This document provides details for a solicitation seeking construction services. The U.S. Army Corps of Engineers is soliciting proposals for the construction of an intelligence production center located at Wright-Patterson Air Force Base, Ohio. The project scope includes the addition of approximately 256,000 square feet of controlled and secured multi-floor facilities, along with the alteration of approximately 22,500 square feet of existing space. The contract value is estimated between $100-250 million. The performance period is 900 calendar days. Offerors must complete security vetting requirements before accessing solicitation materials via a secure site. The solicitation will utilize a two-phase process, with initial proposals due in January 2022 and final proposals due following amendment. The selection method will be a best value tradeoff evaluation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation For Add/Alter Intelligence Production Complex, WPAFB, OH

P2: 473089

Design-Bid-Build

Specifications - Stagger 1

Restricted Access

28 February 2020

W912QR20R0002

ARIMS: 200A

Disposition: Maintain for 15yrs after construction

Construction of the NASIC Intelligence Production Center located at Wright-Patterson Air Force Base.

The estimated magnitude of construction is betw een $100,000,000 and $250,000,000.

NAICS Code: 236220 - Size Determination: $39.5 Million

This is a full and open procurement. In accordance w ith Federal Acquisition Regulation 19.1307, this project requires the HUBZone 10% price evaluation.

Central Contractor Registration and ORCA are now available on the System for Aw ard Management (SAM), available at w w w .beta.sam.gov.

Offerors must comply w ith the requirements of 52.204-7, 52.204-8, 52.232-33, and any other CCR/ORCA requirements in this solicitation through SAM.

PLEASE NOTE: SAM is completely free of charge for both registrants and users.

BJORN T HALE 502.315.6571

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

28-Feb-2020

(RFP)

(IFB)

X

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________900 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________6 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________30 Mar 2020 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

10:00 AM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

502.315.6195 OR 6193FAX:TEL: 502.315.6172 TEL: FAX:

W912QR20R0002 111

W912QR20R0002CT-0000

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912QR20R0002

Section 00 10 00 - Solicitation

SF1442 BLOCK 10 CONTINUATION

Technical inquiries and questions relating to the proposal procedures or bonds are to be submitted via Bidder Inquiry in PROJNET at http://projnet.org/projnet. Please see Section 00 21 00, PROJNET for further instructions.

Please see FAR 52.236-27 for site visit information.

The term bid and proposal are used interchangeably in industry and may be used interchangeably throughout this solicitation.

Please note, page numbering in this document may not be accurate.

PRICE BREAKOUT SCHEDULE

THE PRICE BREAKOUT SCHEDULE IS BEING PROVIDED FOR

INFORMATIONAL PURPOSES ONLY

PROPOSAL PRICING IS NOT TO BE SUBMITTED UNTIL STAGGER 2

PRICE BREAKOUT SCHEDULE

BASE PROPOSAL

CLIN 0001 – Add/Alter Intelligence Production Complex: All work, labor, materials, and equipment required to complete new construction and alterations for the Add/Alter Intelligence Production Complex (Building 10854) at Wright Patterson Air Force Base, Ohio.

JOB $__________

CLIN 0002 – Service Connection Fee (Water/Sewer) – American Water: Fixed price payable by the awarded contractor to American Water Military Services Group for the work, labor, materials, and equipment required to construct water and sanitary sewer infrastructure for the Add/Alter Intelligence Production Complex at Wright Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, and compaction. Final grading and seeding shall be included in

CLIN 0001.

JOB $26,806.00

CLIN 0003 – Service Connection Fee (Natural Gas) – VECTREN: Fixed price payable by the awarded contractor to VECTREN for the work, labor, materials and equipment required to construct natural gas infrastructure for the Add/Alter Intelligence Production Complex at Wright Patterson Air Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, and compaction. Final grading and seeding shall be included in CLIN 0001.

JOB $8,935.00

CLIN 0004 – Service Connection Fee (Electrical) – Dayton Power & Light: Fixed price payable by the awarded contractor to Dayton Power & Light for the work, labor, inspection, materials and equipment required to construct and tie-in to electrical infrastructure for the Add/Alter Intelligence Production Complex at Wright-Patterson Air

Force Base, Ohio. Includes staging and laydown, clearing site, trenching, utility connections and disconnections, removal of debris, testing, backfill, and compaction. Final grading and seeding shall be included in CLIN 0001.

JOB $1,392,027.00

TOTAL (Base Items) $__________

CLIN 0005, Option 0001 – Alter Intelligence Production Complex – Second Story Addition (Building 10822):

All work, labor, materials, and equipment required to complete the second story addition (10822) for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0001 may be exercised within thirty (30) calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0006, Option 0002 – North Parking Lot Grading, Surfacing, & Lighting: All work, labor, materials, and equipment required to complete the north parking lot grading, surfacing, and lighting for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0002 may be exercised within thirty (30) calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0007, Option 0003 – East Parking Lot Grading, Surfacing, & Lighting: All work, labor, materials, and equipment required to complete the east parking lot grading, surfacing, and lighting for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0003 may be exercised within thirty (30) calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0008, Option 0004 – AVRT RF Shielding: All work, labor, materials, and equipment required to complete the AVRT RF shielding installation for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0004 may be exercised within thirty (30) calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0009, Option 0005 – One (1) Additional Year Extended Warranty for Mechanical Equipment: Shall cover all division 23 mechanical equipment for one additional year beyond the base year warranty for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0005 may be exercised within thirty (30) calendar days from the date of the Notice to Proceed..

JOB $__________

CLIN 0010, Option 0006 – Construction Security Support (Trailer & Site CCTV): All work, labor, materials, and equipment required to furnish and install construction security support for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0006 may be exercised within thirty (30) calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0011, Option 0007 – Building 10854 Furniture Fixtures & Equipment (FF&E): All work, labor, materials, and equipment required to furnish and install building 10854 FFE for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0007 may be exercised within 750 calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0012, Option 0008 – AVRT AV Equipment-GFCI (3 Large Monitors): All work, labor, materials, and equipment required to install AVRT AV equipment provided by the government for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio. Supporting infrastructure provided by general electrical trades, including junction boxes, conduit, and 120/208v electrical power circuits, shall be excluded from this item and included in CLIN 0001.

NOTE: Option 0008 may be exercised within 750 calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0013, Option 0009 – UPS Equipment & Install: All work, labor, materials, and equipment required to furnish and install UPS Equipment for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio. Supporting infrastructure provided by general electrical trades, including junction boxes, conduit, and 120/208v electrical power circuits, shall be excluded from this item and included in CLIN 0001.

NOTE: Option 0009 may be exercised within 360 calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0014, Option 0010 – Electronic Security Systems (ACS, IDS, CCTV): All work, labor, materials, and equipment required to furnish and install electronic security systems for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio. Supporting infrastructure provided by general electrical trades, including junction boxes, conduit, and 120/208v electrical power circuits, shall be excluded from this item and included in CLIN 0001.

NOTE: Option 0010 may be exercised within 360 calendar days from the date of the Notice to Proceed.

JOB $__________

CLIN 0015, Option 0011 – Building 10822 FF&E Package 1 Workstations: All work, labor, materials, and equipment required to furnish and install FF&E package 1 workstations for the Add/Alter Intelligence Production Complex at Wright-Patterson Air Force Base, Ohio.

NOTE: Option 0011 may be exercised within 750 calendar days from the date of the Notice to Proceed.

JOB $__________

TOTAL (Option Items) $__________

TOTAL (Base plus Option Items $__________

NOTES FOR CONTRACT LINE ITEM (CLIN) SCHEDULE

NOTE NO. 1: To better facilitate the proposal submission and receipt process, all modifications to proposals are to be submitted on copies of the latest Contract Line Item (CLIN) schedules as published in the solicitation or the latest amendment thereto. In lieu of indicating additions/deductions to line items, all Offerors should state their revised prices for each item.

NOTE NO. 2: Offerors must insert a price on all numbered items including unit prices and options of the CLIN Schedule. Failure to do so may result in the offer being unacceptable.

NOTE NO. 3: The dollar amounts shown in CLINs 0002, 0003, and 0004 are approximate. Upon contract award, the USACE COR shall provide the awarded contractor with the final confirmed dollar amounts, and the information needed to facilitate the contractor's payment of the utility services fees to American Water Military Services Group, VECTREN, and Dayton Power & Light.

Section 00 21 00 - Instructions

PROJNET INSTRUCTIONS

OFFEROR'S QUESTIONS AND COMMENTS

Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.ProjNet.org/ProjNet. As noted below, offerors shall not submit their proposals via ProjNet.

Offerors shall submit their proposals in accordance with the provisions stated in the solicitation.

To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system.

The Solicitation Number is: W912QR20R0002

The Bidder Inquiry Key is: 67N7KW-446C83

Specific Instructions for ProjNet Bid Inquiry Access:

1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

2. Identify the Agency. This should be marked as USACE.

3. Key. Enter the Bidder Inquiry Key listed above.

4. Email. Enter the email address you would like to use for communication.

5. Select Continue. A page will then open stating a user account was not found and will ask you to create one using the provided form.

6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

7. Select Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

Specific Instructions for Future ProjNet Bid Inquiry Access:

1. For future access to ProjNet, you will not be emailed any type of password. You will utilize your Secret Question and Secret Answer to log in.

2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

3. Identify the Agency. This should be marked as USACE.

4. Key. Enter the Bidder Inquiry Key listed above.

5. Email. Enter the email address you used to register previously in ProjNet.

6. Select Continue. A page will then open asking you to enter the answer to your Secret Question.

7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

From this page you may view all bidder inquiries or add an inquiry.

Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

Offerors are requested to review the specification in its entirety and to review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids/proposals.

http://www.projnet.org/projnet

NOTES:

1. Offerors shall not submit their proposals via ProjNet, but in accordance with the provisions stated in the solicitation. Any questions regarding acceptable means of submitting offers shall be made directly to the Contract Specialist identified in the solicitation.

2. Government responses to technical inquiries and questions relating to proposal procedures or bonds that are submitted to ProjNet in accordance with the procedures above are not binding on the Government unless an amendment is issued on Standard Form 30. In the case of any conflicts, the solicitation governs. Any changes or revisions to the solicitation will be made by formal amendment. Government responses will be limited to: (a) Notice that an amendment will be issued; (b) Reference to an existing requirement contained in the solicitation; or (c) Notice that a response is not necessary.

3. The ability to enter technical inquiries and questions relating to proposal procedures or bonds will be disabled five (5) days prior to the closing date stated in the solicitation. No Government responses will be entered into the ProjNet system within two (2) days prior to the closing date stated in the solicitation.

CLAUSES INCORPORATED BY REFERENCE

52.204-7 System for Award Management OCT 2018 52.204-16 Commercial and Government Entity Code Reporting JUL 2016 52.204-18 Commercial and Government Entity Code Maintenance JUL 2016 52.211-2 Availability of Specifications, Standards, and Data Item

Descriptions Listed in the Acquisition Streamlining and Standardization Information System (ASSIST)

APR 2014

52.211-6 Brand Name or Equal AUG 1999 52.215-1 Instructions to Offerors--Competitive Acquisition JAN 2017 52.215-20 Requirements for Certified Cost or Pricing Data or

Information Other Than Certified Cost or Pricing Data

OCT 2010

52.217-5 Evaluation Of Options JUL 1990 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.225-12 Notice of Buy American Requirement - Construction Materials Under Trade Agreements

MAY 2014

52.236-28 Preparation of Proposals--Construction OCT 1997 252.236-7006 Cost Limitation JAN 1997

CLAUSES INCORPORATED BY FULL TEXT

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

Any contract awarded as a result of this solicitation will be DO-C2 rated order certified for national defense, emergency preparedness, and energy program use under the Defense Priorities and Allocations System (DPAS) (15 CFR 700), and the Contractor will be required to follow all of the requirements of this regulation. [Contracting Officer check appropriate box.]

(End of provision)

52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a FIRM FIXED PRICE contract resulting from this solicitation.

(End of provision)

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

11.5 6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Wright-Patterson AFB, OH – Dayton, OH (Greene County)

(End of provision)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from

U.S. Army Corps of Engineers, CELRL April Judd, Room 821 600 Dr. Martin Luther King Jr. Place Louisville, KY 40202

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

(End of provision)

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

** SITE VISIT INFORMATION WILL BE PROVIDED WITH THE STAGGER 2 AMENDMENT **

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for--

TBD

(c) Participants will meet at--

TBD

(End of provision)

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

The full text of FAR clauses and provisions can be found at https://www.acquisition.gov/

The full text of DFARS clauses and provisions can be found at https://www.acq.osd.mil/dpap/

(End of provision)

52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (APR 1984)

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of"(DEVIATION)" after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.

(End of provision)

W912QR20R0002CT-0000

https://www.acquisition.gov/ https://www.acq.osd.mil/dpap/

Section 00 22 00 - Supplementary Instructions

SUBMISSION & EVALUATION INFO

SECTION 00 22 12 – PROCEDURES FOR SUBMITTAL OF OFFERS AND PROPOSAL EVALUATION

CRITERIA

1. Overview.

1.1 The intent of this solicitation is to select one (1) contractor for the Construction of Additions and Alterations to the Intelligence Production Facility (IPC) at Wright-Patterson Air Force Base (WPAFB), OH. The Government will evaluate the proposals in accordance with the criteria described herein, and award a firm fixed price contract to the responsible Offeror whose proposal conforms with all the terms and conditions of the solicitation and whose proposal is determined to represent the overall best value to the Government.

1.2 The basis of award is the Best Value Trade-Off Process. The Contracting Officer will award a firm fixed price contract to the responsible Offeror whom the Source Selection Authority determines conforms to the solicitation, is fair and reasonable, and offers the best overall value to the Government. The Government reserves the right to accept other than the lowest priced offer or to reject all offers.

1.3 This project is for the construction of a new facility (approximately 250,000 square feet), a second-story addition (approximately 6,000 square feet) to existing facility 10822, a stairwell addition (approximately 250 square feet) to existing facility 10853, supporting infrastructure and site work. All facilities are/will be a part of the secure Intelligence Production Complex, and all work in or on any affected facility shall require security measures as described in the solicitation documents.

1.4 The target ceiling for contract is $165,000,000.00 for the MILCON-funded items (CLINS 0001-0009);

target ceiling for the O&M-funded items (CLINS 0010-0011, 0014-0015) is $16,000,000.00; and the target ceiling for the 3080-funded items (CLIN 0012-0013) is $2,250,000.00. Based on the funds made available for this project. The Government cannot guarantee that additional funds will be available for award.

Offerors are under no obligation to approach this ceiling.

2. Submittal of offers.

2.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, in order to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror's capability for successfully completing the solicited project. Requirements stated in this Request for Proposal (RFP) are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the Offeror’s disqualification from award.

2.2 Offerors shall submit their proposals to the U.S. Army Corps of Engineers, 600 Dr. Martin Luther King, Jr.

Place, Contracting Room 821, Louisville, KY 40202-2267 no later than the time and date specified in Block 13 of Standard Form 1442. Mark your proposal submission to the attention of Bjorn Hale. NOTE:

The Louisville District is in the Eastern Time Zone.

2.3 The Government is utilizing the staggered receipt of proposals method for this project. For the initial proposal submission (Stagger 1), Offerors are required to submit a proposal consisting of the information identified in paragraphs 2.4 below. An amendment will be issued to all responsive Offerors who submitted proposals by the due date and time required for initial receipt of proposals (Stagger 1). This amendment will include the 100% completed design including technical plans and specifications and will provide instruction for the submission of the information identified in paragraph 2.5 below (Stagger 2). All proposal materials shall be submitted in binders with a table of contents and tabbed section dividers. The sections should parallel the submission requirements identified below.

*NOTE: The complete Volume I shall be submitted in original and six (6) paper copies and one (1) electronic copy on CD/DVD. The paper version of the proposal shall be used for evaluation and will control any conflicts or discrepancies between the two media. Offeror is responsible for ensuring the paper copy is consistent with the electronic copy of the proposal. Failure to place the required submission information under the appropriate tab (factor) may result in a lower rating if the evaluators cannot readily find the appropriate information. Any specified page limits will be strictly adhered to and enforced.

Information submitted that exceeds the specified limit will not be evaluated.

Volume II shall be submitted in original and one (1) electronic copy on CD/DVD. The paper version of the proposal shall be used for evaluation and will control any conflicts or discrepancies between the two media.

Offeror is responsible for ensuring the paper copy is consistent with the electronic copy of the proposal.

Failure to place the required submission information under the appropriate tab (factor) may result in a lower rating if the evaluators cannot readily find the appropriate information.

2.4 The initial proposal submission (Stagger 1) will include the following information:

• Volume I – Factor I: Past Performance

• Volume I – Factor II: Management Plan

• Volume I – Factor III: Schedule

• Volume II – Tab A: Standard Form 1442

• Volume II – Tab B: Joint Venture Agreements

• Volume II – Tab C: Evidence of Ability to Obtain Bonding and Proof of Financial Ability

• Volume II – Tab D: Pre-Award Information

2.5 The amendment (Stagger 2) will include the following information:

• Volume I – Factor IV: Small Business Participation Plan

• Volume II – Tab A: Price Breakout Schedule

• Volume II – Tab E: Subcontracting Plan

3. Proposal Evaluation Process.

3.1. A Source Selection Evaluation Board (SSEB) comprised of representatives of the Corps of Engineers, User/Customer, and other required personnel will evaluate the proposals. The SSEB will evaluate proposals using a staggered method in which proposals for the Volume I Factors, Past Performance, Management Plan, and Schedule, will be submitted and evaluated prior to the completion of the project design (Stagger 1). Once completed, the Government will provide the final design and request for the Volume I Factor – Small Business Participation Plan, and price proposals via an amendment to the solicitation (Stagger 2). The SSEB will re-convene to evaluate the Volume I Factor – Small Business Participation Plan and price proposals after receipt of this information in response to the amendment (Stagger 2). Offerors are advised that the technical evaluation and rating of proposals will be conducted in strict confidence. Technical proposals will be reviewed and rated without knowledge of the price offered.

The number and identities of Offerors will not be revealed to anyone who is not involved in the evaluation and award process or to other Offerors. Proposals will be evaluated based on the factors described herein, and the basis of award is best value trade-off, as stated in paragraph 1.2 above.

3.2 The evaluation process essentially consists of four parts: proposal compliance review and responsibility review, technical evaluation, price evaluation, and cost/technical trade-off analysis.

3.2.1 Proposal Compliance Review: This is an initial review to ensure that all required forms and certifications are complete and that the Offeror is financially capable of sustaining performance under the contract and is able to obtain the required level of performance and payment bonds from an acceptable surety.

3.2.2 Technical Evaluation: The SSEB will evaluate and rate the Volume I proposals against the RFP requirements. Factor I – Past Performance will be rated using Tables 1 and 2 below. The rating will be based on overall confidence in performance, with the final confidence assessment rating based on the extent of recent, relevant past experience and the quality of the Offeror’s performance. Factor II – Management Plan and Factor III - Schedule will be rated using Table 3 below. Factor IV – Small Business Participation Plan will be rated using Table 4 below.

3.2.3 Price Evaluation: The SSEB and Contracting Officer/SSA will evaluate price proposals independent of the technical evaluation. The SSEB will not have access to price information until completion of the technical evaluation.

3.2.4 Price/Technical Trade-off Analysis: After all above evaluations are complete, the Contracting Officer/SSA will compare the relative advantages and disadvantages of technical proposals and compare prices. The Source Selection Authority (SSA) will then consider all factors to select the proposal offering the best value to the Government.

4. Proposal Information and Related Evaluation Factors.

4.1 Proposals will be evaluated in accordance with the factors below, listed in relative order of importance. All evaluation factors, other than cost or price, when combined are considered approximately equal to price.

The Government intends to evaluate proposals and award a contract without discussions with Offerors (except clarifications as described in FAR 15.306(a)). Therefore, the Offeror’s complete Stagger 1 and Stagger 2 proposal should contain the Offeror’s best terms from a cost or price and technical standpoint.

The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.

4.2 Volume I – Factor I – Past Performance 1st

4.3 Volume I – Factor II – Management Plan 2nd

4.4 Volume I – Factor III – Schedule 3rd

4.5 Volume I – Factor IV – Small Business Participation Plan* 4th

4.6 Volume II - Price and Pro Forma Information (Sealed Envelope)

Tab A Standard Form 1442 and Price Breakout Schedule* Not Rated

Tab B Joint Venture Agreement Not Rated

Tab C Evidence of Ability to Obtain Bonding and Not Rated Proof of Financial Ability

Tab D Pre-Award Information Not Rated

Tab E Subcontracting Plan* Not Rated

NOTE: The Price Breakout Schedule being issued with Stagger 1 is intended for informational purposes only. The price proposal, along with the Volume I – Factor IV – Small Business Participation Plan and Volume II – Tab E – Subcontracting Plan, will be required submissions of Stagger 2. The Price Breakout Schedule document is subject to change prior to the amendment (Stagger 2).

4.6 Ratings

Evaluators will apply the adjectival rating for the definition that most closely matches the evaluation.

TABLE 1

Past Performance Relevancy Ratings Rating Description Very Relevant Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

TABLE 2

Past Performance Confidence Assessments

Rating Description Substantial Confidence Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort.

Satisfactory Confidence Based on the Offeror’s recent/relevant performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort.

Neutral Confidence No recent/relevant performance record is available or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The Offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Limited Confidence Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort.

No Confidence Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will successfully perform the required effort.

TABLE 3

Technical Assessment Ratings Adjectival Rating Description

Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.

Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.

Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.

Unacceptable Proposal does not meet the requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.

TABLE 4

4.7 Definitions

1. Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.

2. Strength. An aspect of an offeror’s proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.

3. Significant Strength. An aspect of an offeror’s proposal that has appreciable merit or appreciably exceeds specified performance or capability requirements in a way that will be appreciably advantageous to the Government during contract performance.

4. Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See

FAR 15.001.

5. Significant Weakness. A flaw in the proposal that appreciably increases the risk of unsuccessful contract performance. See FAR 15.001.

6. Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission, or mistake).

7. Clarification. Limited exchanges between the Government and Offerors that may occur when award without discussions is contemplated. See FAR 15.306(a)(1).

Small Business Participation Plan Ratings Adjectival Rating Description Outstanding Proposal indicates an exceptional approach and understanding of the small business objectives.

Good Proposal indicates a thorough approach and understanding of the small business objectives.

Acceptable

Proposal meets requirements and indicates an adequate approach and understanding of the small business objectives.

Marginal Proposal has not demonstrated an adequate approach and understanding of the small business objectives.

Unacceptable Proposal does not meet the small business objectives.

8. Adverse Past Performance. Past performance information that supports a less than satisfactory rating on any evaluation.

5. Volume I – Factor I: Past Performance

5.1 Submission Requirements:

5.1.1 Provide descriptions of up to three (3) projects substantially complete or completed by the Prime

Contractor within the last seven (7) years (from the solicitation issue date) that are similar to this project in size and scope. Projects completed more than seven (7) years before the solicitation issue date may be considered for evaluation purposes but may lessen the overall relevancy rating for that project. Projects are considered substantially complete if enough work has been performed such that it demonstrates the ability to complete all phases of the project. An Indefinite Delivery Indefinite Quantity (IDIQ) contract may be submitted only if a single task order could be considered similar to this project. Task orders may not be combined in order for the project to be considered similar.

5.1.2 Projects considered similar in size would be a minimum of 150,000 SF of administrative space. Projects of less than 150,000 SF may be considered for evaluation purposed but may lessen the overall relevancy rating for that project.

5.1.3 Projects considered similar in scope to this project include new construction or renovation of multi-story, administrative and/or electronics laboratory space. Please NOTE: Renovation must include both interior and exterior renovation, adjacent to occupied space, in order to be considered similar.

5.1.4 The prime contractor must have self-performed at least 15 percent of the direct contract labor (including testing and layout personnel), exclusive of other general conditions or field overhead personnel, material, equipment, or subcontractors to be considered similar.

5.1.5 Additional consideration may be given for projects that contain the following features:

a) Projects that demonstrate experience with both new construction and renovation work of a similar scope (as outlined in 5.1.3).

b) Previous DOD project experience.

c) Previous USACE project experience.

d) Previous experience with ICD 705 requirements, to include all associated communications and utility features.

e) Previous experience with new construction or renovation of multi-story, SECURE administrative and/or electronics laboratory space.

5.1.6 The following information shall be provided for each project:

a) Project Title, Location, and Contract Number/Unique Identifier

b) Current percentage of construction complete and the date it was or will be complete

a. For projects that are not yet complete, provide description of work remaining to be completed.

c) Scope of the project, to include purpose/use of facility

d) Size of the project, differentiate square footage of new construction versus renovation if the project includes both

e) Portion and percentage of work that was self-performed

f) Two references, including name, telephone number, and email address

5.1.7 For this factor, also include any ratings, letters, awards, etc. that support past performance on these projects. Any of this information that is submitted shall clearly identify to which of the submitted projects it pertains. A sample Past Performance Questionnaire is attached for your convenience. If used, the Past Performance Questionnaire must be submitted by the Offeror with the proposal submission and not sent directly to the agency from the reference. For each project, the offeror may provide information on problems encountered on the identified contracts and the offeror’s respective corrective action.

NOTE: For purposes of evaluating past performance, the Prime Contractor is defined as the contractor identified in Block 14 of the Standard Form 1442. If more than one contractor is listed in Block 14, then a signed joint venture must be submitted with the proposal and the joint venture shall be registered as such in the System for Award Management (SAM). However, each party of the Joint Venture (JV) must submit their own Unique Entity Identifier Number (formerly known as DUNS) with the JV proposal. Projects performed by other contractors than the offeror, such as teaming partners or subcontractors, will not be evaluated for past performance, unless those other contractors are part of a JV offeror as demonstrated by a signed JV agreement. If the offeror represents the combining of two or more companies as a JV for the purpose of this RFP, each company in the JV may submit project examples, but the total submitted by the JV will not exceed three (3).

5.2 Evaluation Criteria:

5.2.1 The SSEB will first evaluate the relevancy of recent past performance identified in the proposal in response to paragraph 5.1 above. By using the criteria identified above, the SSEB will determine how relevant a past project is when compared to the scope, size, and magnitude of effort and complexities of the solicited project. A relevancy rating will be assigned to each submitted project using the Past Performance Relevancy Ratings table above.

5.2.2 The SSEB will next review how well the offeror performed on those projects. The Government reserves the right to check any or all cited references to verify supplied information and to assess owner satisfaction.

In addition to the information submitted by the offeror, the Government reserves the right to review any other sources of relevant information for evaluating past performance, including projects other than those submitted by the offeror. The Government will, at a minimum, review past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/Unique Entity Identifier numbers. Other sources may include, but are not limited to, past performance information retrieved from inquiries of owner representative(s), Federal Awardee Performance and Integrity System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.

5.2.3 The SSEB will review all past performance information collected and determine the quality of the offeror’s performance, general trends, and usefulness of the information and incorporate this information into the performance confidence assessment. The SSEB will assign a final, overall Performance Confidence rating, using the ratings in the Performance Confidence Assessment table above, based on the SSEB’s assessment of (1) the degree of the offeror’s recent, relevant experience, and (2) how well the offeror performed that experience.

6. Volume I – Factor II: Management Plan:

6.1 Submission Requirements:

Provide a management plan narrative for this project that describes how your labor, resources, designers, subcontractors, and material suppliers will be managed, supervised, coordinated, and used to ensure successful completion of the project. Additionally, the Management Plan shall include the following information:

• Describe how you will manage and sequence new work, including mobilization (personnel, equipment, and materials). Describe your coordination of renovation efforts to maintain ongoing operations. Also describe work on this secure site, which includes coordination of subcontractors and trades, government security escorts, and NASIC Site Security Managers (SSMs).

• Identify significant areas of risk and provide your plan for mitigating risk during contract performance. Describe your process for managing, coordinating and tracking changes that arise during the construction phase(s) and your plan to mitigate risks.

• Provide a Quality Control (QC) narrative that explains the corporate view of quality control and how that will be implemented on this project. In particular, explain how the USACE three-phase QC process will be followed and utilized on this project.

• Offeror shall provide a Security narrative. The narrative shall include, at a minimum, the following details/components:

o Key issues/Potential impacts to construction along with solutions for the Issue/Impact o Communication Protocols o A Document Handling Plan, including management of all documents on-site and at the home office. Plan to include appropriate marking and storage for documents o Procedures for management of secure deliverables and logistics for segregation/storage of materials o Handling of logs and registers for materials and personnel coming onto/leaving the site o Process for collaboration with the user Site Security Manager (SSM) o Implementation of a plan for use/restriction of electronic communications

• Discuss the qualifications of your on-site team (e.g., degrees, registrations, number of years of experience, etc.). NOTE: The on-site team discussed in the Management Plan shall be used on the contract.

This is the start of the file's text. The full file is on GovTribe.