W912QR20R0009Specs_Vol3-0000.pdf
PDF 3 MB Posted
- Attached to
- Replacement of High Temperature Hot Water (HTHW) Line at Wright-Patterson Air Force Base
- Solicitation number
- W912QR20R0009
About this file
This document provides details for a federal contract solicitation for replacement of a high temperature hot water heating system at Wright-Patterson Air Force Base in Ohio. The U.S. Army Corps of Engineers Louisville District will issue a request for proposal for removal and replacement of an existing degraded central steam heat distribution system serving several facilities. The project scope includes demolition of old equipment and piping, installation of new outdoor gas-fired boilers and associated equipment, upgrading mechanical rooms, and addition of security cameras. The contract duration is 600 calendar days from award. The contract type will be firm-fixed-price. The North American Industry Classification code is 237310. The acquisition is a full and open competition with a best value tradeoff source selection evaluating past performance, technical, small business participation, and price factors. Discussions are not planned but may be held at the government's discretion. The construction magnitude is estimated between $10-25 million. The solicitation is anticipated for release on November 12, 2019 on FBO.gov. Offerors must register in SAM to be eligible for award. The point of contact is provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation For Repair HTHW Line C (Area A) With Natural Gas Boilers Wright-Patterson
AFB, OH
P2: 459947
Design Bid Build
SPECIFICATIONS Volume 3 of 4 RTA Submittal
26 December 2019
W912QR20R0009
ARIMS: 200A
Disposition: Maintain for 15yrs after construction
W912QR20R0009-0000
RTA Submittal Specifications – Volume 3 of 4
Woolpert 4454 Idea Center Boulevard
Dayton, OH 45430-1500
Repair HTHW Line C (Area A) with Natural Gas Boilers
Wright-Patterson Air Force Base, Ohio
FY17
Project Number: ZHTV 120035
P2 Number: 459947 7 November 2018
REPAIR HTHW LINE C WITH NATURAL GAS BOILERS
RTA SUBMITTAL
Repair HTHW Line C (Area A) with Natural Gas Boilers 7 November 2018 Wright Patterson AFB, OH ii
This page intentionally blank
Repair HTHW Line C (Area A) with Natural Gas Boilers 7 November 2018 Wright Patterson AFB, OH iii
REPAIR HTHW LINE C (AREA A) WITH NATURAL GAS BOILERS
RTA SUBMITTAL
TABLE OF VOLUMES
Volume 1
Division 00 Division 01
Volume 2
Division 02 Division 03
Volume 3
Division 04 Division 05 Division 07 Division 08 Division 09 Division 10 Division 21 Division 22
Volume 4
Division 23 Division 26 Division 28 Division 31 Division 32 Division 33
Repair HTHW Line C (Area A) with Natural Gas Boilers 7 November 2018 Wright Patterson AFB, OH iv
This page intentionally blank
Repair HTHW Line C with Natural Gas Boilers, WPAFB
ZHTV 120035
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00 SUMMARY (WPAFB)
01 02 20 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 13.00 10 ASBESTOS ABATEMENT
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 83 13.00 20 LEAD IN CONSTRUCTION
02 83 19.13 10 LEAD-BASED PAINT ABATEMENT
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
02 85 00.00 20 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 01 20.70 UNIT MASONRY CLEANING AND RESTORATION
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 51 00 METAL STAIRS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
PROJECT TABLE OF CONTENTS Page 1
07 22 00 ROOF AND DECK INSULATION
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
07 54 19 POLYVINYL-CHLORIDE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR
PAINTING
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL
PETROLEUM FUEL TANKS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 44 16 FIRE EXTINGUISHERS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 01 BACKFLOW PREVENTION DEVICES (WPAFB)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL (DDC) FOR HVAC AND OTHER LOCAL
BUILDING SYSTEMS (WPAFB)
23 11 25 FACILITY GAS PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 52 46.00 20 LOW PRESSURE OUTDOOR WATER HEATING BOILERS (OVER 800,000
BTU/HR OUTPUT)
23 70 02.00 10 CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL
FIRED
23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM
PROJECT TABLE OF CONTENTS Page 2
DIVISION 26 - ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 00.00 10 PANELBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM SYSTEM, MODIFICATIONS TO EXISTING
SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 21 13 RADON MITIGATION (WPAFB)
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 51 15 NATURAL-GAS
33 52 10 SERVICE PIPING, FUEL SYSTEMS
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 3
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
SECTION 04 01 20.70
UNIT MASONRY CLEANING AND RESTORATION
11/15
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
AMERICAN CONFERENCE OF GOVERNMENTAL INDUSTRIAL HYGIENISTS (ACGIH)
ACGIH 0100 (2015; Suppl 2002-2016) Documentation of the Threshold Limit Values and Biological Exposure Indices
ASTM INTERNATIONAL (ASTM)
ASTM A36/A36M (2014) Standard Specification for Carbon Structural Steel
ASTM C1196 (2014) Standard Test Method for In Situ Compressive Stress Within Solid Unit Masonry Esitmated Using Flatjack Measurements
ASTM C1197 (2014) Standard Test Method for In Situ Measurement of Masonry Deformability Properties Using the Flatjack Method
ASTM C1324 (2015) Standard Test Method for Examination and Analysis of Hardened Masonry Mortar
ASTM C1364 (2016; E 2016) Standard Specification for Architectural Cast Stone
ASTM C1489 (2015) Standard Specification for Lime Putty for Structural Purposes
ASTM C1531 (2015) Standard Test Methods for In Situ Measurement of Masonry Mortar Joint Shear Strength Index
ASTM C1601 (2014) Standard Test Method for Field Measurement of Water Penetration of Masonry Wall Surfaces
ASTM C170/C170M (2016) Standard Test Method for Compressive Strength of Dimension Stone
ASTM C1713 (2012) Standard Specification for Mortars for the Repair of Historic Masonry
SECTION 04 01 20.70 Page 1
ASTM C207 (2006; R 2011) Standard Specification for Hydrated Lime for Masonry Purposes
ASTM C216 (2016) Facing Brick (Solid Masonry Units Made from Clay or Shale)
ASTM C34 (2013) Structural Clay Load-Bearing Wall Tile
ASTM C67 (2016) Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
ASTM C926 (2016b) Standard Specification for Application of Portland Cement-Based Plaster
ASTM E2260 (2012) Standard Guide for Repointing (Tuckpointing) Historic Masonry
ASTM E2659 (2015) Standard Practice for Certificate Programs
ASTM E96/E96M (2016) Standard Test Methods for Water Vapor Transmission of Materials
NATIONAL PARK SERVICE (NPS)
NPS Hist Prop (1995) National Standards for the Treatment of Historic Properties with Guidelines for Preserving, Rehabilitating, Restoring, and Reconstructing Historic Buildings
NPS TPS Brief 1 (2000) Assessing Cleaning and Water-Repellent Treatments for Historic Masonry Buildings
NPS TPS Brief 2 (1998) Repointing Mortar Joints in Historic Masonry Buildings
THE MASONRY SOCIETY (TMS)
TMS MSJC (2011) Masonry Standard Joint Committee's (MSJC) Book - Building Code Requirements and Specification for Masonry Structures, Containing TMS 402/ACI 530/ASCE 5, TMS 602/ACI 530.1/ASCE 6, and Companion Commentaries
U.S. GENERAL SERVICES ADMINISTRATION (GSA)
GSA HPTP 07656-01 Installing Lead Stone Flashing to Protect Masonry Joints
1.2 DEFINITIONS
Terms are defined below as applicable to this project.
SECTION 04 01 20.70 Page 2
1.2.1 Aggregates
The sand component of mortar.
1.2.2 Biocides
A chemical treatment that inhibits, deters, or controls organic growth.
Such growth is typically removed by cleaning following biocide treatment..
1.2.3 Binder
The component of mortar that binds together the aggregate particles into a cohesive material.
1.2.4 Dispersed Lime Crack Injection
A repair method in which dispersed lime material is injected into small cracks ranging in width from hairline to 1/8 in by use of needle or syringe.
1.2.5 Consolidant
A chemical product meant to strengthen loose or deteriorated stone.
1.2.6 Dutchman
A repair method in which deteriorated stone is removed in part and replaced with salvaged, harvested or new stone to make a seamless patch.
1.2.7 Harvested
Units removed from inconspicuous areas of the building.
1.2.8 In situ
A term referencing a repair procedure in which the masonry units and mortar remain in place and are repaired without removal from the wall system
1.2.9 Joint Sealant
A flexible, chemical product that is used to create a weather-tight seal at the boundary of masonry units with other units or dissimilar materials.
1.2.10 Lead Flashing
An extruded lead material that is inserted into joints to assist in precluding water entry into the masonry.
1.2.11 Lime Wash
A protective surface treatment comprised of calcium hydroxide particles in suspension in water, along with small amounts of calcium carbonate, silica particles and other minerals.
1.2.12 Mockup
Specific area on the building approved by Contracting Officer to demonstrate the contractor's ability to apply, match and install specified
SECTION 04 01 20.70 Page 3 materials.
1.2.13 Mortar
A mixture of binders, aggregates, and pigments used for reconstruction, repointing or stucco applications.
1.2.14 New Elements
New, non-historic materials added to masonry structures to aid in their ability to resist loads (typically seismic) or to resist water infiltration.
1.2.15 Patch
The use of substitute repair materials to treat damaged or deteriorated masonry units in situ.
1.2.16 Remediate
An intervention of a historic masonry structure and its component materials with the intent to maintain the original fabric to the greatest extent possible.
1.2.17 Remove
Specifically for historic masonry materials, the term means to detach an item from existing construction to the limits indicated.
1.2.18 Replace
To reinstall an item in its original position (or where indicated) after remedial treatment, or to duplicate and reinstall an entire item with new material; with the original item serving as the pattern for creating the duplicate.
1.2.19 Repoint
To remove existing mortar joints to the specified depth and replace with a mortar that matches in color, texture, and performance with water vapor transmission, bond, hardness, and flexibility compatible with original mortar, as assessed in accordance with ASTM C1713.
1.2.20 Retool
A repair method in which a chisel is used to re-create the surrounding stone texture finish by removing loose pieces of stone.
1.2.21 Stucco
A mixture of binders and aggregates, sometimes including animal hair or fibers used for the repair treatment of existing stucco.
1.2.22 Surface Treatment
The application of traditional materials or contemporary chemical products to the surface of masonry to provide protection to the masonry units and mortar and/or reduce water infiltration.
SECTION 04 01 20.70 Page 4
1.2.23 Test Panel
Specific area on the building approved by the Contracting Officer to demonstrate individual applicator competency and workmanship proficiency prior to the start of restoration work.
1.2.24 Tuckpointing
Often called skim-coating, an American practice of surface repairing mortar joints without the required removal of existing deteriorated mortar beneath. This practice is not recommended for mortar joint repair work on historic masonry. There is also an acceptable British form of tuckpointing practice that involves careful thin penciling of smaller joints within larger ones to give the wall the appearance of an ashlar finish.
1.2.25 Water Repellent
A surface-applied chemcial intended to reduce liquid water entry into a masonry wall without significantly affecting the vapro transmission properties of the original material.
1.2.26 Wall System
A term used to address the fact that masonry structures are comprised of different materials but function holistically, requiring that all restoration and cleaning process take into account the implications of the treatment to the adjacent materials and the building as a whole.
1.2.27 Masonry Treatment Requirement (MTR)
Defined treatments that are required by the specification (contract) documents for project specific repairs to masonry.
1.2.28 Saturated Surface Dry (SSD)
Condition of the wall surface after water has been applied sufficient to saturate more than the surface, then allowed to dry until the surface is dry but the body of the masonry still has moisture.
1.3 ADMINISTRATIVE REQUIREMENTS
1.3.1 Pre-Installation Meeting
Prior to beginning the work of this Section, convene a meeting with the Contracting Officer's Representative(s) to review the requirements of the Quality Control Plan, Project Training Program, installation procedures, location of required mockup areas, and all job conditions and processes.
All subcontracting firms involved with this work shall participate in this meeting.
1.4 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submittals with an "S" are for inclusion in the Sustainability Notebook, in conformance to Section 01 33 29.00 06 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00.00 06 SUBMITTAL PROCEDURES:
SECTION 04 01 20.70 Page 5
SD-01 Preconstruction Submittals
Quality Control Plan; G Project Training Program; G Qualifications; G
SD-02 Shop Drawings; G
Photographic Documentation Structural Upgrades; G
SD-03 Product Data
Qualifications Cleaning and Restoration Methods; G Cleaning Materials; G Biocides Replacement Mortar And Stucco; G Mortar Mix; G Water Repellents Infiltration; G Stone Consolidants; G
SD-04 Samples
Mock-ups; G
SD-05 Design Data
Calculations for Structural Upgrades; G
SD-06 Test Reports
Testing and Matching Existing Sealants for Asbestos and PCBs
SD-07 Certificates
Repair Materials
1.5 QUALITY CONTROL
1.5.1 Quality Control Plan
Prior to beginning restoration and cleaning work, submit a written Quality Control Plan. Include a separate section in the overall project Quality Control Plan specifically addressing this restoration and cleaning work.
Do not proceed without written approval of the Quality Control Plan. At a minimum, include the following items in the Quality Control Plan:
a. Describe methods of dust containment during the work specific to the work of this section.
b. Describe the methods of protecting surrounding masonry, windows, doors, roof, and building trim as well as surrounding landscape.
Provide drawings of protection when requested.
c. Describe the work procedures, materials, and tools the contractor proposes to use for each Masonry Treatment Requirement (MTR) specified.
SECTION 04 01 20.70 Page 6
d. Describe the sequence of each MTR.
e. Describe how each MTR sequence and the overall construction schedule changes with weather variations and how completed work will be protected.
f. Describe the methods for surveying original layout and collecting datum points and plumb lines for rebuilding masonry.
g. Describe the methods for shoring and providing a safe working environment.
h. Describe the methods for select deconstruction of individual masonry units and tools/methods for cleaning the masonry for reuse.
i. Describe the method and approach to mortar joint removal.
j. Describe the method and approach for assuring repair material compatibility with original materials.
k. Describe the method and approach to cleaning mortar, coating, smears and old patching materials from the masonry surfaces.
l. Describe, in detail, the procedures relating to techniques and tools proposed for masonry matching.
m. Describe the complete masonry removal and matching procedures; include equipment, approach, length of time the masonry will be out of the wall, documentation on mapping the location, and where (on-site or in shop) the masonry units will be repaired.
n. Describe the procedure for matching of different colors at different locations.
o. Describe the procedure for mixing and matching of repair materials.
p. Describe the methods and system by which the use of reclaimed masonry units can be utilized.
q. Describe the methods for setting masonry back into its original position and maintaining the original bond patterns and joint width.
r. Describe the methods of transition points where replacement/preservation work will meet the original historic work.
s. Describe the on-site project training program. Provide the opportunity for workers to be trained in each masonry treatment requirement (MTR) as work proceeds.
1.5.2 Qualifications
1.5.2.1 Historic Masonry Consultant
a. Secure the services of a historic masonry consultant with a minimum of 10 years experience applying NPS Hist Prop as they relate to the work in this section.
b. Submit a resume that describes five relevant projects within that
SECTION 04 01 20.70 Page 7 period and include how NPS Hist Prop was applied to the work of similar scope and scale and what jurisdiction or agency was involved in approving the work..
c. The consultant's services include:
(1) Investigating the condition of the masonr materials and mortar.
(2) Arranging for material analysis in the laboratory
(3) Recommending appropriate cleaning methods and materials
(4) Recommending restoration options.
(5) Providing project specific specifications.
(6) Providing an on-site training program.
(7) Providing quality control services during construction.
(8) Recommending appropriate repair and restoration materials.
1.5.2.2 Masonry Firm
a. The firm performing the masonry work shall have a minimum of five years experience on relevant projects.
b. The firm shall have completed work similar in material, design, and extent to that indicated for this Project and shall demonstrate a record of successful in-service performance.
c. Proven implementation of NPS Hist Prop and related Preservation Briefs are required.
d. Submit a resume that describes the required experience.
1.5.2.3 Field Supervisor
Retain an experienced full-time supervisor on the project site at all times when masonry restoration is in progress. A single individual shall be responsible for supervising the historic masonry restoration work throughout the duration of the project.
Submit a resume that describes the required experience.
1.5.2.4 Masonry Applicator
a. Employ craftspeople who are experienced with and specialize in restoration work of the types they will be performing.
b. All masonry restoration treatments must be performed by a craftsperson that is familiar with historic masonry construction and has worked on historic masonry projects for at least five years.
c. Only skilled technicians who are familiar and experienced with the materials and methods specified may be used.
d. Submit resumes for all historic masonry applicators, demonstrating the required experience.
SECTION 04 01 20.70 Page 8
1.5.3 Project Training Definition and Use
In addition to five years demonstrable experience on masonry restoration projects, offer workers project training certificate(s) within the framework of ASTM E2659. Project training certificates are earned by individual workers and issued with the understanding that they are for limited time use, enforceable only to this specific project and for a specific MTR. It is not necessary, nor a requirement of this specification, that all restoration workers obtain all project training certificates offered. Rather it is desirable that workers be trained for each project specific task they will perform to ensure the highest quality results from the cleaning and restoration program.
1.5.4 Mortar Analyst
Laboratory mortar analysis equipment should be operated by and results analyzed by trained personnel experienced with analysis of historic masonry mortar.
1.5.5 Documentation
Submit digital photographic documentation of the all phases of masonry restoration, including prior to the start of restoration work.
Provide thorough photo documentation of the project and project details and targeted areas.
1.5.6 Cleaning and Restoration Methods
1.5.6.1 General Procedure
a. Submit the cleaning and restoration methods, and materials selected for a specific structure for approval before work starts.
b. Take into account the total construction system of the building to be worked upon, including different masonry and mortar materials, as well as non-masonry elements which may be affected by the work.
c. Utilize mockups to identify the appropriate cleaning and restoration treatment and materials and set the standard for each project task.
d. Demonstrate the correct execution of the approved cleaning and restoration methods and materials during the on-site workmanship training program within the framework of ASTM E2659.
1.5.6.2 Cleaning Products and Procedures
a. General Cleaning Requirements
(1) Establish cleaning products and procedures during the mockup process.
(2) Select the least aggressive method used to achieve the desired level of cleanliness.
(3) Where chemical products are selected for cleaning, use them in accordance with the manufacturer's instructions.
SECTION 04 01 20.70 Page 9
b. Cleaning Mock-Ups
(1) Demonstrate the materials, equipment, and methods to be used in cleaning in a test section approximately 3 feet by 3 feet.
(2) Locate test patches in inconspicuous areas of the building. The areas tested are subject to approval by the Contracting Officer.
The areas tested shall exhibit soiling characteristics representative of those larger areas to be cleaned.
(3) Adjust the cleaning process as required and the test section rerun until an acceptable process is obtained.
(4) Conduct tests on areas to be stripped of paint.
(5) Allow tested areas to dry before a determination is made on the effectiveness of a particular treatment.
1.5.7 Masonry Restoration Products and Procedures
a. General Restoration Requirements
(1) Do not use masonry or mortar in the work until the mock-ups and the represented material and workmanship have been submitted and approved.
(2) Demonstrate the methods and quality of workmanship to be performed in each masonry treatment requirement (MTR). Provide a mock-up for each MTR indicated.
b. General Restoration Mock-Up Requirements
(1) Throughout restoration, retain approved mock-up panels in undisturbed condition, suitably marked, as a standard for judging completed work.
(2) Review manufacturer's product data sheets to determine suitability of each product for each surface.
(3) Apply products using manufacturer-approved application methods, determining actual requirements for application..
(4) Obtain approval as to the preservation treatment approach, design, and workmanship to include, but not limited to the verification of all material applications and finishes as specified to the requirements of color, texture, profiles, and finishes before proceeding with work.
(5) Mock-ups: May be performed on inconspicuous sections of actual construction under the same weather conditions expected the remainder of the work.
(a) Location and number as directed.
(b) Size: 3 feet by 3 feet or as appropriate for the repair specified.
(c) Repair unacceptable work.
SECTION 04 01 20.70 Page 10
c. Restoration Mock-Ups
(1) Repointing: Repoint mortar joints, minimum acceptable mock up dimensions: twelve feet in length - 2/3 horizontal joints and 1/3 vertical joints. Demonstrate method for cutting out mortar joints, preparing wall for repointing, mixing mortar, installing mortar and curing the mortar. Prepare and place repointing mortar in accordance with NPS TPS Brief 2 and in compliance with NPS Hist Prop .
(2) Retooling Stone Masonry In situ: Demonstrate treatment technique and methods to retool three deteriorated stone faces in situ in all known historic profile textures identified.
(3) Masonry Removal and Replacement: Fully remove masonry and replace to specified dimensions and texture. Select size of masonry units representing typical conditions. Return one masonry unit to same location, set to surrounding profile joint width and bond pattern. Set masonry unit using specified mortar. Confirm with Contracting Officer's Representative that the replacement masonry units meet specification requirements for matching and that sufficient quantity required for the work have been identified.
Leave one stone dry-set into opening set on wood shims for evaluation and approval of preparation conditions.
(4) Repair Material
(a) Patching: Apply repair material on at least two masonry units for repair. Include one masonry unit on which to demonstrate proficiency in removing previous patching material and repairing with new substitute repair material. Include the removal of metal anchors at two locations and fill in the holes with repair material on the second masonry unit (where applicable).
(b) Dutchman: Undertake dutchman repairs in two locations, including one that is only cut and prepared for application.
Demonstrate the quality of the stone insert, as well as the workmanship and techniques to be performed in the dutchman repairs. Do not proceed with other dutchman repairs until the technique has been approved.
(5) Crack Repair: Repair one crack, 2 feet in length, using mortar.
Repair one crack, 2 feet in length, using dispersed hydrated lime injection technique with appropriate repair material.
(6) Surface Treatments: Install a minimum 1.5 square meter 16 square foot mockup for each surface treatment on each substrate to be treated. For stucco, demonstrate the means for installing each coat; including mechanical support systems such as wood or metal lath. For water repellents and/or consolidants, demonstrate the equipment and installation procedure. Allow 48 hours for limewash applications to dry to their final color and appearance.
(7) New Masonry Elements: Install new components in a manner demonstrating their final installation on the structure.
1.6 DELIVERY, STORAGE, AND HANDLING
a. Furnish cement in suitable bags used for packaging cements.
SECTION 04 01 20.70 Page 11
b. Provide packages with labeling that clearly defines contents, manufacturer, and batch identification.
c. Provide detergents, masonry cleaners, paint removers, solvents, epoxies and other chemicals used for masonry cleaning in sealed containers that legibly show the designated name, formula or specification number, quantity, date of manufacture, manufacturer's formulation number, manufacturer's directions including any warnings and special precautions, and name of manufacturer.
d. Store materials in weathertight structures which will protect all materials from moisture and contaminants.
e. Store accessories to avoid contamination and deterioration.
f. Do not use admixtures which have been in storage onsite for six months or longer, or which have been subjected to freezing, unless retested and proven to meet the specified requirements.
1.7 PROJECT/SITE CONDITIONS
1.7.1 Environmental Requirements
a. Do not place materials when weather conditions adversely affect the quality of the finished product.
b. Do not place masonry or mortar when the air or surface temperature is below 40 degrees F in the shade and will remain so for at least 48 hours after completion of the work. Heated enclosures may be used to overcome ambient weather restrictions, where such enclosures are feasible.
c. Do not place masonry or mortar when air or surface temperature is above 90 degrees F with a wind speed above8 miles per hour and will remain so for at least 48 hours after completion of the work.
d. Do not place masonry or mortar when air or surface temperature is above 100 degrees F with or without wind and will remain so for at least 48 ours after completion of the work.
e. Do not product or place materials during periods of rain or other precipitation. Stop material placements, and protect all in-place material from exposure, during periods of rain or other precipitation.
f. Clean masonry surfaces when air temperatures are above 40 degrees F and will remain so until masonry has dried out, but for not less than 7 days after completion of the work.
g. Do not perform work in wind conditions that may blow materials onto surfaces not intended to be treated.
1.7.2 Masonry Installation Requirements
a. Phase work during hot weather by performing work on the shady side(s) of the building during daylight hours and on the daylight side(s) of the building during cooler evening hours to prevent premature evaporation of the water from the mortar.
SECTION 04 01 20.70 Page 12
b. Do not use frozen materials or materials mixed or coated with ice or frost. Do not apply materials to frozen surfaces; allow complete thawing prior to installation.
c. Do not lower the freezing point of mortar by the use of admixtures or anti-freeze agents. Do not add chlorides or admixtures containing greater than 0.2 percent chlorides to the mortar, per TMS MSJC.
d. Prevent mortar from staining the face of the masonry or other exposed surfaces. Immediately remove mortar that comes in contact with such surfaces. Cover partially completed work when work is not in progress. Protect sills, ledges and projections from mortar droppings. Building damage resulting from work of this Section is the Contractor's responsibility. Restore damaged areas to the satisfaction of the Owner at no expense to the Owner. Do not apply products under conditions outside product manufacturer's requirements.
1.8 WARRANTY
1.8.1 Cleaning Warranty
Warrant cleaning procedures for a period of two years against harm to substrate (masonry and mortar) or to adjacent materials including, but not limited to: discoloration of substrate from improper procedures or usage, chemical damage from inadequate rinse procedures, and abrasive damage from improper procedures.
1.8.2 Repair Warranty
Warrant repair procedures, including repointing, for a period of two years against: discoloration or mismatch of new mortar to adjacent original historic mortar, discoloration or damage to masonry from improper mortar clean-up, loss of bond between masonry and mortar, fracturing of masonry edges from improper mortar joint preparation procedures or improper mortar formulation, and occurrence of efflorescence from improper repair procedures.
PART 2 PRODUCTS
2.1 CLEANING MATERIALS
2.1.1 General Requirements
Selection of appropriate cleaning products requires a clear understanding of the masonry materials to be cleaned, a rationale for the cleaning, and an understanding of the anticipated level of cleanliness expected from the cleaning program. Overly aggressive cleaning methods and materials can cause subtle, long-term damage to masonry units. Use products that have a minimum 5 year performance record on relevant projects. Select the products predicated on long-term negative effects to the masonry rather than current level of cleanliness of the comparable structure.
2.1.2 Paint Removers
a. Provide chemical paint removers that are water soluble, low toxicity products, effective for removal of paint on masonry without altering, damaging, or discoloring the masonry surface.
b. Provide commercially available poulticing materials designed to adhere
SECTION 04 01 20.70 Page 13 to and peel off paint without damaging the underlying masonry or project specific mixtures that include absorbent materials and cleaning solutions which can be demonstrated to do no harm to the masonry.
2.1.3 Chemical Cleaners
a. Provide commercially available products that have a proven record of cleaning masonry without altering, damaging or discoloring the masonry units, mortar or surrounding materials.
b. Provide the associated pre and post treatment material to neutralize the long term effects of the chemicals.
2.1.4 Biocides
Provide commercially available biocides with accompanying product literature containing information on the product as well as the expected service life of the material and any detrimental effects it may have on the masonry or mortar.
2.1.5 Liquid Strippable Masking Agent
Provide manufacturer's standard liquid, film-forming, strippable masking material for protecting glass, metal, and polished stone surfaces from the damaging effect of acidic and alkaline masonry cleaners.
2.1.6 Cleaning Implements
Furnish brushes that contain natural or nylon fiber bristles only. Do not use metallic wire brushes. Scrapers and application paddles shall be made of wood with rounded edges. Metallic tools are not permitted.
2.1.7 Water
Obtain potable water from a local source. Filter to remove minerals resulting in a neutral pH, prior to application.
2.2 REPAIR MATERIALS
2.2.1 General
Use repair materials of one type and from one source, when used in repair treatments that will have surfaces exposed in the finished structure.
2.2.2 Mortar and Stucco
2.2.2.1 Testing and Matching
a. Take test specimens of existing mortar and stucco from a sound and intact representative portion of the structure, at locations indicated or by the Contracting Officer's Representative and assess in accordance with ASTM C1713 and ASTM C1324.
b. Subject a part of the historic mortar sample to petrographic examination and differential thermal analysis, or X-ray diffraction, SECTION 04 01 20.70 Page 14 or analytical chemistry to determine the binder components.
c. Aggregate Analysis
(1) Separate aggregate of the mortar sample from the binder.
(2) Rinse the separated aggregate clean with water and dry.
(3) Perform sand analysis using a sieve analysis of the aggregate as part of the ASTM C1324 process.
d. Match the replacement mortar and stucco to the original existing material in color, texture and tooling.
2.2.2.2 Replacement Mortar and Stucco
Provide replacement mortar and stucco that will:
a. Coexist with the old in a sympathetic, supportive and, if necessary, sacrificial capacity.
b. Have greater vapor permeability and be softer (measured in compressive strength) than the masonry units.
(1) Measure water vapor transmission in accordance with ASTM E96/E96M.
(2) Prepare ASTM E96/E96M water vapor transmission specimens with thickness similar to that expected in service, or a maximum of 1/2 inch, whichever is thinner.
c. Be as vapor permeable, and as soft, or softer, (measured in compressive strength) than the existing historic mortar or stucco.
2.2.2.3 Binder Content
Provide binder type or mixture of mortar (and stucco) with a cement, lime, or combination thereof consistent with the original existing mortar (and stucco) content in order to provide uniform durability, weathering characteristics, and the same, or better, life-cycle performance expectations.
2.2.2.4 Repointing Mortar
Repointing mortar shall be pre-blended in single containers in a factory-controlled environment. Use lime for repointing mortar that conforms to ASTM C207, Type S, or ASTM C1489 or unless otherwise specified.
2.2.2.5 Admixtures
Do not use admixtures in the mortar or stucco unless specifically approved in writing by the Contracting Officer.
2.2.3 Crack Injection
a. Comply with the dispersed hydrated lime manufacturer's written instructions.
b. Inject cracks that are no greater than 1/8 inch in width and masonry is soundly bonded but cracked.
SECTION 04 01 20.70 Page 15
c. Inject the full length of the cracks unless specifically instructed otherwise.
2.2.4 Replacement Masonry Materials
2.2.4.1 Clay Brick
a. Provide replacement brick matching color, shape, size, texture, appearance, and thermal expansion properties of the existing historic brick.
b. Test brick in comparison to the original existing historic brick using
ASTM C67.
c. Do not use reclaimed brick unless approved by Contracting Officer.
d. Provide brick meeting the requirements of ASTM C216 Grade SW, including a rating of "not effloresced", unless otherwise specified.
2.2.4.2 Stone
a. Provide replacement sotne matching type, color, shape, size, texture, finish-profile, and compressive strength of the existing historic stone units.
b. Test replacement stone in comparison to the existing historic stone using ASTM C170/C170M.
2.2.4.3 Terra Cotta
a. Provide replacement terra cotta matching color, shape, size, texture and finish-profile of the existing historic terra cotta units.
b. Test replacement terra cotta in comparison to the existing historic terra cotta using ASTM C34.
2.2.4.4 Architectural Precast Stone
a. Provide replacement architectural precast stone matching color, shape, size, texture and finish-profile of the existing historic architectural precast stone units.
b. Test replacement architectural precast stone in comparison to the existing historic architectural precast stone using ASTM C1364.
2.2.5 Surface Treatments
2.2.5.1 General
Provide commercially available coatings with water vapor permeabillity of
0.98 or greater, as measured in accordance with ASTM E96/E96M, including silanes and siloxanes.
2.2.5.2 Consolidants
Provide commercially available consolidants designed to strengthen loose or deteriorated stone without damaging intact stone or reducing water vapor permeability below 0.98, as measured in accordance with ASTM E96/E96M.
SECTION 04 01 20.70 Page 16
2.2.5.3 Water Repellents
Provide commercially available water repellents designed to preclude water droplet entry into the masonry walls without reducing water vapor permeability below 0.98. as measured in accordance with ASTM E96/E96M.
2.2.6 Miscellaneous Materials
2.2.6.1 Cementitious Grout
Use cementitious grout, recommended by the manufacturer for the application, to bond steel anchors to masonry.
2.2.6.2 Metal Attachments
a. Provide threaded or deformed stainless steel anchors for spall repairs, size as indicated.
b. Provide other plates, angles, anchors, and embedments conforming to ASTM A36/A36M, prime painted with inorganic zinc primer.
2.2.6.3 Lead Flashing
Provide commercially available lead flashing conforming to
GSA HPTP 07656-01 .
2.3 EQUIPMENT
2.3.1 Cleaning Equipment
Provide cleaning equipment that does not cause staining, erosion, marring, or other damage or changes in the appearance of the surfaces to be cleaned.
2.3.1.1 Sandblasting
Use of sandblasting equipment is not allowed for cleaning masonry surfaces.
2.3.1.2 Water Blasting
a. Provide water blasting equipment including a trailer-mounted water tank, pumps, high-pressure hose, wand with safety release cutoff control, nozzle, and auxiliary water re-supply equipment.
b. Do not operate the equipment at a pressure which will cause etching or other damage to the masonry surface or mortar joints. Operate the equipment at a discharge capacity of 55 to 400 psi and 2.5 to 3 gpm for general surface cleaning operations.
c. Provide water tank and auxiliary re-supply equipment of sufficient capacity to permit continuous operations.
d. Provide protective covers and barriers as required to prevent over-spray onto adjacent surfaces.
2.3.1.3 Alternative Blasting Equipment
a. Alternative blasting methods require equipment designed to discharge sponges, walnut shells, ice, soda and other friable materials.
SECTION 04 01 20.70 Page 17
b. Operate equipment in accordance with manufacturer's recommendations and maintain in good working order.
c. Do not operate equipment at a pressure which will cause etching or other damage to the masonry surface or mortar joints.
d. Determine discharge capacity on a case by case basis during the mockup test panel demonstration and approval process.
e. Provide protective covers and barriers as required to prevent over-spray onto adjacent surfaces.
2.3.2 Spray Equipment
a. Provide spray equipment for chemical cleaners with low-pressure tanks or chemical pumps suitable for chemical cleaner indicated, and equipped with stainless steel, cone-shaped spray-tip.
b. Disperse water through a fan-shaped spray tip at an angle of not less than 15 degrees.
c. Deliver water at a pressure not greater than 400 psi and at a volume between 2.5 and 3 gpm.
d. Deliver heated water at flow rates indicated maintaining between 140 and 180 degrees F.
2.3.3 Drilling Equipment
a. Use standard small, powered, handheld masonry drills, commonly used for drilling small holes in concrete and masonry to drill holes in masonry for patch anchors and other applications.
b. Use drills in rotary mode only. Do not use impact type drills.
2.3.4 Compressed Air Supplies
a. Use compressed air equipment that delivers clean, oil and moisture free compressed air at the surface to be cleaned. Use a minimum of two in-line air filters to remove oil and moisture from the air supply.
b. Test the compressed air supply during each shift for the presence of oil and moisture.
2.3.5 Material Handling and Associated Equipment
2.3.5.1 Mixing, Transporting, and Placing Job Materials
a. Provide equipment used for mixing, transporting, placing, and confining masonry and mortar placements capable of satisfactorily mixing material and supporting uninterrupted placement operations.
b. Provide equipment used for mixing, conveying, and placing of materials that is clean, free of old materials and contaminants, and in conformance with material manufacturer's recommendations.
SECTION 04 01 20.70 Page 18
2.3.5.2 Associated Equipment
Provide associated equipment, such as mixer timing equipment, valves, pressure gauges, pressure hoses, other hardware, and tools, as required to ensure a continuous supply of material and operation control.
2.4 Mortar Mix
2.4.1 General
a. Proportion materials appropriately with regard to the effect of moisture content on the individual components (cement, sand and lime).
b. Batch materials using volumetric measurement devices and consistently consolidate the material in these devices to ensure the uniformity of the mortar. Do not batch by shovel counts.
2.4.2 Batching
a. Utilize a calibrated measuring device for batching Portland cement.
b. Utilize a calibrated measuring device for batching hydrated lime or lime putty.
c. Utilize a calibrated measuring device for batching the sand.
2.4.3 Cement and Lime Proportions
a. Fill the measuring device with portland cement, hydrated lime or lime putty.
b. Briskly strike the bottom of the measuring device against the ground a minimum of ten times and then strike the top flush.
c. For dry hydrate lime, fill the measuring device using a minimum of 3 lifts, strike the bottom of the measuring device against the ground a minimum of ten times for each lift and then strike the top flush.
Mix dry hydrate lime to a wet paste that is 40 to 42 percent solid.
d. For lime putty briskly strike the bottom of the measuring device against the ground a minimum of ten times and then strike the top flush. No additional lime is required when measuring from putty.
2.4.4 Sand Proportions
a. Proportion sand when the sand is in saturated surface dry (SSD), loose damp condition.
b. Proportion the sand by filling a measuring device using a minimum of 3 lifts, striking the sides a minimum of ten times, and then striking the top flush.
PART 3 EXECUTION
3.1 EXAMINATION
a. Undertake masonry renovation only after complete evaluation and analysis of the areas to be repaired are completed, including sampling and testing of the existing mortar to determine its composition and
SECTION 04 01 20.70 Page 19 qualities. Do not start repair work until conditions that have caused masonry deterioration have been identified and corrected.
b. Use the gentlest means to perform the work and take the greatest of care to ensure that the historic materials are not damaged in the process of the work, as established by mock-ups and testing.
c. In addition to requirements in this Section, comply with NPS Hist Prop.
3.1.1 Field (In Situ) Mortar Examination
a. Detect cracks, degradation and de-bonding from the surrounding masonry.
b. Determine previous surface coating treatments that may be contributing to the current conditions.
c. Compare the bedding mortar with the pointing mortar and determine the cross-sectional characteristics of the wall.
d. Determine the level of moisture movement in the in situ mortar, and if the mortar or masonry units are handling the brunt of the water movement through the wall.
e. Evaluate in situ mortar joint shear strength in accordance with
ASTM C1531.
3.1.2 Taking and Preparation of Samples
a. Take and analyze samples of unweathered original historic mortar and different types of mortar in the structure in order to match the new mortar to be used for repointing.
b. Remove three or four samples of each type of mortar to be matched with a hand chisel from several locations on the building. Mortar samples to be intact pieces with a minimum size of 1 ounce.
c. Set aside the largest sample for comparison with the repointing mortar.
d. Place the remaining samples in labeled, sealed sample bags for transport to the laboratory for evaluation per Part 2 of this Specification.
3.2 PREPARATION
3.2.1 Protection
a. Protect persons, motor vehicles, adjacent surfaces, surrounding buildings, equipment, and landscape materials from chemicals used and runoff from cleaning and paint removal operations.
b. Erect temporary protection covers, which will remain in operation during the course of the work, over pedestrian walkways and at personnel and vehicular points of entrance and exit.
c. Protect the interior of buildings from the weather, cleaning, and repair operations at all times.
d. Do not expose workers to chemical substances in excess of the limits established by ACGIH 0100 . Comply with more stringent regulations
SECTION 04 01 20.70 Page 20 where applicable.
3.2.2 Surface Preparation
a. Do not proceed with cleaning until mock-ups have been approved.
b. Do not proceed with repointing or stucco until existing mortar and stucco have been analyzed and suitable repair materials have been determined.
c. Do not proceed with restoration work until the cause of observed distresses have been identified and corrected.
d. Do not proceed with surface treatments until all other restoration work has been completed.
3.2.3 Equipment and Techniques Demonstration
a. Demonstrate equipment and techniques of operation in an approved location.
b. Assemble dependable and sufficient equipment, appropriate and adequate to accomplish the work specified, at the work site with sufficient lead time before the start of the work to permit inspection, calibration of weighing and measuring devices, adjustment of parts, and the making of any repairs that may be required.
c. Maintain the equipment in good working condition throughout the project.
3.3 MASONRY CLEANING
3.3.1 General
a. Exercise caution against over-cleaning of surfaces, which may be detrimental, and which may remove desirable historic surface details or patinas. For example, if cleaning reveals unexpected joint painting or historic signage; suspend the cleaning action, protect the exposed area and notify the Contracting Officer.
b. Do not damage or mar historic materials in the process of cleaning.
c. Perform cleaning per NPS TPS Brief 1 .
d. Protect open joints to prevent water and cleaner intrusion into the interior of the structure.
e. Protect non-masonry materials and severely deteriorated masonry by approved methods prior to initiation of cleaning operations.
f. Remove all organic and inorganic contaminants from the surface and pores of the substrate, without causing any short or long-term negative consequences.
g. Clean surfaces evenly with no evidence of streaking or bleaching.
h. Do not affect the density, porosity, or color of the existing masonry or mortar.
SECTION 04 01 20.70 Page 21
i. Maintain a neutral pH on surface of cleaned masonry units.
j. Use the gentlest methods possible for cleaning historic masonry to achieve the desired results.
k. Proceed with cleaning in an orderly manner, working from top to bottom of each scaffold width and from one end of each elevation to the other.
l. Perform cleaning in a manner which results in uniform coverage of all surfaces, including corners, moldings, interstices and which produces an even effect without streaking or damage to masonry.
m. Use the following sequence of methods to determine the least aggressive, effective cleaning method:
(1) Water with non-metallic brushes (cold water).
(2) Water with mild soap
(3) Water with stronger soap
(4) Water with stronger soap plus ammonia
(5) Water with stronger soap plus vinegar (but not on calcareous masonry)
(6) Stronger chemical cleaners, only when above methods are determined to be ineffective by the Contracting Officer
3.3.2 Chemical Cleaners
a. Do not use chemical cleaners without approval from the Contracting Officer.
b. Do not use acidic chemical cleaners on limestone, marble, concrete and other calcareous (calcium containing) masonry materials. If chemical cleaners are used on such materials, use alkaline based cleaners with neutralizing afterwashes.
3.3.3 Paint Removal
a. Prior to removal, test existing paint for lead in accordance with Section 02 83 19.13 10 LEAD-BASED PAINT ABATEMENT.
b. Clean areas where paint is to be removed with water and detergent solution to remove surface dirt. Rinse and allow to dry.
c. Remove paint and other coatings from masonry…