1. 18” Grab Bar is listed on the Toilet Accessories Legend but none are shown on the plans. Are any 18” grab bars required?
No, the 18” grab bars are not required.
2. There is no Toilet Tissue Dispenser shown at Women 109. I assume one would be required. Please verify.
Yes, a TTDJ toilet tissue dispenser is required.
3. The ceiling at Corridor C1 appears to be open to the structure on B1/A‐121 and B1/A‐301. The finish schedule on A‐722 shows acoustical ceiling at Corridor C1. Which is correct?
The RCP on A‐121 and A‐301 is correct – open to the structure.
4. The ceiling at Kitchen 119A and Dining 119D appears to be open to the structure with a partial gypsum ceiling on B1/A‐121. The finish schedule on A‐722 only notes gypsum ceiling. Which is correct?
The RCP on A‐121 is correct. There is a combination of gypsum ceiling and exposed structure.
5. Wall type M6G1.1 is labeled on A‐101A along Corridor C2 between the corridor and Women 109, Laundry 108 and Training Storage 117B. Wall type M6G1.1 would be a 6” CMU wall with a 6” furring wall on one side. The floor plan does not show a 6” CMU wall AND a 6” furring wall. Please clarify if wall type M6G1.1 is the correct wall type at this location.
Please refer to wall type M6G1.1 shown on sheet A‐004. No furring is shown.
6. Wall type M6G1.1 is labeled on A‐101A along Corridor C2 between the corridor and Women 109, Laundry 108 and Training Storage 117B. Wall type M6G1 on A‐003 shows a CMU wall extending to the underside of the concrete lid. There is no concrete lid at this location. What is the required height of the CMU at this location?
Please refer to wall type M6G1.1 shown on sheet A‐004. Drawing indicates height of CMU.
7. I have been unable to locate any Elastomeric Sheet Waterproofing on the plans. Does section 071353 apply to this project? If so please provide locations.
Tentative Answer: Not Required (Will Confirm)
8. The door schedule notes door 128 as Bid Option A03. The plans note door 126E as Bid Option A03. Which is correct?
The plan is correct. Door 126E is Bid Option A03.
9. Moisture resistant gypsum board is mentioned in section 092900 but is not noted anywhere on the plans. If any moisture resistant gypsum board is required please provide locations.
Tentative Answer: Not Used (Will Confirm)
10. I have been unable to locate any Spray Applied Fireproofing on the plans. Does section 078100 apply to this project? If so please provide locations.
Spray fireproofing is shown on sheet A‐513 to provide a continuous 1 hour fire rating at perimeter of concrete lid.
11. Please provide a plan that shows the dimensions required for the new roof deck over existing roof deck noted on C1/S‐401 and B1/S‐402. There is no way to quantify this material from the information provided.
Approximately 5500 SF is required (estimated from the Revit model). Approximate dimensions are 65’‐10” x 86’‐3” overall, with a 3’‐6” x 45’‐0” opening at new roof monitor.