Asbestos Lead-Containing Paint Report - NYARNG Roofs RochesterSyracuse.pdf
PDF 2 MB Posted
- Attached to
- Roofing Project Rochester
- Solicitation number
- W912PQ20B0001
About this file
This solicitation notice seeks bids for a roofing project at two New York Army National Guard facilities. The project includes re-roofing at the Rochester Combined Support Maintenance Shop and the Syracuse Armory. Bids are due by September 15, 2020. The contract will be a firm fixed-price contract awarded to the responsible bidder offering the lowest price. The project value is between $500,000 and $1,000,000. The North American Industry Classification code is 238160. The solicitation is set aside 100% for Service Disabled Veteran Owned Small Businesses. A site visit will be held on September 1, 2020. The General Decision Number for Monroe County wage rates is NY20200010.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Asbestos Survey & Lead Paint
Testing Report
New York Air National Guard Roofs
Combined Support Maintenance Shop “C”
Rochester, Monroe County, New York
Syracuse Armory
East Syracuse, Onondaga County, New York
December 9, 2019
Terracon Project No. J5197049
Prepared for:
Pond & Company
Peachtree Corners, Georgia
Prepared by:
Terracon Consultants-NY, Inc.
Rochester, New York
Terracon Consultants -NY, Inc. 15 Marway Circle Rochester , New York 14624
P [585] 247 3471 terracon.com
December 9, 2019
Pond & Company 3500 Parkway Lane, Suite 600 Norcross, GA 30092-2861
Attn: Mr. Matt Allinson
Senior Project Manager
P: (678) 336-7740
E: AllinsonM@ponco.com
Re: Asbestos Survey and Lead Paint Testing Report
Combined Support Maintenance Shop “C”
Roof Areas “B”
1500 East Rochester Road
Rochester, NY 14623
Syracuse Armory
Roof Areas “A” & “A1”
6900 Thompson Road
Syracuse, NY 13211
Dear Mr. Allinson:
Terracon Consultants-NY, Inc. (Terracon) is pleased to submit the attached report for the two (2) above-referenced project sites to Pond & Company (Pond). The purpose of this report is to present the results of an asbestos survey and lead paint testing which was performed on November 19 and
November 20, 2019 regarding specific roof sections/areas and select rooftop mounted mechanical systems to be replaced. The scope of services was conducted in accordance with
Terracon’s proposal dated October 21, 2019.
Asbestos and lead paint was detected in collected samples. Please refer to the report for details.
We trust this report meets your needs at this time. If you have any questions regarding this report, please feel free to contact us.
Sincerely, Terracon Consultants, Inc.
Tony Hill Joe Tussey, CHMM
Project Manager Authorized Project Reviewer
TABLE OF CONTENTS
EXECUTIVE SUMMARY ............................................................................................................................... i
INTRODUCTION
1.1 Project Objective
Project DESCRIPTION
FIELD ACTIVITIES
3.1 Asbestos Survey
3.2 Visual Assessment
Physical Assessment Sample Collection Sample Analysis
3.3 Limited Lead-containing Paint Testing
REGULATORY OVERVIEW
4.1 Asbestos
4.2 Lead-Containing Paint (LCP)
FINDINGS AND RECOMMENDATIONS
5.1 Asbestos Survey Results
5.2 Limited Lead Paint Testing
LIMITATIONS/GENERAL COMMENTS
LIST OF APPENDICES
APPENDIX A IDENTIFIED ASBESTOS-CONTAINING MATERIALS BY HOMOGENEOUS AREA (HA)
APPENDIX B ASBESTOS SURVEY SAMPLE SUMMARY
APPENDIX C ANALYTICAL LABORATORY DATA
APPENDIX D LICENSES AND CERTIFICATIONS
Asbestos Survey & Lead Paint Testing
NYANG Roofs ■ Rochester & Syracuse, New York
December 9, 2019 ■ Terracon Project No. J5197059
Responsive ■ Resourceful ■ Reliable i
EXECUTIVE SUMMARY
Terracon Consultants-NY, Inc. (Terracon) conducted an asbestos survey and lead paint testing regarding specific roof sections/areas at the New York Air National Guard’s Combined Support
Maintenance Shop “C” (CSMS-C) (roof area “B”) located in Rochester, New York and the
Syracuse Armory (roof sections “A” and “A1”) located in Rochester, New York. The subject roof areas/sections and select rooftop mounted mechanical systems of these buildings are scheduled for replacement. The purposes of our services was to identify asbestos-containing materials
(ACM) and lead-containing paint (LCP), if any, prior to the commencement of the renovation project.
The site visit was conducted on November 19 and November 20, 2019 by Terracon representative
Mr. Tony Hill, a New York state certified asbestos building inspector (Inspector Certification No.
06-02018), in accordance with the sampling protocols established in Environmental Protection
Agency (EPA) 40 Code of Federal Regulations (CFR) Part 763-Asbestos Subpart E-Asbestos-
Containing Materials in Schools, known as the Asbestos Hazard Emergency Response Act
(AHERA). Terracon collected nine bulk samples from three homogeneous areas of suspect ACM from the CSMS-C roof (area “B”) and six bulk samples from two homogeneous areas of suspect
ACM from the Syracuse Armory roof sections (sections “A” and “A1”). With respect to the scope of the survey, laboratory analysis did not identify the presence of >1% asbestos (the EPA threshold) in the samples collected from the subject buildings. However, laboratory analysis identified <1% asbestos in black built-up roofing material samples collected from CSMC-C roof area “B” (bottom roof layer, approximately 19,000 square feet of material). Materials containing <1% asbestos are not regulated by the EPA but are regulated under OSHA (29 CFR 1926.1101 – Asbestos in
Construction) due to the potential for worker exposure when disturbed.
While on site for the asbestos survey, Mr. Hill collected two paint chips from the CSMS-C roof mechanical components and two paint chips from the Syracuse Armory roof mechanical components. Lead was detected above the laboratory analytical method’s detection limit in each of the four samples. The disturbance of LCP is regulated under OSHA (29 CFR 1926.62 – Lead in
Construction) due to the potential for worker exposure.
Responsive ■ Resourceful ■ Reliable 1
ASBESTOS SURVEY & LEAD PAINT TESTING
NEW YORK AIR NATIONAL GUARD ROOFS
COMBINED SUPPORT MAINTENANCE SHOP “C” - ROOF AREA “B”,
ROCHESTER, NY
SYRACUSE ARMORY - ROOF AREAS “A” AND “A1”, SYRACUSE, NY
TERRACON PROJECT NO. J5197049
INTRODUCTION
Terracon Consultants-NY, Inc. (Terracon) conducted an asbestos survey and lead paint testing regarding specific roof sections/areas at the New York Air National Guard’s Combined Support
Maintenance Shop “C” (CSMS-C) (roof area “B”) located in Rochester, New York and the
Syracuse Armory (roof sections “A” and “A1”) located in Rochester, New York. The subject roof sections/areas and select rooftop mounted mechanical systems of these buildings are scheduled for replacement. The purposes of our services was to identify asbestos-containing materials
(ACM) and lead-containing paint (LCP), if any, prior to the commencement of the renovation project.
The site visit was conducted on November 19 and November 20, 2019 by Terracon representative
Mr. Tony Hill, who is a state of New York certified asbestos building inspector. With respect to the specific roof sections/areas, homogeneous areas of suspect asbestos-containing materials
(ACM) were visually identified and documented. Suspect ACM samples were collected in accordance with the sampling protocols outlined in Environmental Protection Agency (EPA) 40
Code of Federal Regulations (CFR) Part 763-Asbestos Subpart E-Asbestos-Containing Materials in Schools, known as the Asbestos Hazard Emergency Response Act (AHERA). Samples were delivered to an accredited laboratory for analysis by polarized light microscopy (PLM), PLM-non-friable organically bound (PLM-NOB), and transmission electron microscopy (TEM)-NOB (as required by New York State regulations). While conducted the asbestos survey of the specific roof sections/areas, Mr. Hill also collected paint samples from select rooftop mounted mechanical systems for the purpose of determined lead-content by laboratory analysis.
1.1 Project Objective
We understand the asbestos survey and lead paint testing was requested prior to the planned roof replacement projects of the above-referenced site structures.
EPA regulation 40 CFR 61, Subpart M, National Emission Standards for Hazardous Air Pollutants
(NESHAP), prohibits the release of asbestos fibers to the atmosphere during renovation or demolition activities. The asbestos NESHAP requires that potentially regulated ACM be identified, classified and quantified prior to planned disturbances or demolition activities.
Responsive ■ Resourceful ■ Reliable 2
The Occupational Safety and Health Administration (OSHA) Lead Standard for Construction (29
CFR 1926.62) regulates lead exposure to workers where an employee may be occupationally exposed to lead. All work related to construction, alteration, or repair (including painting and decorating) is included. The lead-in-construction standard applies to any detectable concentration of lead in paint, as even small concentrations of lead can result in unacceptable employee exposures depending upon on the method of removal and other workplace conditions.
PROJECT DESCRIPTION
We understand that roof sections/areas associated with the two (2) subject facilities are scheduled to be replaced due to age, delamination and to increase energy efficiency. Associated rooftop mechanical systems will also be removed and/or replaced during the roof replacement project.
The CSMS-C roof area “B” located in Rochester, NY is approximately 19,000 square feet (SF) and the Syracuse Armory roof sections “A” and “A1” are approximately 34,000 SF and 7,900 SF, respectively.
FIELD ACTIVITIES
3.1 Asbestos Survey
We understand the asbestos survey was requested due to the planned roof replacements of specific sections/areas of the existing buildings to satisfy requirements of the USEPA 40 CFR
Part 61, Subpart M, the NESHAP regulation. The purpose of the survey was to sample suspect
ACM for laboratory analysis, and provide information regarding the identity, location, condition and approximate quantities of ACM, if any, in roofing components.
The asbestos survey was performed on November 19 and November 20, 2019 by Mr. Tony Hill, USEPA AHERA-accredited and state of New York certified asbestos inspector (Inspector
Certification Nos. 06-02018). A copy of Mr. Hill’s asbestos inspector certifications is attached as
Appendix D. The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763 Subpart E 763.86, AHERA. A summary of survey activities is provided below.
3.2 Visual Assessment
Survey activities were initiated with visual observation of the accessible specified roof areas/sections of to identify homogeneous areas of suspect ACM. A homogeneous area (HA) consists of building materials that appear similar throughout in terms of color and texture with consideration given to the date of application. Roof materials identified as concrete, glass, wood, metal or rubber were not considered suspect ACM.
Responsive ■ Resourceful ■ Reliable 3
Terracon inspected the varying layers of each subject roof sections/areas to the identify roof composition down to the decking at each building. Suspect ACM was not observed below the rubber roof membrane of the Syracuse Armory roof areas “A” and “A1”.
Physical Assessment
A physical assessment of each homogeneous area of suspect ACM was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials.
Sample Collection
Based on results of the visual observation, bulk samples of suspect ACM were collected in general accordance with USEPA AHERA sampling protocols. Samples of suspect materials were collected from randomly selected locations in each homogeneous area. Bulk samples were collected using wet methods as applicable to reduce the potential for fiber release. Samples were placed in sealable containers and labeled with unique sample numbers using an indelible marker.
The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content.
Terracon collected nine bulk samples from three homogeneous areas of suspect ACM from the
CSMS-C roof area “B” and six bulk samples from two homogeneous areas of suspect ACM from the Syracuse Armory roof Sections “A” and “A1”. A summary of suspect ACM samples collected during the survey is included as Appendix B.
Sample Analysis
Bulk samples were submitted under chain of custody to EMSL Analytical, Inc. (EMSL) of
Rochester, New York, a New York State Department of Health (NYSDOH) Environmental
Laboratory Accreditation Program (ELAP) accredited laboratory, accreditation number 12088.
EMSL is also accredited under the National Voluntary Laboratory Accreditation Program
(NVLAP), accreditation number 600183-0.
As per NYSDOH-ELAP, friable materials were analyzed by PLM Method 198.1, nonfriable organically bound (NOB) materials (e.g., floor tiles and caulking) were analyzed using PLM-NOB
Method 198.6, and inconclusive NOBs were additionally analyzed using transmission electron microscopy (TEM) Method 198.4 for a conclusive result. The laboratory analytical data reports are included as Appendix C.
Responsive ■ Resourceful ■ Reliable 4
3.3 Limited Lead-containing Paint Testing
While conducting the asbestos survey, Terracon collected limited paint chip samples for laboratory analysis to determine lead-content from select painted roof top mounted mechanical components.
The paint chip samples were submitted for lead-content analysis by flame atomic absorption spectrophotometry (Flame AAS; EPA Method SW 846 3050B/7000B) to EMSL of Carle Place, New
York, a laboratory participating in the Environmental Lead Laboratory Accreditation Program
(ELLAP), accreditation number 102344. Terracon collected two paint chips from the CSMS-C roof mechanical components and two paint chips from the Syracuse Armory roof mechanical components.
REGULATORY OVERVIEW
4.1 Asbestos
The federal asbestos National Emission Standards for Hazard Air Pollutants (NESHAP; 40 CFR
Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices.
NESHAP requires an asbestos survey of structures prior to renovation and demolition projects and has specific requirements for the removal of certain categories of ACM prior to renovation and demolition projects. Friable ACM is a material containing more than 1% asbestos that, when dry, may be crumbled, pulverized or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos-containing material (RACM).
The NESHAP regulation classifies ACM as either RACM, Category I non-friable ACM or Category
II non-friable ACM. RACM includes all friable ACM, along with Category I and Category II non-friable ACM that has become friable or will be or has been subjected to sanding, grinding, cutting or abrading, or ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder in the course of renovation or demolition activity. Category I non-friable
ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, resilient floor covering mastics and asphalt roofing products that contain more than 1% asbestos. Category
II non-friable ACM are all other non-friable materials other than Category I non-friable ACM that contain more than 1% asbestos.
In the State of New York, asbestos abatement activities are regulated by the New York State
Department of Labor (NYSDOL) under the Part 56 of Title 12 of the Official Compilation of Codes, Rules and Regulations of the State of New York (12 NYCRR Part 56). New York regulations require that any asbestos-related activity conducted in the state be performed by personnel licensed by
NYSDOL. NYSDOL 12 NYCRR has instituted nine different certifications for asbestos related activities that include: Handler; Allied Trades; Air Sampling Technician; Inspector; Operations and
Maintenance; Supervisor; Project Designer; Project Monitor; and Management Planner. The owner or operator must provide the NYSDOL with written notification of planned asbestos removal
Responsive ■ Resourceful ■ Reliable 5 activities at least 10 working days prior to the commencement of a large project (greater than or equal to 160 square feet or 260 linear feet). Removal of ACM must be conducted by a State of New
York certified asbestos abatement contractor.
NYSDOL enforces the federal Occupational Safety and Health Administration (OSHA) standards at 29 CFR 1910.1001 and 29 CFR 1926.1101, which regulates employee exposure to asbestos.
The OSHA standard requires that employee exposure to airborne asbestos fibers be maintained at or below 0.1 fibers per cubic centimeter of air (0.1 f/cc) as an eight hour time weighted average
(TWA) and not exceed 1.0 fibers per cubic centimeter of air (1.0 f/cc) over a 30 minute time period known as an excursion limit (EL). The TWA and EL are known as OSHA’s permissible exposure limits (PELs). The OSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work.
4.2 Lead-Containing Paint (LCP)
Lead is regulated by the USEPA, New York State Department of Health (NYSDOH), and OSHA.
The EPA and NYSDOH regulate lead use, removal, and disposal, and OSHA regulates lead exposure to workers. The USEPA defines Lead-Based Paint (LBP) as paint, varnish, stain, or other applied coating that contains lead equal to or greater than 1.0 mg/cm2, 5,000 mg/Kg, or
0.5% by dry weight as determined by laboratory analysis. For the purpose of the OSHA lead standard, lead includes metallic lead, all inorganic lead compounds, and organic lead soaps.
Lead containing paint (LCP), is paint with any detectable levels of lead (levels above the analytical method’s limit of detection). A synopsis of the OSHA regulations (29 CFR 1926.62) and the applicability are as follows:
The OSHA Lead Standard for Construction (29 CFR 1926.62) applies to all construction work where an employee may be occupationally exposed to lead. All work related to construction, alteration, or repair (including painting and decorating) is included. The lead-in-construction standard applies to any detectable concentration of lead in paint, as even small concentrations of lead can result in unacceptable employee exposures depending upon on the method of removal and other workplace conditions. Under this standard, construction includes, but is not limited to, the following:
Demolition or salvage of structures where lead or materials containing lead are present
Removal or encapsulation of materials containing lead
New construction, alteration, repair, or renovation of structures, substrates, or portions containing lead, or materials containing lead
Installation of products containing lead
Responsive ■ Resourceful ■ Reliable 6
Lead contamination/emergency clean-up
Transportation, disposal, storage, or containment of lead or materials containing lead on the site or location at which construction activities are performed
Maintenance operations associated with construction activities described above
FINDINGS AND RECOMMENDATIONS
5.1 Asbestos Survey Results
Based on laboratory analytic results, and with respect to the scope of the survey, asbestos >1%
(the EPA threshold) was not identified in the samples collected from each of the specific roof sections/areas pertaining to the two sites. However, the material listed in the table below was identified by laboratory analysis to contain <1% asbestos. Materials containing 1% or less asbestos are not regulated by EPA (under NESHAP). However, materials containing <1% asbestos are regulated under OSHA given the potential for exposure when disturbed. Contractors who disturb the material containing <1% asbestos would need to comply with the OSHA asbestos provisions found in 29 CFR 1926.1101.
MATERIALS CONTAINING 1% OR LESS ASBESTOS
CSMS-C Roof Area “B”
Material Description Material Location Estimated Quantity
Black Built-up Roofing Area “B” Roof – Bottom Layer ~19,000 Square Feet (SF)
A summary of samples collected during this survey is included in Appendix B, and the laboratory analytical report is included in Appendix C.
It should be noted that suspect materials, other than those identified during the survey may exist.
Should suspect materials other than those which were identified during the survey be uncovered prior to or during the roof replacement project, those materials must be assumed as asbestos-containing (>1%) until sampled by an accredited inspector and laboratory analysis can refute the positive assumption.
5.2 Limited Lead Paint Testing
A total of four paint chip samples were collected during this limited sampling event; each of the four samples was identified by laboratory analysis to contain detectable concentrations of lead. A summary of the paint chip samples collected and the analytical results is presented in the table below. Data highlighted in bold indicates LCP. A copy of the laboratory report is attached in
Appendix C.
Responsive ■ Resourceful ■ Reliable 7
Table 5.2.1 - Summary of Paint Chip Lead Analysis – CSMS-C Roof Area “B”
Sample ID Color Substrate Component Location Analytical Result
(% lead by wt.)
PNT-001 Grey Metal
Exhaust
Fan
Housing
Area “B” Roof –
South Side
Center
0.014 %
PNT-002 Green/Brown Metal
Curved
Exhaust
Duct
Area “B” Roof –
South Side East
End
4.7 %
Table 5.2.2 - Summary of Paint Chip Lead Analysis – Syracuse Armory Roof Sections “A” & “A1”
Sample ID Color Substrate Component Location Analytical Result
(% lead by wt.)
PNT-001 Grey Metal Large A/C
Housing
Area “A” Roof –
Southwest
0.11 %
PNT-002 Brown/Grey Metal
Tall Round
Exhaust
Housing
Area “A” Roof –
Northwest
Corner
0.044 %
As summarized above, lead was detected above the laboratory detection limit in all four of the samples collected and analyzed. OSHA construction rules do not specify any "safe" or acceptable levels of lead within paints or other surface coatings for the purposes of occupational exposures.
Construction work LCP must be completed in accordance with OSHA regulations, not limited to the lead standard, 29 CFR 1926.62. Contractors completing work in areas found to contain lead, or where it is reasonable to assume lead may be present, should be notified of the presence (and potential presence) of lead and proper work protocols should be used.
The LCP sampling was limited to visible and accessible surfaces described herein, and the scope of work outlined in our proposal. It should be understood that this limited LCP sampling is not considered to be comprehensive in nature, and the results are not intended to be used to determine lead hazards, develop abatement plans, or prepare detailed cost estimates for abatement. Any untested paints should be assumed as lead-containing.
Responsive ■ Resourceful ■ Reliable 8
LIMITATIONS/GENERAL COMMENTS
The asbestos survey and lead paint testing was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions, and recommendations expressed in this report are based on conditions observed at the time of our site visit. The information contained in this report is relevant to the date on which our services were performed and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Pond for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding quantities and any further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories, or other third-parties supplying information which may have been used in the preparation of this report. No warranty, express or implied is made.
Responsive ■ Resourceful ■ Reliable
APPENDIX A
New York Air National Guard Roofs
MATERIALS CONTAINING 1% OR LESS ASBESTOS BY HA
CSMS-C Roof Area “A”
HA No. Material Description Material Location % and Type
Asbestos Condition
Estimated
Quantity
1 Black Built-up Roofing Area “B” Roof – Bottom Layer
<1% Chrysotile - confirmed by transmission electron microscopy
(TEM)
Good ~19,000 Square
Feet (SF)
Asbestos was not identified in the samples collected and analyzed with respect to the Syracuse Armory Roof Areas “A” & “A1”.
Materials containing less than 1% asbestos are not regulated by EPA NESHAP; however, the OSHA personal exposure limits (0.1 f/cc of air as an eight hour time weighted average or 1.0 f/cc of air over 30 minutes) for asbestos apply when materials containing 1% asbestos or less are disturbed during renovations or demolitions.
A listing of materials that contain 1% asbestos or less is provided above to enable the renovation/demolition contractor to make appropriate decisions concerning compliance issues with applicable OSHA regulations.
December 9, 2019 ■ Terracon Project No. J5197049
APPENDIX B
ASBESTOS SURVEY SAMPLE SUMMARY
CSMS-C Roof Area “B”
HA No. Sample Number Material Description Sample Location Lab Results
1A Black Built Up Roofing Area B Roof Field Northwest Bottom
Layer <1% Chrysotile (by TEM)
1B Black Built Up Roofing Area B Roof Field South Center Bottom
Layer <1% Chrysotile (by TEM)
1C Black Built Up Roofing Area B Roof Field Southeast Bottom
Layer <1% Chrysotile (by TEM)
2A Grey Gypsum Roof Decking Area B Roof deck Northwest No Asbestos Detected
2B Grey Gypsum Roof Decking Area B Roof deck South Center No Asbestos Detected
2C Grey Gypsum Roof Decking Area B Roof deck Southeast No Asbestos Detected
3A Black/Grey Caulking Area B Termination Bar No Asbestos Detected
3B Black/Grey Caulking Area B Exhaust Curb on Metal No Asbestos Detected
3C Black/Grey Caulking Area B Exhaust Curb on Metal No Asbestos Detected
December 9, 2019 ■ Terracon Project No. J5197049
Syracuse Armory Roof Areas “A” & “A1”
HA No. Sample Number Material Description Sample Location Lab Results
1A Black/Grey Roof Cement "A1" Roof Tie Down Pitch Pocket No Asbestos Detected
1B Black/Grey Roof Cement "A1" Roof Tie Down Pitch Pocket No Asbestos Detected
1C Black/Grey Roof Cement "A1" Roof Tie Down Pitch Pocket No Asbestos Detected
2A Black Seam Sealant "A" Roof EPDM Seam No Asbestos Detected
2B Black Seam Sealant "A" Roof EPDM Seam No Asbestos Detected
2C Black Seam Sealant "A" Roof Exhaust Boot No Asbestos Detected
APPENDIX C
ASBESTOS AND LEAD LABORATORY ANALYTICAL DATA
EMSL Analytical, Inc.
2975 Brighton Henrietta Town Line Rd ,100 Ste 130 Rochester, NY 14623
Tel/Fax: (585) 957-9436 / (585) 957-9437 http://www.EMSL.com / rochesterlab@EMSL.com
531901871EMSL Order:
Customer ID: TRNY42
Customer PO: J5197049
Project ID:
Attention: Phone:Tony Hill (585) 739-0663
Fax:Terracon Consultants, Inc
Received Date:15 Marway Circle 11/20/2019 4:23 PM
Analysis Date:Suite 2B 11/21/2019 - 11/25/2019
Collected Date:Rochester, NY 14624 11/19/2019
Project: NYANG Roofs, Henrietta
Test Report:Asbestos Analysis of Bulk Material
Test Color
Analyzed
Date Fibrous Non-Fibrous Asbestos
Non-Asbestos
Sample ID 1A Description Area B Roof Field Northwest Bottom Layer - Black Built Up Roofing
531901871-0001 Homogeneity Heterogeneous
PLM NYS 198.1 Friable Not Analyzed
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Black11/21/2019 <1.00% Glass 100.00% Other Inconclusive : <1% Chrysotile
Inseparable black tar between homogeneous layers of roof felt.
Final Residue <1% of original subsample –trace ACM, not analyzed by TEM.
TEM NYS 198.4 NOB Not Analyzed
Sample ID 1B Description Area B Roof Field South Center Bottom Layer - Black Built Up Roofing
531901871-0002 Homogeneity Heterogeneous
PLM NYS 198.1 Friable Not Analyzed
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Black11/21/2019 <1.00% Glass 100.00% Other Inconclusive : <1% Chrysotile
Inseparable black tar between homogeneous layers of roof felt.
Final Residue <1% of original subsample – trace ACM, not analyzed by TEM.
TEM NYS 198.4 NOB Not Analyzed
Sample ID 1C Description Area B Roof Field Southeast Bottom Layer - Black Built Up Roofing
531901871-0003 Homogeneity Heterogeneous
PLM NYS 198.1 Friable Not Analyzed
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Black11/21/2019 <1.00% Glass 100.00% Other Inconclusive : <1% Chrysotile
Inseparable black tar between homogeneous layers of roof felt.
TEM NYS 198.4 NOB Black11/25/2019 None 100.00% Other <1% Chrysotile
Sample ID 2A Description Area B Roof deck Northwest - Grey Gypsum Roof Decking
531901871-0004 Homogeneity Homogeneous
PLM NYS 198.1 Friable Gray None Detected11/21/2019 2.00% Cellulose 85.00%
13.00%
Gypsum
Non-fibrous (other)
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Not Analyzed
TEM NYS 198.4 NOB Not Analyzed
Sample ID 2B Description Area B Roof deck South Center - Grey Gypsum Roof Decking
531901871-0005 Homogeneity Homogeneous
PLM NYS 198.1 Friable Gray None Detected11/21/2019 2.00% Cellulose 85.00%
13.00%
Gypsum
Non-fibrous (other)
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Not Analyzed
TEM NYS 198.4 NOB Not Analyzed
Initial report from: 11/25/2019 15:26:45
Page 1 of 3ASB_198x_0009 - 1.71 Printed 11/25/2019 3:26:48PM
Tel/Fax: (585) 957-9436 / (585) 957-9437 http://www.EMSL.com / rochesterlab@EMSL.com
531901871EMSL Order:
Customer ID: TRNY42
Customer PO: J5197049
Project ID:
Test Report:Asbestos Analysis of Bulk Material
Test Color
Analyzed
Date Fibrous Non-Fibrous Asbestos
Non-Asbestos
Sample ID 2C Description Area B Roof deck Southeast - Grey Gypsum Roof Decking
531901871-0006 Homogeneity Homogeneous
PLM NYS 198.1 Friable Gray None Detected11/21/2019 2.00% Cellulose 85.00%
13.00%
Gypsum
Non-fibrous (other)
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Not Analyzed
TEM NYS 198.4 NOB Not Analyzed
Sample ID 3A Description Area B Termination Bar - Black/Grey Caulking
531901871-0007 Homogeneity Homogeneous
PLM NYS 198.1 Friable Not Analyzed
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Gray Inconclusive: None Detected11/21/2019 100.00% Other
Final Residue <1% of original subsample – Non-ACM, not analyzed by TEM.
TEM NYS 198.4 NOB Not Analyzed
Sample ID 3B Description Area B Exhaust Curb on Metal - Black/Grey Caulking
531901871-0008 Homogeneity Homogeneous
PLM NYS 198.1 Friable Not Analyzed
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Gray Inconclusive: None Detected11/21/2019 100.00% Other
Final Residue <1% of original subsample – Non-ACM, not analyzed by TEM.
TEM NYS 198.4 NOB Not Analyzed
Sample ID 3C Description Area B Exhaust Curb on Metal - Black/Grey Caulking
531901871-0009 Homogeneity Homogeneous
PLM NYS 198.1 Friable Not Analyzed
PLM NYS 198.6 VCM Not Analyzed
PLM NYS 198.6 NOB Gray Inconclusive: None Detected11/21/2019 100.00% Other
TEM NYS 198.4 NOB Gray None Detected11/25/2019 100.00% Other
Page 2 of 3ASB_198x_0009 - 1.71 Printed 11/25/2019 3:26:48PM
Tel/Fax: (585) 957-9436 / (585) 957-9437 http://www.EMSL.com / rochesterlab@EMSL.com
531901871EMSL Order:
Customer ID: TRNY42
Customer PO: J5197049
Project ID:
Test Report:Asbestos Analysis of Bulk Material
The samples in this report were submitted to EMSL for analysis by Asbestos Analysis of Bulk Materials via NYS ELAP Approved Methods . The reference number for these samples is the EMSL Order ID above. Please use this reference number when calling about these samples.
Report Comments:
Sample Receipt Date:
Analysis Completed Date: Analysis Completed Time:
Sample Receipt Time:11/20/2019 4:23 PM
11/21/2019 4:16 PM
Analyst(s):
Melissa Hartwig PLM NYS 198.1 Friable (3) Melissa Hartwig PLM NYS 198.6 NOB (6)
Peter Donato TEM NYS 198.4 NOB (2)
Samples reviewed and approved by:
Peter Donato Asbestos Laboratory Manager or Other Approved Signatory
NOB = Non Friable Organically Bound N/A = Not Applicable VCM = Vermiculite Containing Material
-In New York State, TEM is currently the only method that can be used to determine if NOB materials can be considered or treated as non-asbestos containing.
All samples examined for the presence of vermiculite when analyzed via NYS 198.1.
-NYS Guidelines for Vermiculite containing samples are available at http ://www.wadsworth.org/labcert/elapcert/forms/VermiculiteInterimGuidance_Rev070913.pdf EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by
EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations . Interpretation and use of test results are the responsibility of the client.
Samples were received in good condition unless otherwise noted.
This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. This report may contain data that is not covered by the NVLAP accreditation .
Samples analyzed by EMSL Analytical, Inc. Rochester, NY NYS ELAP 12088
Page 3 of 3ASB_198x_0009 - 1.71 Printed 11/25/2019 3:26:48PM
OrderID: 531901871
Client Sample Description ConcentrationLab ID Analyzed Lead
Collected
EMSL Analytical, Inc.
528 Mineola Avenue, Carle Place, NY 11514 Phone/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com carleplacelab@emsl.com
Attn: Tony Hill Terracon Consultants, Inc 15 Marway Circle Suite 2B Rochester, NY 14624
Received: 11/21/19 10:17 AM
NYANG Roofs J5187049, Henrietta, New York.
Fax:
Phone: (585) 247-3471
Project:
11/19/2019Collected:
Test Report: Lead in Paint Chips by Flame AAS (SW 846 3051A/7000B)*
061926361 CustomerID: TRNY42 CustomerPO: J5187049 ProjectID:
EMSL Order:
Site: Area "B" Roof Exhaust Fan Housing Desc: Grey
061926361-0001PNT-001 0.014 % wt11/29/201911/19/2019
Site: Area "B" Roof Curved Exhaust Duct Desc: Green/Brown
061926361-0002PNT-002 4.7 % wt11/29/201911/19/2019
Alger Liang, Lead Laboratory Manager or other approved signatory
Test Report ChmSnglePrm/nQC-7.32.3 Printed: 11/29/2019 4:41:17 PM
*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies the analyte was not detected at or above the warning limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements unless specifically indicated otherwise.
Definitions of modifications are available upon request.
Samples analyzed by EMSL Analytical, Inc. Carle Place, NY Lab ID 102344 is accredited by the AIHA LAP, LLC in the Environmental Lead accred. program for Lead in Dust, CT PH-0249, NYS ELAP
11469, CA 2339.
Initial report from 11/29/2019 16:41:17 http://www.EMSL.com mailto:carleplacelab@emsl.com
OrderID: 061926361
Analyzed Date Asbestos Fibrous Non-FibrousTest Color
Non Asbestos
Test Report:Asbestos Analysis of Bulk Material
EMSL Analytical, Inc.
2975 Brighton Henrietta Town Line Rd ,100 Ste 130, Rochester, NY 14623 Phone/Fax: (585) 957-9436 / (585) 957-9437 http://www.EMSL.com rochesterlab@EMSL.com
531901872 CustomerID: TRNY42 CustomerPO: J5197049 ProjectID:
EMSL Order:
Attn: Tony Hill Terracon Consultants, Inc 15 Marway Circle Suite 2B Rochester, NY 14624
Received: 11/20/19 4:31 PM
NYANG Roofs, J5197049
Fax:
Phone: (585) 247-3471
Project:
11/26/2019Analysis Date:
11/20/2019Collected:
1A 531901872-0001
Description "A1" Roof Tie Down Pitch Pocket - Black/Grey Roof Cement
PLM NYS 198.1 Friable
PLM NYS 198.6 NOB
TEM NYS 198.4 NOB
11/25/2019
11/26/2019
Not Analyzed
Inconclusive: None Detected
None Detected
Gray/Black
Gray/Black
Sample ID
Result includes a small amount of inseparable attached material.
Homogeneity Heterogeneous
PLM NYS 198.6 VCM Not Analyzed
Other100%
Other100%
1B 531901872-0002
Description "A1" Roof Tie Down Pitch Pocket - Black/Grey Roof Cement
PLM NYS 198.1 Friable
PLM NYS 198.6 NOB
TEM NYS 198.4 NOB
11/25/2019
11/26/2019
Not Analyzed
Inconclusive: None Detected
None Detected
Gray/Silver
Gray/Silver
Sample ID
Inseparable layer of silver paint included in analysis.
Homogeneity Heterogeneous
PLM NYS 198.6 VCM Not Analyzed
Other100%
Other100%
1C 531901872-0003
Description "A1" Roof Tie Down Pitch Pocket - Black/Grey Roof Cement
PLM NYS 198.1 Friable
PLM NYS 198.6 NOB
TEM NYS 198.4 NOB
11/25/2019
11/26/2019
Not Analyzed
Inconclusive: None Detected
None Detected
Gray/Silver
Gray/Silver
Sample ID
Inseparable layer of silver paint included in analysis.
Homogeneity Heterogeneous
PLM NYS 198.6 VCM Not Analyzed
Other100%
Other100%
2A 531901872-0004
Description "A" Roof EPDM Seam - Black Seam Sealant
PLM NYS 198.1 Friable
PLM NYS 198.6 NOB
TEM NYS 198.4 NOB
11/25/2019
11/26/2019
Not Analyzed
Inconclusive: None Detected
None Detected
Brown/White/ Black
Brown/White/ Black
Sample ID
Result includes a small amount of inseparable attached material.
Homogeneity Heterogeneous
PLM NYS 198.6 VCM Not Analyzed
Other100%
Other100%
Page 1Test Report 198VCM-7.30.0 Printed: 11/26/2019 2:22:17 PM
Initial Report From 11/26/2019 14:22:17 mailto:rochesterlab@EMSL.com
Asbestos Fibrous Non-FibrousTest Color Non Asbestos
Test Report:Asbestos Analysis of Bulk Material
EMSL Analytical, Inc.
2975 Brighton Henrietta Town Line Rd ,100 Ste 130, Rochester, NY 14623 Phone/Fax: (585) 957-9436 / (585) 957-9437 http://www.EMSL.com rochesterlab@EMSL.com
531901872 CustomerID: TRNY42 CustomerPO: J5197049 ProjectID:
EMSL Order:
2B 531901872-0005
Description "A" Roof EPDM Seam - Black Seam Sealant
PLM NYS 198.1 Friable
PLM NYS 198.6 NOB
TEM NYS 198.4 NOB
11/25/2019
11/26/2019
Not Analyzed
Inconclusive: None Detected
None Detected
Brown/White/ Black
Brown/White/ Black
Sample ID
Result includes a small amount of inseparable attached material.
Homogeneity Heterogeneous
PLM NYS 198.6 VCM Not Analyzed
Other100%
Other100%
2C 531901872-0006
Description "A" Roof Exhaust Boot - Black Seam Sealant
PLM NYS 198.1 Friable
PLM NYS 198.6 NOB
TEM NYS 198.4 NOB
11/25/2019
11/26/2019
Not Analyzed
Inconclusive: None Detected
None Detected
Brown/White/ Black
Brown/White/ Black
Sample ID
Result includes a small amount of inseparable attached material.
Homogeneity Heterogeneous
PLM NYS 198.6 VCM Not Analyzed
Other100%
Other100%
-In New York State, TEM is currently the only method that can be used to determine if NOB materials can be considered or treated as non-asbestos containing.
All samples examined for the presence of vermiculite when analyzed via NYS 198.1.
-NYS Guidelines for Vermiculite containing samples are available at http://www.wadsworth.org/labcert/elapcert/forms/VermiculiteInterimGuidance_Rev070913.pdf EMSL maintains liability limited to cost of analysis. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities or analytical method limitations. Interpretation and use of test results are the responsibility of the client. Samples were received in good condition unless otherwise noted.
This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST, or any agency of the federal government. This report may contain data that is not covered by the NVLAP accreditation.
Peter Donato Asbestos Laboratory Manager or other approved signatory
Analyst(s)
NOB = Non Friable Organically Bound N/A = Not Applicable VCM = Vermiculite Containing Material
Melissa Hartwig
Peter Donato
Samples analyzed by EMSL Analytical, Inc. Rochester, NY NYS ELAP 12088
Page 2THIS IS THE LAST PAGE OF THE REPORT.Test Report 198VCM-7.30.0 Printed: 11/26/2019 2:22:17 PM
Initial Report From 11/26/2019 14:22:17 http://www.EMSL.com mailto:rochesterlab@EMSL.com http://www.wadsworth.org/labcert/elapcert/forms/VermiculiteInterimGuidance_Rev070913.pdf
OrderID: 531901872
Client Sample Description ConcentrationLab ID Analyzed Lead
Collected
EMSL Analytical, Inc.
528 Mineola Avenue, Carle Place, NY 11514 Phone/Fax: (516) 997-7251 / (516) 997-7528 http://www.EMSL.com carleplacelab@emsl.com
Attn: Tony Hill Terracon Consultants, Inc 15 Marway Circle Suite 2B Rochester, NY 14624
Received: 11/21/19 12:00 AM
NYANG Roofs J5187049. Syracuse, NY.
Fax:
Phone: (585) 247-3471
Project:
11/20/2019Collected:
Test Report: Lead in Paint Chips by Flame AAS (SW 846 3051A/7000B)*
061926341 CustomerID: TRNY42 CustomerPO: J5187049 ProjectID:
EMSL Order:
Site: "A" Roof Large Air Conditioner Housing Desc: Grey
061926341-0001PNT-001 0.11 % wt11/29/201911/20/2019
Site: "A" Rood Tall Air Conditioner Housing Desc: Brown/Grey
061926341-0002PNT-002 0.044 % wt11/29/201911/20/2019
Alger Liang, Lead Laboratory Manager or other approved signatory
Test Report ChmSnglePrm/nQC-7.32.3 Printed: 11/29/2019 4:43:21 PM
*Analysis following Lead in Paint by EMSL SOP/Determination of Environmental Lead by FLAA. Reporting limit is 0.008 % wt based on the minimum sample weight per our SOP. Unless noted, results in this report are not blank corrected. This report relates only to the samples reported above and may not be reproduced, except in full, without written approval by EMSL. EMSL bears no responsibility for sample collection activities. Samples received in good condition unless otherwise noted. "<" (less than) result signifies the analyte was not detected at or above the warning limit. Measurement of uncertainty is available upon request. The QC data associated with the sample results included in this report meet the recovery and precision requirements unless specifically indicated otherwise.
Definitions of modifications are available upon request.
Samples analyzed by EMSL Analytical, Inc. Carle Place, NY Lab ID 102344 is accredited by the AIHA LAP, LLC in the Environmental Lead accred. program for Lead in Dust, CT PH-0249, NYS ELAP
11469, CA 2339.
Initial report from 11/29/2019 16:43:21 mailto:carleplacelab@emsl.com
OrderID: 061926341
APPENDIX D
LICENSES AND CERTIFICATIONS
New York State – Department of Labor Division of Safety and Health License and Certificate Unit State Campus, Building 12
Albany, NY 12240
ASBESTOS HANDLING LICENSE
Terracon Consultants, Inc.
10841 S. Ridgeview Road
Olathe, KS 66061
FILE NUMBER: 16-93056
LICENSE NUMBER: 93056
LICENSE CLASS: RESTRICTED
DATE OF ISSUE: 04/30/2019
EXPIRATION DATE: 04/30/2020
Duly Authorized Representative – Charles Guzzetta:
This license has been issued in accordance with applicable provisions of Article 30 of the Labor Law of New York State and of the New York State Codes, Rules and Regulations (12 NYCRR Part 56). It is subject to suspension or revocation for a (1) serious violation of state, federal or local laws with regard to the conduct of an asbestos project, or (2) demonstrated lack of responsibility in the conduct of any job involving asbestos or asbestos material.
This license is valid only for the contractor named above and this license or a photocopy must be prominently displayed at the asbestos project worksite. This license verifies that all persons employed by the licensee on an asbestos project in New York State have been issued an Asbestos Certificate, appropriate for the type of work they perform, by the New York State Department of Labor.
Eileen M. Franko, Director SH 432 (8/12) For the Commissioner of Labor
| Rochester ASB Results Final.pdf |
| 531901871_001.pdf |
| Rochester PB Results Final.pdf |
| 061926361_001.pdf |
| Syracuse ASB Results Final.pdf |
| 531901872_001.pdf |
| Syracuse PB Results Final.pdf |
| 061926341_001.pdf |
| Hard Card Expires 9-20.pdf |
| Terracon NY AHL 2019-2020.pdf |
| 2019-12-10T12:46:00-0500 | |
| Tussey, Joe A |
| 2019-12-10T13:05:31-0500 | |
| Hill, Tony J |
File details come from the government source that posted it. Updated .