Enterprise Dredge Delivery Center Overview 09092026.pptx

PPTX presentation 19 MB Posted

Attached to
Virtual Industry Day for FY27 USACE National Dredging Procurement Strategies
Solicitation number
W912PM27DREDG
Issued by

About this file

This is an Enterprise Dredge Delivery Center (EDDC) overview presentation outlining USACE's national dredging procurement strategy. The Department of the Army Corps of Engineers is implementing a phased, enterprise-wide approach to consolidate approximately 190 individual dredging contracts into 10 consolidated contracts, centralizing procurement through a delivery center established for October 1, 2027. The initiative encompasses three primary acquisition strategies: (1) Hopper Contracts consolidating maintenance dredging and beach renourishment projects, with 8 contracts totaling 40 million cubic yards (MCY) for Navigation Entrances and 2 contracts totaling 14.5 MCY for Coastal Storm Risk Management; (2) Scope Dredge-to-Budget (SDtB), which optimizes scope and quality within a target budget for the Galveston/Houston Area of Responsibility with Group 1 valued at $190 million for 25 MCY across Texas projects; and (3) National Small Business MATOC awarding a 5-year contract with approximately 90 task orders annually covering 50 MCY across 250-300 projects. The FY 2027 implementation includes 11 Texas-based projects ranging from $2.1 million to $54.6 million with historical quantities from 325,000 to 5 million cubic yards.

The Scope Dredge-to-Budget procurement employs a two-phase evaluation process compliant with FAR 15 procedures. Phase One requires technical qualifications-based proposals (maximum 5 offerors per FAR 36.101-2(b)(4)) evaluated on proof of bonding capacity, past performance, and proposed plant, with no cost or detailed design information required. Phase Two, issued by amendment to the most highly qualified offerors, implements FAR 15 source selection procedures to determine best value. A Virtual Industry Day was held on September 9, 2026, at 1:00 PM EST via Teams to present acquisition strategies and solicit industry feedback on proposed consolidated project pairings. This enterprise approach aims to maximize buying power, standardize specifications, implement national small business contracting, and streamline procurement and specification development across USACE's entire dredging portfolio.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Enterprise Dredging Delivery Center (EDDC) Industry Day

9 sepT 2026

MISSION

Implement a HQUSACE led, SAD executed, enterprise dredging solution for all ~190 contracts by establishing a delivery center to optimize contracting structures and standardize plans and specifications that maximizes our buying power to benefit the nation.

New procurement structures for dredging that fundamentally increase enterprise buying power.

Innovative approaches to the acquisition of high-priority projects.

Implementing a national approach to small business contracts.

Streamlining P&S and our associated development processes.

Steady State (100%/100%)

Loose ends

Non-Routine Work for others

Earmarks

8(a) Set Asides

Entire USACE dredging portfolio incorporated

PHASED APPROACH

Kick-Off Establish Interim National Team with Members from Across the Enterprise Develop Dredge Order Template Develop Standardized P&S Hopper Consolidation/SDtB/ National SB Procurement(s) (71%/59%)

Task #1 – Nav Entrance/CSRM Hopper Task #2 – Small Business Task #3 – SDtB Pilot

Transition Workload to Center and Incorporate Large Pipelines/Buckets (90%/95%)

Center Established – 1 October 2027

Incorporate Large Pipeline & Bucket

Finalize HQ Steady State Guidance

INITIATE

JUL 2026

YEAR 2

FY 2028

STEADY STATE

FY 2029 and Beyond

YEAR 1

FY 2027

SDtB: Scope-Dredge-to-Budget SB: Small-Business Current Enterprise Dredging Plan – 190 Contracts/210 MCY Centralized Phased Approach:

(% # of Contracts/% of Dredge Qty)

Begin Issuing Solicitations 26 Individual projects to 10 consolidated contracts

Nav Entrances (Hopper) 8 Contracts

40 MCY

CSRM (Hopper) 2 Contracts

14.5MCY

Year 1:

Implementation Timeline Kick-Off DEEP Team established w/ Members from Across the Enterprise (12 Kickoff Meeting – 10 Aug; Mobile, AL Establish Battle Rhythm Engagement Gathering District data Finalize Project Lists for FY27 Establish Battle Rhythm for Industry engagement Hopper F2F – Week of 28 Sept SDtB Virtual – 16 Oct SDtB F2F – Week of 2 Nov P&S Utilize ERDC AI model for “Perfect Spec” Coordinate with Districts on operational changes (surveys, S&A, etc.)

Develop streamlined approach to reviews

INITIATE

JUL 2026

INNOVATE

3rd Qtr. FY 2027

ISSUE

2nd Qtr. FY 2027

Coordinate End FY 2026 Scope Dredge to Budget Group 1 – $190M,25MCY Sabine Houston Galveston Texas City Freeport GIWW North GIWW South Corpus Brazos Channel to Victoria Channel to Port Isabel National Small Business MATOC Award 5yr National Small Business MATOC 90 TO Annually

50 MCY

250 – 300 Projects included

Enterprise Dredge Delivery Center Established

STANDARDIZE

End FY 2026

IMPLEMENT

1 OCT 2027

DEEP: Dredging Evolution for Enterprise Production

Current FY 27 Hopper Plan

Scope Dredge to Budget Scope

Project NameDREDGINGHistorical Quantities
BRAZOS ISLAND HARBOR, TX$5,805,000400K CY
CHANNEL TO HARLINGEN, TX$2,640,000325K CY
CORPUS CHRISTI SHIP CHANNEL, TX$22,900,0003.5-5.0M CY
FREEPORT HARBOR, TX$10,910,0003M CY
GALVESTON HARBOR AND CHANNEL, TX$28,500,0003.5-5.0 M CY
GIWW, CHANNEL TO VICTORIA, TX$9,640,0001-2M CY
GULF INTRACOASTAL WATERWAY, TX$13,960,0002-3M CY
HOUSTON SHIP CHANNEL, TX$54,620,0005M CY
MATAGORDA SHIP CHANNEL, TX$2,110,000500-600K CY
SABINE - NECHES WATERWAY, TX$29,590,0003.5-4M CY
TEXAS CITY SHIP CHANNEL, TX$9,900,0001-2M CY
$190,575,00023.7M - 30.3M CY