This submittal register outlines the submittal requirements for a repair project at HPW Building 441 located at Wright-Patterson Air Force Base in Ohio. Key systems to be commissioned include HVAC systems consisting of new chillers, towers, and pumps, as well as the building automation system controlling the chilled water plant.

The document requires submittals for items like the commissioning specialists' qualifications, the commissioning plan, testing procedures and reports, training documentation, and the systems manual. It specifies when these submittals are due, the level of approval required, and distribution. Submittals are due no later than 30 days after notice to proceed for the commissioning specialists' certification. Testing is to be in accordance with applicable standards from ASHRAE, NEBB, and SMACNA.

The related federal contract opportunity provides additional context. It describes the project as a design-bid-build renovation with an estimated construction cost between $10-25 million. The NAICS code is 236220 and businesses must meet the small business size standard for that code in SAM to qualify as small. The solicitation is available electronically only through beta.SAM.gov and will not be distributed by other means.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W912QR20B0021 Renvoate HPW Bldg. 441 located at WPAFB, OH is hereby modified as follow s:

SEE CONTINUATION

1. CONTRACT ID CODE PAGE OF PAGES

1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912QR20B0021

X 9B. DATED (SEE ITEM 11)

31-Jul-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2020

CODE

U. S. ARMY ENGINEER DISTRICT, LOUISVILLE

600 DR. MARTIN LUTHER KING, JR. PLACE

ROOM 821

LOUISVILLE KY 40202-2239

W912QR 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912QR20B0021Specs-0003

W912QR20B0021

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMDT 0003 SUMMARY OF CHANGES

Solicitation W912QR20B0021 Renvoate HPW Bldg. 441 located at WPAFB, OH is hereby modified as follows:

a. The following Specification Sections have been revised and replaced in their entirety:

a. PROJECT TABLE OF CONTENTS

b. SUBMITTAL REGISTER

c. 01 46 00.00 06 BUILDING COMMISSIONING

d. 07 21 13 BOARD AND BLOCK INSULATION

b. The following Specification sections have been deleted in their entirety:

a. 13 34 41 PORTABLE AND MODULAR BUILDINGS

c. The following Plan Sheets have been revised and replaced in their entirety:

a. G-101 BASEMENT FLOOR PLAN – SEQUENCE 1

b. G-102 FIRST FLOOR PLAN – SEQUENCE 1

c. G-103 SECOND FLOOR PLAN – SEQUENCE 1

d. G-105 BASEMENT FLOOR PLAN – SEQUENCE 2

e. G-106 FIRST FLOOR PLAN – SEQUENCE 2

f. G-107 BASEMENT FLOOR PLAN – SEQUENCE 3

g. G-108 FIRST FLOOR PLAN – SEQUENCE 3

h. G-111 FIRST FLOOR PLAN – SEQUENCE 4

i. G-112 FIRST FLOOR PLAN – SEQUENCE 5

j. G-113 SECOND FLOOR PLAN SEQUENCE – 5

k. C-101 CIVIL SITE PLAN

l. C-501 CIVIL DETAILS

m. S-001 GENERAL STRUCTURAL NOTES

n. S-401 NEW ADDITION FOUNDATION & EQUIPMENT PAD PLAN

o. A-101 BASEMENT FLOOR PLAN

p. A-201 ELEVATIONS

q. A-202 ELEVATIONS

r. A-401 ENLARGED PLANS & ELEVATIONS – MECHANICAL ROOM

s. A-402 ENLARGED PLANS – COURTYARDS

t. A-601 DOOR SCHEDULE & DETAILS

u. A-702 STAIR PLANS AND SECTIONS

v. I-101 BASEMENT EXISTING FURNITURE PLAN

w. I-102 FIRST FLOOR EXISTING FURNITURE PLAN

x. I-103 DETAILS – FIRE ALARM

y. FA111 FIRST FLOOR PLAN – WEST FIRE ALARM

z. FA112 FIRST FLOOR PLAN – EAST FIRE ALARM

aa. FA501 DETAILS FIRE ALARM

bb. M-603 SCHEDULES – MECHANICAL

cc. EP111 FIRST FLOOR PLAN WEST – POWER

W912QR20B0021

dd. EP112 FIRST FLOOR PLAN EAST – POWER

ee. E-411 ENLARGED FIRST FLOOR PLANS – ELECTRICAL

ff. E-701 DIAGRAMS – ELECTRICAL

d. The following Plan Sheets have been deleted in their entirety:

a. I-401 ENLARGED FURNITURE PLANS – NEW FURNITURE REMOVED FROM

CONTRACT

b. I-402 ENLARGED PANEL PLAN – NEW FURNITURE REMOVED FROM

CONTRACT

e. The due date is hereby changed from 10:00am ET on 08 September 2020 to 2:00pm ET on 10 September 2020.

f. All other terms and conditions remain unchanged.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 08-Sep-2020 10:00 AM to 10-Sep-2020 02:00 PM.

(End of Summary of Changes)

Repair FSD-1 Interior Exterior and HVAC F441 1705011

AMENDMENT 003

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 80 00.00 06 SPECIAL PROVISIONS

DIVISION 01 - GENERAL REQUIREMENTS

01 01 50 PROJECT GENERAL REQUIREMENTS (WPAFB)

01 02 20 GENERAL ENVIRONMENTAL PROTECTION REQUIREMENTS (WPAFB)

01 11 00 SUMMARY OF WORK

01 32 01.00 06 PROJECT SCHEDULE

01 33 00.00 06 SUBMITTAL PROCEDURES

01 35 26.00 06 GOVERNMENT SAFETY REQUIREMENTS

01 45 00.15 10 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 45 04.10 06 CONTRACTOR QUALITY CONTROL

01 46 00.00 06 TOTAL BUILDING COMMISSIONING

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 19.00 06 TEMPORARY ENVIRONMENTAL CONTROLS AND PERMITS

01 74 19 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT

01 78 23 OPERATION AND MAINTENANCE DATA

01 80 00 SPECIAL SECURITY

DIVISION 02 - EXISTING CONDITIONS

02 09 10 OZONE DEPLETING SUBSTANCE RECOVERY (WPAFB)

02 41 00 DEMOLITION

02 42 51 CARPET REMOVAL AND RECLAMATION

02 83 13.00 06 LEAD IN CONSTRUCTION

DIVISION 03 - CONCRETE

03 30 00 CAST-IN-PLACE CONCRETE

DIVISION 04 - MASONRY

04 20 00 UNIT MASONRY

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 21 00 STEEL JOIST FRAMING

05 30 00 STEEL DECKS

05 50 13 MISCELLANEOUS METAL FABRICATIONS

05 52 00 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 ROUGH CARPENTRY

06 20 00 FINISH CARPENTRY

06 61 16 SOLID SURFACING FABRICATIONS

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 BOARD AND BLOCK INSULATION

07 21 16 MINERAL FIBER BLANKET INSULATION

07 42 13 METAL WALL PANELS

07 54 23 THERMOPLASTIC POLYOLEFIN ROOFING

07 60 00 FLASHING AND SHEET METAL

PROJECT TABLE OF CONTENTS Page 1

W912QR20B0021Specs-0003W912QR20B0021Specs-0003

07 84 00 FIRESTOPPING

07 92 00 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 STEEL DOORS AND FRAMES

08 11 16 ALUMINUM DOORS AND FRAMES

08 51 13 ALUMINUM WINDOWS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DIVISION 09 - FINISHES

09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD

09 29 00 GYPSUM BOARD

09 30 10 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 ACOUSTICAL CEILINGS

09 65 00 RESILIENT FLOORING

09 68 00 CARPETING

09 90 00 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

10 14 00.20 INTERIOR SIGNAGE

10 21 13 TOILET COMPARTMENTS

10 22 13 WIRE MESH PARTITIONS

10 28 13 TOILET ACCESSORIES

DIVISION 21 - FIRE SUPPRESSION

21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION

DIVISION 22 - PLUMBING

22 00 00 PLUMBING, GENERAL PURPOSE

22 00 01 BACKFLOW PREVENTION DEVICES (WPAFB)

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 00 00 AIR SUPPLY, DISTRIBUTION, VENTILATION, AND EXHAUST SYSTEMS

23 01 30.41 HVAC SYSTEM CLEANING

23 03 00.00 20 BASIC MECHANICAL MATERIALS AND METHODS

23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND

EQUIPMENT

23 05 93.00 06 TESTING, ADJUSTING, AND BALANCING (TAB) OF HVAC

23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS

23 09 00 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC

23 09 23.02 BACNET DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING

CONTROL SYSTEMS

23 09 93 SEQUENCES OF OPERATION FOR HVAC CONTROL

23 11 25 FACILITY GAS PIPING

23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM

23 21 23 HYDRONIC PUMPS

23 23 00 REFRIGERANT PIPING

23 52 00 HEATING BOILERS

23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE

23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS

PROJECT TABLE OF CONTENTS Page 2

23 73 13.00 40 MODULAR INDOOR CENTRAL-STATION AIR-HANDLING UNITS

DIVISION 25 - INTEGRATED AUTOMATION

25 10 10 UTILITY MONITORING AND CONTROL SYSTEM (UMCS) FRONT END

AND INTEGRATION

DIVISION 26 - ELECTRICAL

26 00 00.00 20 BASIC ELECTRICAL MATERIALS AND METHODS

26 20 00 INTERIOR DISTRIBUTION SYSTEM

26 20 00.12 00 DRIVE ISOLATION TRANSFORMERS

26 24 13 SWITCHBOARDS

26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS - WPAFB

26 41 00 LIGHTNING PROTECTION SYSTEM

26 51 00 INTERIOR LIGHTING

DIVISION 27 - COMMUNICATIONS

27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 49 CARBON MONOXIDE DETECTORS

28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM

DIVISION 31 - EARTHWORK

31 00 00.00 06 EARTHWORK

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 31 13 CHAIN LINK FENCES AND GATES

32 92 19 SEEDING

DIVISION 33 - UTILITIES

33 11 00 WATER UTILITY DISTRIBUTION PIPING

33 11 23 NATURAL GAS AND LIQUID PETROLEUM PIPING

33 30 00 SANITARY SEWERS

33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 3

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 57 PAGES

Repair FSD-1 Interior Exterior and HVAC F441

00 80 00.00 06 SD-01 Preconstruction Submittals

1.28 GLabor, Equipment, and Material

Report

1.28 GDaily Equipment Report

1.14 GFingerprints of all persons

employed or to be employed

SD-02 Shop Drawings

1.41 GMechanical/Electrical Room

Layout

SD-04 Samples

1.16 GEquipment Warranty Identification

Tags

SD-05 Design Data

1.12 GSF1413 Statement and

Acknowledgement

1.45 GProgress Photographs

SD-07 Certificates

1.16 GWarranty of Construction

1.15 GNO ASBESTOS - CONTAINING

MATERIAL (ACM)

CERTIFICATION

1.32 GInsurance

1.30 GSales and Use Tax

SD-11 Closeout Submittals

1.7.4 GPreliminary (Working) As-Built

Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 57 PAGES

00 80 00.00 06 1.7.1 GFinal As-Built Drawings

1.7.1.2 GCAD Working As-Built Drawings

1.9.1 GEquipment-in-Place List

1.9.1 GMaintenance and Parts Data

1.16 GWarranty Management Plan

01 02 20 SD-01 Preconstruction Submittals

3.1 GContractor's Environmental

Coordinator

3.3 GApplication for Authorization -

Environmental Restoration Site

Disturbance

3.4.2 GErosion Control Plan

GStorm Water Pollution Prevention

Plan (SWPPP)

GSanitary or Wastewater Permit to

Install (PTI)

GDrinking Water Plans Approval

3.5.1Ohio EPA Notification of

Demolition and

Renovation/Abatement

3.5.2 GAsbestos Work Plan

3.5.9 GCertificate of Conformity

3.5.10Boiler Startup Information

3.8 GSite Specific Spill Plan (SSSP)

3.9.2HAZMAT Summary

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 57 PAGES

01 02 20 3.10.3 GWPAFB Form 1433 - Hazardous

Waste Storage Permit

3.11.3 GCertification of Recovered and

Biobased Products

3.12 GPermit Applications for UST work

3.14.2Storage Compensation

Agreement

SD-06 Test Reports

3.5.3Asbestos Abatement Clearance

Air Sampling Report

3.7 GRecycling and Solid Waste

Summary Report

SD-11 Closeout Submittals

Notice of Termination (NOT)

3.11.3 GGreen Products Determination

Form (GPDF)

01 11 00 SD-01 Preconstruction Submittals

1.6 GSalvage Plan

01 32 01.00 06 SD-01 Preconstruction Submittals

3.4.1 GPreliminary Project Schedule

3.4 GProject Schedule

1.3 GQuality Assurance Resume

SD-05 Design Data

3.5.2Narrative Report

3.5.4Schedule Reports

3.4.3 GPeriodic Schedule Updates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 57 PAGES

01 33 00.00 06 SD-01 Preconstruction Submittals

G ROSubmittal register

01 35 26.00 06 SD-01 Preconstruction Submittals

1.7Accident Prevention Plan (APP)

1.7Fatigue Management Plan

1.7Bloodborne Pathogen Plan

1.7Exposure Control Plan

1.7Site Layout Plan

1.7Hearing Conservation Program

1.7Respiratory Protection Plan

1.7Health Hazard Control Program

1.7Hazard Communication Program

Lead Compliance Plan &

Specifications

Asbestos Abatement Plan &

Specifications

1.7Heat Stress Monitoring Plan

1.7Cold Stress Monitoring Plan

1.7Indoor Air Quality Management

Plan

1.7Mold Remediation Plan

1.7Crystalline Silica Assessment

1.7Traffic Control Plan

1.7Fire Prevention Plan

1.7Hazardous Energy Control Plan

1.7Standard Pre-Lift Plan (LHE)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 57 PAGES

01 35 26.00 06 1.7Critical Lift Plan - LHE

1.7Fall Protection and Prevention

Plan

1.7Demolition/Renovation Plan (to include engineering survey)

1.7Excavation/Trenching Plan

1.7Confined Space Entry

Procedures

1.7Confined Space Program

1.8 G ROActivity Hazard Analysis (AHA)

1.5.1.1 G ROSite Safety and Health Officer

Qualifications(SSHO)

1.3 G ROCertified Safety

Professional/Certified Industrial

Hygienist Qualifications

1.12.7 G ROProof of qualification for Crane

Operators

1.12.7 G ROCritical Lift Plan

SD-06 Test Reports

1.12Reports

1.12.1Accident Reports

1.12.3Monthly Exposure Reports

1.12.5Crane Reports

1.12.4Regulatory Citations and

Violations

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 57 PAGES

01 35 26.00 06 1.12.8Confined Space Entry Permit

1.13Hot work permit

1.12.6Crane Certificate of Compliance

01 45 04.10 06 SD-01 Preconstruction Submittals

3.2 G ROConstruction Quality Control Plan

01 46 00.00 06 SD-01 Preconstruction Submittals

1.4 G DOCommissioning Specialists

1.4.2 G DOCommissioning Specialists

1.8 G DOProject Schedule

SD-05 Design Data

3.1.4 G DODesign Review Report

SD-06 Test Reports

3.1.3 G DOConstruction Phase

Commissioning Plan

G DOBuilding Envelope Inspection

Checklists

3.1.6.2 G DOPre-Functional Checklists

G DOPVT Procedures

G DOPVT Report

1.6Issues Log

3.1.6.5Trend Log Report

Post-Construction Trend Log

Report

3.6 G DOCommissioning Report

G DOPost-Construction

Commissioning Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 57 PAGES

01 46 00.00 06 3.7.1 G DOMonthly Monitoring Based

Commissioning Update

3.7.1 G DOMonitoring Based Commissioning

Report

SD-07 Certificates

1.7 G DOCertificate of Readiness

SD-10 Operation and Maintenance

Data

3.2 G DOSystems Training

3.3 G ROTraining Plan

3.3 G ROTraining Attendance Rosters

3.4 G DOSystems Manual

G DOPost-Construction Systems

Manual

G DOMaintenance and Service Life

Plans

SD-11 Closeout Submittals

S DOFinal Commissioning Report

SFinal Construction Phase

Commissioning Plan

01 50 00 SD-01 Preconstruction Submittals

1.3 GConstruction Site Plan

3.4.1 GTraffic Control Plan

SD-06 Test Reports

2.5Backflow Preventer Tests

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 57 PAGES

01 50 00 1.4.1Backflow Tester

1.4Backflow Preventers

01 57 19.00 06 SD-01 Preconstruction Submittals

1.6.1Preconstruction Survey

1.10 GSolid Waste Management Permit

1.6.2 GRegulatory Notifications

1.7Environmental Protection Plan

1.7.9.1 GDirt and Dust Control Plan

1.6.5 GEmployee Training Records

1.6.4 GEnvironmental Manager

Qualifications

GStormwater Pollution Prevention

Plan (Swppp)

SD-06 Test Reports

3.7.1.1.2Laboratory Analysis

3.7.2.1 GSolid Waste Management Report

SD-07 Certificates

1.6.5 GEmployee Training Records

1.6.5Erosion and Sediment Control

Inspector

SD-11 Closeout Submittals

3.7.1 GWaste Determination

Documentation

3.7.4.6 GDisposal Documentation for

Hazardous and Regulated Waste

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 57 PAGES

01 57 19.00 06 1.6.5 GAssembled Employee Training

Records

1.10 GSolid Waste Management Permit

3.7.2.1 GSolid Waste Management Report

3.7.4.1 GHazardous Waste/Debris

Management

1.6.2 GRegulatory Notifications

3.7.2.1 GSales Documentation

3.7.2.1Contractor Certification

01 74 19 SD-01 Preconstruction Submittals

1.5Waste Management Plan

SD-11 Closeout Submittals

1.6Records

01 78 23 SD-10 Operation and Maintenance

Data

3.1.1 GTraining Plan

3.1.3 GTraining Outline

3.1.2 GTraining Content

SD-11 Closeout Submittals

3.1.4 GTraining Video Recording

3.1.6 GValidation of Training Completion

02 09 10 SD-01 Preconstruction Submittals

GWork Plan

SD-07 Certificates

1.1 GCertified Refrigerant Technician

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 57 PAGES

02 09 10 1.1 GCertified Recovery of Recycling

Equipment

3.1 GForm 1471

02 41 00 SD-01 Preconstruction Submittals

1.2.1 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.7 GNotification

02 42 51 SD-01 Preconstruction Submittals

1.4.2Proposed Dust-Control Measures

1.4.2Proposed Packing and

Transportation Measures

1.4.4Schedule of Carpet Reclamation

Activities

1.4.3Carpet Reclamation Agency

Records

02 83 13.00 06 SD-01 Preconstruction Submittals

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.2 GLead Compliance Plan

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.8 GLead waste management plan

1.5.2.4 GMedical Examinations

SD-06 Test Reports

1.5.2.3 GSampling results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 57 PAGES

02 83 13.00 06 1.5.2.3 GOccupational and Environmental

Assessment Data Report

SD-07 Certificates

1.5.1.3 GTesting laboratory

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 Ghazardous waste manifest

03 30 00 SD-01 Preconstruction Submittals

1.6.3 GQuality Control Plan

1.6.4 GQuality Control Personnel

Certifications

1.6.6 GLaboratory Accreditation

SD-02 Shop Drawings

1.6.2.1 GReinforcing Steel

SD-05 Design Data

1.6.1.1 GConcrete Mix Design

SD-06 Test Reports

1.6.1.1 GConcrete Mix Design

3.12.2.3 GCompressive Strength Tests

3.12.2.4Air Content

3.12.2.1Slump Tests

SD-07 Certificates

1.6.4.2Field Testing Technician and

Testing Agency

04 20 00 SD-02 Shop Drawings

3.4.1.1 GDetail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 57 PAGES

04 20 00 SD-03 Product Data

2.2.2 GClay Brick

SD-04 Samples

2.2.2 GClay Brick

2.2.3.1 GConcrete Masonry Units (CMU)

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

SD-06 Test Reports

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

05 12 00 SD-02 Shop Drawings

1.3.1 GFabrication Drawings

SD-05 Design Data

1.3.2 GDesign Calculations for Steel

Connections

SD-07 Certificates

2.5Galvanizing

05 21 00 SD-02 Shop Drawings

1.3.1 GSteel Joist Framing

05 30 00 SD-02 Shop Drawings

1.3.3 GFabrication Drawings

SD-05 Design Data

2.1 GDeck Units

05 50 13 SD-02 Shop Drawings

2.3 GBollards/Pipe Guards

2.4 GAngles and Plates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 57 PAGES

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

SD-03 Product Data

2.1.3 GProtective Coating

2.2.7 GSteel Railings and Handrails

2.2.8 GAluminum Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.1.1 GNailing Strips

SD-03 Product Data

1.8Fire-retardant Treatment

2.3.2Adhesives

SD-07 Certificates

1.7Preservative Treatment

1.9.1Indoor Air Quality

06 20 00 SD-02 Shop Drawings

1.3 GDetail Drawings Indicating All

Wood and Millwork Assemblies

SD-03 Product Data

2.2 GCountertops and Millwork

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 57 PAGES

06 20 00 SD-04 Samples

1.5 GSamples

06 61 16 SD-02 Shop Drawings

3.1 GInstallation

SD-03 Product Data

2.1Solid Polymer Material

1.4.1Qualifications

2.3Fabrications

SD-04 Samples

2.1 GMaterial

2.3.3 GCounter Tops

SD-10 Operation and Maintenance

Data

3.2Clean-up

07 21 13 SD-03 Product Data

2.1 GBlock or Board Insulation

1.3 GProtection Board or Coatings

2.4 GAccessories

SD-07 Certificates

2.1 GBlock or Board Insulation

2.3 GDrainage Board

3.4.3 GDrainage Board

1.6 GSpecial Warranties

1.6 GSpecial Warranties

SD-08 Manufacturer’s Instructions

2.1Block or Board Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 57 PAGES

07 21 13 2.4.1Adhesive

07 21 16 SD-03 Product Data

2.1Blanket Insulation

2.3Accessories

SD-08 Manufacturer’s Instructions

3.3.1Insulation

07 42 13 SD-03 Product Data

2.2.1 GWall Panels

2.2.2Factory Color Finish

1.5.2Closure Materials

1.5.2 GAccessories

2.5 GAccessories

SD-08 Manufacturer’s Instructions

3.1 GInstallation

07 54 23 SD-03 Product Data

2.1.1 GTPO Sheet

2.1.4Bonding Adhesive

2.1.3Lap Splice Adhesive

2.1.6Water Cutoff Mastic/Water Block

2.1.5Lap Cleaner, Lap Sealant, and

Edge Treatment

3.3Flashings

2.1.7Flashing Accessories

2.1.7.1Flashing Tape

2.1.8Fasteners and Plates

2.1.10Roof Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 57 PAGES

07 54 23 2.1.9Pre-Manufactured Accessories

1.8 Gwarranty

SD-05 Design Data

1.4.4 GWind Uplift Calculations

SD-07 Certificates

1.4.1Qualification of Manufacturer

1.4.2Qualification of Applicator

1.4.4 GWind Uplift Resistance

1.4.3 GFire Resistance

SD-08 Manufacturer’s Instructions

3.2 GApplication

3.2.3 GApplication Method

3.3.2 GMembrane Flashing

2.1.2Seam Tape

3.2.4Tape Seams / Lap Splices

3.2.5Adhesive Seams / Lap Splices

3.2.6Perimeter Attachment

3.2.4Primer

3.2.7Fasteners

2.1.9Pre-Manufactured Accessories

1.6 GCold Weather

SD-11 Closeout Submittals

1.8Warranty

3.9Information Card

3.8Instructions To Government

Personnel

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 57 PAGES

07 60 00 SD-02 Shop Drawings

2.1.1 GExposed Sheet Metal

3.1.14 GDownspouts

3.1.19 GExpansion Joints

3.1.15 GFlashing for Roof Drains

3.1.10 GBase Flashing

3.1.11 GCounterflashing

3.1.20 GFlashing at Roof Penetrations

and Equipment Supports

2.1.7 GReglets

3.1.16 GScuppers

3.1.22 GCopings

3.1.13 GDrip Edges

3.1.17 GConductor Heads

SD-04 Samples

1.4.2 GFinish Samples

SD-08 Manufacturer’s Instructions

1.4.3 GInstructions for Installation

3.5 GQuality Control Plan

SD-10 Operation and Maintenance

Data

1.4.3 GCleaning and Maintenance

07 84 00 SD-03 Product Data

2.2 GFirestopping Materials

SD-07 Certificates

1.5.2Inspector Qualifications

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 57 PAGES

07 84 00 2.2Firestopping Materials

1.5.1 GInstaller Qualifications

07 92 00 SD-03 Product Data

2.1 GSealants

2.2 GPrimers

2.3 GBond Breakers

2.4 GBackstops

08 11 13 SD-02 Shop Drawings

2.1 GDoors

2.1 GDoors

2.7 GFrames

2.7 GFrames

2.5Accessories

2.9Weatherstripping

SD-03 Product Data

2.1 GDoors

2.7 GFrames

2.5Accessories

2.9Weatherstripping

08 11 16 SD-02 Shop Drawings

1.5.1 GDoor and Frame Assembly

SD-03 Product Data

1.5.1 GDoor and Frame Assembly

SD-04 Samples

1.5.2 GFinish Samples

1.2.1 GAir Infiltration

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 57 PAGES

08 11 16 1.2.2 GWater Penetration

SD-08 Manufacturer’s Instructions

1.5.1 GDoor and Frame Assembly

1.5.3 GAdjustments, Cleaning, and

Maintenance

08 51 13 SD-02 Shop Drawings

2.1 GWindows

1.6Fabrication Drawings

SD-03 Product Data

2.1 GWindows

2.2.6.1 GHardware

2.2.2 GFasteners

1.7 GWindow Performance

2.2.3Adhesives

1.7.4 GThermal Performance

SD-04 Samples

1.3.3.1Finish Sample

1.3.3.2Window Sample

SD-05 Design Data

2.1 GStructural Calculations for

Deflection

1.3.4 GDesign Analysis

SD-06 Test Reports

1.3.5Minimum Condensation

Resistance Factor

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 57 PAGES

08 51 13 SD-10 Operation and Maintenance

Data

2.1 GWindows

08 71 00 SD-02 Shop Drawings

1.3 GManufacturer's Detail Drawings

1.3 GVerification of Existing Conditions

1.5 GHardware Schedule

2.3.5 GKeying System

SD-03 Product Data

2.3 GHardware Items

SD-08 Manufacturer’s Instructions

3.1Installation

SD-10 Operation and Maintenance

Data

1.5 GHardware Schedule

08 81 00 SD-03 Product Data

2.3Insulating Glass

2.4.1.1Sealants

2.4.2Joint Backer

SD-04 Samples

2.3Insulating Glass

SD-07 Certificates

2.3Insulating Glass

SD-08 Manufacturer’s Instructions

2.4Setting and Sealing Materials

3.2Glass Setting

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 57 PAGES

08 81 00 SD-11 Closeout Submittals

1.6.1Insulated Glass Units

08 91 00 SD-02 Shop Drawings

1.4Wall louvers

1.5Wall louvers

SD-03 Product Data

2.2Metal Wall Louvers

09 22 00 SD-02 Shop Drawings

2.1 GMetal support systems

09 29 00 SD-03 Product Data

2.1.3Cementitious Backer Units

2.1.2Glass Mat Water-Resistant

Gypsum Tile Backing Board

2.1.7Accessories

2.1.1Gypsum Board

SD-07 Certificates

2.1 GAsbestos Free Materials

09 30 10 SD-03 Product Data

2.1.1 GPorcelain Tile

2.3 GMortar, Grout, and Adhesive

SD-04 Samples

2.1 GTile

2.1 GAccessories

2.1 GTransition Strips

2.5 GTransition Strips

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 57 PAGES

09 30 10 1.3.1Indoor Air Quality

SD-08 Manufacturer’s Instructions

3.6Maintenance Instructions

SD-10 Operation and Maintenance

Data

3.1 GInstallation

09 51 00 SD-06 Test Reports

2.1.1Ceiling Attenuation Class and

Test

09 65 00 SD-02 Shop Drawings

2.9 GResilient Flooring and

Accessories

SD-03 Product Data

2.9 GResilient Flooring and

Accessories

2.5Adhesives

SD-04 Samples

2.9 GResilient Flooring and

Accessories

SD-08 Manufacturer’s Instructions

3.2 GSurface Preparation

3.1 GInstallation

SD-10 Operation and Maintenance

Data

2.9 GResilient Flooring and

Accessories

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 57 PAGES

09 68 00 SD-02 Shop Drawings

3.4 GInstallation Drawings

SD-03 Product Data

2.1 GCarpet

SD-04 Samples

2.1 GCarpet

SD-06 Test Reports

3.2 GMoisture and Alkalinity Tests

SD-08 Manufacturer’s Instructions

3.1Surface Preparation

SD-10 Operation and Maintenance

Data

3.5Cleaning and Protection

SD-11 Closeout Submittals

1.5Warranty

09 90 00 SD-02 Shop Drawings

3.10Piping identification

3.10 Gstencil

SD-03 Product Data

2.1Manufacturer's Technical Data

Sheets

SD-04 Samples

1.8 GColor

SD-07 Certificates

1.3Applicator's qualifications

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 57 PAGES

09 90 00 3.2.1Application instructions

3.6.2Mixing

1.6.2Manufacturer's Safety Data

Sheets

10 14 00.20 SD-02 Shop Drawings

1.4.1 GDetail Drawings

SD-03 Product Data

3.1 GInstallation

1.6 GWarranty

SD-04 Samples

1.3 GSoftware

SD-10 Operation and Maintenance

Data

3.1.2 GProtection and Cleaning

10 21 13 SD-02 Shop Drawings

2.1Fabrication Drawings

3.2 GInstallation Drawings

SD-03 Product Data

2.1Cleaning and Maintenance

Instructions

2.7Colors And Finishes

2.2.1Anchoring Devices and Fasteners

2.2.3Hardware and Fittings

2.2.2Brackets

2.2.4Door Hardware

2.5Pilaster Shoes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 57 PAGES

10 21 13 2.2.3.2 GFinishes

SD-04 Samples

2.7 GColors and Finishes

2.2.3Hardware and Fittings

2.2.1Anchoring Devices and Fasteners

SD-07 Certificates

1.5Warranty

10 22 13 SD-02 Shop Drawings

1.4Wire Mesh Partitions

SD-03 Product Data

1.4Wire Mesh Partitions

10 28 13 SD-03 Product Data

2.1.2 GFinishes

2.2 GAccessory Items

21 13 13.00 10 SD-02 Shop Drawings

1.4.3 GShop Drawings

3.7As-Built Drawings

SD-03 Product Data

1.4.1Fire Protection Related

Submittals

2.3 GMaterials and Equipment

1.6Spare Parts

3.6 GPreliminary Tests

3.7 GFinal Acceptance Test

3.8 GOnsite Training

1.4.1 GFire Protection Specialist

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 57 PAGES

21 13 13.00 10 1.4.2 GSprinkler System Installer

SD-05 Design Data

1.4.3 GSway Bracing

1.2.1.2 GHydraulic Calculations

SD-06 Test Reports

3.6Preliminary Test Report

3.7Final Acceptance Test Report

SD-07 Certificates

3.3Inspection by Fire Protection

Specialist

SD-10 Operation and Maintenance

Data

3.8 GOperating and Maintenance

Manuals

22 00 00 SD-02 Shop Drawings

3.8.1 GPlumbing System

SD-03 Product Data

2.4Fixtures

2.4.2Flush Valve Water Closets

2.4.3Flush Valve Urinals

2.4.4Wall Hung Lavatories

2.4.5Countertop Lavatories

2.4.6Kitchen Sinks

2.4.7Plastic Shower Stalls

2.8 GWater Heaters

2.9 GPumps

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 57 PAGES

22 00 00 3.8.1.1 GBackflow Prevention Assemblies

1.5.1Welding

3.8.1Plumbing System

SD-06 Test Reports

3.8Tests, Flushing and Disinfection

3.8.1.1 GTest of Backflow Prevention

Assemblies

SD-07 Certificates

1.3Materials and Equipment

2.1.1Bolts

SD-10 Operation and Maintenance

Data

3.8.1 GPlumbing System

22 00 01 SD-03 Product Data

Catalog cuts

Technical data

AF Form 843, 844 or 845

23 00 00 SD-02 Shop Drawings

1.4.3 GDetail Drawings

SD-03 Product Data

2.10.1.1Metallic Flexible Duct

2.10.1.2Insulated Nonmetallic Flexible

Duct Runouts

2.10.1.2Duct Connectors

2.10.2 GDuct Access Doors

2.10.3Fire Dampers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 57 PAGES

23 00 00 2.10.4 GManual Balancing Dampers

2.10.8Sound Attenuation Equipment

2.10.8.3Acoustical Duct Liner

2.10.9.1Diffusers

2.10.9.2Registers and Grilles

2.10.10Louvers

2.10.11Air Vents, Penthouses, and

Goosenecks

2.11.1.1Centrifugal Fans

2.11.1.2In-Line Centrifugal Fans

2.11.1.3Centrifugal Type Power Roof

Ventilators

2.11.1.4Ceiling Exhaust Fans

2.11.1.4 SEnergy Star label for ceiling

exhaust fan product

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GConstant Volume, Single Duct

Terminal Units

2.12.2.2 GVariable Volume, Single Duct

Terminal Units

1.2.1.2 GDiagrams

2.10.1 SIndoor Air Quality for Duct

Sealants

SD-06 Test Reports

3.13 GPerformance Tests

3.11 GDamper Acceptance Test

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 57 PAGES

23 00 00 SD-08 Manufacturer’s Instructions

3.2Manufacturer's Installation

Instructions

3.15.2Operation and Maintenance

Training

SD-10 Operation and Maintenance

Data

3.15.1 GOperation and Maintenance

Manuals

2.10.3 GFire Dampers

2.10.4 GManual Balancing Dampers

2.11.1.1 GCentrifugal Fans

2.11.1.2 GIn-Line Centrifugal Fans

2.11.1.3 GCentrifugal Type Power Roof

Ventilators

2.11.1.4 GCeiling Exhaust Fans

2.12.1 GRoom Fan-Coil Units

2.12.2.1 GConstant Volume, Single Duct

Terminal Units

2.12.2.2 GVariable Volume, Single Duct

Terminal Units

2.12.2.3 GReheat Units

2.2.1 GRound, High-Pressure, Double-Wall Sheet Metal Ducts

2.2.2 GSound Traps

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 57 PAGES

23 00 00 3.14 SIndoor Air Quality During

Construction

23 01 30.41 SD-01 Preconstruction Submittals

3.1.1.1 GRecord of Existing Conditions

3.1.1.2 GCoordination Plan

1.4.1 GNADCA Firm

1.4.1 GNADCA Team Assistants

1.4.1 GNADCA Air System Cleaning

Specialist (ASCS)

1.4.1 GNADCA Supervisor Qualifications

1.4.2 GRecords of Experience in the

Field of HVAC System Cleaning

1.5.1 GNADCA Work Execution

Schedule

SD-03 Product Data

1.4.3 GSafety Data Sheets (SDS)

SD-06 Test Reports

3.3.2 GTesting Procedures Summary

3.3.2 GPost-Project Report

23 05 48.00 40 SD-02 Shop Drawings

1.2 GInstallation Drawings

1.2 GOutline Drawings

SD-03 Product Data

1.2 GEquipment and Performance

Data

2.2.6 GIsolators

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 57 PAGES

23 05 48.00 40 SD-06 Test Reports

2.4 GType of Isolator

2.4 GType of Base

2.4 GAllowable Deflection

2.4 GMeasured Deflection

23 05 93.00 06 SD-02 Shop Drawings

3.3 GTAB Schematic Drawings and

Report Forms

SD-03 Product Data

3.2TAB Related HVAC Submittals

3.6.1 GDuct Air Leakage Test

Procedures

3.4 GTAB Procedures

3.5 GCalibrations

3.6Duct Air Leakage Tests

3.7Systems Readiness Check

3.8.2 GTAB Field Work

3.10 GTAB Verification

SD-06 Test Reports

3.1 GDesign Review Report

3.6.4 GDraft Duct Air Leakage Test

Report

3.6.6 GFinal Duct Air Leakage Test

Report

3.7 GSystems Readiness Check

Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 57 PAGES

23 05 93.00 06 3.9.1 GDraft TAB Report

3.9.2 GFinal TAB Report

SD-07 Certificates

1.5.1 GTAB Firm

1.5.2 GTAB Specialist

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMICA Plates

2.3Pipe Insulation Systems

3.2Pipe Insulation Systems

3.3Duct Insulation Systems

3.4Equipment Insulation Systems

2.3.1 SRecycled content for insulation

materials

SD-03 Product Data

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

SD-04 Samples

2.2.1.3 GThermal Insulation

3.1.1 GDisplay Samples

SD-07 Certificates

2.2.1 SIndoor air quality for adhesives

SD-08 Manufacturer’s Instructions

2.3 GPipe Insulation Systems

3.2 GPipe Insulation Systems

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 57 PAGES

23 07 00 3.3 GDuct Insulation Systems

3.4 GEquipment Insulation Systems

23 09 00 SD-02 Shop Drawings

3.2 GDDC Contractor Design Drawings

3.2 GDraft As-Built Drawings

3.2 GFinal As-Built Drawings

SD-03 Product Data

2.2 GManufacturer's Product Data

SD-05 Design Data

1.9Boiler Or Chiller Plant Gateway

Request

SD-06 Test Reports

3.4.2 GStart-Up Testing Report

3.5.1 GPVT Procedures

3.5.3 GPVT Report

1.10.1 GPre-Construction Quality Control

(QC) Checklist

1.10.2 GPost-Construction Quality Control

(QC) Checklist

SD-10 Operation and Maintenance

Data

3.6 GOperation and Maintenance

(O&M) Instructions

3.8.1 GTraining Documentation

SD-11 Closeout Submittals

2.5 GEnclosure Keys

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 57 PAGES

23 09 00 3.1.6.1 GPassword Summary Report

1.10.3 GCloseout Quality Control (QC)

Checklist

23 11 25 SD-02 Shop Drawings

1.5.2 GGas Piping System

2.2 GGas Piping System

3.2 GGas Piping System

SD-03 Product Data

1.5.2 GGas Equipment Connectors

1.5.2 GGas Piping System

2.2 GGas Piping System

3.2 GGas Piping System

2.1 GPipe Coating Materials

2.5 GPressure Regulators

2.3 GValves

2.2.2 GWarning and Identification Tape

SD-06 Test Reports

3.15 GTesting

3.15.1 GPressure Tests

3.15.2 GTest with Gas

SD-07 Certificates

1.5.1 GWelders Procedures and

Qualifications

1.5.1 GAssigned Number, Letter, or

Symbol

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE…