01400.doc

DOC document 52 KB Posted

Attached to
Repair Airfield Pavements
Solicitation number
W912PQ-08-R-0016
Issued by

About this file

Quality Control

View the file

Other files

File Type Posted
02585.doc DOC document
01025.doc DOC document
02520.doc DOC document
W912PQ-08-R-0016.doc DOC document
02515.doc DOC document
WKVB082015 SOW.doc DOC document
bid sheet.XLS XLS spreadsheet
Airfield Pavement Plans.pdf PDF
01000.doc DOC document
02521.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01400 - QUALITY CONTROL

PART 1 - GENERAL

1.1

SUMMARY

A.

This Section includes administrative and procedural requirements for quality-control services.

B.

Quality-control services include inspections, tests, and related actions, including reports performed by Contractor, by independent agencies, and by governing authorities. They do not include contract enforcement activities performed by Contracting Officer's Representative.

C.

Inspection and testing services are required to verify compliance with requirements specified or indicated. These services do not relieve Contractor of responsibility for compliance with Contract Document requirements.

D.

Requirements of this Section relate to customized fabrication and installation procedures, not production of standard products.

1.

Specific quality-control requirements for individual construction activities are specified in the Sections that specify those activities. Requirements in those Sections may also cover production of standard products.

2.

Specified inspections, tests, and related actions do not limit Contractor's quality-control procedures that facilitate compliance with Contract Document requirements.

3.

Requirements for Contractor to provide quality-control services required by Contracting Officer's Representative, Owner, or authorities having jurisdiction are not limited by provisions of this Section.

1.2 seq level2 \h \r0 seq level3 \h \r0

RESPONSIBILITIES

Contractor Responsibilities: Unless otherwise indicated as the responsibility of another identified entity, Contractor shall provide inspections, tests, and other quality-control services specified elsewhere in the Contract Documents and required by authorities having jurisdiction. Costs for these services are included in the Contract Sum.

Where individual Sections specifically indicate that certain inspections, tests, and other quality-control services are the Contractor's responsibility, the Contractor shall employ and pay a qualified independent testing agency acceptable to the Contracting Officer to perform quality-control services. Costs for these services are included in the Contract Sum.

B.seq level3 \h \r0 Retesting: The Contractor is responsible for retesting where results of inspections, tests, or other quality-control services prove unsatisfactory and indicate noncompliance with Contract Document requirements, regardless of whether the original test was Contractor's responsibility.

The cost of retesting construction, revised or replaced by the Contractor, is the Contractor's responsibility where required tests performed on original construction indicated noncompliance with Contract Document requirements.

C.seq level3 \h \r0 Associated Services: Cooperate with agencies performing required inspections, tests, and similar services, and provide reasonable auxiliary services as requested. Notify the agency sufficiently in advance of operations to permit assignment of personnel. Auxiliary services required include, but are not limited to, the following:

Provide access to the Work.

Furnish incidental labor and facilities necessary to facilitate inspections and tests.

Take adequate quantities of representative samples of materials that require testing or assist the agency in taking samples.

4.

Provide facilities for storage and curing of test samples.

5.

Deliver samples to testing laboratories.

6.

Provide the agency with a preliminary design mix proposed for use for materials mixes that require control by the testing agency.

7.

Provide security and protection of samples and test equipment at the Project Site.

D.seq level3 \h \r0 Duties of the Testing Agency: The independent agency engaged to perform inspections, sampling, and testing of materials and construction specified in individual Sections shall cooperate with the Contracting Officer's Representative (COR) and the Contractor in performance of the agency's duties. The testing agency shall provide qualified personnel to perform required inspections and tests.

The agency shall notify the COR and the Contractor promptly of irregularities or deficiencies observed in the Work during performance of its services.

The agency is not authorized to release, revoke, alter, or enlarge requirements of the Contract Documents or approve or accept any portion of the Work.

The agency shall not perform any duties of the Contractor.

E.seq level3 \h \r0 Coordination: Coordinate the sequence of activities to accommodate required services with a minimum of delay. Coordinate activities to avoid the necessity of removing and replacing construction to accommodate inspections and tests.

The Contractor is responsible for scheduling times for inspections, tests, taking samples, and similar activities.

1.3 seq level2 \h \r0 seq level3 \h \r0

SUBMITTALS

Unless the Contractor is responsible for this service, the independent testing agency shall submit a certified written report, in duplicate, of each inspection, test, or similar service to the COR. If the Contractor is responsible for the service, submit a certified written report, in duplicate, of each inspection, test, or similar service through the Contractor.

Submit additional copies of each written report directly to the governing authority, when the authority so directs.

Report Data: Written reports of each inspection, test, or similar service include, but are not limited to, the following:

a.

Date of issue.

b.

Project title and number.

c.

Name, address, and telephone number of testing agency.

d.

Dates and locations of samples and tests or inspections.

e.

Names of individuals making the inspection or test.

f.

Designation of the Work and test method.

g.

Identification of product and Specification Section.

h.

Complete inspection or test data.

i.

Test results and an interpretation of test results.

j.

Ambient conditions at the time of sample taking and testing.

k.

Comments or professional opinion on whether inspected or tested Work complies with Contract Document requirements.

l.

Name and signature of laboratory inspector.

m.

Recommendations on retesting.

1.4 seq level2 \h \r0 seq level3 \h \r0 seq level4 \h \r0

QUALITY ASSURANCE

Qualifications for Service Agencies: Engage inspection and testing service agencies, including independent testing laboratories, that are pre-qualified as complying with the American Council of Independent Laboratories' "Recommended Requirements for Independent Laboratory Qualification" and that specialize in the types of inspections and tests to be performed. Laboratory shall meet the requirements of ANSI/ASTM E329 and ANSI/ASTM D3740.

Each independent inspection and testing agency engaged on the Project shall be authorized by authorities having jurisdiction to operate in the state where the Project is located.

Each independent inspection and testing agency engaged on the Project shall be approved in writing by COR before commencing work.

PART 2

seq level1 \h \r0 seq level2 \h \r0 seq level3 \h \r0 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION

3.1

REPAIR AND PROTECTION

General: Upon completion of inspection, testing, sample taking and similar services, repair damaged construction and restore substrates and finishes.

B.

Protect construction exposed by or for quality-control service activities, and protect repaired construction.

C.

Repair and protection is Contractor's responsibility, regardless of the assignment of responsibility for inspection, testing, or similar services.

END OF SECTION 01400