W912QR20R0018Plans-0002.pdf

PDF 3 MB Posted

Attached to
Renovation of Caven Point Army Reserve Center Facility
Solicitation number
W912QR20R0018
Issued by

About this file

This solicitation package includes plans and specifications for the renovation of the Caven Point Army Reserve Center Facility in Jersey City, New Jersey. Key details include:

  • The project involves design/build services for renovations with an estimated construction cost between $10-25 million. The primary NAICS code is 236220 and the size determination is $39.5 million.

  • Solicitation number W912QR20R0018 was issued by the Department of the Army Corps of Engineers Louisville District for full and open competition. The procurement requires a 10% price evaluation preference for HUBZone small businesses.

  • The solicitation package contains architectural and engineering drawings depicting door schedules, wall details, communication diagrams and related specifications.

  • The pre-bid site visit date is not provided. Questions are to be submitted through ProjNet and responses are due by the date listed on the cover sheet. Award will be contingent upon available appropriated funds.

  • Offerors must be registered in SAM, which combines CCR and ORCA. Technical, proposal and bonding questions should be directed through ProjNet. Pages may not be accurately numbered.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C P

N J

A -6

.d g n

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps

C A

T E

G O

R Y C

O D

E

D E

S C

R

IP

T

IO

N

L O

U

IS

V

IL

L E

K E

N T

U C

K Y

C P ro je c ts \0

\0

C

A D

B

IM

S h e e ts \0

A rc h \C

P N J

A -6

.d g n

-M

A R -2

:0

M A

S O

N H

A N

G E

R

L O

U

IS

V

IL

L E D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G P

L

P R

O J E

C T N

U M

B E

R P

J E

R S

E Y C

IT

Y

N E

W J

E R

S E

Y

C A

V E

N P

O

IN

T U S

A R

M Y R

E S

E R

V E C

E N

T E

R

T R

A

IN

IN

G B

U

IL

D

IN

G R

E N

O V

A T

IO

N

W

Q R -1

-D -0

J A

N

CERTIFIED FINAL SUBMITTAL

DOOR TYPES

SCALE: 1/4"=1'=0"

NOTES:

2.

1.

A

SCALE: 1/4"=1'=0"

FRAME TYPES

TRANSITION STRIP

NOT TO SCALE

LEGEND

B

PER PER

PER SCHED

P E

R S

C H

E D

PER

8" 8"

SCHED SCHED

HOOD

SCHED SCHED

PER

2" 2" 2"2"

1 2

PORCELAIN TILE

METAL TRANSITION

SHALL CENTER UNDER DOOR.

WHEN USED AS THRESHOLD AT DOORS,TRANSITION STRIPS

WITH THE HARDWARE SET.

CHANGES AT DOOR AND NO THRESHOLD IS SCHEDULED

TRANSITION STRIPS SHALL BE USED WHEN FLOOR MATERIAL

E

SCHED

PER

SCHED

PER

6" 8" 6"

C D

6" FOR TYPE

SCHEDULE

GLASS. SEE FOR TYPE

SCHEDULE

GLASS. SEE

NOT TO SCALE

TRANSITION STRIP

CPT

NOT TO SCALE

TRANSITION STRIP

VCT

RUBBER STRIP

RUBBER TILE

GLASS LEGEND

3. FIRE RATED GLASS

2. TEMPERED SAFETY GLASS

SEE SHEET A-510

1. LAMINATED INSULATED GLASS.

RUBBER

RUBBER

CONC

TRANSITION STRIP

NOT TO SCALE

METAL TRANSITION

QUARRY TILE CONC

TRANSITION STRIP

NOT TO SCALE

PORCELAIN TILE

METAL TRANSITION

VCT

TRANSITION STRIP

NOT TO SCALE

METAL TRANSITION

QUARRY TILE VCT

NOT TO SCALE

TRANSITION STRIP

CPT

RUBBER

VCT

PR- PAIR

NK - NO KEY

SS - STAINLESS STEEL

STL - STEEL

INS/MT - INSULATED METAL

ALUM - ALUMINUM

INSUL- LOW-E INSULATED, LAMINATED

SW- SOLID CORE WOOD

HM - HOLLOW METAL

R P

R O

C T

O R

T R

A

IN

IN

G B

U

IL

D

IN

G

D O

O R S

C H

E D

U L E

R P

R O

C T

O R

1A-600

K

B L

A N

F O

R D

M

A R

C H

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

M A

R C

H

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

W

2Q R

R

Pl an s-

.S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C P

N J

A -6

.d g n

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps

C A

T E

G O

R Y C

O D

E

D E

S C

R

IP

T

IO

N

L O

U

IS

V

IL

L E

K E

N T

U C

K Y

P P ro je c ts \0

\0

C

A D

B

IM

S h e e ts \0

A rc h \C

P N J

A -6

.d g n

-M

A R -2

:5

M A

S O

N H

A N

G E

R

L O

U

IS

V

IL

L E D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G P

L

P R

O J E

C T N

U M

B E

R P

J E

R S

E Y C

IT

Y

N E

W J

E R

S E

Y

C A

V E

N P

O

IN

T U S

A R

M Y R

E S

E R

V E C

E N

T E

R

T R

A

IN

IN

G B

U

IL

D

IN

G R

E N

O V

A T

IO

N

W

Q R -1

-D -0

J A

N

CERTIFIED FINAL SUBMITTAL

R P

R O

C T

O R

T R

A

IN

IN

G B

U

IL

D

IN

G

D O

O R S

C H

E D

U L E

R P

R O

C T

O R

1A-601

K

B L

A N

F O

R D

M A

R C

H

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

W

2Q R

R

Pl an s-

ARMS VAULT 140

.S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C P

N J T -5

.d g n

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps

C A

T E

G O

R Y C

O D

E

D E

S C

R

IP

T

IO

N

L O

U

IS

V

IL

L E

K E

N T

U C

K Y

P P ro je c ts \0

\0

C

A D

B

IM

S h e e ts \1

T e lc o m \C

P N J T -5

.d g n

-M

A R -2

:5

M A

S O

N H

A N

G E

R

L O

U

IS

V

IL

L E D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G P

L

P R

O J E

C T N

U M

B E

R P

J E

R S

E Y C

IT

Y

N E

W J

E R

S E

Y

C A

V E

N P

O

IN

T U S

A R

M Y R

E S

E R

V E C

E N

T E

R

T R

A

IN

IN

G B

U

IL

D

IN

G R

E N

O V

A T

IO

N

W

Q R -1

-D -0

J A

N

CERTIFIED FINAL SUBMITTAL

60" MAX

RATED J - HOOKS

NON-METALLIC CATEGORY 6

TRAY

WIREMESH

NON-METALLIC CATEGORY 6 RATED J - HOOK

NON-CONTINUOUS CABLE SUPPORT

NOTES:

NOTES:

NOT TO SCALE

DETAIL

T-502

T-502

MOUNTING BRACKET

LOW VOLTAGE

DISTANCE FROM CONDUIT STUB OUT TO CABLE TRAY SHALL NOT EXCEED 40 FEET.3.

CONDUIT.

CEILINGS. CABLES IN ALL OTHER AREAS SHALL BE INSTALLED IN CABLE TRAY OR

J-HOOKS (OPEN CABLES) ARE ONLY ALLOWED IN AREAS WITH ACOUSTICAL TILE 2.

J-HOOKS SHALL NOT EXCEED 50% OF THE FILL CAPACITY.1.

FINISHED CEILING

PROTECTION.

OF CONDUIT FOR CABLE

PROVIDE BUSHING AT END

ABOVE CEILING (TYPICAL).

CONDUIT STUB - OUT

DEVICE

COMMUNICATION

2.1.5.3 THROUGH 2.1.5.3.5.

PROVIDE IN ACCORDANCE WITH AR NEC INFRASTRUCTURE TECHNICAL CRITERIA 3.

CONDUIT.

CEILINGS. CABLES IN ALL OTHER AREAS SHALL BE INSTALLED IN CABLE TRAY OR

J-HOOKS (OPEN CABLES) ARE ONLY ALLOWED IN AREAS WITH ACOUSTICAL TILE 2.

J-HOOKS SHALL NOT EXCEED 50% OF THE FILL CAPACITY.1.

NOT TO SCALE

DETAIL1

1T-114

(GFGI)

PANEL

CONTROL

IDS

NOTES

TO IDS PANEL.

(3) DETECTORS PER HOMERUN BACK

DETECTORS (GFGI). MAXIMUM THREE

1" CONDUIT TO INFRARED MOTION

DETECTOR (GFGI) (TYP)

INFRARED MOTION

SLACK CABLE IN THE IDS PANEL.

PATCH PANEL. PROVIDE 8"-12" OF

TERMINATED ON A RACK MOUNTED

CONDUIT TO MAIN TR 104 AND

2 CATEGORY 6 CABLES IN 1 INCH EMT

ARMS VAULT IDS

ALARM (GFGI)

BOX FOR DURESS

4" X 4" JUNCTION

'TIDS' SAFETY SWITCH

120V AC POWER FROM

SWITCH (GFGI).

CONNECTION TO BALANCE MAGNETIC

AUDIO SENSOR (GFGI) AND

4" X 2" JUNCTION BOX FOR ULTRASONIC

KEYPAD (GFGI)

FOR ARM / DISARM

4" X 4" JUNCTION BOX

IDS PANEL.

DETECTORS PER HOMERUN BACK TO

(GFGI). MAXIMUM THREE (3)

1" CONDUIT TO SEISMIC DETECTORS

DETECTOR (GFGI)

SEISMIC

WALL MOUNTED

SEISMIC DETECTOR (GFGI)

BACKBONE SYSTEM AS SHOWN ON DETAIL AND FLOORPLANS.

ALL IDS DEVICES ARE GFGI UNLESS OTHERWISE NOTED. CONTRACTOR SHALL PROVIDE 4.

TAMPERS MUST BE WIRED SEPARATELY FROM THE SENSORS.

DETECTION SENSORS SHALL NOT BE DAISY CHAINED BACK TO IDS PANEL AND 3.

REFER TO SHEETS 1T-114 FOR IDS EQUIPMENT LAYOUT AND LOCATIONS.2.

REFER TO SHEETS 1EP114 FOR ADDITIONAL POWER INFORMATION.1.

SHEET 1T-111

FOR EXTERIOR ALARM SIREN ON

PULLSTRING TO JUNCTION BOX

1" IMC CONDUIT WITH

A

D A

V

IS

1T-502

R

M A

Y S

T R

A

IN

IN

G B

U

IL

D

IN

G

C O

M M

U N

IC

A T

IO

N S D

E T

A

IL

S

T

M

IZ

E

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

M A

R

R E

V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

M

A R

W

2Q R

R

Pl an s-mizebt Stamp mizebt Stamp

MAIN T.R. 104

.S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

C P

N J T -6

.d g n

A N

S I

D

C H

E C

K E

D B

Y

D R

A W

N B

Y

IS

S

U E D

A T

E

SHEET ID

F

IL

E N

A M

E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

S O

L

IC

IT

A T

IO

N N

O

D E

S

IG

N E

D B

Y

A

M A

R K

S

IZ

E

S U

B M

IT

T E

D B

Y

D A

T E

C O

N T

R A

C T N

O

®of Engineers

US Army Corps

C A

T E

G O

R Y C

O D

E

D E

S C

R

IP

T

IO

N

L O

U

IS

V

IL

L E

K E

N T

U C

K Y

P P ro je c ts \0

\0

C

A D

B

IM

S h e e ts \1

T e lc o m \C

P N J T -6

.d g n

-M

A R -2

:5

M A

S O

N H

A N

G E

R

L O

U

IS

V

IL

L E D

IS

T R

IC

T

D

R

M A

R T

IN

L

U T

H E

R K

IN

G P

L

P R

O J E

C T N

U M

B E

R P

J E

R S

E Y C

IT

Y

N E

W J

E R

S E

Y

C A

V E

N P

O

IN

T U S

A R

M Y R

E S

E R

V E C

E N

T E

R

T R

A

IN

IN

G B

U

IL

D

IN

G R

E N

O V

A T

IO

N

W

Q R -1

-D -0

J A

N

CERTIFIED FINAL SUBMITTAL

TMGB

PLYWOOD.

ON EACH SHEET OF

STAMP IS TO BE VISIBLE

LEAST ONE FIRE RATED

A.F.F. DO NOT PAINT. AT

ROOM. MOUNT AT 8"

SIDE FACES INTO THE

SO THAT THE A GRADE

BACKBOARD. INSTALLED

4' x 8' x 3/4", PLYWOOD

COMMUNICATIONS ONE-LINE DIAGRAM

SHEET NOTES#

GENERAL NOTES

NOTES:

THAN 295' PER TIA/EIA.

TOTAL LENGTH OF HORIZONTAL CABLE SHALL BE LESS

TYP

EP502

1 10 205 15

1 5 10 15 20

PROVIDE TWO (2) 4" CONDUITS TO BUILDING 115 TR 202.24.

CABLE TO BUILDING 204 TR 142.

12 STRAND SINGLE MODE FIBER OPTIC BACKBONE 23.

TR 142.

25 PAIR COPPER BACKBONE CABLE TO BUILDING 204 22.

TO ICT OUTLETS.21.

PROVIDE TWO (2) 4" CONDUITS TO TR 142.20.

4RU FIBER PATCH PANEL.19.

2RU HORIZONTAL WIRE MANAGER.18.

202.

TO TR 230. CABLE TO TR 230 SHALL PASS THROUGH TR

CABLE TO TR 202 AND 12 STRAND SINGLE MODE FIBER

12 STRAND SINGLE MODE FIBER OPTIC BACKBONE 17.

COPPER. TYPICAL.

FROM TOP OF RACK. BOND RGB TO TGB WITH #6 AWG

BUSBAR (RGB) SHALL BE MOUNTED ON THE BACK, 1RU

STATIC LOAD RATING. A RACK MOUNTED GROUNDING

CHANNELS, RMU MARKINGS, SUPPORT UP TO 1,500lb

7'H X 19"W, TWO-POST EQUIPMENT RACK WITH 8" 16.

USE A LARGER CABLE MANAGER.

RADIUS REQUIREMENTS AND MAY BE REQUIRED TO

IS RESPONSIBLE TO NOT EXCEED THE MINIMUM BEND

INTERVALS IN THE BACK. TYPICAL. THE CONTRACTOR

OPEN TROUGH WITH SPIN-LATCH CLOSURES AT 12"

FINGERS AT 1 RMU INTERVALS IN THE FRONT AND AN

COMBINATION CABLE MANAGER WITH CABLE GUIDE

7'H X 8"W X 14.61"D, DOUBLE-SIDED, DOUBLE HINGED 15.

EXISTING OMS.

BACKBONE CABLE FROM ENTRANCE FACILITY IN

PROVIDE ONE 24 STRAND SINGLE MODE FIBER OPTIC 14.

FROM ENTRANCE FACILITY IN EXISTING OMS.

PROVIDE ONE 25 PAIR COPPER BACKBONE CABLE 13.

CEILING).

FIRE-STOPPING SLEEVES. (TYP OF 2 WALL AND 2

SELF-SEALING, RE-ENTERABLE, MECHANICAL 12.

TWO EXISTING 4" CONDUITS FROM OMS EF/TER.11.

BACKBONE.

BUILDING ENTRANCE PROTECTOR FOR COPPER 10.

COLOR-CODED FRONT LABELING.

STYLE IDC TERMINATIONS, TIA-606-A COMPLIANT

FOR HORIZONTAL CABLES WITH T568B WIRING FOR 110

48 PORT, CATEGORY 6, 19" RACK MOUNT PATCH PANEL 9.

THE TOP OF THE RACK.

ELEVATION BRACKET WITH A 4" - 6" STAND OFF FROM 8.

SEPARATE AND GUIDE CABLES. TYPICAL.

RADIUS, SUPPLIED WITH 1 1/2" CABLE SPOOLS TO

MAINTAIN PROPER CATEGORY 6 OR FIBER BEND

MOUNTS TO RUNWAY CROSS MEMBER TO HELP

EQUIPMENT RACK. CABLE RUNWAY RADIUS DROP,

PROVIDE METAL CABLE DROP WHERE CABLES FEED TO 7.

C-5 CLIPS FOR COPPER BACKBONE.

CROSS CONNECT 110-TYPE CONECTOR BLOCKS WITH 6.

SUCH THAT IT WILL NOT FALL BACK INTO THE CONDUIT.

PROVIDE A MINIMUM OF 5' COILED UP AND SECURED

PROVIDE PULL STRING IN ALL SPARE CONDUITS. 5.

WITH BUSHINGS TO PREVENT CABLE DAMAGE.

ALL CONDUITS SHALL BE DE-BURRED AND PROVIDED 4.

TYPICAL FOR ALL WALL SLEEVES.

CABLE RADIUS DROP OUTS (WATERFALL SUPPORT) 3.

PAIR COPPER BACKBONE CABLE TO TR 230.

25 PAIR COPPER BACKBONE CABLE TO TR 202 AND 25 2.

SUPPORT BRACKETS.

RACKS WITH ELEVATION KITS AND TO WALLS WITH

RUNGS AT 12" INTERVALS. FASTEN TO EQUIPMENT

OF 1-1/2" X 3/8" STRINGERS WITH 1/2" X 1" WELDED

HORIZONTAL LADDER RACK SYSTEM, CONSTRUCTED 1.

VERTICAL LADDER RACK SHALL BE 12" WIDE.6.

ATTACH TO PLYWOOD BACKBOARD.

BACKBONE CABLING. LOOSELY COIL ALL SLACK AND

PROVIDE A MINIMUM OF 20 FT SLACK FOR ALL 5.

REQUIREMENTS.

REFER TO SHEET 1EP602 FOR GROUNDING 4.

REQUIREMENTS.

SPECIFICATIONS AND MANUFACTURER'S

PROVIDE WALL MOUNTED CABLE MANAGEMENT PER 3.

OTHER RELATED COMPONENTS.

CROSS-CONNECT BLOCKS, PATCH PANELS AND

CONTRACTOR SHALL VERIFY QUANTITY OF ALL 110 2.

TO SHEET 1T-410.

EQUIPMENT PLACEMENT AND ROOM LAYOUT REFER

EQUIPMENT PLACEMENT IS SCHEMATIC ONLY. FOR 1.

A

D A

V

IS

1T-601

R

M A

Y S

T R

A

IN

IN

G B

U

IL

D

IN

G

C O

M M

U N

IC

A T

IO

N S O

N E -L

IN

E D

IA

G R

A M

T

M

IZ

E

R

E V

IS

E D I

N A

C C

O R

D A

N C

E W

IT

H A

M E

N D

M E

N T

M A

R

W

2Q R

R

Pl an s-mizebt Stamp mizebt Stamp

1A-600
1A-601
1T-502
1T-601

File details come from the government source that posted it. Updated .