This document provides a pre-solicitation notice for Request for Proposal W912QR20R0009 to replace an existing high-temperature hot water heating system at Wright-Patterson Air Force Base with new gas-fired heating systems. The project scope includes removing and abandoning degraded central steam heat distribution systems serving multiple facilities. The contract will be a firm-fixed-price contract with a duration of 600 calendar days from award. The solicitation is anticipated for release on November 12, 2019. Evaluation will use a best value tradeoff process considering past performance, technical, small business participation, and price factors. Discussions are not planned but may be held if in the government's interest. The project magnitude is estimated between $10-25 million. The contractor must register in SAM and the point of contact is provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes
1. CONTRACT ID CODE PAGE OF PAGES
1 6
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20R0009
X 9B. DATED (SEE ITEM 11)
26-Dec-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0003
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Feb-2020
CODE
U. S. ARMY ENGINEER DISTRICT, LOUISVILLE
600 DR. MARTIN LUTHER KING, JR. PLACE
ROOM 821
LOUISVILLE KY 40202-2239
W912QR 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912QR20R0009Spec-0003
W912QR20R0009
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
SUMMARY OF CHANGES
Summary of changes Amendment 0003 Repairs to the HTHW Line C (Area A) at WPAFB, OH
1. The Price Breakout schdule has been REVISED to include Note 8.
2. The following PLAN SHEETS have been replaced in their entirety:
1A-101 STAND-ALONE MECHANICAL BUILDING 10840 FIRST FLOOR PLAN
2A-601 SCHEDULES AND DETAILS
3A-101 BUILDING 10280 FIRST FLOOR AND MECHANICAL ROOM 1324
FLOOR PLANS
3A-102 BUILDING 10280 MECHANICAL ROOM 1324 REFLECTED CEILING
PLAN
3A-601 SCHEDULES AND DETAILS
3AD101 BUILDING 10280 DEMOLITION PLAN
3S-001 GENERAL NOTES BUILDING 10280
4A-111 MECHANICAL ROOMS W100 AND E100
4A-115 BUILDING 10853 MECHANICAL ROOM E100 ROOF PLAN
4A-401 BUILDING 10853 MECHANICAL ROOM E100 SECTION AND
ELEVATIONS
4A-402 BUILDING 10853 MECHANICAL ROOM E100
4E-101 OVERALL TENANT PLAN - 1st FLOOR
4E-603 PANELBOARD SCHEDULES
4M-001 HVAC LEGEND
4S-101 BUILDING 10853 & 10856 MECHANICAL ROOM W100 AND E100
FOUNDATION PLANS
4S-103 BUILDING 10828 MECHANICAL ROOM 8115 FOUNDATION PLAN
4S-501 FOUNDATION DETAILS
5S-101 BUILDING 10825 - FOUNDATION PLAN
5S-102 BUILDING 10826 - FOUNDATION PLAN
5S-103 BUILDING 10827 - FOUNDATION PLAN
3. The following SPECIFICATION SECTION has been replaced in their entirety:
PROJECT TABLE OF CONTENTS
00 80 00.00 06 WPB SUBMITTAL REGISTER
03 30 00 CAST IN PLACE CONCRETE
08 11 13 STEEL DOORS AND FRAMES
4. The following SPECIFICATION SECTIONS have been deleted in their entirety:
05 21 00 STEEL JOIST FRAMING
07 54 19 POLYVINYL-CHLORIDE ROOFING
10 44 16 FIRE EXTINGUISHERS
31 21 13 RADON MITIGATION (WPAFB)
All other terms and conditions remain the same.
The following have been deleted:
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
PRICE BREAKOUT SCHEDULE
OFFEROR’S NAME:
Item No.
Description Qty Unit of Issue
Total
All work, labor, materials, and equipment (not related to hazardous material abatement) required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – HQ AFMC (Buildings 10262, 10266, and 10271) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes converting two separate HTHW services to natural gas condensing boilers; new boilers, primary and secondary pumps and associated support equipment; repair and replacement of existing door, wall, and floor systems; abandon in place existing high-pressure steam and cap ends at buildings; staging and laydown.
1 Job $
All work, labor, materials, and equipment required for hazardous material abatement, staging, and laydown for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – HQ AFMC (Buildings 10262, 10266, and 10271) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
1 Job $
All work, labor, materials, and equipment (not related to hazardous material abatement) required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Tenant (Buildings 10822, 10828, 10829, 10853, 10856, and 10858) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes all work needed to replace the steam-to-hot water exchangers with new hot water gas fired condensing boilers; remove existing abandoned steam piping routing, replace with hot water piping; all associated supporting equipment; all associated door, wall, and floor work needed to adapt mechanical rooms to serve new mechanical equipment;
relocate storm sewer and sanitary sewer for new mechanical rooms; cap abandoned and left in place steam lines; staging and laydown.
1 Job $
All work, labor, materials, and equipment required for hazardous material abatement, staging, and laydown for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Tenant (Buildings 10822, 10828, 10829, 10853, 10856, and 10858) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
1 Job $
All work, labor, materials, and equipment (not related to hazardous material abatement) required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Building 10280 Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes demolition of existing high-pressure steam to building and pressure reducing station; provide new steam boilers and associated equipment; demolishing and constructing new exterior access, vestibule, and expanded mechanical room; relocate storm sewer and sanitary sewer for new mechanical rooms; staging and laydown.
1 Job $
All work, labor, materials, and equipment required for hazardous material abatement, staging, and laydown for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Building 10280 Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
1 Job $
All work, labor, materials, and equipment (not related to hazardous material abatement) required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Medical Center (Building 10840) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes replacing existing HTHW heat exchangers with dual fuel, high pressure steam boilers; all associated support equipment; demolition of existing concrete curbs, repair and replacement of existing equipment support surfaces; install backup diesel fuel tank with fence, paved access drive, and connection line between tank and existing mechanical plant; staging and laydown.
1 Job $
All work, labor, materials, and equipment required for hazardous material abatement, staging, and laydown for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Medical Center (Building 10840) Project No.
ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
1 Job $
Contractor shall coordinate work performed by the private utility provider VECTREN, to include but not limited to the following: Construction and demolition of natural gas infrastructure for "Repair HTHW Line C (Area A) with Natural Gas Boilers Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading and seeding, and pavement repair. Excludes natural gas utility work associated with the Visiting Quarters (Buildings 10825, 10826, and 10827).
1 Job $724,976.83
Contractor shall coordinate work performed by the private utility provider AMERICAN WATER, to include but not limited the following:
Construction and demolition of water and sewer infrastructure for "Repair HTHW Line C (Area A) with Natural Gas Boilers Project No.
ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading and seeding, and pavement repair.
1 Job $19,631.28
BASE TOTAL: $
(Option
1)
All work, labor, materials, and equipment (not related to hazardous material abatement) required to complete the repair for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Visiting Quarters (Buildings 10825, 10826, and 10827) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes demolition of existing hot water heat exchanger and insulating piping; installation of outdoor boilers and equipment support pads; all associated support equipment; new piping mains from boilers to building; upgrading mechanical room doors and door hardware; cap abandoned exterior steam lines; staging and laydown.
(Option
1)
All work, labor, materials, and equipment required for hazardous material abatement, staging, and laydown for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Visiting Quarters (Buildings 10825, 10826, and 10827) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
1 Job $
(Option
1)
Contractor shall coordinate work performed by the private utility provider VECTREN, to include but not limited to the following: Construction and demolition of natural gas infrastructure for "Repair HTHW Line C (Area A) with Natural Gas Boilers Visiting Quarters (Buildings 10825, 10826, and 10827) Project No. ZHTV120035 at Wright-Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, compaction, final grading and seeding, and pavement repair.
1 Job $188,535.17
(Option
2)
All work, labor, materials, and equipment required to install security cameras and all supporting infrastructure, including staging and laydown for “Repair HTHW Line C (Area A) with Natural Gas Boilers” – Tenant (Buildings 10822, 10828, 10829, 10853, 10856, and 10858) Project No.
ZHTV120035 at Wright-Patterson Air Force Base, Ohio.
OPTIONS TOTAL: $
BASE PLUS ALL OPTIONS: $
NOTES FOR PRICE BREAKOUT ITEM NUMBERS
NOTE NO. 1. To better facilitate the receipt and proposal process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.
NOTE NO. 2. Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.
NOTE NO. 3. The Offeror’s Base Bid and all Options will be evaluated. In accordance with 52.217-5, Evaluation of Options, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
NOTE NO. 4. OPTION 1 (CLIN 0011) may be exercised within 90 days of the date of the Notice to Proceed.
NOTE NO. 5. OPTION 1 (CLIN 0012) may be exercised within 90 days of the date of the Notice to Proceed.
NOTE NO. 6. OPTION 1 (CLIN 0013) may be exercised within 90 days of the date of the Notice to Proceed.
NOTE NO. 7. OPTION 2 (CLIN 0014) may be exercised within 360 days of the date of the Notice to Proceed.
NOTE NO. 8. The estimated utility fees to be proposed for bidding purposes are shown in the schedule, and were provided by the utility owners. If the actual fees vary from these amounts after award, the Contract will be adjusted accordingly.
(End of Summary of Changes)
Repair HTHW Line C with Natural Gas Boilers, WPAFB
ZHTV 120035
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 10 00 PRICE BREAKOUT SCHEDULE
00 80 00.00 06 SPECIAL PROVISIONS
DIVISION 01 - GENERAL REQUIREMENTS
01 01 00 SUMMARY (WPAFB)
01 02 20 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)
01 32 01.00 06 PROJECT SCHEDULE
01 33 00.00 06 SUBMITTAL PROCEDURES
01 33 29.00 06 SUSTAINABILITY REPORTING
01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE(RMS CM)
01 45 04.10 06 CONTRACTOR QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
01 46 00.00 06 TOTAL BUILDING COMMISSIONING (CONTRACTOR CxA)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS
01 78 23 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION AND DECONSTRUCTION
02 82 13.00 10 ASBESTOS ABATEMENT
02 82 16.00 20 ENGINEERING CONTROL OF ASBESTOS CONTAINING MATERIALS
02 82 33.13 20 REMOVAL/CONTROL AND DISPOSAL OF PAINT WITH LEAD
02 83 13.00 20 LEAD IN CONSTRUCTION
02 83 19.13 10 LEAD-BASED PAINT ABATEMENT
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
02 84 33 REMOVAL AND DISPOSAL OF POLYCHLORINATED BIPHENYLS (PCBs)
02 85 00.00 20 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 01 20.70 UNIT MASONRY CLEANING AND RESTORATION
04 20 00 UNIT MASONRY
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
PROJECT TABLE OF CONTENTS Page 1
RTA SUBMITTAL
******** Amendment 0003 ***********
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 52 00 METAL RAILINGS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 22 00 ROOF AND DECK INSULATION
07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING
******** Amendment 0003 ***********
07 60 00 FLASHING AND SHEET METAL
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 01 90.50 PREPARATION OF HISTORIC WOOD AND METAL SURFACES FOR
PAINTING
09 06 00 SCHEDULES FOR FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTICAL CEILINGS
09 67 23.15 FUEL RESISTIVE RESINOUS FLOORING, 3-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 97 13.17 THREE COAT EPOXY INTERIOR COATING OF WELDED STEEL
PETROLEUM FUEL TANKS
DIVISION 10 - SPECIALTIES
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 00 01 BACKFLOW PREVENTION DEVICES (WPAFB)
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 COMMON PIPING FOR HVAC
23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 23 DIRECT DIGITAL CONTROL (DDC) FOR HVAC AND OTHER LOCAL
BUILDING SYSTEMS (WPAFB)
23 11 25 FACILITY GAS PIPING
23 25 00 CHEMICAL TREATMENT OF WATER FOR MECHANICAL SYSTEMS
23 52 00 HEATING BOILERS
23 52 46.00 20 LOW PRESSURE OUTDOOR WATER HEATING BOILERS (OVER 800,000
BTU/HR OUTPUT)
23 70 02.00 10 CENTRAL STEAM GENERATING SYSTEM - COMBINATION GAS AND OIL
FIRED
23 70 03.00 10 HEATING AND UTILITIES SYSTEMS, CENTRAL STEAM
DIVISION 26 - ELECTRICAL
26 05 19.10 10 INSULATED WIRE AND CABLE
PROJECT TABLE OF CONTENTS Page 2
RTA SUBMITTAL
******** Amendment 0003 ***********
******** Amendment 0003 ***********
******** Amendment 0003 ***********
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 28 00.00 10 PANELBOARDS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 41 00 LIGHTNING PROTECTION SYSTEM
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 49 CARBON MONOXIDE DETECTORS
28 31 76 INTERIOR FIRE ALARM SYSTEM, MODIFICATIONS TO EXISTING
SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
PROJECT TABLE OF CONTENTS Page 3
RTA SUBMITTAL
31 32 11 SOIL SURFACE EROSION CONTROL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 12 17 HOT MIX BITUMINOUS PAVEMENT
32 31 13 CHAIN LINK FENCES AND GATES
32 92 19 SEEDING
DIVISION 33 - UTILITIES
33 08 55 COMMISSIONING OF FUEL FACILITY SYSTEMS
33 51 15 NATURAL-GAS
33 52 10 SERVICE PIPING, FUEL SYSTEMS
33 56 10 FACTORY-FABRICATED FUEL STORAGE TANKS
33 58 00 LEAK DETECTION FOR FUELING SYSTEMS
33 61 13.13 PREFABRICATED UNDERGROUND HYDRONIC ENERGY DISTRIBUTION
-- End of Project Table of Contents --
******** Amendment 0003 ***********
THIS PAGE INTENTIONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
RTA SUBMITTAL
(a) (b) (c) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
Line Activity
Transmittal
Specification
Section SD # Submittal Description Item Submitted Paragraph # Classification: GOVT or
A/E Reviewer Submit Approval
Needed By Material
Needed By Action Code
Date Of Action
Date FWD to APPR / Auth Date RCD From CONTR
Date FWD To Other Revwr
Date RCD From Other Reviewer
Action Code
Date Of Action
Mailed To CONTR/ Date RCD From APPR Authority Remarks
1 00 80 00.00 06 1 Preconstruction Submittals Labor, Equipment, and Material Report 1.28 G 2 00 80 00.00 06 1 Preconstruction Submittals Daily Equipment Report 1.28 G 3 00 80 00.00 06 1 Preconstruction Submittals Nuclear gauges or equipment 1.37 G 4 00 80 00.00 06 2 Shop Drawings Mechanical/Electrical Room Layout 1.41 G 5 00 80 00.00 06 4 Samples Equipment Warranty Identification Tags 1.16 G 6 00 80 00.00 06 5 Design Data Equipment-in-Place List 1.9.1 7 00 80 00.00 06 5 Design Data Maintenance and Parts Data 1.9.1 8 00 80 00.00 06 5 Design Data SF1413 Statement and Acknowledgement 1.12 9 00 80 00.00 06 5 Design Data Local Agency Check 1.14
10 00 80 00.00 06 5 Design Data Progress Photographs 1.45 11 00 80 00.00 06 7 Certificates Warranty of Construction 1.16
12 00 80 00.00 06 7 Certificates NO ASBESTOS - CONTAINING MATERIAL
(ACM) CERTIFICATION 1.15 G
13 00 80 00.00 06 7 Certificates Insurance 1.32 14 00 80 00.00 06 7 Certificates Sales and Use Tax 1.3 15 00 80 00.00 06 11 Closeout Submittals Preliminary (Working) As-Built Drawings 1.7.4 G 16 00 80 00.00 06 11 Closeout Submittals Final As-Built Drawings 1.7.1 G 17 00 80 00.00 06 11 Closeout Submittals Warranty Management Plan 1.16 G 18 01 02 20 1 Preconstruction Submittals Contractor's Environmental Coordinator 3.1 G
19 01 02 20 1 Preconstruction Submittals Application for Authorization - Environmental Restoration Site Disturbance 3.3 G
20 01 02 20 1 Preconstruction Submittals Erosion Control Plan 3.4.2 G 21 01 02 20 1 Preconstruction Submittals Sanitary or Wastewater Permit to Install (PTI) 3.4.4 G 22 01 02 20 1 Preconstruction Submittals Drinking Water Plans Approval 3.4.5 G
23 01 02 20 1 Preconstruction Submittals Ohio EPA Notification of Demolition and Renovation/Abatement 3.5.1
24 01 02 20 1 Preconstruction Submittals Asbestos Work Plan 3.5.2 G 25 01 02 20 1 Preconstruction Submittals Certificate of Conformity 3.5.9 G 26 01 02 20 1 Preconstruction Submittals Boiler Startup Information 3.5.10 27 01 02 20 1 Preconstruction Submittals Site Specific Spill Plan (SSSP) 3.8 G 28 01 02 20 1 Preconstruction Submittals HAZMAT Summary 3.9.2
29 01 02 20 1 Preconstruction Submittals WPAFB Form 1433 - Hazardous Waste Storage Permit 3.10.3 G
30 01 02 20 1 Preconstruction Submittals Certification of Recovered and Biobased Products 3.11.3 G
31 01 02 20 1 Preconstruction Submittals Storage Compensation Agreement 3.14.2
32 01 02 20 6 Test Reports Asbestos Abatement Clearance Air Sampling Report 3.5.3
33 01 02 20 6 Test Reports Recycling and Solid Waste Summary Report 3.7 G 34 01 02 20 11 Closeout Submittals Green Products Determination Form (GPDF) 3.11.3 G 35 01 32 01.00 06 1 Preconstruction Submittals Preliminary Project Schedule 3.4.1 G 36 01 32 01.00 06 1 Preconstruction Submittals Project Schedule 3.4 G 37 01 32 01.00 06 1 Preconstruction Submittals Periodic Schedule Updates 3.4.3 38 01 33 29.00 06 1 Preconstruction Submittals Sustainability Action Plan 1.4.1.1 G 39 01 33 29.00 06 1 Preconstruction Submittals Sustainability Progress Report 1.4.1.4 G 40 01 33 29.00 06 11 Closeout Submittals Final Sustainability eNotebook 1.4.1.2 G 41 01 33 29.00 06 11 Closeout Submittals Amended Final Sustainability eNotebook 1.4.1.2 G
42 01 33 29.00 06 11 Closeout Submittals Final High Performance and Sustainable Building Checklist 1.4.1.2 G
43 01 35 26.00 06 1 Preconstruction Submittals Accident Prevention Plan (APP) 1.7 44 01 35 26.00 06 1 Preconstruction Submittals Fatigue Management Plan 1.7 45 01 35 26.00 06 1 Preconstruction Submittals Bloodborne Pathogen Plan 1.7 46 01 35 26.00 06 1 Preconstruction Submittals Exposure Control Plan 1.7 47 01 35 26.00 06 1 Preconstruction Submittals Site Layout Plan 1.7 48 01 35 26.00 06 1 Preconstruction Submittals Hearing Conservation Program 1.7 49 01 35 26.00 06 1 Preconstruction Submittals Respiratory Protection Plan 1.7 50 01 35 26.00 06 1 Preconstruction Submittals Health Hazard Control Program 1.7 51 01 35 26.00 06 1 Preconstruction Submittals Hazard Communication Program 1.7 52 01 35 26.00 06 1 Preconstruction Submittals Asbestos Abatement Plan & Specifications 1.7 53 01 35 26.00 06 1 Preconstruction Submittals Radiation Safety Program 1.7 54 01 35 26.00 06 1 Preconstruction Submittals Heat Stress Monitoring Plan 1.7 55 01 35 26.00 06 1 Preconstruction Submittals Cold Stress Monitoring Plan 1.7 56 01 35 26.00 06 1 Preconstruction Submittals Crystalline Silica Assessment 1.7 57 01 35 26.00 06 1 Preconstruction Submittals Lighting Plan for Night Operations 1.7 58 01 35 26.00 06 1 Preconstruction Submittals Traffic Control Plan 1.7 59 01 35 26.00 06 1 Preconstruction Submittals Fire Prevention Plan 1.7 60 01 35 26.00 06 1 Preconstruction Submittals Standard Pre-Lift Plan (LHE) 1.7 61 01 35 26.00 06 1 Preconstruction Submittals Critical Lift Plan - LHE 1.7 62 01 35 26.00 06 1 Preconstruction Submittals Masonry Bracing Plan 1.7 63 01 35 26.00 06 1 Preconstruction Submittals Steel Erection Plan 1.7 64 01 35 26.00 06 1 Preconstruction Submittals Confined Space Entry Procedures 1.7 65 01 35 26.00 06 1 Preconstruction Submittals Confined Space Program 1.7 66 01 35 26.00 06 1 Preconstruction Submittals Activity Hazard Analysis (AHA) 1.8
67 01 35 26.00 06 1 Preconstruction Submittals Site Safety and Health Officer Qualifications(SSHO) 1.5.1.1 G RO
TITLE: 77141 Wright Patt HTHW Line C Repair
SUBMITTAL REGISTER
JOB NAME: WRIGHTPATT
LOCATION:
CONTRACT NO:
CONTRACTOR:
APPROVING AUTHORITY
(d)
CONTRACTOR SCHEDULE DATES CONTRACTOR
ACTION
68 01 35 26.00 06 1 Preconstruction Submittals Proof of qualification for Crane Operators 1.12.7 G RO 69 01 35 26.00 06 1 Preconstruction Submittals Critical Lift Plan 1.12.7 G RO 70 01 35 26.00 06 6 Test Reports Reports 1.12 71 01 35 26.00 06 6 Test Reports Accident Reports 1.12.1 72 01 35 26.00 06 6 Test Reports Monthly Exposure Reports 1.12.3 73 01 35 26.00 06 6 Test Reports Crane Reports 1.12.5 74 01 35 26.00 06 6 Test Reports Regulatory Citations and Violations 1.12.4 75 01 35 26.00 06 7 Certificates Confined Space Entry Permit 1.12.8 76 01 35 26.00 06 7 Certificates Hot work permit 1.13 77 01 35 26.00 06 7 Certificates Crane Certificate of Compliance 1.12.6 78 01 45 04.10 06 1 Preconstruction Submittals Construction Quality Control Plan 3.3 G RO 79 01 45 35 7 Certificates Fabrication Plant 2.1 80 01 45 35 7 Certificates Steel Truss Plant 2.1 81 01 45 35 7 Certificates AC472 Accreditation 2.1 82 01 45 35 7 Certificates Steel Joist Institute Membership 2.1 83 01 45 35 7 Certificates Certified Plant 2.1 84 01 45 35 7 Certificates Certificate of Compliance 2.1 85 01 45 35 7 Certificates Special Inspector of Record 1.5 G 86 01 45 35 7 Certificates Special Inspector 1.5 G 87 01 46 00.00 06 1 Preconstruction Submittals Commissioning Specialists 1.3 G DO 88 01 46 00.00 06 1 Preconstruction Submittals Project Schedule 1.6.2 G DO 89 01 46 00.00 06 6 Test Reports Construction Phase Commissioning Plan 3.1.2 G DO 90 01 46 00.00 06 6 Test Reports PVT Procedures 3.1.4.5 91 01 46 00.00 06 6 Test Reports PVT Report 3.1.4.5 92 01 46 00.00 06 6 Test Reports Issues Log 1.4 93 01 46 00.00 06 6 Test Reports Trend Log Report 3.1.4.6 94 01 46 00.00 06 6 Test Reports Trend Log Report 3.3 95 01 46 00.00 06 6 Test Reports Commissioning Report 3.2 G DO 96 01 46 00.00 06 7 Certificates Certificate of Readiness 1.5 G DO 97 01 46 00.00 06 10 Operation and Maintenance Data Systems Training 3.1.5 G DO 98 01 46 00.00 06 10 Operation and Maintenance Data Training Plan 3.1.6 G RO 99 01 46 00.00 06 10 Operation and Maintenance Data Systems Manual 3.1.7 G DO
100 01 46 00.00 06 10 Operation and Maintenance Data Maintenance and Service Life Plans 3.1.8 G DO 101 01 50 00 1 Preconstruction Submittals Construction Site Plan 1.3 G 102 01 50 00 1 Preconstruction Submittals Traffic Control Plan 3.4.1 G 103 01 50 00 1 Preconstruction Submittals Haul Road Plan 2.2.1 G 104 01 50 00 3 Product Data Backflow Preventers 1.4 G 105 01 50 00 6 Test Reports Backflow Preventer Tests 2.5 106 01 50 00 7 Certificates Backflow Tester 1.4.1 107 01 50 00 7 Certificates Backflow Preventers 1.4 108 01 57 19.00 06 1 Preconstruction Submittals Preconstruction Survey 1.6.1 109 01 57 19.00 06 1 Preconstruction Submittals Solid Waste Management Permit 1.9 G 110 01 57 19.00 06 1 Preconstruction Submittals Regulatory Notifications 1.6.2 G 111 01 57 19.00 06 1 Preconstruction Submittals Environmental Protection Plan 1.7 G 112 01 57 19.00 06 1 Preconstruction Submittals Dirt and Dust Control Plan 1.7.9.1 G 113 01 57 19.00 06 1 Preconstruction Submittals Employee Training Records 1.6.5 G 114 01 57 19.00 06 1 Preconstruction Submittals Environmental Manager Qualifications 1.6.4 G 115 01 57 19.00 06 1 Preconstruction Submittals Notice Of Soil Treatment 3.17 G 116 01 57 19.00 06 6 Test Reports Laboratory Analysis 3.7.1.1.2 117 01 57 19.00 06 6 Test Reports Inspection Reports 3.2.2.2 118 01 57 19.00 06 6 Test Reports Solid Waste Management Report 3.7.2.1 G 119 01 57 19.00 06 7 Certificates Employee Training Records 1.6.5 G 120 01 57 19.00 06 7 Certificates Erosion and Sediment Control Inspector 1.6.5 121 01 57 19.00 06 11 Closeout Submittals Waste Determination Documentation 3.7.1 G
122 01 57 19.00 06 11 Closeout Submittals Disposal Documentation for Hazardous and Regulated Waste 3.7.4.6 G
123 01 57 19.00 06 11 Closeout Submittals Assembled Employee Training Records 1.6.5 G 124 01 57 19.00 06 11 Closeout Submittals Solid Waste Management Permit 1.9 G 125 01 57 19.00 06 11 Closeout Submittals Solid Waste Management Report 3.7.2.1 G 126 01 57 19.00 06 11 Closeout Submittals Hazardous Waste/Debris Management 3.7.4.1 G 127 01 57 19.00 06 11 Closeout Submittals Regulatory Notifications 1.6.2 G 128 01 57 19.00 06 11 Closeout Submittals Sales Documentation 3.7.2.1 G 129 01 57 19.00 06 11 Closeout Submittals Contractor Certification 3.7.2.1 130 01 78 23 10 Operation and Maintenance Data O&M Database 1.4 G 131 01 78 23 10 Operation and Maintenance Data Training Plan 3.1.1 G 132 01 78 23 10 Operation and Maintenance Data Training Outline 3.1.3 G 133 01 78 23 10 Operation and Maintenance Data Training Content 3.1.2 G 134 01 78 23 11 Closeout Submittals Training Video Recording 3.1.4 G 135 01 78 23 11 Closeout Submittals Validation of Training Completion 3.1.6 G 136 02 41 00 1 Preconstruction Submittals Demolition Plan 1.2.1 G 137 02 41 00 1 Preconstruction Submittals Deconstruction Plan 1.2.1 G 138 02 41 00 1 Preconstruction Submittals Existing Conditions 1.1 139 02 41 00 7 Certificates Notification 1.6 G 140 02 82 13.00 10 2 Shop Drawings Detailed Drawings 1.4 G 141 02 82 13.00 10 3 Product Data Asbestos Waste Shipment Records 3.11.3.1 G 142 02 82 13.00 10 3 Product Data Weight Bills and Delivery Tickets 1.1 143 02 82 13.00 10 3 Product Data Encapsulants 2.1 G 144 02 82 13.00 10 3 Product Data Respiratory Protection Program 1.9.1 G 145 02 82 13.00 10 3 Product Data Cleanup and Disposal 3.11 G 146 02 82 13.00 10 3 Product Data Qualifications 1.6.1 G 147 02 82 13.00 10 3 Product Data Training Program 1.11 148 02 82 13.00 10 3 Product Data Licenses, Permits and Notifications 1.8.1 149 02 82 13.00 10 3 Product Data Asbestos Management Plan 3.11.3.2 G
150 02 82 13.00 10 6 Test Reports Exposure Assessment and Air Monitoring 3.9 151 02 82 13.00 10 6 Test Reports Local Exhaust System 1.7.3 152 02 82 13.00 10 7 Certificates Local Exhaust System 1.7.3 153 02 82 13.00 10 7 Certificates Encapsulants 2.1 G 154 02 82 13.00 10 7 Certificates Medical Surveillance Requirements 1.9 155 02 82 16.00 20 3 Product Data Local Exhaust Equipment 3.1.4 G 156 02 82 16.00 20 3 Product Data Vacuums 3.1.5 G 157 02 82 16.00 20 3 Product Data Respirators 3.1.1.1 G
158 02 82 16.00 20 3 Product Data Pressure Differential Automatic Recording Instrument 3.1.4 G
159 02 82 16.00 20 3 Product Data Amended Water 1.2.2 G 160 02 82 16.00 20 3 Product Data Glovebags 3.1.7 G 161 02 82 16.00 20 3 Product Data Safety Data Sheets (SDS) for all materials 1.3.8 G 162 02 82 16.00 20 3 Product Data Encapsulants 2.1 G 163 02 82 16.00 20 6 Test Reports Air Sampling Results 1.5.5 G
164 02 82 16.00 20 6 Test Reports Pressure Differential Recordings For Local Exhaust System 1.5.6 G
165 02 82 16.00 20 6 Test Reports Asbestos Disposal Quantity Report 3.3.3.2 G 166 02 82 16.00 20 6 Test Reports Encapsulation Test Patches 3.2.5.2 G 167 02 82 16.00 20 6 Test Reports Clearance Sampling 3.2.6.3 G 168 02 82 16.00 20 7 Certificates Asbestos Hazard Abatement Plan 1.3.9 G 169 02 82 16.00 20 7 Certificates Testing Laboratory 1.3.10 G 170 02 82 16.00 20 7 Certificates Private Qualified Person Documentation 1.5.1 G 171 02 82 16.00 20 7 Certificates Contractor's License 1.5.4 G 172 02 82 16.00 20 7 Certificates Competent Person 1.5.2 G 173 02 82 16.00 20 7 Certificates Worker's License 1.5.3 G 174 02 82 16.00 20 7 Certificates Landfill Approval 1.3.11 G 175 02 82 16.00 20 7 Certificates Employee Training 1.3.3 G 176 02 82 16.00 20 7 Certificates Medical Certification 1.3.12 G 177 02 82 16.00 20 7 Certificates Waste Shipment Records 1.3.11 G 178 02 82 16.00 20 7 Certificates Respiratory Protection Program 1.3.6 G 179 02 82 16.00 20 7 Certificates Delivery Tickets 1.3.11 G 180 02 82 16.00 20 7 Certificates Vacuums 3.1.5 G 181 02 82 16.00 20 7 Certificates Water Filtration Equipment 3.1.2.3 G 182 02 82 16.00 20 7 Certificates Ventilation Systems 3.1.5 G
183 02 82 16.00 20 7 Certificates Equipment Used To Contain Airborne Asbestos Fibers 3.1 G
184 02 82 16.00 20 7 Certificates Encapsulants 2.1 G 185 02 82 16.00 20 7 Certificates Notifications 1.3.4 186 02 82 16.00 20 11 Closeout Submittals Notifications 1.3.4 G 187 02 82 16.00 20 11 Closeout Submittals Rental Equipment 1.6.1 G 188 02 82 16.00 20 11 Closeout Submittals Respirator Program Records 1.3.6.1 G 189 02 82 16.00 20 11 Closeout Submittals Permits and Licenses 1.3.4 G
190 02 82 16.00 20 11 Closeout Submittals Protective Clothing Decontamination Quality Control Records 1.5.7 G
191 02 82 16.00 20 11 Closeout Submittals Protective Clothing Decontamination Facility Notification 1.5.8 G
192 02 82 33.13 20 3 Product Data Vacuum Filters 1.6.4 G 193 02 82 33.13 20 3 Product Data Respirators 1.6.1 G 194 02 82 33.13 20 6 Test Reports Sampling Results 1.5.2.3 G
195 02 82 33.13 20 6 Test Reports Occupational and Environmental Assessment Data Report 1.5.2.3 G
196 02 82 33.13 20 7 Certificates Qualifications of CP 1.5.1.1 G 197 02 82 33.13 20 7 Certificates Testing Laboratory 1.5.1.3 G 198 02 82 33.13 20 7 Certificates Training Certification 1.5.1.2 G 199 02 82 33.13 20 7 Certificates Third Party Consultant Qualifications 1.5.1.4 G
200 02 82 33.13 20 7 Certificates lead-based paint/paint with lead removal/control plan 1.5.3 G
201 02 82 33.13 20 7 Certificates Rental equipment notification 1.6.3 G 202 02 82 33.13 20 7 Certificates Respiratory Protection Program 1.5.2.6 G 203 02 82 33.13 20 7 Certificates Hazard Communication Program 1.5.2.7 G
204 02 82 33.13 20 7 Certificates EPA Ohio approved hazardous waste treatment, storage, or disposal facility 3.5.2 G
205 02 82 33.13 20 7 Certificates Lead Waste Management Plan 1.5.2.8 G 206 02 82 33.13 20 7 Certificates Vacuum filters 1.6.4 G 207 02 82 33.13 20 7 Certificates Clearance Certification 3.5.1.1 G 208 02 82 33.13 20 11 Closeout Submittals Hazardous Waste Manifest 3.5.2.1 G 209 02 82 33.13 20 11 Closeout Submittals Medical Examinations 1.5.2.4 G 210 02 82 33.13 20 11 Closeout Submittals Training Certification 1.5.1.2 G
211 02 83 13.00 20 1 Preconstruction Submittals Occupational and Environmental Assessment Data Report 1.5.2.3 G
212 02 83 13.00 20 1 Preconstruction Submittals Lead Compliance Plan 1.5.2.2 G 213 02 83 13.00 20 1 Preconstruction Submittals Competent Person 1.5.1.1 G 214 02 83 13.00 20 1 Preconstruction Submittals Training Certification 1.5.1.2 G 215 02 83 13.00 20 1 Preconstruction Submittals Lead Waste Management Plan 1.5.2.8 G 216 02 83 13.00 20 1 Preconstruction Submittals Written Evidence 3.5.2.1 G 217 02 83 13.00 20 1 Preconstruction Submittals Medical Examinations 1.5.2.4 G 218 02 83 13.00 20 6 Test Reports Sampling Results 1.5.2.3 G
219 02 83 13.00 20 6 Test Reports Occupational and Environmental Assessment Data Report 1.5.2.3 G
220 02 83 13.00 20 7 Certificates Testing Laboratory 1.5.1.3 G 221 02 83 13.00 20 7 Certificates Occupant Notification 3.1.1.1 G 222 02 83 13.00 20 7 Certificates Third Party Consultant Qualifications 1.5.1.4 G 223 02 83 13.00 20 7 Certificates Clearance Certification 3.5.1.1 G 224 02 83 13.00 20 11 Closeout Submittals hazardous waste manifest 3.5.2.1 G 225 02 83 13.00 20 11 Closeout Submittals turn-in documents or weight tickets 3.5.2.1 G
226 02 83 19.13 10 3 Product Data Materials and Equipment 2.1 227 02 83 19.13 10 3 Product Data Expendable Supplies 2.1.1 228 02 83 19.13 10 3 Product Data Qualifications 1.5.1 G 229 02 83 19.13 10 3 Product Data Occupant Protection Plan 1.5.4 G 230 02 83 19.13 10 6 Test Reports Pressure Differential Log 3.1.3 231 02 83 19.13 10 6 Test Reports Sampling and Analysis 1.3.3 G 232 02 83 19.13 10 6 Test Reports Abatement Report 3.5 G 233 02 84 16 7 Certificates Qualifications of CIH 1.8.1 G 234 02 84 16 7 Certificates Training Certification 1.8.1 G 235 02 84 16 7 Certificates PCB and Lamp Removal Work Plan 1.8.2 G 236 02 84 16 7 Certificates PCB and Lamp Disposal Plan 1.8.3 G 237 02 84 16 11 Closeout Submittals Transporter certification 3.5.2 G 238 02 84 16 11 Closeout Submittals Certification of Decontamination 3.2.4 239 02 84 16 11 Closeout Submittals Certificate of Disposal and/or recycling 3.5.2.1 240 02 84 16 11 Closeout Submittals Testing results 3.3.1 241 02 84 33 7 Certificates Training certification 1.7.1 242 02 84 33 7 Certificates Qualifications of CIH 1.7.2 243 02 84 33 7 Certificates PCB removal work plan 1.7.3 244 02 84 33 7 Certificates PCB disposal plan 1.7.4 245 02 84 33 7 Certificates Notification 1.7.5 246 02 84 33 7 Certificates Transporter certification 3.8 247 02 84 33 7 Certificates Certification of Decontamination 3.5.4 248 02 84 33 7 Certificates Post cleanup sampling 3.5.5 249 02 84 33 7 Certificates Certificate of disposal 3.8.1 250 02 85 00.00 20 1 Preconstruction Submittals Preliminary Visual Assessment Report 1.4.1.1 G 251 02 85 00.00 20 1 Preconstruction Submittals Microbial Remediation Plan 1.4.1.2 G 252 02 85 00.00 20 1 Preconstruction Submittals Worker Records 1.4.1.4 253 02 85 00.00 20 1 Preconstruction Submittals Respiratory Protection Program 1.4.1.3 G
254 02 85 00.00 20 1 Preconstruction Submittals Certified Industrial Hygienist (CIH)/Industrial Hygienist (IH) Qualifications 1.4.1.5 G
255 02 85 00.00 20 1 Preconstruction Submittals Microbial Remediation Supervisor Qualifications 1.4.1.6 G
256 02 85 00.00 20 1 Preconstruction Submittals Ventilation System Mold Remediator Qualifications 1.2.24 G
257 02 85 00.00 20 1 Preconstruction Submittals Ventilation System Mold Remediator Qualifications 3.5.1 G
258 02 85 00.00 20 3 Product Data Personal Protective Equipment (PPE) 1.2.19 G 259 02 85 00.00 20 3 Product Data Air Filtration Units 3.1.5 260 02 85 00.00 20 3 Product Data Dehumidifiers 3.1.4 261 02 85 00.00 20 3 Product Data Pressure Differential Measuring Instrument 1.2.22 262 02 85 00.00 20 3 Product Data Fungicidal Agents, (EPA) 1.2.12 G 263 02 85 00.00 20 3 Product Data Disinfectants or Biocide Sanitizing Solutions 1.2.10 G 264 02 85 00.00 20 6 Test Reports Daily Reports 1.4.3 G
265 02 85 00.00 20 11 Closeout Submittals Submittals at Completion of Remediation Work 1.4.4 G
266 03 30 00 1 Preconstruction Submittals Quality Control Plan 1.6.4 G 267 03 30 00 1 Preconstruction Submittals Quality Control Personnel Certifications 1.6.5 G 268 03 30 00 1 Preconstruction Submittals Quality Control Organizational Chart 1.6.5 269 03 30 00 1 Preconstruction Submittals Laboratory Accreditation 1.6.7 G 270 03 30 00 2 Shop Drawings Reinforcing Steel 1.6.2.1 G AE 271 03 30 00 3 Product Data Joint Sealants 2.4.7 272 03 30 00 3 Product Data Joint Filler 2.4.6 273 03 30 00 3 Product Data Materials for Forms 2.1 274 03 30 00 3 Product Data Cementitious Materials 2.4.1 275 03 30 00 3 Product Data Concrete Curing Materials 2.3.3 276 03 30 00 3 Product Data Reinforcement 2.5 277 03 30 00 3 Product Data Admixtures 2.4.5 278 03 30 00 3 Product Data Mechanical Reinforcing Bar Connectors 2.5.2 279 03 30 00 3 Product Data Waterstops 2.2.1 280 03 30 00 5 Design Data Mix Design 2.3.1 G AE 281 03 30 00 6 Test Reports Concrete Mix Design 1.6.1.1 G 282 03 30 00 6 Test Reports Fly Ash 1.6.3.1 283 03 30 00 6 Test Reports Pozzolan 1.6.3.1 284 03 30 00 6 Test Reports Ground Granulated Blast-Furnace Slag 1.6.3.2 285 03 30 00 6 Test Reports Aggregates 2.4.3 286 03 30 00 6 Test Reports Compressive Strength Tests 3.14.2.3 G 287 03 30 00 6 Test Reports Unit Weight of Structural Concrete 3.14.2.5 288 03 30 00 6 Test Reports Air Content 3.14.2.4 289 03 30 00 6 Test Reports Slump Tests 3.14.2.1 290 03 30 00 6 Test Reports Water 2.4.2 291 03 30 00 7 Certificates Reinforcing Bars 2.5.1 292 03 30 00 7 Certificates Welder Qualifications 1.9
293 03 30 00 7 Certificates Forest Stewardship Council (FSC) Certification 1.8.1
294 03 30 00 7 Certificates Field Testing Technician and Testing Agency 1.6.5.2
295 03 30 00 8 Manufacturer’s Instructions Curing Compound 2.3.3 296 03 45 00 1 Preconstruction Submittals Pre-Installation Meeting 1.12.5 297 03 45 00 2 Shop Drawings Precast Drawings 1.12.1 G AE 298 03 45 00 3 Product Data Cast-In Embedded Items And Connectors 2.3 299 03 45 00 3 Product Data Connection Devices 2.3.2 G 300 03 45 00 3 Product Data Admixtures 2.2.6 301 03 45 00 3 Product Data Gasket 2.5 302 03 45 00 3 Product Data Bearing Pads 2.6 303 03 45 00 4 Samples Concrete Wall Panel Surface Finish 1.12.2 G
304 03 45 00 4 Samples Mock-up 1.12.4 305 03 45 00 5 Design Data Design Calculations 1.5.4 G 306 03 45 00 5 Design Data Contractor-Furnished Mix Design 2.1.1 G AE 307 03 45 00 5 Design Data Repair of Surface Defects 2.4.9 G 308 03 45 00 5 Design Data Thermal Calculations 1.5.5 G 309 03 45 00 6 Test Reports Strength Tests 1.11.2 G AE 310 03 45 00 6 Test Reports Slump 1.11.2 311 03 45 00 6 Test Reports Air Content 1.11.2 312 03 45 00 6 Test Reports Test for Concrete Materials 1.11.1 313 03 45 00 6 Test Reports Water 2.2.7 314 03 45 00 6 Test Reports Testing Precast Units for Strength 3.6.4 315 03 45 00 7 Certificates Manufacturer's Qualifications 1.4 G 316 03 45 00 7 Certificates Fabricator Quality Certifications 1.8.1 317 03 45 00 7 Certificates Erector Certification 1.9 318 03 45 00 7 Certificates Erector's Post Audit Declaration 1.1 319 03 45 00 8 Manufacturer’s Instructions Installation 3.3 G 320 03 45 00 8 Manufacturer’s Instructions Cleaning 3.8 G 321 03 45 00 11 Closeout Submittals Batch Ticket Information 1.12.3 G 322 03 45 00 11 Closeout Submittals Recycled Content for Fly Ash and Pozzolan 2.2.1 S
323 03 45 00 11 Closeout Submittals Recycled Content for Ground Iron Blast-Furnace Slag 2.2.1 S
324 03 45 00 11 Closeout Submittals Recycled Content for Silica Fume 2.2.1 S 325 04 01 20.70 1 Preconstruction Submittals Quality Control Plan 1.5.1 G 326 04 01 20.70 1 Preconstruction Submittals Project Training Program 1.5.1 G 327 04 01 20.70 1 Preconstruction Submittals Qualifications 1.5.2 G 328 04 01 20.70 2 Shop Drawings Photographic Documentation 1.5.5 329 04 01 20.70 2 Shop Drawings Structural Upgrades 3.5.1 G 330 04 01 20.70 3 Product Data Qualifications 1.5.2 331 04 01 20.70 3 Product Data Cleaning and Restoration Methods 1.5.6 G 332 04 01 20.70 3 Product Data Cleaning Materials 2.1 G 333 04 01 20.70 3 Product Data Biocides 2.1.4 334 04 01 20.70 3 Product Data Replacement Mortar And Stucco 2.2.2.2 G 335 04 01 20.70 3 Product Data Mortar Mix 2.4 G 336 04 01 20.70 3 Product Data Water Repellents Infiltration 3.4.8.3 G 337 04 01 20.70 3 Product Data Stone Consolidants 3.4.8.4 G 338 04 01 20.70 4 Samples Mock-ups 1.5.7 G 339 04 01 20.70 5 Design Data Structural Upgrades 3.5.1 G 340 04 01 20.70 6 Test Reports Testing and Matching 2.2.2.1 341 04 01 20.70 6 Test Reports Existing Sealants for Asbestos and PCBs 3.5.2 342 04 01 20.70 7 Certificates Repair Materials 2.2 343 04 20 00 2 Shop Drawings Cut CMU 3.3.2.1 G AE 344 04 20 00 2 Shop Drawings Detail Drawings 3.4.1.1 G AE 345 04 20 00 3 Product Data Hot Weather Procedures 1.5.1 G 346 04 20 00 3 Product Data Cold Weather Procedures 1.5.2 G 347 04 20 00 3 Product Data Cement 2.2.2.2.1 G 348 04 20 00 3 Product Data Cementitious Materials 2.4.1.1 G 349 04 20 00 4 Samples Mock-Up Panel 1.3.1.1 G 350 04 20 00 4 Samples Concrete Masonry Units (CMU) 2.2.2.2 G 351 04 20 00 4 Samples Admixtures for Masonry Mortar 2.4.1.3 G 352 04 20 00 4 Samples Anchors, Ties, and Bar Positioners 2.6.2 G 353 04 20 00 4 Samples Joint Reinforcement 2.6.3 G 354 04 20 00 5 Design Data Masonry Compressive Strength 2.1.2 G 355 04 20 00 5 Design Data Fire-Rated Concrete Masonry Units 2.2.2.3 356 04 20 00 5 Design Data Bracing Calculations 3.2.5 G 357 04 20 00 6 Test Reports Fire-Rated Concrete Masonry Units 2.2.2.3 358 04 20 00 6 Test Reports Field Testing of Mortar 3.6.1.1 359 04 20 00 6 Test Reports Field Testing of Grout 3.6.1.2 360 04 20 00 6 Test Reports Prism Tests 3.6.1.3
361 04 20 00 6 Test Reports Single-Wythe Masonry Wall Water Penetration Test 3.6.1.4
362 04 20 00 7 Certificates Special Masonry Inspector Qualifications 1.3.2 363 04 20 00 7 Certificates Concrete Masonry Units (CMU) 2.2.2.2 364 04 20 00 7 Certificates Cementitious Materials 2.4.1.1 365 04 20 00 7 Certificates Admixtures for Masonry Mortar 2.4.1.3 366 04 20 00 7 Certificates Admixtures for Grout 2.4.2.2 367 04 20 00 7 Certificates Anchors, Ties, and Bar Positioners 2.6.2 368 04 20 00 7 Certificates Joint Reinforcement 2.6.3 369 04 20 00 8 Manufacturer’s Instructions Admixtures for Masonry Mortar 2.4.1.3 370 04 20 00 8 Manufacturer’s Instructions Admixtures for Grout 2.4.2.2 371 04 20 00 10 Operation and Maintenance Data Take-Back Program 3.8 372 04 20 00 11 Closeout Submittals Recycled Content 2.2.2.2.2 S 373 05 12 00 1 Preconstruction Submittals Erection Drawings 1.4.1.1 G AE 374 05 12 00 2 Shop Drawings Fabrication Drawings 1.4.2 G AE 375 05 12 00 3 Product Data Shop Primer 2.6.2 376 05 12 00 3 Product Data Welding Electrodes and Rods 2.4.1 377 05 12 00 3 Product Data Direct Tension Indicator Washers 2.3.2.3 378 05 12 00 3 Product Data Non-Shrink Grout 2.4.2 379 05 12 00 3 Product Data Tension Control Bolts 2.3.3 380 05 12 00 6 Test Reports Class B Coating 2.6.2 381 05 12 00 6 Test Reports Bolts, Nuts, and Washers 2.3 382 05 12 00 6 Test Reports Weld Inspection Reports 3.7.1.2
383 05 12 00 6 Test Reports Direct Tension Indicator Washer Inspection Reports 3.7.2.1
384 05 12 00 6 Test Reports Bolt Testing Reports 3.7.3.1 385 05 12 00 6 Test Reports Embrittlement Test Reports 3.7.4 386 05 12 00 7 Certificates Steel 2.2 387 05 12 00 7 Certificates Bolts, Nuts, and Washers 2.3 388 05 12 00 7 Certificates Galvanizing 2.5 389 05 12 00 7 Certificates AISC Fabrication Plant Quality Certification 1.3 390 05 12 00 7 Certificates AISC Erector Quality Certification 1.3 391 05 12 00 7 Certificates Welding Procedures and Qualifications 1.4.3.1 392 05 12 00 7 Certificates Welding Electrodes and Rods 2.4.1
400 05 30 00 2 Shop Drawings Fabrication Drawings 1.3.5 G AE 401 05 30 00 3 Product Data Accessories 2.2 402 05 30 00 3 Product Data Deck Units 2.1 403 05 30 00 3 Product Data Galvanizing Repair Paint 2.1.4 404 05 30 00 3 Product Data Mechanical Fasteners 2.2.13 405 05 30 00 3 Product Data Touch-Up Paint 2.1.4 406 05 30 00 3 Product Data Welding Equipment 1.3.3 407 05 30 00 3 Product Data Welding Rods and Accessories 1.3.3 408 05 30 00 4 Samples Metal Roof Deck Units 2.1.1 409 05 30 00 4 Samples Flexible Closure Strips 2.2.4 410 05 30 00 5 Design Data Deck Units 2.1 G 411 05 30 00 7 Certificates Powder-Actuated Tool Operator 1.3.2 412 05 30 00 7 Certificates Welder Qualifications 1.3.3 413 05 30 00 7 Certificates Welding Procedures 1.3.3 414 05 30 00 7 Certificates Fire Safety 1.3.4.1 415 05 30 00 7 Certificates Wind Storm Resistance 1.3.4.2 416 05 30 00 7 Certificates Manufacturer's Certificate 1.3.1 417 05 30 00 7 Certificates Stud Manufacture's Certification 2.2.9 418 05 30 00 7 Certificates Stud Manufacture's Test Reports 2.2.9 419 05 30 00 11 Closeout Submittals Recycled Content of Steel Products 2.1 S 420 05 40 00 2 Shop Drawings Framing Components 1.6.1 G A/E 421 05 40 00 3 Product Data Studs, Joists 2.1 422 05 40 00 5 Design Data Metal Framing Calculations 1.6.2 G 423 05 40 00 7 Certificates Load-Bearing Cold-Formed Metal Framing 1.4 424 05 40 00 7 Certificates Welds 3.2.1 425 05 40 00 11 Closeout Submittals Recycled Content of Steel Products 2.1 S
446 05 52 00 2 Shop Drawings Fabrication Drawings 1.2.1 G AE 447 05 52 00 2 Shop Drawings Iron and Steel Hardware 3.2 G AE 448 05 52 00 2 Shop Drawings Steel Shapes, Plates, Bars and Strips 3.2 G AE 449 05 52 00 3 Product Data Structural Steel Plates, Shapes, and Bars 2.2.1 G AE 450 05 52 00 3 Product Data Structural Steel Tubing 2.2.2 G AE 451 05 52 00 3 Product Data Protective Coating 2.1.3 G AE 452 05 52 00 3 Product Data Steel Railings and Handrails 2.2.5 G AE 453 05 52 00 3 Product Data Aluminum Railings and Handrails 2.2.6 G 454 05 52 00 3 Product Data Anchorage and Fastening Systems 1.2.1 G AE 455 05 52 00 7 Certificates Welding Procedures 1.4.1 G AE 456 05 52 00 7 Certificates Welder Qualification 1.4.2 G AE 457 05 52 00 8 Manufacturer’s Instructions Installation Instructions 3.2 G 458 07 22 00 2 Shop Drawings Insulation Board Layout 1.3 G AE 459 07 22 00 2 Shop Drawings Verification of Existing Conditions 1.3 G 460 07 22 00 3 Product Data Insulation 2.2 G AE 461 07 22 00 3 Product Data Cover Board 1.4 G AE 462 07 22 00 3 Product Data Fasteners 2.5 G 463 07 22 00 3 Product Data Moisture Control 2.4 G AE 464 07 22 00 3 Product Data Flame Spread Rating 1.8.1 G AE 465 07 22 00 7 Certificates Volatile Organic Compounds (VOC) Content 1.9 G
******** Amendment 0003 ***********
******** Amendment 0003 ***********
******** Amendment 0003 ***********
466 07 22 00 7 Certificates Installer Qualifications 1.6 G
467 07 22 00 7 Certificates Certificates Of Compliance For Felt Materials 1.6 G
468 07 22 00 8 Manufacturer’s Instructions Fasteners 2.5 G 469 07 22 00 8 Manufacturer’s Instructions Insulation 2.2 G AE 470 07 22 00 11 Closeout Submittals Volatile Organic Compounds (VOC) Content 1.9 S 471 07 53 23 2 Shop Drawings Roof Plan Drawing 1.3.1 472 07 53 23 2 Shop Drawings Wind Load Calculations 1.3.1 473 07 53 23 2 Shop Drawings Boundaries of Enhanced Perimeter 1.3.1
474 07 53 23 2 Shop Drawings Corner Attachments of Roof System Components 1.3.1
475 07 53 23 2 Shop Drawings Location of Perimeter Half-Sheets 1.3.1 476 07 53 23 2 Shop Drawings Slopes and Drain Locations 1.3.1 477 07 53 23 3 Product Data Cement 2.2 478 07 53 23 3 Product Data EPDM Sheet 2.1.1 G 479 07 53 23 3 Product Data Seam Tape 2.1.3 480 07 53 23 3 Product Data Bonding Adhesive 2.1.5 481 07 53 23 3 Product Data Lap Splice Adhesive 2.1.4 482 07 53 23 3 Product Data Water Cutoff Mastic/Water Block 2.1.7
483 07 53 23 3 Product Data Lap Cleaner, Lap Sealant, and Edge Treatment 2.1.6
484 07 53 23 3 Product Data Flashings 3.3 485 07 53 23 3 Product Data Flashing Accessories 2.1.8 486 07 53 23 3 Product Data Flashing Tape 2.1.8.1 487 07 53 23 3 Product Data Fasteners and Plates 2.1.9 488 07 53 23 3 Product Data Roof Insulation 2.1.11 489 07 53 23 3 Product…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .