Amend_2.pdf
PDF 50 KB Posted
- Attached to
- AIR MONITORING FOR ASBESTOS REMOVAL
- Solicitation number
- W912PQ15R0005
About this file
Amend 2...Option Evaluation description.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PQ15-C-0004_GYMO _PC.pdf | ||
| W912PQ-15-R-0005-0003.doc | DOC document | |
| 15-R-0005Amend1.pdf | ||
| 15-R-0005Amend1Conf.pdf | ||
| W912PQ15R0005 AIRMONITORING.pdf | ||
| SOW_Asbestos_Abatement_2_and_3.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA6323 - 109 MSG/MSC STRATTON ANGB
1 AIR NATIONAL GUARD ROAD
SCOTIA NY 12302-9752
VBDZ152006
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. To make additonal clarifications to Amendment 1.
B. The proposal due date of 16 Dec 2014 @ 3 EST remains unchanged as a result of this Amendment.
C. Nothing follow s.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Dec-2014
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PQ-15-R-0005
X 9B. DATED (SEE ITEM 11)
07-Nov-2014
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Dec-2014
CODE
W912PQ - 109 MSG/MSC
1 AIR NATIONAL GUARD ROAD
SCOTIA NY 12302-9752
W912PQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W912PQ
FACILITY CODECODE
EMAIL:TEL:
W912PQ-15-R-0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS
The following have been added by full text:
OPTION EVALUATION
A single award is contemplated. Prospective contractors must submit prices on all items (to include CLIN 005) in order to be considered for award. There is one Option to this award.
The Government will evaluate proposals for award purposes by adding the total price for all Clins; to include Option 1 (CLIN 5) to the total price for the basic requirement. The Government may determine that a proposal is unacceptable if the option prices are significantly unbalanced.
Evaluation of options shall not obligate the Government to exercise the option(s).
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
AMEND 2
Q Amendment 0001 to the original solicitation # W912PQ-15-R-0005, AIR MONITORING FOR ASBESTOS REMOVAL incorporates an stipulation of "not to exceed amount" for item # 5 on page 5 the Amendment to confirmed copy dated December 5, posted on FedBiz does not reflect any such stipulation..
A. The Not to Exceed (NTE) was added to the contract award system - this cost constraint does not show in the conformed copy but shows in the Global Changes CLIN 0001 - CLIN 0005 noted in on Page 2 of Amendment 1.
Q Additionally, since Item # 5 is optional, the amendments does not indicate whether bid selection will be based on lowest price total for item 1 through 4 or item 1 through 5 total.
Please, kindly give us clarification regarding pricing schedule.
A. The following Clarification of Price Evaluation; was added to Section 00100:
A single award is contemplated. Prospective contractors must submit prices on all items (to include CLIN 005) in order to be considered for award. There is one Option to this award.
The Government will evaluate proposals for award purposes by adding the total price for all Clins; to include Option 1 (CLIN 5) to the total price for the basic requirement. The
W912PQ-15-R-0005
Government may determine that a proposal is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(End of Summary of Changes)
File details come from the government source that posted it. Updated .