Attachment 2 - FY27 Hopper Groupings_Industry Day.xlsx
XLSX spreadsheet 35 KB Posted
- Solicitation number
- W912PM27DREDG
About this file
This is a hopper dredging project grouping spreadsheet detailing FY27 U.S. Army Corps of Engineers (USACE) National Dredging Procurement Strategies across nine geographic districts. The document outlines 24 proposed maintenance dredging and beach nourishment projects organized into nine consolidated hopper contract groupings, with projects spanning from Baltimore to Los Angeles.
The projects are distributed across Norfolk, Jacksonville, New Orleans, Mobile, Portland, San Francisco, Los Angeles, Philadelphia, Savannah, Charleston, Wilmington, and Baltimore districts. Maintenance dredging contracts dominate the portfolio, with quantities ranging from 250,000 to 11,000,000 cubic yards or hours, while beach nourishment projects range from 300,000 to 1,800,000 cubic yards. Advertising dates span from November 2026 through August 2027, with bid opening dates following 30-60 days after advertisement and award dates typically 15-30 days after bid opening. Performance periods generally run 6-12 months, commencing between January 2027 and December 2027. Dredged material placement is designated as open-water placement for most maintenance dredging contracts, while beach nourishment projects specify beach/shoreline nourishment placement. The expected dredge types are exclusively hopper dredges, with some Jacksonville and Philadelphia projects permitting bucket dredges or pipeline alternatives. This grouping structure supports USACE's national procurement strategy to consolidate related geographic and functional dredging requirements into larger contract packages for improved efficiency and contractor participation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Hopper List
| Row Labels |
| Baltimore |
| BALTIMORE HARBOR AND CHANNELS (50 FOOT), MD |
| Charleston |
| (blank) |
| Jacksonville |
| JACKSONVILLE HARBOR, FL |
| KINGS BAY ENTRANCE CHANNEL |
| NAVAL STATION MAYPORT |
| Los Angeles |
| WORK FOR OTHERS |
| Mobile |
| FY27 GULF COAST REG HOPPER #1 |
| New Orleans |
| CALCASIEU RIVER AND PASS, LA |
| MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA |
| MISSISSIPPI RIVER, BATON ROUGE TO THE GULF OF MEXICO, LA;CALCASIEU RIVER AND PASS, LA |
| Norfolk |
| NORFOLK HARBOR, VA |
| Philadelphia |
| BRIG. INL TO GRT EGG INL N.J. |
| DE. COAST FROM HENLOPEN TO FENWICK ISLAND, DE |
| DEL COAST CAPE HENL. TO FENWICK |
| DELAWARE COAST BETHANY/S. BETHANY |
| MANASQUAN INLET TO BARNEGAT |
| NJ COASTAL INLETS&BEACHES, CAPE MAY-LOWER TWNSHP |
| Portland |
| COLUMBIA AND LOWER WILLAMETTE RIVERS BELOW VANCOUVER, WA & PORTLAND, OR |
| COLUMBIA RIVER AT THE MOUTH, OR & WA |
| COOS BAY, OR |
| San Francisco |
| HUMBOLDT HARBOR AND BAY, CA |
| OAKLAND HARBOR, CA |
| Savannah |
| BRUNSWICK HARBOR, GA;WILMINGTON HARBOR, NC;SAVANNAH HARBOR, GA |
| Wilmington |
| (blank) |
| (blank) |
| MOREHEAD CITY HARBOR, NC |
| (blank) |
| Grand Total |
Hopper Nav-CSRM Detail
| Potential Groupings (Not Prioirty) | District Name | Job Name | Class(es) of Work | Advertising Date | Bid Open Date | Expected Award Date | Estimated Period of Performance Start Date | Estimated Period of Perfromance End Date | Expected Dredge Types | Estimated Total Dredging Quantity (CY) | Expected Pay Measure | Dredged Material Placement Categories |
| 1 | Norfolk | THIMBLE SHOAL CHANNEL | Maintenance Dredging | 11/6/26 | 12/8/26 | 2/11/27 | 3/5/27 | 8/31/27 | Bucket;Hopper | 1,570,000 | Cubic yards | Beach/Shoreline Nourishment; Construction and Industrial/Commercial Uses; Open-Water Placement |
| 1 | Jacksonville | JACKSONVILLE HARBOR, FL | Maintenance Dredging | 10/13/26 | 11/12/26 | 12/15/26 | 2/15/27 | 8/15/27 | Bucket;Hopper | 750,000 | Cubic yards | Confined (Diked) Placement |
| 2 | New Orleans | CALCASIEU BAR HD 1-25 | Maintenance Dredging | 11/2/26 | 12/2/26 | 12/17/26 | 1/15/27 | 4/15/27 | Hopper | 6,000,000 | Hours | Open-Water Placement |
| 2 | Mobile | FY27 Mobile District IDIQ - Pascagoula | Maintenance Dredging | 12/15/26 | 1/15/27 | 2/15/27 | 4/1/27 | 9/30/27 | Hopper | 500,000 | Hours | Open-Water Placement |
| 2 | Mobile | FY27 Mobile District IDIQ - Panama City | Maintenance Dredging | 12/15/26 | 1/15/27 | 2/15/27 | 8/1/27 | 9/30/27 | Hopper | 250,000 | Hours | Open-Water Placement |
| 2 | New Orleans | MISS RIVER HD 1-27 | Maintenance Dredging | 12/18/26 | 6/10/27 | 6/30/27 | 2/1/28 | 8/31/28 | Hopper | 10,000,000 | Hours | Open-Water Placement |
| 3 | Portland | WCH MAINTENANCE DREDGING - LOWER COLUMBIA RIVER | Maintenance Dredging | 1/22/27 | 3/1/27 | 3/22/27 | 6/15/27 | 11/15/27 | Hopper | 1,470,000 | Cubic yards | Open-Water Placement |
| 3 | San Francisco | WCH MAINTENANCE DREDGING - HUMBOLDT BAR & ENTRANCE | Maintenance Dredging | 1/22/27 | 3/1/27 | 3/22/27 | 6/1/27 | 11/15/27 | Hopper | 900,000 | Cubic yards | Open-Water Placement |
| 3 | Portland | WCH MAINTENANCE DREDGING - MOUTH OF THE COLUMBIA RIVER | Maintenance Dredging | 1/22/27 | 3/1/27 | 3/22/27 | 4/1/27 | 11/15/27 | Hopper | 1,720,000 | Cubic yards | Beach/Shoreline Nourishment; Open-Water Placement |
| 3 | Portland | WCH MAINTENANCE DREDGING - COOS BAY | Maintenance Dredging | 1/22/27 | 3/1/27 | 3/22/27 | 4/1/27 | 11/15/27 | Hopper | 400,000 | Cubic yards | Beach/Shoreline Nourishment; Open-Water Placement |
| 3 | Los Angeles | Pt. Mugu Beach Nourishment | Beach Nourishment | 6/8/27 | 7/7/27 | 8/11/27 | 9/15/27 | 3/1/28 | 600,000 | Beach/Shoreline Nourishment | ||
| 4 | Jacksonville | MAYPORT O&M | Maintenance Dredging | 2/9/27 | 3/11/27 | 4/12/27 | 6/15/27 | 12/30/27 | Bucket;Hopper | 1,000,000 | Cubic yards | Open-Water Placement |
| 4 | Jacksonville | KINGS BAY ENTRANCE CHAN O&M | Maintenance Dredging | 7/9/27 | 8/10/27 | 9/15/27 | 12/15/27 | 3/31/28 | Hopper | 1,200,000 | Cubic yards | Open-Water Placement |
| 5 | New Orleans | MISS RIVER & CALCASIEU BAR HD | Maintenance Dredging | 12/18/26 | 7/15/27 | 7/30/27 | 1/10/28 | 7/31/28 | Hopper | 11,000,000 | Hours | Open-Water Placement |
| 6 | Philadelphia | Cape May Inlet to Lower Twp | Beach Nourishment | 6/4/27 | 7/22/27 | 8/5/27 | 10/1/27 | 1/30/28 | Hopper | 500,000 | Cubic yards | Beach/Shoreline Nourishment |
| 6 | Philadelphia | ABSECON ISLAND | Beach Nourishment | 2/13/27 | 3/16/27 | 4/2/27 | 6/1/27 | 11/30/27 | Hopper;Pipeline | 1,400,000 | Cubic yards | Beach/Shoreline Nourishment |
| 6.1 | Philadelphia | Barnegat Inlet to Little Egg Inlet, NJ | Beach Nourishment | 5/3/27 | 6/4/27 | 6/18/27 | 8/1/27 | 3/30/27 | Hopper | 1,800,000 | Cubic yards | Beach/Shoreline Nourishment |
| 7 | Savannah | Savannah Harbor Entrance Channel Maintenance Dredging | Maintenance Dredging | 7/9/27 | 8/18/27 | 9/15/27 | 12/15/27 | 3/31/28 | Hopper | 950,000 | Cubic yards | Open-Water Placement |
| 7 | Charleston | FY 27 RHDC Charleston District | Maintenance Dredging | 6/17/27 | 7/16/27 | 9/17/27 | 12/15/27 | 3/31/28 | Hopper | 1,500,000 | Cubic yards | Open-Water Placement |
| 7 | Wilmington | FY27-28 SAD REGIONAL HARBOR 11.1 - WILMINGTON | Maintenance Dredging | 6/30/27 | 8/3/27 | 9/5/27 | 12/1/27 | 4/15/28 | Hopper | 900,000 | Cubic yards | Open-Water Placement |
| 8 | Philadelphia | REHOBOTH/ DEWEY BEACHES | Beach Nourishment | 4/1/27 | 5/3/27 | 5/17/27 | 7/1/27 | 10/30/27 | Hopper | 500,000 | Cubic yards | Beach/Shoreline Nourishment |
| 8 | Philadelphia | BETHANY & SOUTH BETHANY | Beach Nourishment | 4/1/27 | 5/3/27 | 5/17/27 | 7/1/27 | 10/30/27 | Hopper | 700,000 | Cubic yards | Beach/Shoreline Nourishment |
| 8.1 | Philadelphia | Fenwick Island | Beach Nourishment | 4/1/27 | 5/3/27 | 5/17/27 | 7/1/27 | 10/30/27 | Hopper | 300,000 | Cubic yards | Beach/Shoreline Nourishment |
| 9 | Savannah | Brunswick Harbor Entrance Channel Maintenance Dredging | Maintenance Dredging | 7/9/27 | 8/18/27 | 9/15/27 | 12/15/27 | 3/31/28 | Hopper | 1,600,000 | Cubic yards | Open-Water Placement |
| 9 | Wilmington | FY27-28 SAD REGIONAL HARBOR 11.2 - MOREHEAD CITY | Maintenance Dredging | 7/19/27 | 8/20/27 | 9/24/27 | 12/1/27 | 4/15/28 | Hopper | 500,000 | Cubic yards | Open-Water Placement |
| 9 | Baltimore | Baltimore Harbor and Channels (York Spit) | Maintenance Dredging | 8/1/27 | 9/1/27 | 10/15/27 | 11/15/27 | 4/13/28 | Hopper | 1,500,000 | Cubic yards | Open-Water Placement |
| TBD | New York | Fire Island Inlet to Montauk Point (FIMP), NY - Contract 3B - Southampton | Beach Nourishment | 4/15/27 | 6/15/27 | 7/15/27 | 11/15/27 | 3/15/28 | Hopper | 1,700,000 | Cubic yards | Beach/Shoreline Nourishment |