This federal contract opportunity notice describes an upcoming solicitation for the replacement of a high temperature hot water heating system at Wright-Patterson Air Force Base in Ohio. The project scope includes removing and abandoning existing degraded central steam heat distribution systems serving multiple facilities, and installing new outdoor gas-fired boilers, associated equipment, piping mains, and support infrastructure. The contract will be a firm-fixed-price design-bid-build contract awarded without discussions. The project magnitude is estimated between $10-25 million, with a target ceiling of $13.65 million. The solicitation is anticipated for release on November 12, 2019 via the Federal Business Opportunities website. Offerors must register in the System for Award Management to be eligible. The point of contact for questions is the listed Contract Specialist.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Repair HTHW Line C (Area A) With Natural Gas Boilers Wright-Patterson
AFB, OH
P2: 459947
Design Bid Build
SPECIFICATIONS Volume 4 of 4 RTA Submittal
26 December 2019
W912QR20R0009
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0009-0000
RTA Submittal Specifications – Volume 4 of 4
Woolpert 4454 Idea Center Boulevard
Dayton, OH 45430-1500
Repair HTHW Line C (Area A) with Natural Gas Boilers
Wright-Patterson Air Force Base, Ohio
FY17
Project Number: ZHTV 120035
P2 Number: 459947 7 November 2018
REPAIR HTHW LINE C WITH NATURAL GAS BOILERS
RTA SUBMITTAL
Repair HTHW Line C (Area A) with Natural Gas Boilers 7 November 2018 Wright Patterson AFB, OH ii
This page intentionally blank
Repair HTHW Line C (Area A) with Natural Gas Boilers 7 November 2018 Wright Patterson AFB, OH iii
REPAIR HTHW LINE C (AREA A) WITH NATURAL GAS BOILERS
RTA SUBMITTAL
TABLE OF VOLUMES
Volume 1
Division 00 Division 01
Volume 2
Division 02 Division 03
Volume 3
Division 04 Division 05 Division 07 Division 08 Division 09 Division 10 Division 21 Division 22
Volume 4
Division 23 Division 26 Division 28 Division 31 Division 32 Division 33
Repair HTHW Line C (Area A) with Natural Gas Boilers 7 November 2018 Wright Patterson AFB, OH iv
This page intentionally blank
Repair HTHW Line C with Natural Gas Boilers, WPAFB
ZHTV 120035
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00 SUMMARY (WPAFB)
01 01 50 PROJECT GENERAL REQUIREMENTS (WPAFB)
01 02 20 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 13.00 10 ASBESTOS ABATEMENT
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 83 13.00 20 LEAD IN CONSTRUCTION
02 83 19.13 10 LEAD-BASED PAINT ABATEMENT
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
02 85 00.00 20 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 01 20.70 UNIT MASONRY CLEANING AND RESTORATION
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1
07 22 00 ROOF AND DECK INSULATION
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR
PAINTING
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL
PETROLEUM FUEL TANKS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 44 16 FIRE EXTINGUISHERS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 01 BACKFLOW PREVENTION DEVICES (WPAFB)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL (DDC) FOR HVAC AND OTHER LOCAL
BUILDING SYSTEMS (WPAFB)
23 11 25 FACILITY GAS PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 52 46.00 20 LOW PRESSURE OUTDOOR WATER HEATING BOILERS (OVER 800,000
BTU/HR OUTPUT)
23 70 02.00 10 CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL
FIRED
23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM
PROJECT TABLE OF CONTENTS Page 2
DIVISION 26 - ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 00.00 10 PANELBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM SYSTEM, MODIFICATIONS TO EXISTING
SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 21 13 RADON MITIGATION (WPAFB)
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 51 15 NATURAL-GAS
33 52 10 SERVICE PIPING, FUEL SYSTEMS
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
SECTION 23 03 00.00 20
BASIC MECHANICAL MATERIALS AND METHODS
08/10
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE C2 (2017) National Electrical Safety Code
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2016) Motors and Generators
NEMA MG 10 (2013) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-11 Closeout Submittals
Energy Efficient Equipment for Motors
1.3 RELATED REQUIREMENTS
This section applies to all sections of Divisions: 21, FIRE SUPPRESSION;
SECTION 23 03 00.00 20 Page 1
22, PLUMBING; and 23, HEATING, VENTILATING, AND AIR CONDITIONING of this project specification, unless specified otherwise in the individual section.
1.4 QUALITY ASSURANCE
1.4.1 Material and Equipment Qualifications
Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Standard products must have been in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use must include applications of equipment and materials under similar circumstances and of similar size. The product must have been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
1.4.2 Alternative Qualifications
Products having less than a two-year field service record will be acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.4.3 Service Support
The equipment items must be supported by service organizations. Submit a certified list of qualified permanent service organizations for support of the equipment which includes their addresses and qualifications. These service organizations must be reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.4.4 Manufacturer's Nameplate
For each item of equipment, provide a nameplate bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent will not be acceptable.
1.4.5 Modification of References
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "must" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction", or words of similar meaning, to mean the Contracting Officer.
1.4.5.1 Definitions
For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions must be considered mandatory, the word "should" is interpreted as "must." Reference to the "code official" must be interpreted to mean the "Contracting Officer." For Air Force owned property, references to the "owner" must be interpreted to mean the "Contracting Officer." For leased facilities, references to the "owner" must be interpreted to mean the "lessor." References to the "permit holder" must be interpreted to mean the "Contractor."
SECTION 23 03 00.00 20 Page 2
1.4.5.2 Administrative Interpretations
For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, must be applied appropriately by the Contracting Officer as authorized by his administrative cognizance and the FAR.
1.5 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.
1.6 ELECTRICAL REQUIREMENTS
Furnish motors, controllers, disconnects and contactors with their respective pieces of equipment. Motors, controllers, disconnects and contactors must conform to and have electrical connections provided under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Furnish internal wiring for components of packaged equipment as an integral part of the equipment.
Extended voltage range motors will not be permitted. Controllers and contactors shall have a maximum of 120 volt control circuits, and must have auxiliary contacts for use with the controls furnished. When motors and equipment furnished are larger than sizes indicated, the cost of additional electrical service and related work must be included under the section that specified that motor or equipment. Power wiring and conduit for field installed equipment must be provided under and conform to the requirements of Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM.
1.7 ELECTRICAL INSTALLATION REQUIREMENTS
Electrical installations must conform to IEEE C2 , NFPA 70 , and requirements specified herein.
1.7.1 New Work
Provide electrical components of mechanical equipment, such as motors, motor starters, control or push-button stations, float or pressure switches, solenoid valves, integral disconnects, and other devices functioning to control mechanical equipment, as well as control wiring and conduit for circuits rated 100 volts or less, to conform with the requirements of the section covering the mechanical equipment. Extended voltage range motors are not to be permitted. The interconnecting power wiring and conduit, control wiring rated 120 volts (nominal) and conduit, and the electrical power circuits must be provided under Division 26, except internal wiring for components of package equipment must be provided as an integral part of the equipment. When motors and equipment furnished are larger than sizes indicated, provide any required changes to the electrical service as may be necessary and related work as a part of the work for the section specifying that motor or equipment.
1.7.2 Modifications to Existing Systems
Where existing mechanical systems and motor-operated equipment require
SECTION 23 03 00.00 20 Page 3 modifications, provide electrical components under Division 26.
1.7.3 High Efficiency Motors
1.7.3.1 High Efficiency Single-Phase Motors
Unless otherwise specified, single-phase fractional-horsepower alternating-current motors must be high efficiency types corresponding to the applications listed in NEMA MG 11.
1.7.3.2 High Efficiency Polyphase Motors
Unless otherwise specified, polyphase motors must be selected based on high efficiency characteristics relative to the applications as listed in NEMA MG 10. Additionally, polyphase squirrel-cage medium induction motors with continuous ratings must meet or exceed energy efficient ratings in accordance with Table 12-6C of NEMA MG 1.
1.7.4 Three-Phase Motor Protection
Provide controllers for motors rated one 1 horsepower and larger with electronic phase-voltage monitors designed to protect motors from phase-loss, undervoltage, and overvoltage. Provide protection for motors from immediate restart by a time adjustable restart relay.
1.8 INSTRUCTION TO GOVERNMENT PERSONNEL
When specified in other sections, furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system.
Instructors must be thoroughly familiar with all parts of the installation and must be trained in operating theory as well as practical operation and maintenance work.
Instruction must be given during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished must be as specified in the individual section.
When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.
When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
1.9 ACCESSIBILITY
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
SECTION 23 03 00.00 20 Page 4
PART 2 PRODUCTS
2.1 PRODUCT SUSTAINABILITY CRITERIA
2.1.1 Energy Efficient Equipment for Motors
Provide documentation in conformance with ENERGY EFFICIENT EQUIPMENT that the motors meet energy efficiency requirements as outlined in this section.
PART 3 EXECUTION
3.1 PAINTING OF NEW EQUIPMENT
New equipment painting must be factory applied or shop applied, and must be as specified herein, and provided under each individual section.
3.1.1 Factory Painting Systems
Manufacturer's standard factory painting systems may be provided subject to certification that the factory painting system applied will withstand 125 hours in a salt-spray fog test, except that equipment located outdoors must withstand 500 hours in a salt-spray fog test. Salt-spray fog test must be in accordance with ASTM B117, and for that test the acceptance criteria must be as follows: immediately after completion of the test, the paint must show no signs of blistering, wrinkling, or cracking, and no loss of adhesion; and the specimen must show no signs of rust creepage beyond 0.125 inch on either side of the scratch mark.
The film thickness of the factory painting system applied on the equipment must not be less than the film thickness used on the test specimen. If manufacturer's standard factory painting system is being proposed for use on surfaces subject to temperatures above 120 degrees F, the factory painting system must be designed for the temperature service.
3.1.2 Shop Painting Systems for Metal Surfaces
Clean, pretreat, prime and paint metal surfaces; except aluminum surfaces need not be painted. Apply coatings to clean dry surfaces. Clean the surfaces to remove dust, dirt, rust, oil and grease by wire brushing and solvent degreasing prior to application of paint, except metal surfaces subject to temperatures in excess of 120 degrees F must be cleaned to bare metal.
Where more than one coat of paint is specified, apply the second coat after the preceding coat is thoroughly dry. Lightly sand damaged painting and retouch before applying the succeeding coat. Color of finish coat must be aluminum or light gray.
a. Temperatures Less Than 120 Degrees F: Immediately after cleaning, the metal surfaces subject to temperatures less than 120 degrees F must receive one coat of pretreatment primer applied to a minimum dry film thickness of 0.3 mil, one coat of primer applied to a minimum dry film thickness of 1 mil; and two coats of enamel applied to a minimum dry film thickness of 1 mil per coat.
b. Temperatures Between 120 and 400 Degrees F: Metal surfaces subject to temperatures between 120 and 400 degrees F must receive two coats of 400 degrees F heat-resisting enamel applied to a total minimum
SECTION 23 03 00.00 20 Page 5 thickness of 2 mils.
c. Temperatures Greater Than 400 Degrees F: Metal surfaces subject to temperatures greater than 400 degrees F must receive two coats of 600 degrees F heat-resisting paint applied to a total minimum dry film thickness of 2 mils.
-- End of Section --
SECTION 23 03 00.00 20 Page 6
SECTION 23 05 15
COMMON PIPING FOR HVAC
02/14
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
AISC 325 (2011) Steel Construction Manual
AMERICAN WELDING SOCIETY (AWS)
AWS A5.8/A5.8M (2011; Amendment 2012) Specification for Filler Metals for Brazing and Braze Welding
AWS WHB-2.9 (2004) Welding Handbook; Volume 2, Welding Processes, Part 1
ASME INTERNATIONAL (ASME)
ASME A112.18.1/CSA B125.1 (2012) Plumbing Supply Fittings
ASME A112.19.2/CSA B45.1 (2013) Standard for Vitreous China Plumbing Fixtures and Hydraulic Requirements for Water Closets and Urinals
ASME B1.20.7 (1991; R 2013) Standard for Hose Coupling Screw Threads (Inch)
ASME B16.1 (2015) Gray Iron Pipe Flanges and Flanged Fittings Classes 25, 125, and 250
ASME B16.11 (2016) Forged Fittings, Socket-Welding and Threaded
ASME B16.22 (2013) Standard for Wrought Copper and Copper Alloy Solder Joint Pressure Fittings
ASME B16.25 (2012) Standard for Buttwelding Ends
ASME B16.26 (2013) Standard for Cast Copper Alloy Fittings for Flared Copper Tubes
ASME B16.3 (2011) Malleable Iron Threaded Fittings, Classes 150 and 300
ASME B16.39 (2014) Standard for Malleable Iron Threaded Pipe Unions; Classes 150, 250, and 300
ASME B16.4 (2011) Standard for Gray Iron Threaded
SECTION 23 05 15 Page 1
Fittings; Classes 125 and 250
ASME B16.5 (2013) Pipe Flanges and Flanged Fittings:
NPS 1/2 Through NPS 24 Metric/Inch Standard
ASME B16.9 (2012) Standard for Factory-Made Wrought Steel Buttwelding Fittings
ASME B31.3 (2016) Process Piping
ASME B36.10M (2015) Standard for Welded and Seamless Wrought Steel Pipe
ASME B40.100 (2013) Pressure Gauges and Gauge Attachments
ASME BPVC SEC IX (2010) BPVC Section IX-Welding and Brazing Qualifications
ASME BPVC SEC VIII D1 (2015) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1
ASTM INTERNATIONAL (ASTM)
ASTM A105/A105M (2014) Standard Specification for Carbon Steel Forgings for Piping Applications
ASTM A106/A106M (2014) Standard Specification for Seamless Carbon Steel Pipe for High-Temperature Service
ASTM A126 (2004; R 2014) Standard Specification for Gray Iron Castings for Valves, Flanges, and Pipe Fittings
ASTM A197/A197M (2000; R 2011) Standard Specification for Cupola Malleable Iron
ASTM A216/A216M (2016) Standard Specification for Steel Castings, Carbon, Suitable for Fusion Welding, for High-Temperature Service
ASTM A234/A234M (2017) Standard Specification for Piping Fittings of Wrought Carbon Steel and Alloy Steel for Moderate and High Temperature Service
ASTM A276/A276M (2016a) Standard Specification for Stainless Steel Bars and Shapes
ASTM A278/A278M (2015) Standard Specification for Gray Iron Castings for Pressure-Containing Parts for Temperatures Up to 650 degrees F (350 degrees C)
ASTM A307 (2014; E 2017) Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength
SECTION 23 05 15 Page 2
ASTM A312/A312M (2016a) Standard Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes
ASTM A53/A53M (2012) Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM A563 (2015) Standard Specification for Carbon and Alloy Steel Nuts
ASTM A6/A6M (2016a) Standard Specification for General Requirements for Rolled Structural Steel Bars, Plates, Shapes, and Sheet Piling
ASTM A74 (2016) Standard Specification for Cast Iron Soil Pipe and Fittings
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
ASTM B32 (2008; R 2014) Standard Specification for Solder Metal
ASTM B370 (2012) Standard Specification for Copper Sheet and Strip for Building Construction
ASTM B62 (2015) Standard Specification for Composition Bronze or Ounce Metal Castings
ASTM B749 (2014) Standard Specification for Lead and Lead Alloy Strip, Sheet and Plate Products
ASTM B88 (2016) Standard Specification for Seamless Copper Water Tube
ASTM C109/C109M (2016a) Standard Test Method for Compressive Strength of Hydraulic Cement Mortars (Using 2-in. or (50-mm) Cube Specimens)
ASTM C404 (2011) Standard Specification for Aggregates for Masonry Grout
ASTM C476 (2016) Standard Specification for Grout for Masonry
ASTM C553 (2013) Standard Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications
ASTM C564 (2014) Standard Specification for Rubber Gaskets for Cast Iron Soil Pipe and Fittings
ASTM C67 (2016) Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
ASTM C920 (2014a) Standard Specification for
SECTION 23 05 15 Page 3
Elastomeric Joint Sealants
ASTM D2308 (2007; R 2013) Standard Specification for Thermoplastic Polyethylene Jacket for Electrical Wire and Cable
ASTM E1 (2014) Standard Specification for ASTM Liquid-in-Glass Thermometers
ASTM E814 (2013a) Standard Test Method for Fire Tests of Through-Penetration Fire Stops
ASTM E84 (2016) Standard Test Method for Surface Burning Characteristics of Building Materials
ASTM F104 (2011) Standard Classification System for Nonmetallic Gasket Materials
ASTM F2389 (2010) Standard Specification for Pressure-rated Polypropylene (PP) Piping Systems
FLUID SEALING ASSOCIATION (FSA)
FSA-0017 (1995e6) Standard for Non-Metallic Expansion Joints and Flexible Pipe Connectors Technical Handbook
INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
IEEE 515 (2011) Standard for the Testing, Design, Installation, and Maintenance of Electrical Resistance Heat Tracing for Industrial Applications
IEEE C2 (2017) National Electrical Safety Code
MANUFACTURERS STANDARDIZATION SOCIETY OF THE VALVE AND FITTINGS
INDUSTRY (MSS)
MSS SP-125 (2010) Gray Iron and Ductile Iron In-Line, Spring-Loaded, Center-Guided Check Valves
MSS SP-58 (1993; Reaffirmed 2010) Pipe Hangers and Supports - Materials, Design and Manufacture, Selection, Application, and Installation
MSS SP-67 (2011) Butterfly Valves
MSS SP-70 (2011) Gray Iron Gate Valves, Flanged and Threaded Ends
MSS SP-72 (2010a) Ball Valves with Flanged or Butt-Welding Ends for General Service
MSS SP-80 (2013) Bronze Gate, Globe, Angle and Check Valves
SECTION 23 05 15 Page 4
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA MG 1 (2016) Motors and Generators
NEMA MG 10 (2013) Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors
NEMA MG 11 (1977; R 2012) Energy Management Guide for Selection and Use of Single Phase Motors
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;
TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;
TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;
TIA 17-11; TIA 17-12; TIA 17-13; TIA
17-14; TIA 17-15; TIA 17-16; TIA 17-17 )
National Electrical Code
NSF INTERNATIONAL (NSF)
NSF/ANSI 14 (2016a) Plastics Piping System Components and Related Materials
U.S. DEPARTMENT OF DEFENSE (DOD)
MIL-C-18480 (1982; Rev B; Notice 2 2009) Coating Compound, Bituminous, Solvent, Coal-Tar Base
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
CID A-A-1922 (Rev A; Notice 2) Shield, Expansion (Caulking Anchors, Single Lead)
CID A-A-1923 (Rev A; Notice 2) Shield, Expansion (Lag, Machine and Externally Threaded Wedge Bolt Anchors)
CID A-A-1924 (Rev A; Notice 2) Shield, Expansion (Self Drilling Tubular Expansion Shell Bolt Anchors
CID A-A-1925 (Rev A; Notice 2) Shield Expansion (Nail Anchors)
CID A-A-55614 (Basic; Notice 2) Shield, Expansion (Non-Drilling Expansion Anchors)
CID A-A-55615 (Basic; Notice 2) Shield, Expansion (Wood Screw and Lag Bolt Self-Threading Anchors
UNDERWRITERS LABORATORIES (UL)
UL 1479 (2015) Fire Tests of Through-Penetration Firestops
SECTION 23 05 15 Page 5
1.2 GENERAL REQUIREMENTS
Submit Records of Existing Conditions consisting of the results of Contractor's survey of work area conditions and features of existing structures and facilities within and adjacent to the jobsite.
Commencement of work constitutes acceptance of the existing conditions.
Include with Equipment Foundation Data for piping systems all plan dimensions of foundations and relative elevations, equipment weight and operating loads, horizontal and vertical loads, horizontal and vertical clearances for installation, and size and location of anchor bolts.
Submit Fabrication Drawings for pipes, valves and specialties consisting of fabrication and assembly details to be performed in the factory.
Submit Material, Equipment, and Fixture Lists for pipes, valves and specialties including manufacturer's style or catalog numbers, specification and drawing reference numbers, warranty information, and fabrication site information. Provide a complete list of construction equipment to be used.
Submit Manufacturer's Standard Color Charts for pipes, valves and specialties showing the manufacturer's recommended color and finish selections.
Include with Listing of Product Installations for piping systems identification of at least 5 units, similar to those proposed for use, that have been in successful service for a minimum period of 5 years.
Include in the list purchaser, address of installation, service organization, and date of installation.
Submit Record Drawings for pipes, valves and accessories providing current factual information including deviations and amendments to the drawings, and concealed and visible changes in the work.
Submit Connection Diagrams for pipes, valves and specialties indicating the relations and connections of devices and apparatus by showing the general physical layout of all controls, the interconnection of one system (or portion of system) with another, and internal tubing, wiring, and other devices.
Submit Coordination Drawings for pipes, valves and specialties showing coordination of work between different trades and with the structural and architectural elements of work. Detail all drawings sufficiently to show overall dimensions of related items, clearances, and relative locations of work in allotted spaces. Indicate on drawings where conflicts or clearance problems exist between various trades.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
SECTION 23 05 15 Page 6
Material, Equipment, and Fixture Lists; G
SD-02 Shop Drawings
Record Drawings; G
Connection Diagrams; G
Coordination Drawings; G
Fabrication Drawings; G
Installation Drawings; G
SD-03 Product Data
Pipe and Fittings; G
Piping Specialties; G
Valves; G
Miscellaneous Materials; G
Supporting Elements; G
Equipment Foundation Data; G
SD-04 Samples
Manufacturer's Standard Color Charts; G
SD-05 Design Data
Pipe and Fittings; G
Piping Specialties; G
Valves; G
SD-06 Test Reports
Hydrostatic Tests; G
Air Tests; G
Valve-Operating Tests; G
Drainage Tests; G
Non-Destructive Electric Tests; G
System Operation Tests; G
SD-07 Certificates
Record of Satisfactory Field Operation; G
Listing of Product Installations; G
SECTION 23 05 15 Page 7
Records of Existing Conditions; G
SD-10 Operation and Maintenance Data
Operation and Maintenance Manuals; G
1.4 QUALITY ASSURANCE
1.4.1 Material and Equipment Qualifications
Provide materials and equipment that are standard products of manufacturers regularly engaged in the manufacture of such products, which are of a similar material, design and workmanship. Provide standard products in satisfactory commercial or industrial use for 2 years prior to bid opening. The 2-year use includes applications of equipment and materials under similar circumstances and of similar size. Ensure the product has been for sale on the commercial market through advertisements, manufacturers' catalogs, or brochures during the 2 year period.
1.4.2 Alternative Qualifications
Products having less than a two-year field service record are acceptable if a certified record of satisfactory field operation for not less than 6000 hours, exclusive of the manufacturer's factory or laboratory tests, can be shown.
1.4.3 Service Support
Ensure the equipment items are supported by service organizations. Select service organizations that are reasonably convenient to the equipment installation and able to render satisfactory service to the equipment on a regular and emergency basis during the warranty period of the contract.
1.4.4 Manufacturer's Nameplate
Provide a nameplate on each item of equipment bearing the manufacturer's name, address, model number, and serial number securely affixed in a conspicuous place; the nameplate of the distributing agent is not acceptable.
1.4.5 Modification of References
In each of the publications referred to herein, consider the advisory provisions to be mandatory, as though the word, "shall" had been substituted for "should" wherever it appears. Interpret references in these publications to the "authority having jurisdiction," or words of similar meaning, to mean the Contracting Officer.
1.4.5.1 Definitions
For the International Code Council (ICC) Codes referenced in the contract documents, advisory provisions are considered mandatory, the word "should" is interpreted as "shall." Reference to the "code official" is interpreted to mean the "Contracting Officer." For Air Force owned property, interpret references to the "owner" to mean the "Contracting Officer." For leased facilities, references to the "owner" is interpreted to mean the "lessor." References to the "permit holder" are interpreted to mean the "Contractor."
SECTION 23 05 15 Page 8
1.4.5.2 Administrative Interpretations
For ICC Codes referenced in the contract documents, the provisions of Chapter 1, "Administrator," do not apply. These administrative requirements are covered by the applicable Federal Acquisition Regulations (FAR) included in this contract and by the authority granted to the Officer in Charge of Construction to administer the construction of this project. References in the ICC Codes to sections of Chapter 1, are applied as appropriate by the Contracting Officer and as authorized by his administrative cognizance and the FAR.
1.5 DELIVERY, STORAGE, AND HANDLING
Handle, store, and protect equipment and materials to prevent damage before and during installation in accordance with the manufacturer's recommendations, and as approved by the Contracting Officer. Replace damaged or defective items.
1.6 ELECTRICAL REQUIREMENTS
Furnish motors, controllers, disconnects and contactors with their respective pieces of equipment. Ensure motors, controllers, disconnects and contactors conform to and have electrical connections provided under Section 26 20 00 INTERIOR DISTRIBUTION SYSTEM. Furnish internal wiring for components of packaged equipment as an integral part of the equipment.
Extended voltage range motors is not permitted. Provide controllers and contactors with a maximum of 120 volt control circuits, and auxiliary contacts for use with the controls furnished. When motors and equipment furnished are larger than sizes indicated, include the cost of additional electrical service and related work under the section that specified that motor or equipment. Provide power wiring and conduit for field installed equipment under and conform to the requirements of Section 26 20 00
INTERIOR DISTRIBUTION SYSTEM.
1.7 ELECTRICAL INSTALLATION REQUIREMENTS
Ensure electrical installations conform to IEEE C2 , NFPA 70 , and requirements specified herein.
1.7.1 New Work
Provide electrical components of mechanical equipment, such as motors, motor starters, control or push-button stations, float or pressure switches, solenoid valves, integral disconnects, and other devices functioning to control mechanical equipment, as well as control wiring and conduit for circuits rated 100 volts or less, to conform with the requirements of the section covering the mechanical equipment. Extended voltage range motors are not permitted. Provide under Division 26, the interconnecting power wiring and conduit, control wiring rated 120 volts (nominal) and conduit, and the electrical power circuits, except internal wiring for components of package equipment is provided as an integral part of the equipment. When motors and equipment furnished are larger than sizes indicated, provide any required changes to the electrical service as may be necessary and related work as a part of the work for the section specifying that motor or equipment.
SECTION 23 05 15 Page 9
1.7.2 Modifications to Existing Systems
Where existing mechanical systems and motor-operated equipment require modifications, provide electrical components under Division 26.
1.7.3 High Efficiency Motors
1.7.3.1 High Efficiency Single-Phase Motors
Unless otherwise specified, provide high efficiency single-phase fractional-horsepower alternating-current motors corresponding to the applications listed in NEMA MG 11.
1.7.3.2 High Efficiency Polyphase Motors
Unless otherwise specified, select polyphase motors based on high efficiency characteristics relative to the applications as listed in NEMA MG 10. Additionally, ensure polyphase squirrel-cage medium induction motors with continuous ratings meet or exceed energy efficient ratings in accordance with Table 12-6C of NEMA MG 1.
1.7.4 Three-Phase Motor Protection
Provide controllers for motors rated one one horsepower and larger with electronic phase-voltage monitors designed to protect motors from phase-loss, undervoltage, and overvoltage. Provide protection for motors from immediate restart by a time adjustable restart relay.
1.8 INSTRUCTION TO GOVERNMENT PERSONNEL
When specified in other sections, furnish the services of competent instructors to give full instruction to the designated Government personnel in the adjustment, operation, and maintenance, including pertinent safety requirements, of the specified equipment or system.
Provide instructors thoroughly familiar with all parts of the installation and trained in operating theory as well as practical operation and maintenance work.
Give instruction during the first regular work week after the equipment or system has been accepted and turned over to the Government for regular operation. The number of man-days (8 hours per day) of instruction furnished is as specified in the individual section. When more than 4 man-days of instruction are specified, use approximately half of the time for classroom instruction. Use other time for instruction with the equipment or system.
When significant changes or modifications in the equipment or system are made under the terms of the contract, provide additional instruction to acquaint the operating personnel with the changes or modifications.
1.9 ACCESSIBILITY
Install all work so that parts requiring periodic inspection, operation, maintenance, and repair are readily accessible. Install concealed valves, expansion joints, controls, dampers, and equipment requiring access, in locations freely accessible through access doors.
SECTION 23 05 15 Page 10
PART 2 PRODUCTS
2.1 ELECTRICAL HEAT TRACING
Provide heat trace systems for pipes, valves, and fittings that are in accordance with IEEE 515 and be UL listed. System include all necessary components, including heaters and controls to prevent freezing.
Provide self-regulating heaters consisting of two 16 AWG tinned-copper bus wires embedded in parallel in a self-regulating polymer core that varies its power output to respond to temperature along its length. Ensure heater is able to be crossed over itself without overheating. Obtain approval before used directly on plastic pipe. Cover heater with a radiation cross-linked modified polyolefin dielectric jacket in accordance with ASTM D2308.
For installation on plastic piping, apply the heater using aluminum tape.
Provide heater with an outer braid of tinned-copper and an outer jacket of modified polyolefin in accordance with ASTM D2308, to provide a good ground path and to enhance the heater's ruggedness.
Provide heater with self-regulating factor of at least 90 percent, in order to provide energy conservation and to prevent overheating.
Operate heater on line voltages of as shown on electrical drawings without the use of transformers.
Size Heater according to the following table:
Pipe Size
(Inch, Diameter) Minus 10 degrees F Minus 20 degrees F
3 inches or less 5 watts per foot (wpf) 5 wpf
4 inch 5 wpf 8 wpf
6 inch 8 wpf 8 wpf
8 inch 2 strips/5 wpf 2 strips/8 wpf
12 inch 2 strips/8 wpf 2 strips/8 wpf
Control systems by an ambient sensing thermostat set at 40 degrees F either directly or through an appropriate contactor.
2.2 PIPE AND FITTINGS
Submit equipment and performance data for pipe and fittings consisting of corrosion resistance, life expectancy, gage tolerances, and grade line analysis. Submit design analysis and calculations consisting of surface resistance, rates of flow, head losses, inlet and outlet design, required radius of bend, and pressure calculations. Also include in data pipe size, shape, and dimensions, as well as temperature ratings, vibration and thrust limitations minimum burst pressures, shut-off and non-shock pressures and weld characteristics.
SECTION 23 05 15 Page 11
2.2.1 Type BCS, Black Carbon Steel
Ensure pipe 1/8 through 12 inches is Schedule 40 black carbon steel, conforming to ASTM A53/A53M.
Ensure pipe 1/8 through 10 inches is Schedule 40 seamless or electric-resistance welded black carbon steel, conforming to ASTM A53/A53M, Type S (seamless). Grade A should be used for permissible field bending, in both cases.
Ensure pipe 12 through 24 inches is 0.375-inch wall seamless black carbon steel, conforming to ASTM A53/A53M, Type S (seamless).
Ensure fittings 2 inches and under are 150-pounds per square inch, gage (psig) working steam pressure (wsp) banded black malleable iron screwed, conforming to ASTM A197/A197M and ASME B16.3 .
Ensure unions 2 inches and under are 250 pounds per square inch, wsp female, screwed, black malleable iron with brass-to-iron seat, and ground joint, conforming to ASME B16.39 .
Ensure fittings 2-1/2 inches and over are Steel butt weld, conforming to ASTM A234/A234M and ASME B16.9 to match pipe wall thickness.
Ensure flanges 2-1/2 inches and over are 150-pound forged-steel conforming to ASME B16.5 , welding neck to match pipe wall thickness.
2.2.2 Type BCS-125, 125-psi Service
Ensure pipe 1/8 through 1-1/2 inches is Schedule 40 steam, Schedule 80 condensate, furnace butt weld, black carbon steel, conforming to ASTM A53/A53M, Type F (furnace butt welded, continuous welded) and
ASME B36.10M.
Ensure pipe 2 through 10 inches is Schedule 40 steam, Schedule 80 condensate, seamless or electric-resistance welded black carbon steel, conforming to ASTM A53/A53M Type S (seamless) and ASME B36.10M.
Ensure pipe 12 through 24 inches is 0.375-inch wall, seamless welded black carbon steel, conforming to ASTM A53/A53M Type S (seamless) and
ASME B36.10M.
Ensure fittings 2 inches and under are 125-psig wsp, cast iron, screwed end, conforming to ASTM A126 Class A and ASME B16.4 .
Ensure fittings 1 through 2 inches are 2,000-or 3,000-psi water, oil, or gas (wog) to match pipe wall, forged carbon steel socket weld, conforming to ASTM A105/A105M and ASME B16.11 .
Ensure fittings 2 inches and under are 125-psig wsp, cast iron, screwed end, conforming to ASTM A126 Class A and ASME B16.4 .
Ensure fittings 2-1/2 inches and over are wall thickness to match pipe, long radius butt weld, black carbon steel, conforming to ASTM A234/A234M , Grade WPB and ASME B16.9 .
Ensure couplings 2 inches and under are commercial standard weight for Schedule 40 pipe and commercial extra heavy weight for Schedule 80 pipe, black carbon steel where threaded, and 2,000-or 3,000-psi wog forged
SECTION 23 05 15 Page 12 carbon steel, conforming to ASTM A105/A105M and ASME B16.11 , where welded.
Ensure flanges 2-1/2 inches and over are 150-pound, forged carbon-steel welding neck, with raised face or flat face and concentric serrated finish, conforming to ASTM A105/A105M and ASME B16.5 .
2.2.3 Type GCS-DWV, Galvanized Steel Drain, Waste and Vent
Ensure pipe (all sizes) is Schedule 40 seamless galvanized carbon steel, conforming to ASTM A53/A53M, Grade A.
Furnace butt weld pipe is acceptable for sizes less than 2 inches.
Provide risers 3 inches and larger are Type CISP-DWV.
Use long radius fittings wherever space permits. Short-turn tees, branches, and ells may be used for vent piping and connections of branch lines to battery fixtures, except wall-hung water closets.
2.2.4 Type CISP-DWV, Cast-Iron Drain, Waste and Vent
Provide soil pipe drain, waste, and vent bell-and-spigot type pipe cast iron, conforming to ASTM A74. Caulk and lead all joints in lines where necessary to provide proper leaktight support and alignment; other-wise joints may be two-gasket system type chloroprene, conforming to ASTM C564.
Select the extra heavy (CISP-DWV-XH) pipe class.
2.2.5 Type CPR, Copper
2.2.5.1 Type CPR-A, Copper Above Ground
Ensure tubing 2 inches and under is seamless copper tubing, conforming to ASTM B88, Type L (hard-drawn for all horizontal and all exposed vertical lines, annealed for concealed vertical lines).
Ensure fittings 2 inches and under are 150-psig wsp wrought-copper solder joint fittings conforming to ASME B16.22 .
Ensure unions 2 inches and under are 150-psig wsp wrought-copper solder joint, conforming to ASME B16.22 .
Provide brazing rod with Classification BCuP-5, conforming to
AWS A5.8/A5.8M .
Use solder, alloy Sb-5, conforming to ASTM B32.
2.2.5.2 Type CPR-U, Copper Under Ground
Provide Type K seamless copper tube piping, conforming to ASTM B88. Use wrought copper socket-joint fittings, conforming to ASME B16.22 . Ensure fittings for connection to corporation cocks are cast bronze, flared-type, conforming to ASME B16.26 . Braze the joints.
2.2.5.3 Type CPR-INS, Copper Under Ground Insulated
Provide insulated Type K seamless copper tube piping conforming to ASTM B88.
Use wrought copper socket-joint fittings, conforming to ASME B16.22 .
Braze the joints.
SECTION 23 05 15 Page 13
Provide insulation not less than 2 inches thick, suitable for continuous service temperatures of not less than 250 degrees F. Use factory-molded, closed-cell polyurethane foam insulation of not less than 2.5 pounds per cubic foot density. Waterproof insulation with an extruded rigid Type II virgin polyvinylchloride, with minimum wall thickness of 60 mils through 4 inches outside diameter, 85 mils through 6.625 inches and 110 mils through
12.750 inches. Provide fitting covers fabricated from the same materials and thickness as adjacent pipe covering according to the manufacturer's directions.
2.2.6 Polypropylene Pipe
Pipe is manufactured from a PP-R resin meeting the short-term properties and long-term strength requirements of ASTM F2389 Pipe is made in a three layer extrusion process. Piping contains a fiber layer (faser) to restrict thermal expansion. Pipe complies with the rated pressure requirements of ASTM F 2389 Ensure layers are incorporated in the pipe wall to limit thermal expansion to 2 1/4-inches per 100 F per 100-ft. If the hydronic system includes ferrous components, an oxygen barrier is required in pipe wall.
Ensure pipe is certified by NSF International as complying with NSF/ANSI 14 , and ASTM F2389
Ensure pipe wrap or insulation meets the requirements of ASTM E84. Ensure the system has a Flame Spread Classification of less than 25 and Smoke Development rating of less than 50.
Where pipe is exposed to direct UV light for more than 30 days, provide a Factory applied, UV-resistant coating or alternative UV protection.
2.2.7 UNDERGROUND DOUBLE WALL HOT WATER PIPING
a. Contractor shall provide a “Thermacor HT406” or approved equivalent pre-insulated pre-fabricated piping system.
b. Insulation shall be foamed polyisocyanurate completely filling annular space and shall be 1.9 inches thick with a uniform density of 2.4 pounds per cubic foot, and minimum 90% closed cell structure.
c. Jacketing materials shall be extruded black high density polyethylene with a minimum wall thickness of 150 mils. The jacket size shall be determined by the manufacturer.
d. Carrier pipe shall be ASTM A-55 Grade B Schedule 80. All unloading and handling shall be done so as to protect the outer jacket and bared pipe ends at all times.
e. Joints and fittings shall be insulated in accordance with the manufacturer’s specifications. Factory trained personnel for instruction at the job site shall be provided by the piping manufacturer.
f. The trench for buried system shall be a minimum of 18 inches wider than the pre-insulated pipe and a minimum of 2 feet deeper than the top of the pipe. The trench base and all backfill within 6 inches of the piping system shall be free of any debris. Proper testing shall be carried out before any pipe is buried.
SECTION 23 05 15 Page 14
2.3 PIPING SPECIALTIES
Submit equipment and performance data for piping specialties consisting of corrosion resistance, life expectancy, gage tolerances, and grade line analysis. Submit design analysis and calculations consisting of surface resistance, rates of flow, head losses, inlet and outlet design, required radius of bend, and pressure calculations. Also include in data pipe size, shape, and dimensions, as well as temperature ratings, vibration and thrust limitations minimum burst pressures, shut-off and non-shock pressures and weld characteristics.
2.3.1 Air Eliminator and Dirt Separator
Full flow coalescing type combination air eliminator and dirt separator for the hot water systems. Selection shall be based upon system flow with pipe size as a minimum in accordance with the basis of design. In no case shall entering velocity exceed 10 feet per second. Separator shall be fabricated steel, rated for 150 psig working pressure, stamped and registered in accordance with ASME Section VIII, Division 1 for unfired pressure vessels, and include two equal chambers above and below the inlet / outlet nozzles. The vessel diameter and height above and below the inlet / outlet connections must be equal to the basis of design. Unit shall include internal elements filling the entire vessel to suppress turbulence and provide air elimination efficiency of 100 percent free air, 100 percent entrained air, and 99.6 percent dissolved air at the installed location.
Dirt separation efficiency shall be a minimum of 80 percent of all particles 30 micron and larger within 100 passes. The elements must consist of a copper core tube with continuous wound copper wire medium permanently attached and followed by a separate continuous wound copper wire permanently affixed. Each unit shall have a separate venting chamber to prevent system contaminants from harming the float and venting valve operation. At the top of the venting chamber shall be an integral full port float actuated brass venting mechanism. Units shall include a valved side tap to flush floating dirt or liquids and for quick bleeding of large amounts of air during system fill or refill. Basis of design for the air eliminator / dirt separator shall be manufactured by Spirotherm, Inc., or approved equal.
2.3.2 Air Vents
Provide manual air vents using 3/8-inch globe valves.
Provide automatic air vents on pumps, mains, and where indicated using ball-float construction. Ensure the vent inlet is not less than 3/4-inch ips and the outlet not less than 1/4-inch ips.