W912QR20R0018Plans-0002.pdf
PDF 3 MB Posted
- Solicitation number
- W912QR20R0018
About this file
This solicitation package includes plans and specifications for the renovation of the Caven Point Army Reserve Center Facility in Jersey City, New Jersey. Key details include:
-
The project involves design/build services for renovations with an estimated construction cost between $10-25 million. The primary NAICS code is 236220 and the size determination is $39.5 million.
-
Solicitation number W912QR20R0018 was issued by the Department of the Army Corps of Engineers Louisville District for full and open competition. The procurement requires a 10% price evaluation preference for HUBZone small businesses.
-
The solicitation package contains architectural and engineering drawings depicting door schedules, wall details, communication diagrams and related specifications.
-
The pre-bid site visit date is not provided. Questions are to be submitted through ProjNet and responses are due by the date listed on the cover sheet. Award will be contingent upon available appropriated funds.
-
Offerors must be registered in SAM, which combines CCR and ORCA. Technical, proposal and bonding questions should be directed through ProjNet. Pages may not be accurately numbered.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C P
N J
A -6
.d g n
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
C A
T E
G O
R Y C
O D
E
D E
S C
R
IP
T
IO
N
L O
U
IS
V
IL
L E
K E
N T
U C
K Y
C P ro je c ts \0
\0
C
A D
B
IM
S h e e ts \0
A rc h \C
P N J
A -6
.d g n
-M
A R -2
:0
M A
S O
N H
A N
G E
R
L O
U
IS
V
IL
L E D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G P
L
P R
O J E
C T N
U M
B E
R P
J E
R S
E Y C
IT
Y
N E
W J
E R
S E
Y
C A
V E
N P
O
IN
T U S
A R
M Y R
E S
E R
V E C
E N
T E
R
T R
A
IN
IN
G B
U
IL
D
IN
G R
E N
O V
A T
IO
N
W
Q R -1
-D -0
J A
N
CERTIFIED FINAL SUBMITTAL
DOOR TYPES
SCALE: 1/4"=1'=0"
NOTES:
2.
1.
A
SCALE: 1/4"=1'=0"
FRAME TYPES
TRANSITION STRIP
NOT TO SCALE
LEGEND
B
PER PER
PER SCHED
P E
R S
C H
E D
PER
8" 8"
SCHED SCHED
HOOD
SCHED SCHED
PER
2" 2" 2"2"
1 2
PORCELAIN TILE
METAL TRANSITION
SHALL CENTER UNDER DOOR.
WHEN USED AS THRESHOLD AT DOORS,TRANSITION STRIPS
WITH THE HARDWARE SET.
CHANGES AT DOOR AND NO THRESHOLD IS SCHEDULED
TRANSITION STRIPS SHALL BE USED WHEN FLOOR MATERIAL
E
SCHED
PER
SCHED
PER
6" 8" 6"
C D
6" FOR TYPE
SCHEDULE
GLASS. SEE FOR TYPE
SCHEDULE
GLASS. SEE
NOT TO SCALE
TRANSITION STRIP
CPT
NOT TO SCALE
TRANSITION STRIP
VCT
RUBBER STRIP
RUBBER TILE
GLASS LEGEND
3. FIRE RATED GLASS
2. TEMPERED SAFETY GLASS
SEE SHEET A-510
1. LAMINATED INSULATED GLASS.
RUBBER
RUBBER
CONC
TRANSITION STRIP
NOT TO SCALE
METAL TRANSITION
QUARRY TILE CONC
TRANSITION STRIP
NOT TO SCALE
PORCELAIN TILE
METAL TRANSITION
VCT
TRANSITION STRIP
NOT TO SCALE
METAL TRANSITION
QUARRY TILE VCT
NOT TO SCALE
TRANSITION STRIP
CPT
RUBBER
VCT
PR- PAIR
NK - NO KEY
SS - STAINLESS STEEL
STL - STEEL
INS/MT - INSULATED METAL
ALUM - ALUMINUM
INSUL- LOW-E INSULATED, LAMINATED
SW- SOLID CORE WOOD
HM - HOLLOW METAL
R P
R O
C T
O R
T R
A
IN
IN
G B
U
IL
D
IN
G
D O
O R S
C H
E D
U L E
R P
R O
C T
O R
1A-600
K
B L
A N
F O
R D
M
A R
C H
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
M A
R C
H
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
W
2Q R
R
Pl an s-
.S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C P
N J
A -6
.d g n
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
C A
T E
G O
R Y C
O D
E
D E
S C
R
IP
T
IO
N
L O
U
IS
V
IL
L E
K E
N T
U C
K Y
P P ro je c ts \0
\0
C
A D
B
IM
S h e e ts \0
A rc h \C
P N J
A -6
.d g n
-M
A R -2
:5
M A
S O
N H
A N
G E
R
L O
U
IS
V
IL
L E D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G P
L
P R
O J E
C T N
U M
B E
R P
J E
R S
E Y C
IT
Y
N E
W J
E R
S E
Y
C A
V E
N P
O
IN
T U S
A R
M Y R
E S
E R
V E C
E N
T E
R
T R
A
IN
IN
G B
U
IL
D
IN
G R
E N
O V
A T
IO
N
W
Q R -1
-D -0
J A
N
CERTIFIED FINAL SUBMITTAL
R P
R O
C T
O R
T R
A
IN
IN
G B
U
IL
D
IN
G
D O
O R S
C H
E D
U L E
R P
R O
C T
O R
1A-601
K
B L
A N
F O
R D
M A
R C
H
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
W
2Q R
R
Pl an s-
ARMS VAULT 140
.S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C P
N J T -5
.d g n
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
C A
T E
G O
R Y C
O D
E
D E
S C
R
IP
T
IO
N
L O
U
IS
V
IL
L E
K E
N T
U C
K Y
P P ro je c ts \0
\0
C
A D
B
IM
S h e e ts \1
T e lc o m \C
P N J T -5
.d g n
-M
A R -2
:5
M A
S O
N H
A N
G E
R
L O
U
IS
V
IL
L E D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G P
L
P R
O J E
C T N
U M
B E
R P
J E
R S
E Y C
IT
Y
N E
W J
E R
S E
Y
C A
V E
N P
O
IN
T U S
A R
M Y R
E S
E R
V E C
E N
T E
R
T R
A
IN
IN
G B
U
IL
D
IN
G R
E N
O V
A T
IO
N
W
Q R -1
-D -0
J A
N
CERTIFIED FINAL SUBMITTAL
60" MAX
RATED J - HOOKS
NON-METALLIC CATEGORY 6
TRAY
WIREMESH
NON-METALLIC CATEGORY 6 RATED J - HOOK
NON-CONTINUOUS CABLE SUPPORT
NOTES:
NOTES:
NOT TO SCALE
DETAIL
T-502
T-502
MOUNTING BRACKET
LOW VOLTAGE
DISTANCE FROM CONDUIT STUB OUT TO CABLE TRAY SHALL NOT EXCEED 40 FEET.3.
CONDUIT.
CEILINGS. CABLES IN ALL OTHER AREAS SHALL BE INSTALLED IN CABLE TRAY OR
J-HOOKS (OPEN CABLES) ARE ONLY ALLOWED IN AREAS WITH ACOUSTICAL TILE 2.
J-HOOKS SHALL NOT EXCEED 50% OF THE FILL CAPACITY.1.
FINISHED CEILING
PROTECTION.
OF CONDUIT FOR CABLE
PROVIDE BUSHING AT END
ABOVE CEILING (TYPICAL).
CONDUIT STUB - OUT
DEVICE
COMMUNICATION
2.1.5.3 THROUGH 2.1.5.3.5.
PROVIDE IN ACCORDANCE WITH AR NEC INFRASTRUCTURE TECHNICAL CRITERIA 3.
CONDUIT.
CEILINGS. CABLES IN ALL OTHER AREAS SHALL BE INSTALLED IN CABLE TRAY OR
J-HOOKS (OPEN CABLES) ARE ONLY ALLOWED IN AREAS WITH ACOUSTICAL TILE 2.
J-HOOKS SHALL NOT EXCEED 50% OF THE FILL CAPACITY.1.
NOT TO SCALE
DETAIL1
1T-114
(GFGI)
PANEL
CONTROL
IDS
NOTES
TO IDS PANEL.
(3) DETECTORS PER HOMERUN BACK
DETECTORS (GFGI). MAXIMUM THREE
1" CONDUIT TO INFRARED MOTION
DETECTOR (GFGI) (TYP)
INFRARED MOTION
SLACK CABLE IN THE IDS PANEL.
PATCH PANEL. PROVIDE 8"-12" OF
TERMINATED ON A RACK MOUNTED
CONDUIT TO MAIN TR 104 AND
2 CATEGORY 6 CABLES IN 1 INCH EMT
ARMS VAULT IDS
ALARM (GFGI)
BOX FOR DURESS
4" X 4" JUNCTION
'TIDS' SAFETY SWITCH
120V AC POWER FROM
SWITCH (GFGI).
CONNECTION TO BALANCE MAGNETIC
AUDIO SENSOR (GFGI) AND
4" X 2" JUNCTION BOX FOR ULTRASONIC
KEYPAD (GFGI)
FOR ARM / DISARM
4" X 4" JUNCTION BOX
IDS PANEL.
DETECTORS PER HOMERUN BACK TO
(GFGI). MAXIMUM THREE (3)
1" CONDUIT TO SEISMIC DETECTORS
DETECTOR (GFGI)
SEISMIC
WALL MOUNTED
SEISMIC DETECTOR (GFGI)
BACKBONE SYSTEM AS SHOWN ON DETAIL AND FLOORPLANS.
ALL IDS DEVICES ARE GFGI UNLESS OTHERWISE NOTED. CONTRACTOR SHALL PROVIDE 4.
TAMPERS MUST BE WIRED SEPARATELY FROM THE SENSORS.
DETECTION SENSORS SHALL NOT BE DAISY CHAINED BACK TO IDS PANEL AND 3.
REFER TO SHEETS 1T-114 FOR IDS EQUIPMENT LAYOUT AND LOCATIONS.2.
REFER TO SHEETS 1EP114 FOR ADDITIONAL POWER INFORMATION.1.
SHEET 1T-111
FOR EXTERIOR ALARM SIREN ON
PULLSTRING TO JUNCTION BOX
1" IMC CONDUIT WITH
A
D A
V
IS
1T-502
R
M A
Y S
T R
A
IN
IN
G B
U
IL
D
IN
G
C O
M M
U N
IC
A T
IO
N S D
E T
A
IL
S
T
M
IZ
E
R
E V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
M A
R
R E
V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
M
A R
W
2Q R
R
Pl an s-mizebt Stamp mizebt Stamp
MAIN T.R. 104
.S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
C P
N J T -6
.d g n
A N
S I
D
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
SHEET ID
F
IL
E N
A M
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
®of Engineers
US Army Corps
C A
T E
G O
R Y C
O D
E
D E
S C
R
IP
T
IO
N
L O
U
IS
V
IL
L E
K E
N T
U C
K Y
P P ro je c ts \0
\0
C
A D
B
IM
S h e e ts \1
T e lc o m \C
P N J T -6
.d g n
-M
A R -2
:5
M A
S O
N H
A N
G E
R
L O
U
IS
V
IL
L E D
IS
T R
IC
T
D
R
M A
R T
IN
L
U T
H E
R K
IN
G P
L
P R
O J E
C T N
U M
B E
R P
J E
R S
E Y C
IT
Y
N E
W J
E R
S E
Y
C A
V E
N P
O
IN
T U S
A R
M Y R
E S
E R
V E C
E N
T E
R
T R
A
IN
IN
G B
U
IL
D
IN
G R
E N
O V
A T
IO
N
W
Q R -1
-D -0
J A
N
CERTIFIED FINAL SUBMITTAL
TMGB
PLYWOOD.
ON EACH SHEET OF
STAMP IS TO BE VISIBLE
LEAST ONE FIRE RATED
A.F.F. DO NOT PAINT. AT
ROOM. MOUNT AT 8"
SIDE FACES INTO THE
SO THAT THE A GRADE
BACKBOARD. INSTALLED
4' x 8' x 3/4", PLYWOOD
COMMUNICATIONS ONE-LINE DIAGRAM
SHEET NOTES#
GENERAL NOTES
NOTES:
THAN 295' PER TIA/EIA.
TOTAL LENGTH OF HORIZONTAL CABLE SHALL BE LESS
TYP
EP502
1 10 205 15
1 5 10 15 20
PROVIDE TWO (2) 4" CONDUITS TO BUILDING 115 TR 202.24.
CABLE TO BUILDING 204 TR 142.
12 STRAND SINGLE MODE FIBER OPTIC BACKBONE 23.
TR 142.
25 PAIR COPPER BACKBONE CABLE TO BUILDING 204 22.
TO ICT OUTLETS.21.
PROVIDE TWO (2) 4" CONDUITS TO TR 142.20.
4RU FIBER PATCH PANEL.19.
2RU HORIZONTAL WIRE MANAGER.18.
202.
TO TR 230. CABLE TO TR 230 SHALL PASS THROUGH TR
CABLE TO TR 202 AND 12 STRAND SINGLE MODE FIBER
12 STRAND SINGLE MODE FIBER OPTIC BACKBONE 17.
COPPER. TYPICAL.
FROM TOP OF RACK. BOND RGB TO TGB WITH #6 AWG
BUSBAR (RGB) SHALL BE MOUNTED ON THE BACK, 1RU
STATIC LOAD RATING. A RACK MOUNTED GROUNDING
CHANNELS, RMU MARKINGS, SUPPORT UP TO 1,500lb
7'H X 19"W, TWO-POST EQUIPMENT RACK WITH 8" 16.
USE A LARGER CABLE MANAGER.
RADIUS REQUIREMENTS AND MAY BE REQUIRED TO
IS RESPONSIBLE TO NOT EXCEED THE MINIMUM BEND
INTERVALS IN THE BACK. TYPICAL. THE CONTRACTOR
OPEN TROUGH WITH SPIN-LATCH CLOSURES AT 12"
FINGERS AT 1 RMU INTERVALS IN THE FRONT AND AN
COMBINATION CABLE MANAGER WITH CABLE GUIDE
7'H X 8"W X 14.61"D, DOUBLE-SIDED, DOUBLE HINGED 15.
EXISTING OMS.
BACKBONE CABLE FROM ENTRANCE FACILITY IN
PROVIDE ONE 24 STRAND SINGLE MODE FIBER OPTIC 14.
FROM ENTRANCE FACILITY IN EXISTING OMS.
PROVIDE ONE 25 PAIR COPPER BACKBONE CABLE 13.
CEILING).
FIRE-STOPPING SLEEVES. (TYP OF 2 WALL AND 2
SELF-SEALING, RE-ENTERABLE, MECHANICAL 12.
TWO EXISTING 4" CONDUITS FROM OMS EF/TER.11.
BACKBONE.
BUILDING ENTRANCE PROTECTOR FOR COPPER 10.
COLOR-CODED FRONT LABELING.
STYLE IDC TERMINATIONS, TIA-606-A COMPLIANT
FOR HORIZONTAL CABLES WITH T568B WIRING FOR 110
48 PORT, CATEGORY 6, 19" RACK MOUNT PATCH PANEL 9.
THE TOP OF THE RACK.
ELEVATION BRACKET WITH A 4" - 6" STAND OFF FROM 8.
SEPARATE AND GUIDE CABLES. TYPICAL.
RADIUS, SUPPLIED WITH 1 1/2" CABLE SPOOLS TO
MAINTAIN PROPER CATEGORY 6 OR FIBER BEND
MOUNTS TO RUNWAY CROSS MEMBER TO HELP
EQUIPMENT RACK. CABLE RUNWAY RADIUS DROP,
PROVIDE METAL CABLE DROP WHERE CABLES FEED TO 7.
C-5 CLIPS FOR COPPER BACKBONE.
CROSS CONNECT 110-TYPE CONECTOR BLOCKS WITH 6.
SUCH THAT IT WILL NOT FALL BACK INTO THE CONDUIT.
PROVIDE A MINIMUM OF 5' COILED UP AND SECURED
PROVIDE PULL STRING IN ALL SPARE CONDUITS. 5.
WITH BUSHINGS TO PREVENT CABLE DAMAGE.
ALL CONDUITS SHALL BE DE-BURRED AND PROVIDED 4.
TYPICAL FOR ALL WALL SLEEVES.
CABLE RADIUS DROP OUTS (WATERFALL SUPPORT) 3.
PAIR COPPER BACKBONE CABLE TO TR 230.
25 PAIR COPPER BACKBONE CABLE TO TR 202 AND 25 2.
SUPPORT BRACKETS.
RACKS WITH ELEVATION KITS AND TO WALLS WITH
RUNGS AT 12" INTERVALS. FASTEN TO EQUIPMENT
OF 1-1/2" X 3/8" STRINGERS WITH 1/2" X 1" WELDED
HORIZONTAL LADDER RACK SYSTEM, CONSTRUCTED 1.
VERTICAL LADDER RACK SHALL BE 12" WIDE.6.
ATTACH TO PLYWOOD BACKBOARD.
BACKBONE CABLING. LOOSELY COIL ALL SLACK AND
PROVIDE A MINIMUM OF 20 FT SLACK FOR ALL 5.
REQUIREMENTS.
REFER TO SHEET 1EP602 FOR GROUNDING 4.
REQUIREMENTS.
SPECIFICATIONS AND MANUFACTURER'S
PROVIDE WALL MOUNTED CABLE MANAGEMENT PER 3.
OTHER RELATED COMPONENTS.
CROSS-CONNECT BLOCKS, PATCH PANELS AND
CONTRACTOR SHALL VERIFY QUANTITY OF ALL 110 2.
TO SHEET 1T-410.
EQUIPMENT PLACEMENT AND ROOM LAYOUT REFER
EQUIPMENT PLACEMENT IS SCHEMATIC ONLY. FOR 1.
A
D A
V
IS
1T-601
R
M A
Y S
T R
A
IN
IN
G B
U
IL
D
IN
G
C O
M M
U N
IC
A T
IO
N S O
N E -L
IN
E D
IA
G R
A M
T
M
IZ
E
R
E V
IS
E D I
N A
C C
O R
D A
N C
E W
IT
H A
M E
N D
M E
N T
M A
R
W
2Q R
R
Pl an s-mizebt Stamp mizebt Stamp
| 1A-600 |
| 1A-601 |
| 1T-502 |
| 1T-601 |
File details come from the government source that posted it. Updated .