This federal contract opportunity announcement provides details for the replacement of the existing Area A Line C High-Temperature Hot Water heating system at Wright-Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers intends to issue a Request for Proposal for a firm-fixed-price contract requiring the contractor to remove and abandon all existing central steam heat distribution systems serving several facilities. The scope of work includes the installation of new gas-fired heating systems at Headquarters Air Force Materiel Command, tenant facilities, visiting officer quarters, and the 88th Air Base Wing hospital. There are two options concerning additional work at the visiting quarters and security cameras. The performance period is 600 calendar days from award. The project magnitude is estimated between $10-25 million. The solicitation is anticipated for release on November 12, 2019 and proposals will be evaluated using best value tradeoff. The North American Industry Classification System code is 237310 for highway, street, and bridge construction.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Repair HTHW Line C (Area A) With Natural Gas Boilers Wright-Patterson
AFB, OH
P2: 459947
Design Bid Build
SPECIFICATIONS Volume 1 of 4 RTA Submittal
26 December 2019
W912QR20R0009
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0009-0000
Repair HTHW Line C (Area A) w ith Natural Gas Boilers at Wright-Patterson Air Force Base, Ohio
Estimated Construction Cost is betw een $10,000,000 and $25,000,000
NAICS Code 237310. Size Standard $39,500,000. Please note that business size in the System for Aw ard Management (SAM) is determined by the NAICS code. If the vendor size is not listed correctly for a particular NAICS code in SAM the business w ill be considered other than a small business.
This is a Full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.
Central Contractor Registration and ORCA are now available through SAM, available at w w w .sam.gov. Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM. PLEASE NOTE: SAM is completely free of charge for both registrants and users.
JOSHUA K WESTGATE 502.315.6207
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
26-Dec-2019
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________600 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________07 Feb 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee is, X is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR
PAGE OF PAGES
1 OF
CODE 964860
(Title, identifying no., date):
12B. CALENDAR DAYS
01:00 PM (hour)
Sealed envelopes containing offers
CIVIL/OPS/ENVIRONMENTAL BR
ATTN: KELLY MAXWELL
600 DR M L KING JR PL, RM 821
LOUISVILLE KY 40202-2236
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: 502.315.6228 FAX: 502.315.6195
W912QR20R0009 124
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912QR20R0009
Section 00 10 00 - Solicitation
PRICE BREAKOUT SCHEDULE
OFFEROR’S NAME:
Item No.
Description Qty Unit of Issue
Total
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – HQ AFMC (Buildings 10262, 10266, and 10271) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes converting two separate HTHW services to natural gas condensing boilers; new boilers, primary and secondary pumps and associated support equipment; repair and replacement of existing door, wall, and floor systems; abandon in place existing high-pressure steam and cap ends at buildings; staging and laydown.
1 Job $
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – HQ AFMC (Buildings 10262, 10266, and 10271) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes hazardous materials abatement; staging and laydown.
1 Job $
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Tenant (Building 10822, 10828, 10829, 10853, 10856, and 10858) Project No.
ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes all work needed to replace the steam-to-hot water exchangers with new hot water gas fired condensing boilers; remove existing abandoned steam piping routing, replace with hot water piping; all associated supporting equipment; all associated door, wall, and floor work needed to adapt mechanical rooms to serve new mechanical equipment; relocate storm sewer and sanitary sewer for new mechanical rooms; cap abandoned and left in place steam lines;
staging and laydown.
1 Job $
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Tenant (Building 10822, 10828, 10829, 10853, 10856, and 10858) Project No.
ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes hazardous materials abatement; staging and laydown.
1 Job $
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Building 10280 Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
Includes demolition of existing high-pressure steam to building and pressure reducing station; provide new steam boilers and associated equipment; demolishing and constructing new exterior access, vestibule, and expanded mechanical room; relocate storm sewer and sanitary sewer for new mechanical rooms; staging and laydown.
1 Job $
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Building 10280 Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
Includes hazardous materials abatement; staging and laydown.
1 Job $
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Medical Center (Building 10840) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes replacing existing HTHW heat exchangers with dual fuel, high pressure steam boilers; all associated support equipment;
1 Job $ demolition of existing concrete curbs, repair and replacement of existing equipment support surfaces; install backup diesel fuel tank with fence, paved access drive, and connection line between tank and existing mechanical plant; staging and laydown.
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Medical Center (Building 10840) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes hazardous materials abatement; staging and laydown.
1 Job $
All work, labor, materials, and equipment required by the private utility provider – Vectren - to complete the construction and demolition of natural gas infrastructure for "Repair HTHW Line C (Area A)with Natural Gas Boilers Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading and seeding, and pavement repair. Excludes natural gas utility work associated with the Visiting Quarters (Buildings 10825, 10826, and 10827).
1 Job $724,976.83
All work, labor, materials, and equipment required by the private utility provider – American Water - to complete the construction and demolition of water and sewer infrastructure for "Repair HTHW Line C (Area A)with Natural Gas Boilers Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading and seeding, and pavement repair.
1 Job $19,631.28
BASE TOTAL: $
(Option
1)
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Visiting Quarters (Buildings 10825, 10826, and 10827) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes demolition of existing hot water heat exchanger and insulating piping; installation of outdoor boilers and equipment support pads; all associated support equipment; new piping mains from boilers to building; upgrading mechanical room doors and door hardware; cap abandoned exterior steam lines; staging and laydown.
1 Job $
(Option
1)
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Visiting Quarters (Buildings 10825, 10826, and 10827) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes hazardous materials abatement; staging and laydown.
1 Job $
(Option
1)
All work, labor, materials, and equipment required by the private utility provider – Vectren - to complete the construction and demolition of natural gas infrastructure for "Repair HTHW Line C (Area A)with Natural Gas Boilers Visiting Quarters (Buildings 10825, 10826, and 10827) Project No.
ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading and seeding, and pavement repair.
1 Job $188,535.17
(Option
2)
All work, labor, materials, and equipment required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Tenant (Building 10822, 10828, 10829, 10853, 10856, and 10858) Project No.
ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes
1 Job $ installation of security cameras and all supporting infrastructure; staging and laydown.
OPTIONS TOTAL: $
BASE PLUS ALL OPTIONS: $
NOTES FOR PRICE BREAKOUT ITEM NUMBERS
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
NOTE NO. 4. OPTION 1 (CLIN 0011) may be exercised within 90 days of the date of the Notice to Proceed.
NOTE NO. 5. OPTION 1 (CLIN 0012) may be exercised within 90 days of the date of the Notice to Proceed.
NOTE NO. 6. OPTION 1 (CLIN 0013) may be exercised within 90 days of the date of the Notice to Proceed.
NOTE NO. 7. OPTION 2 (CLIN 0014) may be exercised within 360 days of the date of the Notice to Proceed.
Section 00 21 00 - Instructions
PROJNET INSTRUCTIONS
OFFEROR'S QUESTIONS AND COMMENTS
***NOTE: The ProjNet System has a planned maintenance outage from 20 December 2019 to 31 December 2019.
During this time access to ProjNet may not be available. Please wait and submit any questions after this maintenance period. Questions will not be accepted outside of the ProjNet system. ***
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.
Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.
To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.
The Solicitation Number is: W912QR20R0009
The Bidder Inquiry Key is: GMGXVM-8S278R
Specific Instructions for ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
From this page you may view all bidder inquiries or add an inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP. Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids/proposals.
NOTES:
1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.
2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment.
3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled four (4) business days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) business days prior to the closing date stated in the solicitation.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.217-5 Evaluation Of Options JUL 1990 52.236-28 Preparation of Proposals--Construction OCT 1997 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
CLAUSES INCORPORATED BY FULL TEXT
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
(End of provision)
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
11.5% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Wright-Patterson
Air Force Base located in Greene County, Ohio.
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from
U.S. Army Corps of Engineers – LRL Attn: April C. Judd, Room 821 600 Dr. Martin Luther King Jr. Pl.
Louisville, KY 40202
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- 9:00 a.m. Eastern Time on 22 January 2020
(c) Participants will meet at-- Large parking lot off Ogden Avenue, AREA A at WPAFB
Note: No inquiries will be allowed during the site visit. All inquiries must be submitted via the Projnet Bidder Inquiry site. A Bidder Key is provided with the solicitation information. Please RSVP the following information:
1. Name of Attendees
2. Company
3. Phone Number and Email Address
4. Driver's License State and Number
Please remember to bring a State Issued ID in order to attend the site visit.
Send RSVP to John.P.Hearn@usace.army.mil by 1600 hours on January 15, 2020. No additional attendees will be registered after this date or time. A Confirmation email will be sent out on January 17 to confirm each registration.
It will include driving instructions to WPAFB, a base map and any other pertinent information. A bus will be reserved and waiting to transport participants to and from the site visit. The bus will be parked in a large parking lot off Ogden Avenue, AREA A at WPAFB and leaving PROMPTLY at 0845 Hours before the start of the site visit at 0900 hours. All participants must ride the bus. Cellphones/cameras/etc. are allowed at HQ AFMC, VQ’s, and Med Center Only. Cell Phones/Cameras and any other electronic devices are not permitted at the NASIC Complex.
Where photographs are allowed, as always, contractors cannot document proprietary information nor Government employees’ faces.
See Appendix A Facility Access for additional information.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
The full text of FAR clauses and provisions (numbered as 52.XXX-XX) can be found at this site:
https://www.acquisition.gov/browse/index/far
The full text of DFARS clauses and provisions (numbered as 252.XXX-XX) can be found at this site:
https://www.acq.osd.mil/dpap/dars/dfarspgi/current/
Section 00 22 00 - Supplementary Instructions
SECTION 00112
SECTION 00112 - PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION
CRITERIA
1. Overview.
1.1 The intent of this solicitation is to select one contractor for the abandonment of High Temperature Hot Water Line C and the installation of new boilers and supporting infrastructure for the Hospital, Visitor’s Quarters, AFMC Headquarters, and Tenant Unit Facilities. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible offeror, whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government, all factors considered.
1.2 The basis of award is the Tradeoff Process. The Contracting Officer will award a firm fixed price contract to the responsible offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable and offers the best overall value to the Government, all factors considered. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.
2. Submittal of offers.
2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein.
However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the offeror's past performance and management capabilities necessary for successful completion of the project. Requirements stated in this RFP are minimums.
2.2 Offerors shall submit their proposals to the US Army Corps of Engineers, 600 Dr. Martin Luther King, Jr.
Place, Room 821, Louisville, KY 40202-2267 no later than the time and date specified in Block 13 of Standard Form 1442.
2.3 Offerors are required to submit a proposal made up of the Past Performance, Technical Plan (Management Plan and Risk Management Plan) factors, and the Small Business Participation Plan along with Price and Pro Forma information. All proposal materials shall be submitted in binders with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified below. Volume I shall be submitted in original and six (6) paper copies and one electronic copy on CD*. Volume II shall be submitted in original and 1 CD* only and shall be placed in a separate envelope. Failure to place the required submission information under the appropriate tab may result in a lower rating if the evaluators cannot readily find the appropriate information.
2.4 The target ceiling for contract award is $13,000,000 based on funds made available for this project. The Government cannot guarantee that additional funds can be made available for award. Offerors are under no obligation to approach this ceiling.
*NOTE: Provide the complete Volume I proposal submittal including text, renderings, drawings, photographs, etc.
on CD (one copy). Provide the complete Volume II proposal submittal on CD (one copy) with the final price breakout schedule, if available, electronically. The paper copy of the proposal shall be used for evaluation and will control any conflicts or discrepancies between the two media. Offeror is responsible for ensuring the paper copy is consistent with the electronic copy of the proposal.
3. Proposal Evaluation Process.
3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical/quality proposals will be reviewed and rated without knowledge of the price offered. The number and identities of offerors are not revealed to anyone who is not involved in the evaluation and award process or to other offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is the Best Value Tradeoff Process.
3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility determination, technical/quality evaluation, price evaluation, and cost/technical trade-off analysis.
3.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete and that both a technical and price proposal were received.
3.2.2 Technical Evaluation: The SSEB will evaluate and rate the proposals against the RFP requirements. Some factors will be rated using an adjectival-based system. Past Performance will be rated based on recency/relevancy and confidence.
3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical/quality evaluation. The SSEB will not have access to price information until completion of the technical/quality evaluation.
3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.
4. Proposal Information and Related Evaluation Factors.
4.1 Proposals will be evaluated in accordance with the factors and subfactors below, listed in relative order of importance. All evaluation factors, other than cost or price, when combined are considered approximately equal to cost or price. Offerors are reminded to include their best technical and price terms in their initial offer and not to automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interest of the Government.
4.2 Volume I – Factor I – Past Performance (Three-Ring Binder) 1st
4.3 Volume I – Factor II – Technical Plan (Three-Ring Binder) 2nd
Subfactor A Management Plan 2nd
Subfactor B Risk Management Plan 1st
4.4 Volume I- Factor III – Small Business Participation Plan 3rd
4.5 Volume II - Price and Pro Forma Information (Sealed Envelope)
Tab A Standard Form 1442 and Price Breakout Schedule Not Rated
Tab B Joint Venture Agreements Not Rated
Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability
Tab D Subcontracting Plan Not Rated
Tab E Pre-Award Information Not Rated
4.6 Ratings
Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.
Past Performance Relevancy Ratings Rating Definition
Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.
Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
Performance Confidence Assessments
Substantial Confidence Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence Based on the offeror’s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
Neutral Confidence
No recent/relevant performance record is available or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.
Management Plan & Risk Management Plan Assessment Ratings Adjectival Rating Definition
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Acceptable
Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements and/or risk of unsuccessful performance is high.
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable.
Proposal is unawardable.
Small Business Participation Plan
Acceptable Proposal clearly meets the minimum requirements of the solicitation.
Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.
4.7 Definitions
1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.
4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See
FAR 15.001.
5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.
6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).
7. Clarification. Limited exchanges between the Government and offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).
8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating from sources where the information is from other than formal rating systems such as “PPIRS” or “FAPPIS.”
5.0 Volume I – Factor I – Past Performance
5.1 Submission Requirements:
Provide descriptions of up to three (3) projects substantially complete or completed by the prime contractor within the last 5 years from the solicitation issue date which are similar to this project in size and scope.
Projects considered to be substantially complete are projects that are at least 95% complete.
Projects considered similar to this project include projects with both new construction and renovation in areas utilizing gas-fired boilers with direct digital control, piping, metering, and correction to existing facilities heating systems. The construction and/or renovation must include the installation and removal of boilers.
Projects considered similar in size to the solicited project are projects with a single boiler size of at least 10,000 MBTU (Note: Multiple Boilers may NOT be combined to meet the similar in size requirement).
The prime contractor must have self-performed at least 15% of the cost of the contract, not including the cost of materials, with its own employees to be considered similar.
An IDIQ contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.
Formats for Project Details are included for your use. Use as many forms as necessary to meet the criteria.
If you elect not to use the formats, all information identified on the formats is still required for evaluation of this item.
Please note in the proposal if projects submitted have the following additional features. Additional consideration may be given if projects submitted have the following features: Previous experience with:
USACE or Air Force Phased projects A single project with multiple sites Projects that include SCIF or ICD 705 Compliant spaces
Provide two references for all of the projects identified in paragraph 5.1. Reference information must include project name, location, owner's name, point of contact, telephone number, and email address. Also include any ratings, letters, awards, etc. which support past performance on these projects. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the offeror with the proposal submission and not sent directly to the agency from the reference.
NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture must submit their own DUNS number with the Joint Ventures’ proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a joint venture offeror as demonstrated by a signed joint venture agreement. If the Offeror represents the combining of two or more companies as a joint venture for the purpose of this RFP, each company in the joint venture may submit project examples, but the total submitted by the joint venture will not exceed three (3).
5.2. Evaluation Criteria:
The SSEB will evaluate the relevancy of recent past performance identified in the proposal.
Documentation of successful completion of projects similar in size and scope to this project will be considered relevant to the similar characteristics of the RFP. Conversely, proposals that do not show documentation of successful completion of projects similar in size and scope will be considered less relevant to the similar characteristics of the RFP. Additional consideration may be given for projects completed for the USACE or Air Force, Phased projects, A single project with multiple sites, Projects that include SCIF, or ICD 705 Compliant spaces.
The SSEB will assign a confidence rating to each offeror based on the degree of successful performance of all recent and relevant projects identified in the proposal in response to paragraph 5.1. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction. The Government also reserves the right to not contact the provided references.
The Government may also use other tools such as CPARS, FAPPIS, Unique Entity Identifier (Dun & Bradstreet), or any other relevant information to assist in its evaluation of an offeror’s past performance.
6.0 Volume I – Factor II – Subfactor A - Management Plan
6.1 Submission Requirements:
Provide a management plan for the project that describes the following:
1. How your labor, resources, subcontractors and material suppliers will be coordinated and used to ensure successful completion of the project at all sites within the period of performance.
2. How you will manage, supervise and coordinate the subcontractors' work and who in the organization will be responsible for this management and coordination.
3. Discuss the qualifications of your on-site team (e.g., degrees, registrations, and number of years of experience). Resumes are not required, but may be submitted to demonstrate team member qualifications.
4. Provide an organizational chart for this project showing home office support, on-site management and the responsible chain of command. Joint venture offerors must show the respective areas of responsibility for each partner. Clearly delineate on-site from off-site personnel on the organizational chart. Quality Control and Safety must be included in the chart.
There is a page limit of ten (10) single-sided pages (front and back will count as two pages) for the Management Plan factor (excluding the Organizational Chart). The narrative should use a minimum font size of eleven (11). Page size shall be 8.5”x11” with a minimum margin of one-half inch on all sides. The Organizational Chart can be submitted on one 11”x17” page or one 8.5”x11” page. Format restrictions will be strictly adhered to and enforced. Any information that exceeds this page limit will not be evaluated.
6.2 Evaluation Criteria:
Comprehensive plans that demonstrate a clear understanding of the work and an ability to coordinate resources to ensure successful pursuit of the work will be regarded as having met the RFP requirements.
Plans that do not demonstrate a clear understanding of the work or that do not demonstrate a capability to coordinate resources will be regarded as having not met the RFP requirements. Plans will be evaluated based on the level of involvement the contractor will have in the management, oversight, control, and coordination of the work performed by subcontractors. The SSEB will evaluate the clarity, adequacy, capabilities and strengths of the offeror’s narrative describing their ability to manage a successful project.
An organizational chart that clearly depicts a highly qualified on-site team supported by appropriate resources off-site and that clearly defines responsibilities will be regarded as having met the RFP requirements. Charts that are confusing, cluttered with duplicative entries, or that do not clearly define responsibilities will be regarded as having not met the RFP requirements.
7.0 Volume I – Factor II – Subfactor B Risk Management Plan
7.1 Submission Requirements:
Provide a Risk Management Plan narrative for the project that describes how your labor, resources, subcontractors and material suppliers will be managed, supervised and coordinated to reduce risk and ensure successful completion of the project. Minimally, the Risk Management Plan shall address the following information:
Identify and discuss significant areas of project-specific technical risks and provide your plan for mitigating risk during contract performance.
Provide your mechanical firm(s) and specialist(s) qualifications and years of experience.
Include an outline of systems to be construct and commissioned or activities to be performed, and documents to be provided for this project, and a plan to mitigate risk associated with commissioning activities. NOTE: The listed mechanical firm(s) and specialist(s) that is submitted for evaluation under this Factor must be used on the project. No deviations will be permitted after award unless approved in writing by the Contracting Officer.
Describe your process for managing, coordinating and tracking changes that arise during the construction phase(s) and your plan to mitigate risks related to change management.
Provide a detailed schedule showing approach considering multiple sites to include each location of work (simultaneous/phased efforts) and show any shutdowns. The schedule shall include a narrative and the work periods for each item listed within the submitted schedule.
Discuss additional resources that are available to mitigate the risk of schedule slippage.
Provide detailed examples of how change management was accomplished for previous projects that are similar in size and scope.
NOTE:…