Drawing_Clarifications.pdf
PDF 11 MB Posted
- Attached to
- Upgrade Hydrant Loop Federal contract opportunity
- Solicitation number
- W912PQ18R7003
About this file
Attachment 4 - Drawing clarifications
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Hydrant_Loop_Q&A__1.DOCX | DOCX document | |
| Site_Visit_Attendance.pdf | ||
| Specification_Clarifications.pdf | ||
| EXHIBIT_B_Information_and_Consent_Form.doc | DOC document | |
| 60341187_Final_Specs_6-6-16.pdf | ||
| EXHIBIT_C_Package_Information_and_Forms.doc | DOC document | |
| EXHIBIT_A_Performance_Relevancy.doc | DOC document | |
| W912PQ18R7003_UPGRADE_HYDRANT_LOOP.pdf | ||
| Drawings_Reduced.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hydrant Loop Clarification
All:
There are a few changes from when the drawings were produced until now. Please see attached documentation for work area changes.
-There are several areas where Comm crosses this waterline as well as electrical and water on the front gate drawings. (Attachment 1)
-There are granite curbs that will need to be protected or replaced when cutting across some of the roadways. (3 areas)
-there is 1 area where this project crosses a fence. The fence will need to remain in place
-this project crosses the main entrance of the base. The contractor will need to stagger this work and provide road plates to ensure traffic can pass.
-The vault to be removed is 8’ deep. The detail for the vault is attached. (Attachment 2)
-there is a reinforced grass paver system that can be seen on the front gate drawings. The product data is provided. This will need to be placed back after the water line is installed. (Attachment 3)
- Asphalt depth is 4” base / 2” top.
- The specs reference working with the Army Corp of Engineers. They will not be involved on this project. QC and Safety will be the contractor’s responsibility.
There have been some photos taken of the area where the work will be performed. These show the asphalt, curbing, fences, exc.. Ensure this is taken into account prior to submitting cost.
1264467876N Text Box Attachment 1a
Attachment 1b
1281737860M
A)46” – B)19” – C)45” – D)46” – E)52.5” – F)42” – G)37” - 144” and 78” are inside dimensions.
1264467876N
Attachment 2
Photo 4
Photo 5
Photo 6Photo 7
Photo 8
Photo 9
Rectangle
Photo 1
Photo 2
Photo 3
Photo 1
Photo 2
Photo 3
Photo 4
Photo 5
Photo 6
Photo 7
Photo 8
Photo 9
For Evaluation and Action
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
(YYYYMMDD)
Form Approved OMB No 9000-0062 Expires May 31, 2005
MATERIAL APPROVAL SUBMITTAL
(See Instructions on Reverse)
Public reporting burden for this collection of information is estimated to average 20 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to the Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project OMB No 9000-0062, Washington DC 20503. Please DO NOT RETURN your form to either of these addresses. Send your completed form to: SAF/AQCP, 1060 Air Force Pentagon, Washington DC 20330-1060.
TO: (Contracting Officer) FROM: (Contractor) DATE
CONTRACT NUMBER SUBMISSION NUMBER SUBMITTAL
NEW RESUBMITTAL
PREVIOUS SUBMISSION NUMBER PROJECT NUMBER
TO BE COMPLETED BY CONTRACTOR FOR GOVERNMENT USE ONLY
ITEM SPECIFICATION SECTION/ DESCRIPTION OF MATERIAL AP-
PROVED
DISAP-
PROVED
SEE
REVERSE INITIAL
BY COMPLETING THIS FORM, THE UNDERSIGNED CONTRACTOR CERTIFIES THAT
THE MATERIAL COMPLIES WITH ALL SPECIFICATIONS OF SUBJECT CONTRACT.
DATE TYPE OR PRINT NAME AND TITLE SIGNATURE
FOR GOVERNMENT USE ONLY
TO: (Base Civil Engineering Officer)
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (AF Contracting Office)
RECOMMEND APPROVAL DISAPPROVAL AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
TO: (Contractor)
DISAPROVED AS INDICATED ABOVE AND SUBJECT TO ANY APPLICABLE COMMENTS ON THE REVERSE SIDE. REQUEST
APPROVED
RESUBMITTAL ON DISAPPROVED ITEMS WITHIN DAYS OF DATE SHOWN BELOW.
DATE TYPE OR PRINT NAME AND GRADE SIGNATURE
AF IMT 3000, 20030901, V1 PREVIOUS EDITION IS OBSOLETE.
NO. PARA NO./DRAWING NO. (Include Type, Model Number, Catalog Number, Mfg., etc.)
1264467876N
Attachment 3
COMMENTS
(Number to correspond with applicable Item Number on reverse)
INSTRUCTIONS TO CONTRACTORS
1. The term "material" is defined as articles, supplies, raw materials, equipment, parts, components, and end items that are to be incorporated into the work required by the contract.
2. This form is to be used by contractors for submitting Shop Drawings, Equipment Data, Manufacturer's Literature and Certificates and samples of Materials to the Government for approval in accordance with the provisions of this contract. Unless otherwise specified, it is to be prepared in 4 copies, signed, and provided to the contracting officer with appropriate attachments.
3. Item(s) to be approved will be clearly tabbed or identified. Data pertaining to item(s) to be approved will be clearly identified or tabbed, particularly where documents are voluminous, in order to properly evaluate the materials or articles to be incorporated in the work. Each attachment will be numbered to correspond with the item number shown on the face of this form.
4. Requests submitted shall be numbered consecutively, by contract, in the space entitled "Submission No.". This number, in addition to the Contract No., will be used to identify each Material Approval Submittal. Resubmissions will be indicated in the appropriate block and the insertion of previous submission number and data in addition to a new submission number. A single submission should be used for all work of a section of the specifications, but in NO instance should the submission include work for more than one (1) contract. Submittals requiring priority handling will be submitted by separate submittal using the form and so marked across the face of the form.
5. This Material Approval Submittal is not valid unless it is signed by the contracting officer. This approval is required as called for by the contracting officer under the terms of this contract.
AF IMT 3000, 20030901, V1 (REVERSE)
Project: 68504 - Install Denial Barrier System Date:
Contract No.: VBDZ142005
Client
From: To:
109th Airlift Wing Civil Engineering
Schenectady County Airport
1 National Guard Road, Building 25
Scotia, NY 12302
Specification Section: Description:
15 02747 Grass Pavers
15 02747 Aggregate
15 02747 Geotextile
A - SUBMITTAL ACCEPTED E - PRELIMINARY SUBMITTAL
B - SUBMITTAL ACCEPTABLE AS NOTED F - FOR REFERENCE, NO ACCEPTANCE REQUIRED
C - SUBMITTAL RETURNED FOR REVISION G - DISTRIBUTION COPY (PREVIOUSLY ACCEPTED)
D - SUBMITTAL NOT ACCEPTABLE
Spec. No.: 02747
Date Received:
A D Sign & Date Designated Action Sign & Date Designated Action
B E Sign & Date Designated Action Sign & Date Designated Action
C F Sign & Date Designated Action Sign & Date Designated Action
G Sign & Date Designated Action
Approval Action
Submittal Cover Sheet
Submittal Action Stamp:
Submission Number:
BMcD Engineering Project # 68504
Project No./Name:
Lauren Waldron LtCol Ty Randall, Base Civil Engineer
Install Denial Barrier System
18-Sep-14
For Approver's Use Only
Submittal Description:
Burns and McDonnell
100 Eagle Rock Avenue, Suite 303
East Hanover, NJ 07936
Contractor's Approval: Submission of this document shall represent Contractors's approval as specified in the
Contract Documents. Contractor remains liable for accuracy of Submittals as provided in the Contract Documents.
lmonzon Text Box Luis R. Monzon 09/30/2014 lwaldron Typewritten Text 30Sep2014
| Hydrant Loop Questions |
| Front Gate Utilities |
| Page2_11x17 |
| Meter Pit Habel Lane Drawing |
| Photo Layout |
| Photo 1 |
| Photo 2 |
| Photo 3 |
| Photo 4 |
| Photo 5 |
| Photo 6 |
| Photo 7 |
| Photo 8 |
| Photo 9 |
| 015 02747 Grass Pavers_Aggregate_Geotextile_BMcD |
| Cover Sheet Submittal #15 POROUS PAVING |
| AGGREGATE |
| GEOTEXTILE |
| GRASS PAVERS |
| TO Contracting Officer: MSgt. Wanda Yarbor |
| FROM Contractor: Malone and Tate Builders |
| YYYYMMDD DATE: 20140918 |
| CONTRACT NUMBER: W912PQ-14-B-0002-0004 |
| SUBMISSION NUMBER: 15 |
| Check Box1: Yes |
| RESUBMITTAL: Off |
| Check Box2: Off |
| PREVIOUS SUBMISSION NUMBER: |
| PROJECT NUMBER: VBDZ142005 |
| ITEM NORow1: 1 |
| SPECIFICATION SECTION PARA NODRAWING NORow1: 2747- 2.01 |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow1: GRASS PAVERS |
| Check Box3: Yes |
| Check Box4: Off |
| Check Box5: Off |
| INITIAL: SRR |
| ITEM NORow2: 2 |
| SPECIFICATION SECTION PARA NODRAWING NORow2: 2747-2.02 a-c |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow2: AGGREGATE |
| Check Box6: Yes |
| Check Box7: Off |
| Check Box8: Off |
| INITIAL_2: SRR |
| ITEM NORow3: 3 |
| SPECIFICATION SECTION PARA NODRAWING NORow3: 2747-2.02 F |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow3: GEOTEXTILE |
| Check Box9: Yes |
| Check Box10: Off |
| Check Box11: Off |
| INITIAL_3: SRR |
| ITEM NORow4: 4 |
| SPECIFICATION SECTION PARA NODRAWING NORow4: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow4: |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| INITIAL_4: |
| ITEM NORow5: 5 |
| SPECIFICATION SECTION PARA NODRAWING NORow5: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow5: |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| INITIAL_5: |
| ITEM NORow6: 6 |
| SPECIFICATION SECTION PARA NODRAWING NORow6: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow6: |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| INITIAL_6: |
| ITEM NORow7: 7 |
| SPECIFICATION SECTION PARA NODRAWING NORow7: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow7: |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| INITIAL_7: |
| ITEM NORow8: 8 |
| SPECIFICATION SECTION PARA NODRAWING NORow8: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow8: |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| INITIAL_8: |
| ITEM NORow9: 9 |
| SPECIFICATION SECTION PARA NODRAWING NORow9: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow9: |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| INITIAL_9: |
| ITEM NORow10: 10 |
| SPECIFICATION SECTION PARA NODRAWING NORow10: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow10: |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| INITIAL_10: |
| ITEM NORow11: 11 |
| SPECIFICATION SECTION PARA NODRAWING NORow11: |
| DESCRIPTION OF MATERIAL Include Type Model Number Catalog Number Mfg etcRow11: |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| INITIAL_11: |
| YYYYMMDD DATE_2: 20140918 |
| TYPE OR PRINT NAME AND TITLE: David Behan, Project Manager |
| TO Base Civil Engineering Officer: |
| For Evaluation and Action: |
| YYYYMMDD DATE_3: 20141002 |
| TYPE OR PRINT NAME AND GRADE: Emanuele Incorvaia, Project Manager |
| TO AF Contracting Office: |
| YYYYMMDD DATE_4: 20141005 |
| TYPE OR PRINT NAME AND GRADE_2: Shawn Rulison / O-2 |
| TO Contractor: |
| Check Box38: Off |
| Check Box39: Off |
| RESUBMITTAL ON DISAPPROVED ITEMS WITHIN: |
| YYYYMMDD DATE_5: |
| TYPE OR PRINT NAME AND GRADE_3: |
| Check Box36: Yes |
| Check Box37: Off |
| COMMENTS Number to correspond with applicable Item Number on reverseRow1: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow2: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow3: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow4: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow5: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow6: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow7: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow8: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow9: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow10: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow11: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow12: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow13: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow14: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow15: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow16: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow17: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow18: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow19: |
| COMMENTS Number to correspond with applicable Item Number on reverseRow20: |
File details come from the government source that posted it.