Attachment 2 - FY27 Hopper Groupings_Industry Day Revised 8-28-26.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Virtual Industry Day for FY27 USACE National Dredging Procurement Strategies
Solicitation number
W912PM27DREDG
Issued by

About this file

This spreadsheet contains the FY27 hopper dredging project groupings and proposed consolidated procurement packages for the U.S. Army Corps of Engineers National Dredging Center. The document lists 27 dredging projects organized into 10 hopper groupings across multiple USACE districts, including Norfolk, Jacksonville, New Orleans, Mobile, Portland, San Francisco, Los Angeles, Philadelphia, Savannah, Charleston, Wilmington, and Baltimore. Each grouping pairs maintenance dredging and beach nourishment projects scheduled for execution between early 2027 and mid-2028.

The projects include varying dredging quantities ranging from 250,000 to 11,000,000 cubic yards or hours, with advertising dates beginning November 2026 through June 2027 and bid opening dates from December 2026 through August 2027. Expected award dates range from mid-December 2026 through September 2027, with performance periods extending from January 2027 through July 2028. All projects utilize hopper dredges, with some including bucket dredges or pipeline alternatives. Dredged material placement will occur through open-water placement, beach/shoreline nourishment, confined diked placement, or commercial/industrial uses. The groupings are presented as preliminary proposed pairings for feedback from industry stakeholders attending the September 9, 2026 virtual industry day meeting.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hopper List

Row Labels
Baltimore
BALTIMORE HARBOR AND CHANNELS (50 FOOT), MD
Charleston
(blank)
Jacksonville
JACKSONVILLE HARBOR, FL
KINGS BAY ENTRANCE CHANNEL
NAVAL STATION MAYPORT
Los Angeles
WORK FOR OTHERS
Mobile
FY27 GULF COAST REG HOPPER #1
New Orleans
CALCASIEU RIVER AND PASS, LA
MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA
MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA;CALCASIEU RIVER AND PASS, LA
Norfolk
NORFOLK HARBOR, VA
Philadelphia
BRIG. INL TO GRT EGG INL N.J.
DE. COAST FROM HENLOPEN TO FENWICK ISLAND, DE
DEL COAST CAPE HENL. TO FENWICK
DELAWARE COAST BETHANY/S. BETHANY
MANASQUAN INLET TO BARNEGAT
NJ COASTAL INLETS&BEACHES, CAPE MAY-LOWER TWNSHP
Portland
COLUMBIA AND LOWER WILLAMETTE RIVERS BELOW VANCOUVER, WA & PORTLAND, OR
COLUMBIA RIVER AT THE MOUTH, OR & WA
COOS BAY, OR
San Francisco
HUMBOLDT HARBOR AND BAY, CA
OAKLAND HARBOR, CA
Savannah
BRUNSWICK HARBOR, GA;WILMINGTON HARBOR, NC;SAVANNAH HARBOR, GA
Wilmington
(blank)
(blank)
MOREHEAD CITY HARBOR, NC
(blank)
Grand Total

Hopper Nav-CSRM Detail

Potential Groupings (Not Prioirty)District NameJob NameClass(es) of WorkAdvertising DateBid Open DateExpected Award DateEstimated Period of Performance Start DateEstimated Period of Perfromance End DateExpected Dredge TypesEstimated Total Dredging Quantity (CY)Expected Pay MeasureDredged Material Placement Categories
1NorfolkTHIMBLE SHOAL CHANNELMaintenance Dredging11/6/2612/8/262/11/273/5/278/31/27Bucket;Hopper1,570,000Cubic yardsBeach/Shoreline Nourishment; Construction and Industrial/Commercial Uses; Open-Water Placement
1JacksonvilleJACKSONVILLE HARBOR, FLMaintenance Dredging10/13/2611/12/2612/15/262/15/278/15/27Bucket;Hopper750,000Cubic yardsConfined (Diked) Placement
2New OrleansCALCASIEU BAR HD 1-25Maintenance Dredging11/2/2612/2/2612/17/261/15/274/15/27Hopper6,000,000HoursOpen-Water Placement
2MobileFY27 Mobile District IDIQ - PascagoulaMaintenance Dredging12/15/261/15/272/15/274/1/279/30/27Hopper500,000HoursOpen-Water Placement
2MobileFY27 Mobile District IDIQ - Panama CityMaintenance Dredging12/15/261/15/272/15/278/1/279/30/27Hopper250,000HoursOpen-Water Placement
3PortlandWCH MAINTENANCE DREDGING - LOWER COLUMBIA RIVERMaintenance Dredging1/22/273/1/273/22/276/15/2711/15/27Hopper1,470,000Cubic yardsOpen-Water Placement
3San FranciscoWCH MAINTENANCE DREDGING - HUMBOLDT BAR & ENTRANCEMaintenance Dredging1/22/273/1/273/22/276/1/2711/15/27Hopper900,000Cubic yardsOpen-Water Placement
3PortlandWCH MAINTENANCE DREDGING - MOUTH OF THE COLUMBIA RIVERMaintenance Dredging1/22/273/1/273/22/274/1/2711/15/27Hopper1,720,000Cubic yardsBeach/Shoreline Nourishment; Open-Water Placement
3PortlandWCH MAINTENANCE DREDGING - COOS BAYMaintenance Dredging1/22/273/1/273/22/274/1/2711/15/27Hopper400,000Cubic yardsBeach/Shoreline Nourishment; Open-Water Placement
3Los AngelesPt. Mugu Beach NourishmentBeach Nourishment6/8/277/7/278/11/279/15/273/1/28600,000Beach/Shoreline Nourishment
4JacksonvilleMAYPORT O&MMaintenance Dredging2/9/273/11/274/12/276/15/2712/30/27Bucket;Hopper1,000,000Cubic yardsOpen-Water Placement
4JacksonvilleKINGS BAY ENTRANCE CHAN O&MMaintenance Dredging7/9/278/10/279/15/2712/15/273/31/28Hopper1,200,000Cubic yardsOpen-Water Placement
5New OrleansMISS RIVER & CALCASIEU BAR HDMaintenance Dredging12/18/267/15/277/30/271/10/287/31/28Hopper11,000,000HoursOpen-Water Placement
6PhiladelphiaCape May Inlet to Lower TwpBeach Nourishment6/4/277/22/278/5/2710/1/271/30/28Hopper500,000Cubic yardsBeach/Shoreline Nourishment
6PhiladelphiaABSECON ISLANDBeach Nourishment2/13/273/16/274/2/276/1/2711/30/27Hopper;Pipeline1,400,000Cubic yardsBeach/Shoreline Nourishment
6.1PhiladelphiaBarnegat Inlet to Little Egg Inlet, NJBeach Nourishment5/3/276/4/276/18/278/1/273/30/27Hopper1,800,000Cubic yardsBeach/Shoreline Nourishment
7SavannahSavannah Harbor Entrance Channel Maintenance DredgingMaintenance Dredging7/9/278/18/279/15/2712/15/273/31/28Hopper950,000Cubic yardsOpen-Water Placement
7CharlestonFY 27 RHDC Charleston DistrictMaintenance Dredging6/17/277/16/279/17/2712/15/273/31/28Hopper1,500,000Cubic yardsOpen-Water Placement
7WilmingtonFY27-28 SAD REGIONAL HARBOR 11.1 - WILMINGTONMaintenance Dredging6/30/278/3/279/5/2712/1/274/15/28Hopper900,000Cubic yardsOpen-Water Placement
8.1PhiladelphiaREHOBOTH/ DEWEY BEACHESBeach Nourishment4/1/275/3/275/17/277/1/2710/30/27Hopper500,000Cubic yardsBeach/Shoreline Nourishment
8PhiladelphiaBETHANY & SOUTH BETHANYBeach Nourishment4/1/275/3/275/17/277/1/2710/30/27Hopper700,000Cubic yardsBeach/Shoreline Nourishment
8PhiladelphiaFenwick IslandBeach Nourishment4/1/275/3/275/17/277/1/2710/30/27Hopper300,000Cubic yardsBeach/Shoreline Nourishment
9SavannahBrunswick Harbor Entrance Channel Maintenance DredgingMaintenance Dredging7/9/278/18/279/15/2712/15/273/31/28Hopper1,600,000Cubic yardsOpen-Water Placement
9WilmingtonFY27-28 SAD REGIONAL HARBOR 11.2 - MOREHEAD CITYMaintenance Dredging7/19/278/20/279/24/2712/1/274/15/28Hopper500,000Cubic yardsOpen-Water Placement
9BaltimoreBaltimore Harbor and Channels (York Spit)Maintenance Dredging8/1/279/1/2710/15/2711/15/274/13/28Hopper1,500,000Cubic yardsOpen-Water Placement
10New OrleansMISS RIVER HD 1-27Maintenance Dredging12/18/266/10/276/30/272/1/288/31/28Hopper10,000,000HoursOpen-Water Placement
TBDNew YorkFire Island Inlet to Montauk Point (FIMP), NY - Contract 3B - SouthamptonBeach Nourishment4/15/276/15/277/15/2711/15/273/15/28Hopper1,700,000Cubic yardsBeach/Shoreline Nourishment