DUAL METERCASE
LARGE 7.4 CU. FT. CAPACITY, 3
CYCLE OPTIONS: HEAVY-DUTY,
NORMAL AND DELICATES,
FABRIC PROTECTION COOL-
DOWN CARE, EASY-TO-
FOLLOW CONSOLE
INSTRUCTIONS, 180° WIDE-
OPENING SIDE-SWING DOOR
ALLOWS FOR CONVENIENT
ACCESS, 3 CYCLES: HEAVY-
DUTY (HIGH HEAT), NORMAL
(MEDIUM HEAT), AND
DELICATES (LOW HEAT),
BALANCED AIRFLOW SYSTEM,
LARGE REMOVABLE, DOOR-
MOUNTED LINT SCREEN, 3-
WAY VENTING UPPER DRYER
(BACK AND SIDES); 4-WAY,
MULTI-VENT OPTIONS LOWER
DRYER (BACK, BOTTOM, AND
SIDES), ELECTRIC MODEL (2)
ELEMENTS RATED AT 5600
WATTS, 240 VOLT; (2) 30 AMP
CIRCUIT BREAKERS REQUIRED
DR2
WIDTH: 27 1/2" WIDE X 27" DEEP
X 44" TALL
CAPACITY: 3.9 CU. FT.
28 INCH TOP LOAD WASHER
WITH, SOAKING CYCLES,
WATER LEVEL, SELECTION, 12
WASH CYCLES, SMOOTH,
IMPELLER, STAINLESS STEEL
WASH, BASKET, LATE LID
LOCK, QUICK WASH, CYCLE,
EXTRA RINSE OPTION
CONTROL TYPE: KNOBS WASH
CYCLES: 12 STEAM CYCLE: NO
TEMPERATURE SETTINGS: 5
BLEACH
DISPENSER: YES FABRIC
SOFTENER DISPENSER: NO
STAINLESS STEEL DRUM: YES
LEVELING LEGS: YES
REVERSIBLE DOOR: NO SELF
CLEANING LINT FILTER: NO
SOAK SETTING: YES INCLUDES
HOSES: NO WATER HEATER:
NO
USAGE: RESIDENTIAL
WA1
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/4/2020 9:25:33 AM
C:\Users\h2eddrah\Documents\476377_Revit2018_A_TTB_h2eddrah.rvt
A-404
TTB
LA
U
N D
R Y
R O
O M
E
LE
VA
TI
O N
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
M . B
AR
R
Y
R . H
O O
E
J.
SC
H
EN
KE
N
FE
LD
ER
1/2" = 1'-0"A-402
1 LAUNDRY ELEVATION 1
1/2" = 1'-0"A-402
2 LAUNDRY ELEVATION 2
1/2" = 1'-0"A-402
3 LAUNDRY ELEVATION 3
1/2" = 1'-0"A-402
4 LAUNDRY ELEVATION 4
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
W
2Q R
R
_P la ns -0
BEARING ELEV.
48'-0"
4.8
A-511
5'-6"
A-511
5C
MC4 STEEL
CHANNEL
RUNGS
1'-6"
LP-4 LADDER SAFETY POST,
EZ-UP LADDER SAFETY POST,
OR EQUIAVALENT SECURED TO
TOP TWO RUNGS AND / OR AS
RECOMMENDED BY MANUFACTURER. 8
/2
1' -0
1A6
4TH FLOOR
36'-0"
BEARING ELEV.
48'-0"
L K.5
A-511
CLEAR
3'-0"
A-511
5C
MC4 STEEL CHANNEL
CLEAR
3'-0"
A-511
L
4.8
K.5
A-511
A-511
CLEAR
3'-0"
5' -6
5C
OPEN
BELOW
METAL DECK
LANDING
C
LE
AR
2'
-6
3' -0
LP-4 LADDER SAFETY POST,
EASY UP LADDER SAFETY POST
SECURED TO
TOP TWO RUNGS AND / OR PER
INSTRUCTIONS
R U
N G
S 1'
-6
MC4 STEEL
CHANNEL
STEEL
ANGLE
BRACKET
1A3
1A3
1A3
1A3
L
A-511
CLEAR
3'-0"
30" x 36" ROOF HATCH
LP-4 LADDER SAFETY POST,
EASY UP LADDER SAFETY POST
SECURED TO
TOP TWO RUNGS AND / OR PER
INSTRUCTIONS
MC4 STEEL CHANNEL
METAL ANGLE BRACKET
3 5/8" COLD FORM METAL STUD @
16" O.C. WITH 5/8" GWB INTERIOR &
5/8" GLASS MATT EXTERIOR & FILLED
WITH SPRAY POLYURETHANE FOAM ( SPF )
PREFINISHED METAL
FLASHING ROOF HATCH
CURB
P.T. BLOCKING
CONTINOUS SEALANT
METAL DECK
STANDING SEAM METAL ROOFING
SHEATHING
RIGID INSULATION
STEEL STRUCTURE,
SEE STRUCT. DWGS
HOLLOW METAL
DOOR FRAME
3 5/8" METAL STUD @
16" O.C. WITH 5/8" GWB
BOTH SIDES ( 1A3 )
3 5/8" METAL STUD @
16" O.C. WITH 5/8" GWB
BOTH SIDES (1A3 )
CLEAR
3'-0"
CLEAR
3'-0"
ROOFTOP
ANCHOR
A-521
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/4/2020 9:25:47 AM
C:\Users\h2eddrah\Documents\476377_Revit2018_A_TTB_h2eddrah.rvt
A-511
TTB
R O
O F
H
AT
C H
S
EC
TI
O
N S
AN
D
P
LA
N
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
M . B
AR
R
Y
B.
A
LL
EN
J.
SC
H
EN
KE
N
FE
LD
ER
1/2" = 1'-0"A-141
1 ROOF HATCH SECTION #1
1/2" = 1'-0"A-141
2 ROOF HATCH SECTION #2
1/2" = 1'-0"A-511
3 ROOF HATCH TOWER PLAN 5 ISOMETRIC VIEW
1 1/2" = 1'-0"A-511
4 ROOF HATCH DETAIL
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
W
2Q R
R
_P la ns -0
3-5/8" METAL STUD
AT 16" O.C.
STANDING SEAM
METAL ROOFING
ROOF DECKING
RIGID INSULATION
CONTINUOUS BENT
PLATE SUB-FASCIA
3-13/16" METAL
RUNNER CHANNEL
PRE-ENGINEERED
ROOF TRUSS,
COORDINATE WITH
STRUCTURAL
1" PREFINISHED METAL
SOFFIT PANEL
GUTTER STRAP
AT 30" O.C.
GUTTER BRACKET AT 30"
O.C.; ALTERNATE WITH
GUTTER STRAP
5"
1"
1/ 2"
1/
2"
PREFINISHED METAL
FASCIA
CONTINUOUS
PRE-FINISHED
METAL DRIP
EDGE
A-521
8.
M
IN
.0
JOIST SPACING
1250 lb WORKING LOAD 5000 lb ULTIMATE LOAD
(IN ANY DIRECTION)
STEEL PLATE
HSS BRACE
GALV. THREADED
RODMETAL STUD TRUSSES,
COORDINATE WITH STRUCT.
BOTTOM PLATE, HDG
STEEL BASE
PLATE, HDG
3-1/2"Ø GALV.
STEEL STANCHION
3/4" Ø S.S. U-BAR
USE APPROPRIATE BASE TIE-IN
WALL / CURB
CONTINUOUS BEAD OF WATERBLOCK
ALUMINUM COUNTERFLASHING
STANDING SEAM METAL ROOF
MEMBRANE BONDING ADHESIVE
TERMINATION BAR
3" MIN. FACE
FASTENER 12" O.C. MAX.
CONTINUOUS BEAD OF SEALANT
FASTENER 12" O.C. MAX.
Z-CLIP
COUNTER FLASHING TUCKED INTO
MORTAR JOINT
SHEET METAL
RIDGE CAP
TURN PANEL PAN
UP
ZEE CLOSURE
TAPE SEALANT
R-40 RIGID ROOF
INSULATION
SELF-ADHERING
MEMBRANE OVER
ENTIRE ROOF
STEEL DECK
SLOPE SLOPE
PRE-FINISHED ROOF
METAL PANEL
CLEARANCE FOR
THERMAL MOVEMENT
NOTCH AND HEM PANEL
MINIMUM 1"
GUTTER STRAP
SHEET METAL GUTTER.
THE FRONT OF THE
GUTTER SHOULD BE A
MINUMUM 1" LOWER
THAN THE BACK TO
ALLOW OVERFLOW
PRE-FINISHED METAL
FASCIA
SELF-ADHERING
MEMBRANE OVER ENTIRE
ROOF AND DOWN FACE OF
FASCIA
1ST LAYER, SELF-
ADHERING MEMBRANE
EXTEND ON TO ROOF
MINIMUM 4" AND DOWN
FACE OF FASCIA
R-40 RIGID ROOF
INSULATION
STEEL DECK
METAL TRUSS
3 X 3 X 16GA CONT - SEE
STRUCTURAL
BENT PLATE SUBFASCIA -
SEE STRUCTURAL
HAT CHANNELS
ROOF SOFFIT
NOTCH & HEM
PANEL
CLEARANCE
FOR THERMAL
MOVEMENT
SLOPE
NOTCH & HEM
PANEL
CLEARANCE
FOR THERMAL
MOVEMENT
FASTENER
BUTYL TAPE
PANEL SUPPORT
FASTENER AS REQUIRED
SUBSTRATE
SHEET METAL GUTTER
SLOPE
OTHER RIB
GUTTER BRACKET
AT 30" O.C.;
ALTERNATE WITH
GUTTER STRAP
GUTTER STRAP
AT EVERYAT EVERY
SELF-ADHERING
MEMBRANE OVER ENTIRE
ROOF
R-40 RIGID ROOF
INSULATION
METAL ROOF PANEL
STEEL DECK
SHEET METAL RIDGE CAP
TURN PAN UP ALONG
RIDGE
CONTINUIOUS ZEE SET IN
SEALANT
SLOPE
SLOPE
CROSS MEMBER
STAINLESS STEEL BOLT
AND WASHER
CROSS MEMBER
STANDING SEAM
METAL ROOF
UTILITY CLAMP
STAILESS STEEL SCREW
UTILITY CLAMP
PRE-FINISHED COLOR
STRIP
METAL PANEL
SLOPE
EQUIPMENT SUPPORT
STAND/VENT STACK,
LOCATE A MINIMUM OF 3'-0"
FROM RIDGE/ VALLEY
FLASHING
METAL PANEL
PREFORMED
PENETRATION
FLASHINGS
SEALANT BEAD BETWEEN
PIPE AND FLASHING
TOOLED TO FACILITATE
RUNOFF
STAINLESS STEEL
DRAWBAND
SET SECUREMENT RING IN
CONTINUOUS BEAD OF
SEALANT
GASKETED FASTENERS
SECURE FLASHING COLLAR
FLANGE TO ROOF PANEL
AND NOT TO DECK SO AS
NOT TO FIX PANEL AT
PENETRATION
SELF-ADHERING
MEMBRANE OVER ENTIRE
ROOF
STEEL DECK
R-40 RIGID ROOF INSULATION
SLOPE
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/4/2020 9:26:03 AM
C:\Users\h2eddrah\Documents\476377_Revit2018_A_TTB_h2eddrah.rvt
A-521
TTB
R O
O F
D
ET
AI
LS
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
D
R . M
AR
TI
N L
U
TH
ER
K
IN
G
J R
. P
LA
C E
LO
U
IS
VI
LL
E, K Y
D es ig ne r
Au th or
J.
SC
H
EN
KE
N
FE
LD
ER
3" = 1'-0"A-311
7 DETAIL - ROOF AND GUTTER
1 1/2" = 1'-0"A-511
3 ROOFTOP FALL PROTECTION ANCHOR DETAIL
6" = 1'-0"A-313
4 COUNTERFLASHING & TERMINATOR BAR
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
N.T.S.9 CAP FLASHING
N.T.S.5 DOWNSLOPE EDGE METAL WITH GUTTER
N.T.S.A-521
8 EAVE WITH GUTTER FLOATING
N.T.S.A-302
1 RIDGE CAP NON VENTING
N.T.S.6 SNOW GUARD
N.T.S.2 VENT STACK FLASHING
W
2Q R
R
_P la ns -0
1. THE BUILDING SHALL BE FULLY SPRINKLERED. THE SPRINKLER SYSTEM
SHALL BE SUPPLED FROM 8" SPRINKLER SERVICE LINE WHICH RUNS
ACROSS THE PROJECT SITE. SPRINKLER SYSTEM SHALL BE INSTALLED IN
ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13-2016, NFPA 24-2016, NFPA 14-2015,
CONTRACT DRAWINGS AND CONTRACT SPECIFICATION SECTION 21 13 13.00 10. THE
SYSTEM SHALL INCLUDE STANDPIPES IN EACH OF THE THREE STAIRWELLS, AND THE
SPRINKLER SYSTEM SHALL BE FED FROM THE STANDPIPES.
2. THE SPRINKLER SYSTEM SHALL BE DESIGNED FOR LIGHT HAZARD AND
ORDINARY HAZARD OCCUPANCIES.
THE HAZARD CLASSIFICATION SHALL HAVE THE FOLLOWING REQUIREMENTS:
LIGHT HAZARD OCCUPANCY WITH A DENSITY OF 0.10 GPM/SF AND A
DESIGN AREA OF 1,500 SF. HOSE STREAM DEMAND IS 250 GPM, MINIMUM
K-5.6, AND THE DURATION SUPPLY IS 60 MINUTES FOR CEILING HEIGHT UP TO 30FT.
ORDINARY HAZARD OCCUPANCY WITH A DENSITY OF 0.20 GPM/SF AND A
DESIGN AREA OF 2,500 SF. HOSE STREAM DEMAND IS 250 GPM, MINIMUM
K-8.0, AND THE DURATION SUPPLY IS 60 MINUTES FOR CEILING HEIGHT UP TO 30FT.
QUICK RESPONSE SPRINKLERS IAW NFPA 13 REQUIREMENTS LIMITED TO WET PIPE
SYSTEMS. DESIGN AREA REDUCTIONS ARE NOT ALLOWED.
3. THE CONTRACTOR SHALL DESIGN HYDRAULICALLY AN AUTOMATIC WET PIPE
COMBINED SPRINKLER SYSTEM IN ACCORDANCE WITH THE REQUIREMENTS OF NFPA 13,
NFPA 14, CONTRACT DRAWINGS AND CONTRACT SPECIFICATION SECTION 21 13 13.00 10.
THE CONTRACTOR IS RESPONSIBLE FOR THE ENTIRE DESIGN OF THE SPRINKLER
SYSTEM. SPRINKLERS SHALL BE INSTALLED IN ALL SPACES REQUIRED TO BE
PROTECTED BY NFPA 13. THE SYSTEM DESIGN SHALL BE BASED ON THE WATER
DISTRIBUTION SYSTEM WITH A STATIC PRESSURE OF 70 PSIG AND RESIDUAL PRESSURE
OF 50 PSIG WITH A FLOW OF 1186 GPM. THE GAGE HYDRANT IS LOCATED ADJACENT TO
BUILDING 1601, AND THE FLOW HYDRANT IS LOCATED ADJACENT TO BUILDING 1781. THE
CONTRACTOR SHALL PERFORM A FLOW TEST TO VERIFY THE WATER FLOW
INFORMATION (SEE SPECIFICATION 21 13 13.00 10) AND SHALL NOTIFY THE GOVERNMENT
IF THE RESULT IS DIFFERENT.
4. FIRE PROTECTION SYSTEM PIPING, AND FITTINGS SIZES SHOWN ON THESE DRAWINGS
ARE FOR ESTIMATING AND LOCATION PURPOSES ONLY AND SHOULD NOT BE
CONSIDERED AS REQUIREMENTS UNDER THIS CONTRACT. EXPOSED PIPING SHALL BE
PROHIBITED IN ADMINISTRATIVE AREAS. THE CONTRACTOR SHALL COORDINATE
SPRINKLER HEAD LOCATIONS WITH OTHER TRADES TO AVOID FLOW OBSTRUCTION
CONFLICTS. FOR LOCATIONS OF SOFFITS AND CEILING SPACES, SEE ARCHITECTURAL
DRAWINGS.
5. FOR FIRE PROTECTION SYSTEM DETAILS AND SCHEDULES, SEE
SHEET FX500 SERIES DRAWINGS.
6.IN ALL TR ROOMS, INSTALL SIDE WALL HEAD WITH WIRE CAGES OVER SPRINKLER
HEADS.
7. ELEVATOR HOISTWAY AND MACHINE ROOM SHALL BE SPRINKLERED AS REQUIRED
BY NFPA 13 AND IN ACCORDANCE WITH THE MINIMUM REQUIREMENTS SHOWN ON
SHEET FX501.
8. PROVIDE INSPECTOR'S TEST CONNECTION FOR EACH WATER FLOW SWITCH
ASSOCIATED WITH THE ELEVATOR HOISTWAY SPRINKLERS. TEST CONNECTIONS SHALL
BE LOCATED OUTSIDE THE ELEVATOR HOISTWAY ENCLOSURES. TEST CONNECTION
PIPING SHALL BE ROUTED TO DISCHARGE OUTSIDE THE
BUILDING WITH SPLASH BLOCK. EACH FLOOR SHALL HAVE A FLOOR
CONTROL VALVE ASSEMBLY AND SHALL INCLUDE A CHECK VALVE. SEE
FX-501 FOR DETAILS.
9. AIR HANDLING UNITS SHALL HAVE SMOKE DETECTORS MOUNTED AS SHOWN ON HVAC
CONTROL SHEETS M-700 TO M-706. SMOKE DETECTORS SHALL BE FOR FIRE ALARM
ACTIVATION AND SHUT DOWN RESPECTIVE AIR HANDLING UNITS.
10. FIRE SPRINKLER CONTRACTOR AND FIRE ALARM CONTRACTOR SHALL COORDINATE
WORK TO ASSURE A COMPLETE MONITORED AND WORKING SYSTEM.
11.PROVIDE FLOOR SUPPORTS WHERE REQUIRED FOR PIPES VALVES.
12. ALL OVERHEAD PIPING SHALL BE PROPERLY SUPPORTED FROM
BUILDING STRUCTURE.
13. ALL SYSTEM CONTROL VALVES SHALL BE ELECTRONICALLY
SUPERVISED TO THEIR NORMAL POSITION. PROVIDE LOCKS AND CHAINS
ON BACK FLOW PREVENTER DEVICE.
14. EQUIPMENT (PIPING, DUCTWORK, MACHINERY, ETC) THAT DOES
NOT SERVE THE TR(S) SHALL NOT BE INSTALLED
ABOVE OR IN THESE IT SPACES NOR WILL THIS EQUIPMENT PASS
THROUGH OR ENTER THE TR(S).
15. PROVIDE CONCEALED HEADS IN LOBBY AND CORRIDORS.
16. HAZARD OCCUPANCY LEGENDS ARE SHOWN ON PARTIAL FIRE
PROTECTION PLAN.
17. PROVIDE HYDRAULIC CALCULATIONS FOR ALL HAZARD OCCUPANCY AREAS
INDICATED ON CONTRACT DRAWING.
18. PROVIDE THRUST BLOCKING AS REQUIRED. THRUST BLOCKING SHALL BE SIZED IN
ACCORDANCE WITH THE REQUIREMENTS OF NFPA 24.
GENERAL DESIGN NOTESLEGENDS
LIGHT HAZARD
OCCUPANCY
ORDINARY HAZARD
OCCUPANCY
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/2/2020 9:33:27 AM
C:\Users\h2eddkbp\Documents\476377_Revit2018_F_TTB_h2eddkbp.rvt
FX001
TTB
FI
R
E
PR
O
TE
C
TI
O N
L
EG
EN
D
A N
D G
EN
ER
AL
D
ES
IG
N N
O
TE
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
KE
VI
N
P R
AT
H
ER
T.
H
IB
BS
R O
SE
S
C H
AR
R
ER
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
SE
PT
0 2
W
2Q R
R
_P la ns -0
FPVAV
1-1
FPVAV
1-2
FPVAV
1-3
FPVAV
1-4
FPVAV
1-5
FPVAV
1-6 FPVAV
1-9
FPVAV
1-7
FPVAV
1-8
FPVAV
1-12
FPVAV
1-13
FPVAV
1-11
FPVAV
1-10
PIPE ANCHOR
(TYP)
PIPE GUIDE
(TYP)
NOTE: REFRIGERANT PIPING SHALL BE RUN FROM THE CONDENSING
UNITS TO THEIR RESPECTIVE AIR HANDLERS IN ACCORDANCE
WITH MANUFACTURER'S RECOMMENDATIONS, AND SHALL
RUN TO UPPER FLOORS INSIDE THE BUILDING.
R-1 R-2
R-3R-4
CH-4
CH-1
CH-3
CH-2
CH-5
CU-1
CU-2 CU-3
T
T
T
T
T
TSTAT
CH-4
TSTAT
CH-2
TSTAT
CH-1
TSTAT
CH-5
TSTAT
CH-3
GENERAL NOTES
1. HEATING HOT WATER PIPING SHALL BE COPPER, AS NOTED IN
SPECIFICATION SECTION 23 64 26, HOT WATER PIPING SYSTEMS.
2. SEE SCHEDULES FOR BOILER SIZES.
3. SEE MECHANICAL DETAILS, SHEETS M-501 THRU M-503.
4. SEE HOT WATER PIPING RISERS, SHEETS M-415 THRU M-418.
5. A REMOTE BOILER SHUTOFF SWITCH SHALL BE REQUIRED IN
THE MECHANICAL ROOM IN ACCORDANCE WITH ASME CSD-1.
SEE ENLARGED MECHANICAL ROOM PLAN, SHEET M-401.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
PLAN NORTH
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/2/2020 9:30:55 AM
C:\Users\h2eddkbp\Documents\476377_Revit2018_M_TTB_h2eddkbp.rvt
M-150
TTB
H
EA
TI
N
G P
IP
IN
G P
LA
N
1S
T
FL
O O
R C
O M
PR
EH
EN
SI
VE
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
KE
VI
N
P R
AT
H
ER
T.
H
IB
BS
C he ck er
3/32" = 1'-0"M-150
1 HEATING PIPING PLAN - 1ST FLOOR COMPREHENSIVE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
2 0
W
2Q R
R
_P la ns -0
(E1-E6)
LIVING/SLEEPING
BAY
(E1-E6)
LIVING/SLEEPING
BAY
COMPANY
STORAGE
ELEVATOR
STAIR 1
(E1-E6)
LIVING/SLEEPING
BAY
(E1-E6)
LIVING/SLEEPING
BAY
CORRIDOR
ELECTRICAL
CORRIDOR
TR
CORRIDOR
MECHANICAL
LATRINE/
SHOWER
SENIOR LEADERS
QUARTERS
SENIOR LEADERS
QUARTERS
LATRINE/
SHOWER
LATRINE/
SHOWER
225LAUNDRY
LATRINE/
SHOWER
STAIR 2
STAIR 2
FPVAV
1-22
FPVAV
1-25
FPVAV
1-24
FPVAV
1-23
FPVAV
1-18
FPVAV
1-19
FPVAV
1-21
FPVAV
1-20
FPVAV
1-26
CH-8
CH-7
UH-2
M-161
M-161
R-5 R-6
R-8 R-7
FPVAV
1-16
FPVAV
1-17
RECYCLE
CH-6
FPVAV
1-15
FPVAV
1-14
AHU-1
PIPE ANCHOR
(TYP)
PIPE GUIDE
(TYP)
T
T
T
TSTAT
CH-8
TSTAT
CH-7
TSTAT
CH-6
GENERAL NOTES
1. HEATING HOT WATER PIPING SHALL BE COPPER, AS NOTED IN
SPECIFICATION SECTION 23 64 26, HOT WATER PIPING SYSTEMS.
2. SEE SCHEDULES FOR BOILER SIZES.
3. SEE MECHANICAL DETAILS, SHEETS M-501 THRU M-503.
4. SEE HOT WATER PIPING RISERS, SHEETS M-415 THRU M-418.
5. A REMOTE BOILER SHUTOFF SWITCH SHALL BE REQUIRED IN
THE MECHANICAL ROOM IN ACCORDANCE WITH ASME CSD-1.
SEE ENLARGED MECHANICAL ROOM PLAN, SHEET M-401.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
PLAN NORTH
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/2/2020 9:31:05 AM
C:\Users\h2eddkbp\Documents\476377_Revit2018_M_TTB_h2eddkbp.rvt
M-160
TTB
H
EA
TI
N
G P
IP
IN
G P
LA
N
2N
D F
LO
O
R C
O M
PR
EH
EN
SI
VE
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
KE
VI
N
P R
AT
H
ER
T.
H
IB
BS
R O
SE
S
C H
AR
R
ER
3/32" = 1'-0"M-160
1 HEATING PIPING PLAN - 2ND FLOOR COMPREHENSIVE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
2 0
W
2Q R
R
_P la ns -0
E1-E6
BAY
E1-E6
LIVING/SLEEPING
BAY
E1-E6
LIVING/SLEEPING
BAY
E1-E6
LIVING/SLEEPING
BAY
MECHANICAL
SENIOR LEADERS
QUARTERS
SENIOR LEADERS
QUARTERS
CORRIDOR
ELECTRICAL
COMPANY
STORAGE
CORRIDOR
307 ELEVATOR
STAIR 1
STAIR
STAIR
TR
CORRIDOR
CORRIDOR
LATRINE/
SHOWERS
LATRINE/
SHOWERS
LATRINE/
SHOWERS
LAUNDRY
LATRINE/
SHOWERS
FPVAV
2-9
FPVAV
2-12
FPVAV
2-13
FPVAV
2-11
FPVAV
2-5
FPVAV
2-6
FPVAV
2-8
FPVAV
2-7
CH-11
CH-10
R-11
AHU-2
2" HWS
2" HWR
R-10
CH-9
UH-3
M-171
M-171
R-12
R-9
FPVAV
2-2 FPVAV
2-1
FPVAV
2-3
FPVAV
2-4
RECYCLE
PIPE ANCHOR
(TYP)
PIPE GUIDE
(TYP)
T
T
T
TSTAT
CH-9 TSTAT
CH-11
TSTAT
CH-10
GENERAL NOTES
1. HEATING HOT WATER PIPING SHALL BE COPPER, AS NOTED IN
SPECIFICATION SECTION 23 64 26, HOT WATER PIPING SYSTEMS.
2. SEE SCHEDULES FOR BOILER SIZES.
3. SEE MECHANICAL DETAILS, SHEETS M-501 THRU M-503.
4. SEE HOT WATER PIPING RISERS, SHEETS M-415 THRU M-418.
5. A REMOTE BOILER SHUTOFF SWITCH SHALL BE REQUIRED IN
THE MECHANICAL ROOM IN ACCORDANCE WITH ASME CSD-1.
SEE ENLARGED MECHANICAL ROOM PLAN, SHEET M-401.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
PLAN NORTH
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/2/2020 9:31:16 AM
C:\Users\h2eddkbp\Documents\476377_Revit2018_M_TTB_h2eddkbp.rvt
M-170
TTB
H
EA
TI
N
G P
IP
IN
G P
LA
N
3R
D F
LO
O
R C
O M
PR
EH
EN
SI
VE
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
KE
VI
N
P R
AT
H
ER
T.
H
IB
BS
R O
SE
S
C H
AR
R
ER
3/32" = 1'-0"M-170
1 HEATING PIPING PLAN - 3RD FLOOR COMPREHENSIVE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
2 0
W
2Q R
R
_P la ns -0
E1-E6
BAY
E1-E6
LIVING/SLEEPING
BAY
408STAIR
MECHANICAL
SENIOR LEADERS
QUARTERS
SENIOR LEADERS
QUARTERS
E1-E6
LIVING/SLEEPING
BAY
E1-E6
LIVING/SLEEPING
BAY
COMPANY
STORAGE
STAIR 1
TR
CORRIDOR
CORRIDOR
CORRIDOR
ELECTRICAL
CORRIDOR
CORRIDOR
JANITOR
LATRINE/
SHOWERS
LATRINE/
SHOWERS
LATRINE/
SHOWERS
LAUNDRY
LATRINE/
SHOWERS
DSS-8
FPVAV
2-22
FPVAV
2-25
FPVAV
2-26
FPVAV
2-24
FPVAV
2-23
FPVAV
2-18
FPVAV
2-19
FPVAV
2-21
FPVAV
2-20
MAU-1
CH-14
CH-13
CH-12
R-14
UH-4
M-181
M-181
R-16 R-15
R-13
FPVAV
2-15
FPVAV
2-14
FPVAV
2-16
FPVAV
2-17
RECYCLE
VENDING
403 ELEVATOR
DSS-4
PIPE ANCHOR
(TYP)
PIPE GUIDE
(TYP)
SF-1
T
T
T
TSTAT
CH-14
TSTAT
CH-12
TSTAT
CH-13
GENERAL NOTES
1. HEATING HOT WATER PIPING SHALL BE COPPER, AS NOTED IN
SPECIFICATION SECTION 23 64 26, HOT WATER PIPING SYSTEMS.
2. SEE SCHEDULES FOR BOILER SIZES.
3. SEE MECHANICAL DETAILS, SHEETS M-501 THRU M-503.
4. SEE HOT WATER PIPING RISERS, SHEETS M-415 THRU M-418.
5. A REMOTE BOILER SHUTOFF SWITCH SHALL BE REQUIRED IN
THE MECHANICAL ROOM IN ACCORDANCE WITH ASME CSD-1.
SEE ENLARGED MECHANICAL ROOM PLAN, SHEET M-401.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
PLAN NORTH
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
E
AL
EY
9/2/2020 9:31:24 AM
C:\Users\h2eddkbp\Documents\476377_Revit2018_M_TTB_h2eddkbp.rvt
M-180
TTB
H
EA
TI
N
G P
IP
IN
G P
LA
N
4T
H F
LO
O
R C
O M
PR
EH
EN
SI
VE
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
KE
VI
N
P R
AT
H
ER
T.
H
IB
BS
R O
SE
S
C H
AR
R
ER
3/32" = 1'-0"M-180
1 HEATING PIPING PLAN - 4TH FLOOR COMPREHENSIVE
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
2 0
W
2Q R
R
_P la ns -0
MARK AREAS
SERVED
TYPE REMARKS
COOLING
AIR
FLOW
(CFM)
PRIM
EAT
(F)
VAV BOX
LOCATION
ELECTRICAL
V/PH/HZ/AMP
INLET
DIAMETER
(IN)
MIN.
PRIM.
AIRFLOW
(CFM)
HEATING (HW)
COIL
EAT
(F)
BASIS
OF
DESIGN
PARALLEL FAN-POWERED VAV BOX SCHEDULE AHU-2
TEMPERATURE
SENSOR
LOCATION
FPVAV 2-1
FPVAV 2-2
FPVAV 2-3
FPVAV 2-4
FPVAV 2-5
FPVAV 2-6
FPVAV 2-7
FPVAV 2-8
FPVAV 2-9
FPVAV 2-10
FPVAV 2-11
FPVAV 2-12
FPVAV 2-13
FPVAV 2-14
FPVAV 2-15
FPVAV 2-16
FPVAV 2-17
FPVAV 2-18
FPVAV 2-19
FPVAV 2-20
FPVAV 2-21
FPVAV 2-22
FPVAV 2-23
FPVAV 2-24
FPVAV 2-25
FPVAV 2-26
FAN
CFM
HTG
CFM
FAN SP
(IN)
FAN
HP
MIN COIL
HTG CAP.
(MBH)
COIL
EWT
(F)
MAX
COIL
GPM
MAX COIL
WPD
(FT)
MAX COIL
APD
(IN W.C.)
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
TITUS MODEL DFLP-02
ROOM 310
ROOM 310
ROOM 308
ROOM 308
ROOM 305
ROOM 303
ROOM 316
ROOM 317
ROOM 326
ROOM 320
ROOM 320
ROOM 322
ROOM 322
ROOM 410
ROOM 410
ROOM 408
ROOM 408
ROOM 405
ROOM 403
ROOM 416
ROOM 417
ROOM 426
ROOM 420
ROOM 420
ROOM 422
ROOM 422
ROOM 310
ROOM 310
ROOM 308
ROOM 308
ROOM 305
ROOM 302,
303, 304
ROOM 316
ROOM 317
ROOM 326
ROOM 320
ROOM 320
ROOM 322
ROOM 322
ROOM 410
ROOM 410
ROOM 408
ROOM 408
ROOM 405
ROOM 416
ROOM 417
ROOM 426
ROOM 420
ROOM 420
ROOM 422
ROOM 422
ROOM 310
ROOM 310
ROOM 308
ROOM 308
ROOM 305
ROOM 302
ROOM 316
ROOM 317
ROOM 326
ROOM 320
ROOM 320
ROOM 322
ROOM 322
ROOM 410
ROOM 410
ROOM 408
ROOM 408
ROOM 405
ROOM 402
ROOM 416
ROOM 417
ROOM 426
ROOM 420
ROOM 420
ROOM 422
ROOM 422
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/
HW REHEAT
PAR FP W/
HW REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/
HW REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
PAR FP W/ HW
REHEAT
NO.
ROWS
7.1
6.9
7.1
6.9
6.3
3.3
3.1
3.1
7.1
6.9
7.1
6.9
3.3
3.1
3.1
7.1
6.9
7.1
6.9
7.1
6.9
7.1
6.9
6.6
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
120/1/60
1.8
2.8
1.8
2.8
1.8
1.8
1.8
1.8
1.8
1.8
2.8
1.8
2.8
1.8
2.8
1.8
2.8
1.8
1.8
1.8
1.8
1.8
1.8
1.8
2.8
2.8
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.33
0.29
0.28
0.29
0.28
0.28
0.26
0.26
0.26
0.26
0.29
0.28
0.29
0.28
0.29
0.28
0.29
0.28
0.29
0.28
0.29
0.28
0.26
0.26
0.26
0.26
0.28
0.04
0.03
0.04
0.04
0.03
0.03
0.01
0.01
0.01
0.01
0.04
0.04
0.04
0.03
0.03
0.04
0.04
0.03
0.03
0.01
0.01
0.01
0.01
0.04
0.030.03
0.03
0.8
1.91
0.8
1.91
0.8
0.37
0.37
0.37
0.37
0.8
1.91
0.8
1.91
0.8
1.91
0.8
1.91
0.8
0.37
0.37
0.37
0.37
0.8
0.8
1.91
1.91
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
5 MCA, NOTE 1
NOTES:
1. MINIMUM PRIMARY AIRFLOW IS FOR BOTH COOLING AND HEATING.
2. PLENUM AIR INLET ON BOXES SHALL BE PROVIDED WITH FILTER (MERV 8).
ROOM 402,
403, 404
LOUVER SCHEDULE
MARK
TOTAL
REQ'D
MIN. FREE
AREA (SF)
L-1
LOCATION
BASIS
OF
DESIGN
REMARKSSERVICE
SIZE
(W X H)
IN.
L-2
1 EXTERIOR WALL
MECH RM 315 11.7 48 X 66 GREENHECK ESK-402
PARALLEL BLADE LOUVER, ANODIZED COLOR AS SPECIFIED, REMOVABLE BIRDSCREEN.
SEE DETAIL, SHEET M-503. NOTES 1,2,3.
AHU-1/ERU-1 OA AND
AHU-2/ERU-2 OA
L-3
L-4
10.8
3.1
1 EF2 EXHAUST
EXTERIOR WALL
SHOWER RM 125 EF-1 EXHAUST 36 X 30 PARALLEL BLADE LOUVER, ANODIZED COLOR AS SPECIFIED.
NOTES:
1. LOUVERS TO BE SUPPLIED WITH BIRD SCREENS.
2. MOTOR OPERATED BACKDRAFT DAMPERS, LOW LEAKAGE, MAX 3 CFM/SF @ 1" WC.
3. M.O.D. (ERU-1 INTAKE DUCT AND ERU-2 INTAKE DUCT) INTERCONNECTED TO EITHER ERU-1 OR ERU-2.
AHU-1/ERU-1 EA AND
AHU-2/ERU-2 EA
EXTERIOR WALL
MECH RM 215
EXTERIOR WALL
SHOWER RM 225
EXTERIOR WALL
SHOWER RM 325
EXTERIOR WALL
SHOWER RM 425
EF-3 EXHAUST
EF-4 EXHAUST
48 X 66
36 X 30
36 X 30
36 X 30
GREENHECK ESK-402
GREENHECK ESK-402
GREENHECK ESK-402
GREENHECK ESK-402
GREENHECK ESK-402
PARALLEL BLADE LOUVER, ANODIZED COLOR AS SPECIFIED, REMOVABLE BIRDSCREEN.
SEE DETAIL, SHEET M-503. NOTES 1,2,3.
3.1
3.1
3.1
L-5
L-6
SF-1 INTAKE GREENHECK ESK-40212.01L-7 EXTERIOR WALL
MECH RM 425 48 X 66
PARALLEL BLADE LOUVER, ANODIZED COLOR AS SPECIFIED, REMOVABLE BIRDSCREEN.
SEE DETAIL, SHEET M-503. NOTES 1,2,3.
PARALLEL BLADE LOUVER, ANODIZED COLOR AS SPECIFIED.
PARALLEL BLADE LOUVER, ANODIZED COLOR AS SPECIFIED.
PARALLEL BLADE LOUVER, ANODIZED COLOR AS SPECIFIED.
EXPANSION TANK SCHEDULE
MARK LOCATION TYPE SERVICE LENGTH (IN)
SIZE BASIS OF DESIGN
REMARKS
CAPACITY
(GAL)
TOTAL/ACCEPTANCE DIAMETER (IN)
ET-1 MECH. RM. 115 44.4/22.6 BELL & GOSSETT D-80VHOT WATER VERTICAL 56.0 16.25
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S
D R
AW
N
B Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
IS
SU
E D
AT
E:
C O
N
TR
AC
T
N O
SO
LI
C
IT
AT
IO
N N
O
D R
AW
IN
G C
O D
E:
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
AP
PR
JU
L
CERTIFIED FINAL
PN
F Y2
0, P
TR
AN
SI
EN
T
TR
AI
N
IN
G B
AR
R
AC
KS
FT
. M cC O
Y, W
I
B.
EA
LE
Y
9/2/2020 9:31:27 AM
C:\Users\h2eddkbp\Documents\476377_Revit2018_M_TTB_h2eddkbp.rvt
M-603
TTB
M
EC
H
AN
IC
AL
E Q
U
IP
M
EN
T
SC
H
ED
U
LE
S
LO
U
IS
VI
LL
E
D
IS
TR
IC
T
KE
VI
N
P R
AT
H
ER
KE
VI
N P
R
AT
H
ER
R O
SE
S
C H
AR
R
ER
GENERAL NOTE:
EQUIPMENT INDICATED AS BASIS OF DESIGN DOES NOT PROHIBIT
CONTRACTOR FROM SELECTING EQUIVALENT EQUIPMENT, FROM
A DIFFERENT MANUFACTURER, BASED UPON THE EQUIPMENT
PERFORMANCE AND THE PROJECT SPECIFICATIONS.
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
AM
D T
S E P
2 0
W
2Q R
R
_P la ns -0
| 476377_A-302 - BUILDING CROSS SECTIONS |
| 476377_A-311 - WALL SECTIONS |
| 476377_A-312 - WALL SECTIONS |
| 476377_A-402 - ENLARGED LATRINE, LAUNDRY, AND JANITORS ROOM |
| 476377_A-404 - LAUNDRY ROOM ELEVATIONS |
| 476377_A-511 - ROOF HATCH SECTIONS AND PLAN |
| 476377_A-521 - ROOF DETAILS |
| 476377_FX001 - FIRE PROTECTION LEGEND AND GENERAL DESIGN NOTES |
| 476377_M-150 - HEATING PIPING PLAN 1ST FLOOR COMPREHENSIVE |
| Sheets |
| M-150 - HEATING PIPING PLAN - 1ST FLOOR COMPREHENSIVE |
| M-160 - HEATING PIPING PLAN - 2ND FLOOR COMPREHENSIVE |
| M-170 - HEATING PIPING PLAN - 3RD FLOOR COMPREHENSIVE |
| M-180 - HEATING PIPING PLAN - 4TH FLOOR COMPREHENSIVE |
| M-603 - MECHANICAL EQUIPMENT SCHEDULES |