CSMS-C Final Drawings pg 1-7.pdf
PDF 5 MB Posted
- Attached to
- Roofing Project Rochester
- Solicitation number
- W912PQ20B0001
About this file
This solicitation notice seeks bids for a roofing project at the Rochester Combined Support Maintenance Shop (CSMS-C) in Rochester, New York. The United States Property and Fiscal Office for New York will award a firm fixed-price construction contract to provide all labor, materials, equipment and supervision for re-roofing services. The scope of work involves furnishing all requirements to replace the roof at the CSMS-C facility according to the statement of work. The project magnitude is between $500,000 and $1,000,000. The solicitation is set aside 100% for Service-Disabled Veteran Owned Small Businesses. The North American Industry Classification code is 238160. The anticipated contract duration is 180 days after notice to proceed. Bids are due by September 15, 2020 and the pre-bid site visit will take place on September 1, 2020. The solicitation, plans and specifications are available through the Contract Opportunities on Beta SAM website.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECURITY GATE/
PERSONNEL CHECK-IN
CONTRACTOR PARKING
CONTRACTOR STAGING AREA
EXISTING GENERATOR,
MAINTAIN MINIMUM 5'-0" CLEAR
PATH FOR MONTHLY TESTING
CONTRACTOR VEHICLE
ACCESS AFTER CHECK-IN
ARCHITECTURAL:
QPK DESIGN
ARCHITECTS/ENGINEERS
450 SOUTH SALINA ST
SYRACUSE NY 13201
315-472-7806
DRAWING LIST
GENERAL
--- COVER SHEET
ARCHITECTURAL INFORMATION
A-001 GENERAL INFORMATION
ARCHITECTURAL DEMOLITION
AD-101 ROOF PLAN - DEMOLITION
AD-102 ROOF - DEMOLITION DETAILS
ARCHITECTURAL
A-101 ROOF PLAN
A-102 ROOF - DETAILS
PLUMBING
P-001 PLUMBING GENERAL NOTES, ABBREVIATIONS, AND
LEGENDS
PLUMBING DEMOLITION
PD101 PLUMBING DEMOLITION ROOF PLAN
PLUMBING NEW WORK
P-101 PLUMBING ROOF PLAN
MECHANICAL
M-001 MECHANICAL GENERAL NOTES, DESIGN CRITERIA,
ABBREVIATIONS, AND LEGENDS
MECHANICAL DEMOLITION
MD101 MECHANICAL DEMOLITION ROOF PLAN
MECHANICAL NEW WORK
MH101 MECHANICAL ROOF PLAN
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, ABBREVIATIONS AND
LEGEND
ED101 ELECTRICAL DEMOLITION ROOF PLAN
E-101 ELECTRICAL ROOF PLAN
ROCHESTER CSMS-C RE-ROOFING PROJECT
NEW YORK ARMY NATIONAL GUARD
1500 EAST HENRIETTA ROAD
ROCHESTER, NY 14623
6 MAR 2020
100% DESIGN
MEP:
POND
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
PHONE (678) 336-7740
FAX (678) 336-7744
LOCATION MAP
AERIAL IMAGE
Contractor shall provide Unit Pricing with their bids as follows:
Unit price is an amount incorporated in the Agreement, applicable during the duration of the Work as a price per unit of measurement for materials, equipment, or services, or a portion of the Work, added to or deducted from the Contract Sum by appropriate modification, if the scope of Work or estimated quantities of Work required by the Contract Documents are increased or decreased.
Unit prices include all necessary material, plus cost for delivery, installation, insurance, overhead, and profit.
• Unit Price No. 001 – Removal of existing loose or deteriorated asphaltic multi-ply vapor barrier from existing poured gypsum decking. Unit of measurement: (1) square foot.
• Unit Price No. 002 – Removal and replacement of existing poured gypsum deck and form board section not including bulb tees. Unit of measurement: (1) gypsum plank approximately 30” wide x 8’-6” long.
• Unit Price No. 003 - Removal of damaged, wet, or deteriorated existing Wood Blocking and replacement with specified wood blocking to match width and thickness of the existing. Replacement wood blocking material and installation shall be as specified in Section 061053. Unit of measurement: 2x6; Lineal foot.
Contractor shall provide pricing for Alternates with their bids as follows:
Alternate: An amount proposed by bidders for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if the CONTRACTING OFFICER decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.
Alternates described in this Section are part of the Work only if enumerated in the Agreement. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternates into the Work. No other adjustments are made to the Contract Sum.
Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.
Alternate No. 001 – Re-roofing Work Scope (DEDUCT):
• Base Bid: Remove the existing asphaltic multi-ply vapor barrier from the existing poured gypsum decking as indicated on drawings without damaging the existing gypsum deck.
• Alternate: Existing multi-ply vapor barrier on the existing poured gypsum deck to remain. Install specified roof system on top of the existing vapor barrier as instructed by the roofing manufacturer.
N A
ROOM NAME DESIGNATION
ROOM NUMBER DESIGNATION (IF PRESENT)
ROOM AREA DESIGNATION (IF PRESENT)
PARTITION TYPE
DESIGNATION. SEE
PARTITION LEGEND
DOOR NUMBER
DESIGNATION
SPECIAL NOTATION (e.g.
DEMO NOTE)
�� WINDOW TYPE DESIGNATION
1T
ACCESSORY ITEM- SEE
ACCESSORY SCHEDULE
DATUM POINT OR WORK
POINT
BUILDING SECTION
WALL SECTION
DETAIL
NUMBER
SHEET NUMBER
WHERE DETAIL IS
LOCATEDDETAIL
NUMBER
SHEET NUMBER WHERE
DETAIL IS LOCATED
EXTENT OF
SECTION
A-XXX
A1
A2 B1
DETAIL
NUMBERS
SHEET NUMBER
WHERE DETAIL IS
LOCATED
ELEVATIONS
REVISION NOTE
REVISION NUMBER
EXTENT OF REVISION
A1 A2 A3 A4 A5 A6 A7
B1 B2 B3 B4 B5 B6 B7
C1 C2 C3 C4 C5 C6 C7
D1 D2 D3 D4 D5 D6 D7
E1 E2 E3 E4 E5 E6 E7
F1 F2 F3 F4 F5 F6 F7
DETAIL
NUMBER
DETAIL
SCALE
DETAIL NAME
DETAIL NUMBER
SCALE: ��������
AXX
View Name
ROOM NAME
00000
1500 SF
DETAIL SECTION
DETAIL NUMBER
SHEET NUMBER
WHERE DETAIL IS
LOCATED
EXTENT OF
SECTION
PLAN DETAIL
DETAIL NUMBER
SHEET NUMBER
WHERE DETAIL
IS LOCATED
EXTENT OF
DETAIL
NNNL
A-XXX
A-XXX
A-XXX
A-XXX
A-XXX
NEW DOOR IN NEW OR
EXISTING PARTITION, SEE
DOOR SCHEDULE
EXISTING DOOR IN NEW OR
EXISTING PARTITION, WITH
MODIFICATION. SEE DOOR
SCHEDULE
EXISTING DOOR TO BE
REMOVED, SEE REMOVAL
PLAN
EXISTING DOOR TO
REMAIN, IN EXISTING
PARTITION
E-###
FINISHED SURFACES-NEW
REMOVAL OF EXISTING
EXISTING SURFACES
GRAVEL / STONE
CONCRETE -
CAST IN
PLACE
CONCRETE
MASONRY UNIT
BRICK
CONCRETE -
PRECAST
STONE
GRANITE
MARBLE
SAND / MORTAR
GYPSUM
WALLBOARD
ALUMINUM
STEEL
RIGID
INSULATION
TILE
P LAM OVER
COMPOSITE
WOOD
WOOD -
FINISHED
PLYWOOD
ACOUSTIC
TILE
CARPET
EARTH
BATT
INSULATION
WOOD
BLOCKING
REINFORCING -
WWF
SOLID SURFACE
QUARTZ
CULTERED
MARBLE
SYNTHETIC
2017 EXISTING BUILDING CODE OF NY STATE
CHAPTER 7 - ALTERATIONS LEVEL 1
EBC706: REROOFING
EBC706.1 General. Materials and methods of application used for recovering or replacing an existing roof covering shall comply with the requirements of Chapter BC15 of the International Building Code.
Exception: Reroofing shall not be required to meet the minimum design slope requirement of one-quarter unit vertical in 12 units horizontal (2-percent slope) in Section BC1507 of the International Building Code for roofs that provide positive roof drainage.
EBC706.2 Structural and construction loads. Structural roof components shall be capable of supporting the roof-covering system and the material and equipment loads that will be encountered during installation of the system.
EBC706.3 Recovering versus replacement. New roof coverings shall not be installed without first removing all existing layers of roof coverings down to the roof deck where any of the following conditions occur:
1. Where the existing roof or roof covering is water soaked or has deteriorated to the point that the existing roof or roof covering is not adequate as a base for additional roofing.
2. Where the existing roof covering is wood shake, slate, clay, cement or asbestos-cement tile.
3. Where the existing roof has two or more applications of any type of roof covering.
EBC706.6 Flashings. Flashings shall be reconstructed in accordance with approved manufacturer's installation instructions. Metal flashing to which bituminous materials are to be adhered shall be primed prior to installation.
2017 BUILDING CODE OF NEW YORK STATE
Chapter 1511: REROOFING
BC1511.1 General. Materials and methods of application used for recovering or replacing an existing roof covering shall comply with the requirements of Chapter BC15.
Exceptions:
1. (Same as EBC706.1 General; exception regarding slope).
2. Recovering or replacing an existing roof covering shall not be required to meet the requirement for secondary (emergency overflow) drains or scuppers in Section BC1503.4 for roofs that provide for positive roof drainage. For the purposes of this exception, existing secondary drainage or scupper systems required in accordance with this code shall not be removed unless they are replaced by secondary drains or scuppers designed and installed in accordance with Section BC1503.4.
2017 ENERGY CONSERVATION CONSTRUCTION CODE OF NEW YORK STATE
TABLE ECC301.1: CLIMATE ZONES, MOISTURE REGIMES, AND WARM-HUMID DESIGNATIONS BY STATE, COUNTY AND TERRITORY
• Monroe County Climate Zone = 5A
Chapter 5: EXISTING BUILDINGS
ECC503: ALTERATIONS
ECC503.1 General.
Alterations to any building or structure shall comply with the requirements of the code for new construction. Alterations shall be such that the existing building or structure is no less conforming to the provisions of this code than the existing building or structure was prior to the alteration. Alterations to an existing building, building system or portion thereof shall conform to the provisions of this code as those provisions relate to new construction without requiring the unaltered portions of the existing building or building system to comply with this code. Alterations shall not create an unsafe or hazardous condition or overload existing building systems.
Alterations complying with ANSI/ASHRAE/IESNA 90.1. need not comply with Sections ECC402, ECC403, ECC404 and ECC405.
Exception: The following alterations need not comply with the requirements for new construction, provided the energy use of the building is not increased:
1. Construction where the existing roof, wall or floor cavity is not exposed.
2. Roof recover.
3. Air barriers shall not be required for roof recover and roof replacement where the alterations or renovations to the building do not include alterations, renovations or repairs to the remainder of the building envelope.
ECC503.3 Building envelope.
New building envelope assemblies that are part of the alteration shall comply with Sections ECC402.1 through ECC402.5.
ECC503.3.1 Roof replacement. Roof replacements shall comply with Table ECC402.1.3 or Table ECC402.1.4 where the existing roof assembly is part of the building thermal envelope and contains insulation entirely above the roof deck.
ECC 402 – BUILDING ENVELOPE REQUIREMENTS
402.1 General (Prescriptive) - Building thermal envelope assemblies for buildings that are intended to comply with the code on a prescriptive basis, in accordance with the compliance path described in Item 2 of Section ECC401.2, shall comply with the following:
1. The opaque portions of the building thermal envelope shall comply with the specific insulation requirements of Section ECC402.2 and the thermal requirements of either the R-value-based method of Section ECC402.1.3; the U-, C-and F-factor-based method of Section ECC402.1.4; or the component performance alternative of Section ECC402.1.5.
2. Not applicable.
3. Fenestration in building envelope assemblies shall comply with Section ECC402.4.
4. Air leakage of building envelope assemblies shall comply with Section ECC402.5.
GENERAL NOTE
To the best of our knowledge, belief and professional judgment, such plans or specifications are in compliance with the Energy Code.
Table ECC 402.1.4 (U Factor Method)
• Insulation Entirely Above Roof (Main Roof; Zone 5A) = U-0.032
Assemblies:
• Existing to remain: 2” thick poured gypsum deck @ 1.80, ½” thick interior gypsum board @ 0.45 (total R = 2.25).
• Proposed: Roof membrane (.20), ½” Dens-deck Prime (.56), 5” average of Polyisocyanurate insulation (R-30).
• Total R value = 32.25
• U value = 0.0323 (complies).
EFFECTIVE
WIND AREA
ROOF
ZONE 3 ZONE 2 ZONE 1
10 SF
20 SF
50 SF
100 SF
85.5 13.8 56.8 13.8 33.9 13.8
70.8 12.9 50.8 12.9 33.0 12.9
51.4 11.8 42.8 11.8 31.9 11.8
36.7 10.9 36.7 10.9 31.0 10.9
NOTES:
1. ZONE DEFINED IN BUILDING CODE USING A=12'-0"
2. PLUS AND MINUS SIGNS SIGNIFY PRESSURES ACTING
TOWARD AND AWAY FROM THE SURFACES, RESPECTIVELY
3. PRESSURES ARE REPORTED AT STRENGTH LEVEL. USE
APPROPRIATE LOAD COMBINATION ACCORDING TO ASCE 7-10
4. WIND LOADS ARE CALCULATED FROM THESE PARAMETERS FOR
EACH SURFACE OF THE MAIN WIND-FORCE RESISTING SYSTEM
ROOF PLAN
23 3
3 3
2 21
500 SF 36.7 10.9 36.7 10.9 31.0 10.9
WIND LOAD NOTES:
1. ULTIMATE DESIGN WIND SPEED (3 SEC GUST) 116MPH
2. RISK CATEGORY III
3. WIND EXPOSURE CATEGORY C
4. INTERNAL PRESSURE +/- 0.18
5. COMPONENT AND CLADDING NOT SPECIFICALLY DESIGN HEREIN SHALL
BE DESIGNED FOR THE FOLLOWING NET DESIGN WIND PRESSURES;
BASED ON TRIBUTARY AREA.
1. ROOF CONSTRUCTION WAS EVALUATED IN ACCORDANCE WITH THE 2018 INTERNATIONAL EXISTING
BUILDING CODE (IEBC) AS MODIFIED BY THE UNIFIED FACILITIES CRITERIA (UFC).
2. CONTRACTOR SHALL VERIFY IN THE FIELD ALL EXISTING CONDITIONS AT THE SITE PRIOR TO BEGINNING ANY WORK. IF EXISTING FIELD CONDITIONS DO NOT PERMIT THE INSTALLATION OF THE
WORK IN ACCORDANCE WITH THE DETAILS AS SHOWN, NOTIFY ENGINEER IMMEDIATELY.
3. DESIGN LOADS:
ROOF LIVE LOAD:
1. GROUND SNOW LOAD Pg = 40 PSF
2. FLAT ROOF SNOW LOAD Pf = 26 PSF
3. SNOW EXPOSURE FACTOR Cc = 0.9
4. SNOW LOAD IMPORTANCE FACTOR Is = 1.0
5. THERMAL FACTOR Ct = 1.0
6. SNOW DRIFT LOADING DETERMINED IN ACCORDANCE WITH ASCE 7-16.
ULTIMATE BUILDING COMPONENT & CLADDING PRESSURE (PSF)
SEISMIC LOAD NOTES:
RISK CATEGORY……III
SEISMIC IMPORTANCE FACTOR……1..25
SITE CLASS…… D
MAPPED SPECTRAL RESPONSE ACCELERATION……SS = 0.144 G
MAPPED SPECTRAL RESPONSE ACCELERATION……S1 = 0.052 G
DESIGN SPECTRAL RESPONSE ACCELERATION……SDS = 0.154 G
DESIGN SPECTRAL RESPONSE ACCELERATION……SD1 = 0.083 G
ABBREVIATIONS
VWC VINYL
WALLCOVERING
W
W WIDE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDW WINDOW
WDWT WINDOW TREATMENT
WGL WIRED GLASS
WP WATERPROOFING
WPT WORKPOINT
WS WEATHERSTRIP
WWF WELDED WIRE
FABRIC
ABBREVIATIONS
RD ROOF DRAIN
REF REFRIDGERATOR
REINF REINFORCE(D)
REQ'D REQUIRED
RESIL RESILIENT
RESIL C RESILIENT CHANNEL
RET RETURN
REV REVISION
RM ROOM
RO ROUGH OPENING
S
SC SOLID CORE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FEET
SHT SHEET
SHTHG SHEATHING
SIM SIMILAR
SLNT SEALANT
SND SANITARY NAPKIN
DISPENSER
SNDU SANITARY NAPKIN
DISPOSAL UNIT
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SSM SOLID SURFACE
MATERIAL
SST STAINLESS STEEL
STC SOUND
TRANSMISSION
CLASS
STD STANDARD
STL STEEL
STL JST STEEL JOIST
STL LNTL STEEL LINTEL
STL PLATE STEEL PLATE
STN STONE
STRUCT STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SVT SHEET VINYL
FLOORING
SYMM SYMMETRICAL
T
T TREAD
T&G TONGUE AND
GROOVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TERM TERMINAL
THK THICKNESS
THRES THRESHOLD
TK BD TACKBOARD
TMPD TEMPERED
TO TOP OF
TOC TOP OF CONCRETE
TOS TOP OF STEEL
TOW TOP OF WALL
TRANS TRANSOM,
TRANSPARENT
TYP TYPICAL
U
UC UNDERCUT
UL UNDERWRITER'S
LABATORY (TEST)
UNO UNLESS NOTED
OTHERWISE
UR URINAL
V
VCT VINYL COMPOSITION
TILE
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN FIELD
VNR VENEER
VP VENEER PLASTER
VR VAPOR RETARDER
VT VINYL TILE
ABBREVIATIONS
INV INVERT
J
JAN JANITOR
JT JOINT
L
LAM LAMINATE(D)
LAV LAVATORY
LF LINEAR FEET
LL LIVE LOAD
LLH LONG LEG
HORIZONTAL
LLV LONG LEG VERTICAL
LT GA LIGHT GAUGE
LTG LIGHTING
LVR LOUVER
M
MACH MACHINE
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MKR BD MARKER BOARD
MLDG MOULDING
MO MASONRY OPENING
MR MOISTURE
RESISTANT
MTL METAL
MULL MULLION
N
NA NOT APPLICABLE
NAT NATURAL
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NPS NOMINAL PIPE SIZE
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPH OPPOSITE HAND
OPNG OPENING
OPP OPPOSITE
P
PBD PARTICLE BOARD
PCT PORCELAIN CERAMIC
TILE
PERIM PERIMETER
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT
PNTD PAINTED
PR PAIR
PREFAB PREFABRICAT(D)
PT PRESSURE TREATED
PTD PAPER TOWER
DISPENSER
PTN PARTITION
PVC POLYVINYL
CHLORIDE (PLASTIC)
PVG PAVING
Q
QT QUARRY TILE
QTY QUANTITY
R
R RADIUS/RISER
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING
PLAN
ABBREVIATIONS
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMHO ELECTROMAGNETIC
HOLD OPEN
ENTR ENTRANCE
EP ELECTRIC PANEL
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATE
EWC ELECTRIC WATER
COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED,
EXPANSION
EXT EXTERIOR
F
FAAP FIRE ALARM
ANNUNCIATOR PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FH FIRE HYDRANT
FIN FINISH(ED)
FIXT FIXTURE
FLASH FLASHING
FLG FLOORING
FLR FLOOR
FM FACTORY MUTUAL
FO FACE OF
FOF FACE OF FINISH
FOS FACE OF STUD
FP FIREPROOFING
FR FRAME
FRMG FRAMING
FRP FIBERGLASS
REINFORCED
PLASTIC/PANEL
FRTW FIRE RETARDANT
TREATED WOOD
FT FOOT/FEET
FTG FOOTING
FURG FURRING
FURN FURNISHED/FURNITU
RE
FWC FABRIC WALL
COVERING
G
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL
CONTRACTOR
GCT GLAZED CERAMIC
TILE
GL GLASS/GLAZING
GWB GYPSUM WALLBOARD
GYP GYPSUM
H
HC HOLLOW CORE
HCP HANDICAPPED
HDBD HARDBOARD
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HNDRL HANDRAIL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HVAC HEATING/VENTILATIN
G/AIR CONDITIONING
I
ID INSIDE DIAMETER
INCL INCLUDE(D)(-ING)
INSUL INSULATE(D)(-ION)(-IN
G)
INT INTERIOR
ABBREVIATIONS
A
A/C AIR CONDITIONING
AB ANCHOR BOLT
ACC ACCESIBLE
ACS PNL ACCESS PANEL
ADDM ADDENDUM
ADJ ADJUSTABLE
AFF ABOVE FINISH FLOOR
AHR ANCHOR(AGE)
ALT ALTERNATE
ALUM ALUMINUM
ANN PNL ANNUNCIATOR PANEL
ANOD ANODIZED
APC ACOUSTICAL PANEL
CEILING
APPROX APPROXIMATE
ARCH ARCHITECT(URAL)
ASB ASBESTOS
ASPH ASPHALT
ATC ACOUSTICAL TILE
CEILING
B
BD BOARD
BEV BEVELED
BLDG BUILDING
BLKG BLOCKING
BLKT BLANKET
BM BEAM, BENCHMARK
BOT OF BOTTOM OF
BRG BEARING
BSMT BASEMENT
BUR BUILT-UP ROOF
C
CAB CABINET
CEM CEMENT
CH BD CHALKBOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CLG CEILING
CLL CONTRACT LIMIT LINE
CLO CLOSET
CLR CLEAR
CMP CORRUGATED METAL
PIPE
CMPST COMPOSITE
CMT CERAMIC MOSAIC
TILE
CMU CONCRETE MASONRY
UNIT
COL COLUMN
COMB COMBINATION
CONC CONCRETE
CONSTR CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CPRS FL COMPRESSIBLE
FILLER
CPT CARPET
CR CARD READER
CRS COLD ROLLED STEEL
CT CERAMIC TILE
D
D DEPTH
DET DETAIL
DF DRINKING FOUNTAIN
DFLCT DEFLECTION
DH DOUBLE HUNG
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DL DEAD LOAD
DMPF DAMPPROOFING
DR DOOR
DWG DRAWING
E
EA EACH
EIFS EXTERIOR
INSULATION AND
FINISH SYSTEM
GENERAL NOTES-ARCHITECTURE
Key Name GENERAL NOTES
1 ELECTRICAL CIRCUITS TO UNITS INDICATED FOR SALVAGING SHALL BE DISCONNECTED AND
PROTECTED DURING CONSTRUCTION. RE-CONNECT CIRCUIT UPON RE-INSTALLATION OF
UNITS.
2 CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING DIMENSIONS SHOWN WITHIN
DOCUMENTS IN FIELD. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER IMMEDIATELY
IF ANY DISCEPANCIES ARE DISCOVERED.
3 ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE CODES,
ORDINANCES, AND ACCEPTED INDUSTRY STANDARDS.
4 DO NOT INTERRUPT UTILITIES OR MECHANICAL SYSTEMS SERVING FACILITIES UNLESS
PERMITTED UNDER THE FOLLOWING CONDITIONS AND THEN ONLY AFTER PROVIDING
TEMPORARY UTILITY
4.1 NOTIFY CONTRACTING OFFICER NOT LESS THAN (5) DAYS IN ADVANCE OF PROPOSED
UTILITY INTERRUPTIONS.
4.2 OBTAIN CONTRACTING OFFICER'S WRITTEN PERMISSION BEFORE PROCEEDING WITH
UTILITY INTERRUPTIONS
5 CONTRACTOR SHALL TAKE EVERY PRECAUTION TO MINIMIZE DISRUPTION WITHIN
ADJACENT OCCUPIED SPACES. SCHEDULE AND SEQUENCING OF WORK SHALL BE
COORDINATED WITH THE CONTRACTING OFFICER PRIOR TO THE START OF WORK.
6 ALL WORK IS BEING DONE ADJACENT TO & ABOVE OCCUPIED SPACE. GENERAL
CONTRACTOR TO TAKE EVERY PRECAUTION TO ELIMINATE THE TRAVEL OF WATER, DUST,
AND DIRT FROM THE CONSTRUCTION AREA TO THOSE SPACES.
7 LIMIT USE OF PROJECT SITE TO AREAS WITHIN THE AREA APPROVED FOR USE BY
CONTRACTING OFFICER. MAINTAIN PORTIONS OF EXISTING BUILDING(S), AFFECTED BY
CONSTRUCTION OPERATIONS, IN A WEATHER TIGHT AND SECURE CONDITION
THROUGHOUT THE CONSTRUCTION PERIOD.
8 MAINTAIN EGRESS/ EXITING PATHS AND COMPONENTS (STAIRS, CORRIDORS, DOORWAYS,
PATHS) THROUGHOUT THE DURATION OF THE WORK
9 PROJECT IDENTIFICATION TAGS AND BADGES SHALL BE WORN AT ALL TIMES BY
CONTRACTOR AND SUBCONTRACTOR PERSONNEL WORKING ON PROJECT SITE.
10 SMOKING IS NOT PERMITTED ANYWHERE ON SITE.
11 CONTRACTOR IS REQUIRED TO REMOVE, SALVAGE, AND REINSTALL EXISTING CEILING TILE
AS NEEDED TO PERFORM ROOF DRAIN REPLACEMENT SCOPE. COORDINATE ALL INTERIOR
WORK WITH CONTRACTING OFFICER.
12 STRUCTURAL GRID LINE IS APPROX ONLY
SCALE: NO SCALE
C1
ABBREVIATIONS
SCALE: NO SCALE
C4
MATERIALS LEGEND
SCALE: NO SCALE
D4
GRAPHIC KEY
SCALE: NO SCALE
A1
CODE REVIEW
SCALE: NO SCALE
A6
BUILDING CLADDING & COMPONENT PRESSURE
1'
-1 0"
R01
ROOF AREA
#002 (EAST)
ROOF #001
(NIC)
R01
ROOF AREA #
002 (SOUTH)
R02
R02
R02
R03
R03
R03
R04
R06
R05 R05 R05
R02
R02
R02
R07
R07
R07 R07
R07
R07
R07
R07
R07 R07
R07
R07
R07
R07
R04
R04
R08 R08
R08
R08
R08
ROOF AREA
#002A (EAST)
1/4"/FT
EXIST STRUCT
1/ 4"
/F T
E X
IS
T
S T
R U
C T
1/ 4"
/F T
E X
IS
T
S T
R U
C T
EXIST ROOF AREA #001
BELOW (NIC) EXCEPT
AT HOOD VENTS
WHERE INDICATED.
A4
AD-102
A4
AD-102
A1
AD-102
D6
AD-102
R09
R10 R10
R10
D4
AD-102
D4
AD-102
1 2A 3A 4 5 6 7 8 9 10 11 12 13 14 15
M
La
L
Ka
K
J
H
G
R11
1'-11" 22'-6" 22'-6" 19'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 1'-11"
287'-10"
48'-10" 35'-2"
'-0
2' -0
'-6
'-6
2'
-0
'-0
'-0
'-0
'-0
'-0
9'
-1 0"
C6
AD-102
7'-6" ±
6' -0
A6
AD-102
EXIST ROOF AREA #001
BELOW (NIC) EXCEPT
AT HOOD VENTS
WHERE INDICATED.
0.090 EPDM ROOF MEMBRANE (ADHERED).
1/2" COVERBOARD (MECH & ADHERED).
POLYISOCYANURATE INSULATION;
5" (MECH & ADHERED)
EXISTING VAPOR RETARDER
EXISTING 2" GYPSUM DECK
AND BULB TEE STRUCTURE
0.090 EPDM ROOF MEMBRANE (ADHERED).
POLYISOCYANURATE INSULATION;
3.5" (MECH & ADHERED).
EXISTING VAPOR RETARDER
EXISTING 2" GYPSUM DECK
AND BULB TEE STRUCTURE
SCALE: ��������
B1
ROOF PLAN-DEMOLITION
SCALE: NO SCALE
F6
KEYED NOTES - DEMOLITION
KEYED NOTES-DEMOLITION
NUMBER COMMENT
R07 REMOVE AND SALVAGE CONCRETE PAVERS. PALLETIZE AND STAGE
AT GRADE AT DESIGN STAGING LOCATION AS DIRECTED BY
CONTRACTING OFFICER.
R08 REMOVE EXISTING TAPERED INSULATION ON EXISTING INSULATION
AND BELOW ROOF ASSEMBLY
R09 REMOVE EXISTING 4'X4'X8" HEAVY DUTY WOOD PALLET (FREE
STANDING)
R10 EXISTING ROOF PENETRATION AND PLUMBING VENT TO REMAIN.
REFER TO PLUMBING DWGS FOR VENT WORK SCOPE. REMOVE
FLASHING IN CONJUNCTION WITH MEMBRANE REMOVALS.
R11 REMOVE AND SALVAGE APPROXIMATELY 144SF OF EXISTING
CEILING TILE AS NEEDED TO PERFORM FOOR DRAIN REPLACEMENT.
KEYED NOTES-DEMOLITION
NUMBER COMMENT
R01 REMOVE EXISTING ROOF ASSEMBLY IN ITS ENTIRETY, INCLUDING
THE EXISTING VAPOR RETARDER, DOWN TO EXISTING GYPSUM
DECK.
R02 REMOVE PERIMETER METAL FASCIA
R03 REMOVE EXISTING ROOF DRAIN AND PIPING DOWN TO FIRST ELBOW
R04 REMOVE EXISTING EXHAUST HOOD
R05 REMOVE AND SLAVAGE EXHAUST HOOD FOR RE-INSTALLMENT;
REMOVE EXISTING CURB
R06 REMOVE AND SALVAGE RTU IN ORDER TO PERFORM ROOF
REPLACEMENT
SCALE: ����������
A6
EXISTING ROOF ASSEMBLY #002A
SCALE: ����������
A5
EXISTING ROOF ASSEMBLY #002
SCALE: �������
A1
EXISTING CONDITION PHOTO A
SCALE: �������
A2
EXISTING CONDITION PHOTO B
SCALE: �������
A3
EXISTING CONDITION PHOTO C
SCALE: �������
A4
EXISTING CONDITION PHOTO D
ROOF - #002
23'-0"
ROOF - #002
23'-0"
4"
REMOVE EXISTING
PRE-FINISHED METAL
FASCIA
EXISTING PRE-FINISHED
INSULATED METAL PANEL
SYSTEM TO REMAIN
EXISTING 2X BLOCKING TO
REMAIN
EXISTING CMU TO REMAIN
REMOVE EXISTING ROOF
MEMBRANE, INSULATION,
AND VAPOR BARRIER
DOWN TO EXIST GYPSUM
ROOF DECK
EXISTING 2" POURED
GYPSUM DECK ON 1/2"
GYPSUM BOARD FORM
LINERS TO REMAIN
EXISTING CMU TO REMAIN
V A
R
IE
S
REMOVE EXISTING
MEMBRANE IN ITS ENTIRETY
ROOF - #002
23'-0"
EXISTING EXHAUST HOOD;
REFER TO MEP DWGS
REMOVE EXISTING ROOF
MEMBRANE, INSULATION,
AND VAPOR BARRIER
DOWN TO EXIST GYPSUM
ROOF DECK
REMOVE EXISTING
EQUIPMENT CURB,
DECK/PLATFORM, AND
SUPPORT SYSTEM DOWN
TO ROOF DECK
REMOVE EXISTING
MEMBRANE FLASHING &
FLASHING SYSTEMS
EXISTING 2" POURED
GYPSUM DECK ON 1/2"
GYPSUM BOARD FORM
LINERS TO REMAIN
REMOVE EXISTING
EQUIPMENT CURB,
DECK/PLATFORM, AND
SUPPORT SYSTEM DOWN
TO ROOF DECK
ROOF - #002
23'-0"
EXISTING EXHAUST HOOD;
REFER TO MEP DWGS
REMOVE EXISTING ROOF
MEMBRANE, INSULATION,
AND VAPOR BARRIER
DOWN TO EXIST GYPSUM
ROOF DECK
REMOVE EXISTING
EQUIPMENT CURB,
DECK/PLATFORM, AND
SUPPORT SYSTEM DOWN
TO ROOF DECK
REMOVE EXISTING
EQUIPMENT CURB,
DECK/PLATFORM, AND
SUPPORT SYSTEM DOWN
TO ROOF DECK
EXISTING 2" POURED
GYPSUM DECK ON 1/2"
GYPSUM BOARD FORM
LINERS TO REMAIN
REMOVE EXISTING
MEMBRANE FLASHING &
FLASHING SYSTEMS
ROOF - #002
23'-0"
ROOF PLAN AND DECK INFILL DETAILS
EXISTING DECK OPENING; INFILL PER
REMOVE EXISTING EQUIPMENT CURB, DECK/PLATFORM, AND SUPPORT
SYSTEM DOWN TO ROOF DECK
REMOVE EXISTING MEMBRANE FLASHING & FLASHING SYSTEMS
REMOVE EXISTING ROOF MEMBRANE, INSULATION, AND VAPOR
BARRIER DOWN TO EXIST GYPSUM ROOF DECK
EXISTING 2" POURED GYPSUM DECK ON 1/2" GYPSUM BOARD FORM
LINERS TO REMAIN
REMOVE EXISTING EQUIPMENT CURB, DECK/PLATFORM, AND SUPPORT
SYSTEM DOWN TO ROOF DECK
EXISTING EXHAUST HOOD; REFER TO MEP DWGS
ROOF - #002
23'-0"
REMOVE EXISTING ROOF
DRAIN AND PIPING DOWN
TO FIRST ELBOW. REFER
TO MEP DRAWINGS
REMOVE EXISTING ROOF
MEMBRANE, INSULATION,
AND VAPOR BARRIER
DOWN TO EXIST GYPSUM
ROOF DECK
EXISTING 2" POURED
GYPSUM DECK ON 1/2"
GYPSUM BOARD FORM
LINERS TO REMAIN
EXISTING 2X BLOCKING TO
REMAIN
REMOVE EXISTING
PRE-FINISHED METAL
FASCIA
EXISTING CMU TO REMAIN
EXISTING PRE-FINISHED
INSULATED METAL PANEL
SYSTEM TO REMAIN
REMOVE EXISTING
MEMBRANE IN ITS ENTIRETY
ROOF - #001
17'-6"
EXISTING EXHAUST HOOD;
REFER TO MEP DWGS
REMOVE EXISTING
EQUIPMENT CURB,
DECK/PLATFORM, AND
SUPPORT SYSTEM DOWN
TO ROOF DECK
REMOVE EXISTING
EQUIPMENT CURB,
DECK/PLATFORM, AND
SUPPORT SYSTEM DOWN
TO ROOF DECK
REMOVE EXISTING
MEMBRANE FLASHING &
FLASHING SYSTEMS
EXISTING 2" POURED
GYPSUM DECK ON 1/2"
GYPSUM BOARD FORM
LINERS TO REMAIN
EXISTING ROOF
MEMBRANE, INSULATION,
AND VAPOR BARRIER TO
REMAIN
SCALE: ����������
C6
DTL-FASCIA DEMO
SCALE: ����������
A4
DTL-EXHAUST HOOD AND CURB DEMO
SCALE: ����������
A6
DTL-EXHAUST HOOD AND CURB DEMO 2
SCALE: ����������
A1
DTL-EXHAUST HOOD DEMO
SCALE: ����������
D6
DTL-ROOF DRAIN DEMO
SCALE: ����������
D4
DTL-LOWER ROOF EXHAUST HOOD DEMO
1'
-1 0"
48'-10" 35'-2"
S
LO
P E
D N
M A
IN
T
A
IN
E X
IS
T
S T
R U
C T
/4
P
E R
F T
SLOPE DN
MAINTAIN EXIST
STRUCT 1/4" PER FT
S
LO
P E
D N
M A
IN
T
A
IN
E X
IS
T
S T
R U
C T
/4
P
E R
F T
S
LO
P E
D N
M A
IN
T
A
IN
E X
IS
T
S T
R U
C T
/4
P
E R
F T
ROOF AREA
#002 (EAST)
ROOF AREA #
002 (SOUTH)
SLOPE DN
MAINTAIN EXIST
STRUCT 1/4" PER FT
02 02 0202
03 03
ROOF AREA
#001
FIXED GALV STL
LADDER - #001
FIXED GALV STL
LADDER - #002
050505
FALL PROTECTION
FALL PROTECTION
D6
A-102
PROVIDE GYPSUM
DECK INFILL 7'-6"
6' -0
C6
A-102
A6
A-102
A6
A-102
C6
A-102
C6
A-102
C6
A-102
1 2A 3A 4 5 6 7 8 9 10 11 12 13 14 15
M
La
L
Ka
K
J
H
G
17 16
1'-11" 22'-6" 22'-6" 19'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 1'-11"
2' -0
'-6
'-6
2'
-0
'-0
'-0
'-0
'-0
'-0
9'
-1 0"
'-0
287'-10"
EXIST ROOF AREA #001
BELOW (NIC) EXCEPT
AT HOOD VENTS
WHERE INDICATED.
EXIST ROOF AREA #001
BELOW (NIC) EXCEPT
AT HOOD VENTS
WHERE INDICATED.
0.090 EPDM ROOF MEMBRANE;
FULLY ADHERED
5/8" COVERBOARD; FULLY ADHERED
POLYISOCYANURATE INSULATION; 5"
AVERAGE THICKNESS R-30, FULLY ADHERED
EXISTING 2" GYPSUM DECK
AND BULB TEE STRUCTURE
1. CONTRACTOR SHALL FIELD VERIFY CONDITIONS PRIOR TO
COMMENCING WORK. THE CONTRACTOR SHALL RECORD ANY
DISCREPANCIES BETWEEN THE CONTRACT DOCUMENTS AND FIELD
CONDITIONS AND NOTIFY THE CONTRACTING OFFICER PRIOR TO
PROCEEDING.
2. PROVIDE 1/4" SURFACE SLOPE; 1/2" TAPERED INSULATION,
TYPICAL AT ALL LOCATIONS; UNLESS OTHERWISE NOTED.
3. PROVIDE CRICKETS WHERE INDICATED AND AT UPSLOPES OF ALL
EQUIPMENTS REQUIRED TO PREVENT PONDING.
4. REMOVE & REPLACE ALL FLASHING ON ALL EXISTING PIPE AND
ROOF PENETRATIONS TO REMAIN.
5. PROVIDE EPDM WALKWAY PAD UNDER EACH BALLAST SUPPORT
AT FALL PROTECTION RAIL SYSTEM (TYP).
SCALE: ��������
B1
ROOF PLAN
SCALE: NO SCALE
F5
KEYED NOTES
KEYED NOTES-ROOF PLAN
NUMBER COMMENT
12 PROVIDE ROOF TOP PORTABLE RAILINGS. RAIL SYSTEM SHALL COMPLY WITH OSHA 29 CFR 1910. AND 29 CFR 1926.502 AND BE DESIGNED FOR PERMANENT USE WHILE STILL ACCOMMODATING PORTABLILTY. PROVIDE BLUEWATER MANUFACTURING INC. SAFTEY RAIL 2000 - ARCHITECTURAL SERIES OR COMPARABLE PRODUCT. SEE GENERAL NOTE 5.
13 PROVIDE CRICKET AT UPSLOPE OF CURB AS REQUIRED TO PREVENT PONDING.
14 PROVIDE MEMBRANE FLASHING FROM EQUIPMENT CURB TO EXISTING EPDM ROOF MEMBRANE.
15 PARAPET IS SLIGHTLY HIGHER THAN ADJOINING PARAPETS (APPROX. 1 1/2"). PROVIDE FASCIA RETURN AROUND END OF PARAPET ON BOTH SIDES SIMILAR TO EXISTING CONDITION. REFER TO EXISTING CONDITION PHOTO ON E4/A-102.
16 PROVIDE INFILL FOR (1) GYPSUM PLANK PER DECK INFILL DETAILS.
17 PROVIDE INFILL FOR (2) GYPSUM PLANK PER DECK INFILL DETAILS.
18 REINSTALL SALVAGED CEILING TILES THAT WERE REMOVED TO PERFORM ROOF DRAIN REPLACEMENT.
KEYED NOTES-ROOF PLAN
NUMBER COMMENT
01 PROVIDE ROOF ASSEMBLY 1
02 PROVIDE PRE-FINISHED METAL FASCIA; COLOR TO MATCH EXISTING FASCIA / METAL PANELS
03 PROVIDE ROOF DRAIN WITH 30 SQUARE INCH SUMP; PROVIDE PIPING TO EXISTING ELBOW. REFER TO MEP DRAWINGS.
04 RE-INSTALL SALVAGED RTU; PROVIDE ROOF CURB. REFER TO MEP DRAWINGS.
05 PROVIDE TAPERED INSULATION AS INDICATED TO MAINTAIN POSITIVE DRAINAGE
06 RE-INSTALL SALVAGED EXHAUST HOOD; PROVIDE ROOF CURB. REFER TO MEP DRAWINGS.
07 EXISTING PLUMBING VENT TO REMAIN; PROVIDE MEMBRANE FLASHING.
08 PROVIDE 2"x24" SQUARE CONCRETE WALKWAY PADS. MAINTAIN 6" CLEAR EA SIDE OF VALLEYS, AND 1" MIN B/W PADS.
09 PROVIDE FIXED STEEL LADDER
10 PROVIDE OVERFLOW ROOF DRAIN SCUPPER. SEE A5/A-102 FOR DETAIL.
11 INSTALL SPECIFIED EXHAUST HOOD; PROVIDE ROOF CURB. REFER TO MEP DRAWINGS.
SCALE: ����������
A6
ROOF ASSEMBLY #1
SCALE: NO SCALE
A5
GENERAL ROOF NOTES
ROOF - #002
23'-0"
MEMBRANE TERMINATION
EXIST GYPSUM DECK
TO REMAIN
TAPERED INSUL (5" AVG)
ROOF MEMBRAINE
5/8" COVER BOARD
MTL ROOF EDGE
EXIST INSULATED METAL
PANEL TO REMAIN
FULLY ADHERE MEMBRANE
TO EXIST WALL. EXTEND
OVER T.O. EXISTING PRAPET.
M.P.
4" 1/2"
CMU
9 5/8" 7/8"
VIF
1'-3" ±
EXISTING 2X BLOCKING TO
REMAIN
EXISTING CMU
EXIST INSULATED METAL
PANEL TO REMAIN
EXIST GYPSUM DECK
TO REMAIN
MEMBRANE TERMINATION
FULLY ADHERE MEMBRANE
TO EXIST WALL. EXTEND
OVER T.O. EXISTING PRAPET.
TAPERED INSUL (5" AVG)
SEAL WATER TIGHT
5/8" COVER BOARD
MTL ROOF EDGE
ROOF - #002
23'-0"
VIF
1'-3" ± M.P.
4" 11"
ROOF MEMBRAINE
4" PVC PIPE (SEAL
PERIMETER WATER TIGHT).
2"
METAL COLOR,
MATCH FINISH OF
EXIST WALL PANELS
1/2"
PROVIDE MEMBRANE
FLASHING IN AND AROND
PIPE PENETRATIONS (TYP) EXISTING 2X BLOCKING TO
REMAIN
EXISTING CMU
TO SLAB
0"
ROOF - #001
17'-6"
C2
A-102
6"
'-4
3' -6
GALVANIZED STEEL
LADDER GUARD WITH
LOCK HASP; BASIS OF
DESIGN: BLUEWATER
MANUFACTURING LADDER
GUARD (SHOWN DASHED)
FIXED STEEL LADDER
WITH INTEGRAL PARAPET
PLATFORM; HOT DIP
GALVANIZE
FALL PROTECTION BEYOND
CABLE LADDER SAFETY
SYSTEM; BASIS OF DESIGN:
MILLER VI-GO
MAINTAIN 2" MINIMUM
CLEAR FROM TOP OF
ROOF EDGE TO BOTTOM
OF PARAPET PLATFORM
/SEE �� �
LADDER BRACKET
ROOF - #001
17'-6"
ROOF - #002
23'-0"
C2
A-102
FALL PROTECTION BEYOND
PLATFORM
6"
/SEE �� �
LADDER BRACKET
FIXED STEEL LADDER
WITH INTEGRAL PARAPET
PLATFORM; HOT DIP
GALVANIZE
TO SLAB
0"
ROOF - #001
17'-6"
C2
A-102
EXISTING ROOF ASSEMBLY
FALL PROTECTION BEYOND
C3X4.1 STEEL
CHANNEL
STRINGERS
1 1/4" DIAMETER
KNURLED STEEL
RUNGS AT 12" OC
CABLE LADDER
SAFETY SYSTEM
SERRATED PLANK
PARAPET PLATFORM
3" X 1/2" LADDER
LOOP
CONCRETE ROOF
PAVER
LADDER BRACKET
/SEE �� �
3" X 1/4" CLIP ANGLE
BRACKET; SECURE
LADDER LOOP AND
PLATFORM TO PAVER
ROOF - #001
17'-6"
ROOF - #002
23'-0"
C2
A-102
EXISTING 2" POURED
GYPSUM DECK ON 1/2"
GYPSUM BOARD FORM
LINERS TO REMAIN
NEW ROOF ASSEMBLY
PLATFORM
C3X4.1 STEEL
CHANNEL
STRINGERS
1 1/4" DIAMETER
KNURLED STEEL
RUNGS AT 12" OC
LADDER BRACKET
2"x24" SQUARE
CONCRETE PAVER
SEE PLAN FOR SLOPE
TAPERED INSUL
INSTALL NEW
CLAMPING RING &
STRAINER
ROOF MEMBRANE
EXIST GYPSUM
DECK TO REMAIN
5/8" COVER BOARD
FLASHING MEMBRANE
2"± INSUL (R-30 AVG);
TAPERED - SLOPE TO
DRAIN
TAPERED INSUL
ROOF - #002
23'-0"
ALIGN
EXISTING ROOF DECK TO
REMAIN
CUT EXISTING MESH AS
REQUIRED TO REMOVE
PANEL TYP
EXISTING BULB TEE TO
REMAIN
NEW 1 1/2" 18 GA ROOF
DECK W/ #10 TEK SIDELAPS
@ MIDSPAN. PAINT
UNDERSIDE OF DECK W/ (2
COAT) ZERO VOC, LATEX
PAINT. MATCH COLOR AND
SHEEN OF ADJACENT
FINISH.
1" ± INSULATION TO ALIGN
W/ EXISTING
#10-16 SCREWS @ 12" O.C.
EACH END
TAPERED INSUL (5" AVG)
ROOF MEMBRANE
5/8" COVER BOARD
EXG DECK TO REMAIN
SINGLE SPAN ROOF DECK REPAIR DETAIL
NOTES:
1. DEMOLISH EXISTING POURED GYPSUM AND
FORM BOARD FOR EACH FULL FORMBOARD PANEL
AT LOCATIONS REQUIRING REPAIR.
2. SAW CUT GYPSUM & MAINTAIN 3" TAIL OF
EXISTING REINFORCING WIRE. REMOVE GYPSUM
TO FACE OF EXISTING BULB TEE TO REMAIN.
ROOF - #002
23'-0"
MEMBRANE TERMINATION
BAR & SLNT
EXIST GYPSUM DECK
TO REMAIN
TAPERED INSUL (5" AVG)
ROOF MEMBRANE
5/8" COVER BOARD
MTL ROOF EDGE
FULLY ADHERE MEMBRANE
TO EXIST WALL. EXTEND
OVER T.O. EXISTING PRAPET.
EXIST INSULATED METAL
PANEL TO REMAIN
7/8"
CMU
9 5/8" 1/2"
M.P.
4"
VIF
1'-3" ±
EXISTING 2X BLOCKING TO
REMAINEXISTING CMU
TOP OF
PARAPET @
1'-9" ABOVE
EXISTING
GYPSUM DECK
TOP OF PARAPET
@ 1'-5 1/4" ABOVE
EXISTING
GYPSUM DECK
ROOF MEMBRANE
FLASHING
MTL ROOF EDGE
FALL PROTECTION
7"
1/ 2"
CL
RUNG
C3x5 GALV LADDER
STRINGER BREAK MTL COVER PLATE
W/ SLNT
1" SQ OR 1" DIA GALV
LADDER RUNGSPRAY FOAM INSUL AT
CAVITY
EXISTING CMU WALL TO
REMAIN
(3) EXPANSION BOLT
ANCHORS; ANCHOR INTO
EXISTING CMU.
EXISTING VENT
METAL HOOD
CONTINUOUS BEAD
OF LAP SEALANT
COMPRESSION
RING & SEALANT
MEMBRANE
FLASHING
EXISTING ROOF
DECK
ROOF INSULATION
5/8" COVER BOARDROOF
MEMBRANE
FLASHING
2X WOOD BLOCKING
1' -6
RUN ROOF MEMBRANE
FLASHING UP CURB
PRE-FABRICATED
METAL ROOF CURB
3" MIN ADHESIVE OVER
EPDM PRIMER
ALIGN W/ EDGE
OF OPENING
EXISTING ROOF DECK
REFER TO ROOF PLAN
FOR ROOF ASSEMBLY
ROOF - #002
23'-0"
ROOF - #002
23'-0"
NEW 1 1/2" 18 GA ROOF
DECK W/ #10 TEK SIDELAPS
@ MIDSPAN. PAINT
UNDERSIDE OF DECK W/ (2
COAT) ZERO VOC, LATEX
PAINT. MATCH COLOR AND
SHEEN OF ADJACENT
FINISH.
#10-16 SCREWS @ 12" O.C.
EACH END
1" ± INSULATION TO ALIGN
W/ EXISTING
PROVIDE L 1 1/2" X 1 1/2" X
3/16" EDGE 4'S FROM JOIST
TO BEAM AT EDGES OF
INFILL
TAPERED INSUL (5" AVG)
ROOF MEMBRANE
5/8" COVER BOARD
ALIGN
EXISTING STEEL TO
REMAIN
EXISTING 2" POURED
GYPSUM DECK ON 1/2"
GYPSUM BOARD FORM
LINERS TO REMAIN
EXISTING JOIST TO REMAIN
AS REQ'D TO C.L. OF JOIST
DEMO EXG ROOF DECK
EXISTING OPENING INFILL DETAIL
ROOF DECK REPAIR NOTES:
1. REPAIR LOCATIONS AS INDICATED ON PLANS ARE BASED ON VISUAL OBSERVATIONS OF THE
UNDERSIDE OF DECK AND MAY NOT INDICATE ALL AREAS REQUIRING REPAIR.
2. CONTRACTOR TO PROVIDE PLAN LOCATION AND SIZE OF ALL ROOF REPAIR LOCATIONS NOT
INDICATED ON PLANS FOR REVIEW BY CONTRACTING OFFICER TO DETERMINE APPROPRIATE
REPAIR DETAIL.
3. AT REPAIR LOCATIONS CONDITION OF EXISTING BULB TEE MUST BE ASSESSED BY
CONTRACTING OFFICER PRIOR TO PERFORMING REPAIR.
EXISTING CMU TO REMAIN
(3) EXPANSION BOLT
ANCHORS; ANCHOR INTO
EXISTING CMU.
DEMO INSULATED METAL
PANEL AS REQ'D TO
INSTALL LADDER BRACKET
EXISTING INSULATED
METAL PANEL
C3x5 GALV LADDER
STRINGER
BREAK MTL COVER PLATE
W/ SLNT
2" 2"EQ EQ
1" SQ OR 1" DIA GALV
LADDER RUNG
ELEVATION VIEW OF LADDER BRACKET PLAN VIEW OF LADDER BRACKET
1' -0
2'-0"
(3) 1/2" DIA THREADED ROD W/
DEWALT AC100T GOLD. INSTALL
AS FOLLOWS
1. USE SST GROUTED SOCK
ANCHOR @ UNGROUTED WALL
2.USE 4" EMBEDMENT IN
GROUTED WALL 3/8"x6" U BRACKET
TYP
3"
ANCHOR NOT PERMITTED, TYP
EXISTING CMU WALL
SPRAY FOAM INSUL AT
CAVITY
LAYOUT LIMITATION
VIF
6"
GALVANIZED LADDER
STRINGER
CONNECTION TO LADDER
STRINGER
1" SQ OR 1" DIA GALV
LADDER RUNG
SCALE: ����������
A6
SECT DTL-TYPICAL PARAPET@ LOW PORTION OF ROOF SLOPE
SCALE: ����������
A5
SECT DTL- THRU WALL SCUPPER
SCALE: ��������
A1
LADDER ELEVATION A - #001
SCALE: ��������
A3
LADDER ELEVATION A - #002
SCALE: ��������
A2
LADDER ELEVATION B - #001
SCALE: ��������
A4
LADDER ELEVATION B - #002
SCALE: ����������
D6
SECT DTL - TYPICAL ROOF DRAIN
SCALE: ����������
C6
SECT DTL - TYPICAL PARAPET @ HIGH PORTION OF ROOF SLOPE
SCALE: ����������
E4
PLAN DTL - STEPPED CORNER
SCALE: ����������
C2
SECT DTL - TYP LADDER PLAN DETAIL
SCALE: ����������
E2
DTL - TYP PIPE PENETRATION
SCALE: ����������
E3
DTL - TYP ROOF CURB
SCALE: ����������
C3
SECT DTL - ROOF DECK REPAIRS
SCALE: ����������
D1
DTL - TYP LADDER ATTACHEMENT
SCALE: ����������
C1
ELEV DTL - TYP LADDER ATTACHMENT
File details come from the government source that posted it. Updated .