This document is a Questions and Responses file for Solicitation Number W912PM25Q0031, related to the BEJ ADAS Piezometer project at B. Everett Jordan Dam in Moncure, North Carolina. The file contains eight questions and corresponding responses addressing environmental requirements, trenching details, safety training, pricing expectations, site challenges, trenching methods, technical qualifications, and post-installation support. Key details include the government's intent to award without discussions, requiring offerors to submit their best and final pricing, and noting that trenching work will be confined to lower dam slopes and a short roadway length. The project involves installing an ADAS Piezometer with specific technical requirements, including NEC guidelines for underground utility installation and one site visit 30 days after installation.
The solicitation is structured as a Request for Quote under simplified acquisition procedures, with electronic submissions required by email to specific USACE personnel. Offerors must submit both technical and pricing proposals in PDF format, with award to be made to the lowest-priced technically acceptable offer. A site visit is scheduled for 29 May 2025 at 11:00 AM EST, and requests for information must be submitted by 3 June 2025 at 4:00 PM EST. The project is being managed by the Department of the Army Corps of Engineers Engineering District Wilmington, with the objective of providing and installing a piezometer at the B. Everett Jordan Dam.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A23 - Site Visit Sign in Sheet.pdf | ||
| A21 - BEJ ADAS Trenching Layout.pdf | ||
| A12 - Brand Name JA_BEJ Dam ADAS_KO signed.pdf | ||
| A21 - W912PM25Q0031.pdf | ||
| A2 - SOW_BEJ_ADAS (Final).pdf | ||
| A21 - Piezometer Location Map.pdf | ||
| A21 - BEJ Dam PZ-AsBuilts.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question # Question Response
Since the site is near water, are there any additional environmental requirements?
There are no special environmental provisions required for the work being conducted.
The scoped trenching work should produce negligible material outwash and the total impacted area is expected to be less than 1-acre ( for sediment control purposes).
2 Is there trenching required on #39? Yes a small amount.
Any additional safety or pre-work training?
There are no site-specific health and safety training requirements for the execution of this contract.
Could you please confirm if you are expecting a detailed, finalized construction pricing proposal at this time, or if preliminary pricing estimates will suffice at this stage?
The Government intends to Award without Discussions. All offerors should submit their best and final pricing.
Are there any specific challenges or undocumented utilities on-site that we should consider beyond what is detailed in the provided documentation?
The prospective bidder should review Paragraph 1.1 Project Location, specifically, the materials that comprise the dam. B. Everett Jordan Dam has embankment fill material that is a mix of cobble to boulder to gravelly material, with some fines. Embankment slopes are 2.5H:1V and the upper slopes are covered in dumped rock. Trenching is confined to the lower slopes and a short length of roadway as shown in Figure 8, page 26.
As stated in the SOW, paragraph 4.1, the Contractor shall locate and mark utilities that may be present in the vicinity of the trenching work (see Figure 8, page 26), prior to commencing work.
Could you provide additional details on the preferred methods or special considerations for trenching and conduit placement on this site?
The prospective bidder should review Section 4 (page 11) and paragraph 4.6.2.3 "Trenching", which directs him that trenching and backfill procedures are to conform to NEC guidelines for installation of underground utilities. Als see Figure 9, page 27 for pavement cuts. The bidder may also elect to forgo the pavement cutting and trenching for Piezometers 27 and 58 (crest of dam), instrumenting them both instead with RIO box/dataloggers.
Are there specific technical qualifications or certifications required beyond standard USACE guidelines for personnel assigned to this project?
The prospective bidder should review paragraph 1.12 "Instrumentation Specialist" on page 7 of the SOW.
Could you confirm if the post-installation support requires any specific response times or conditions beyond the scheduled site visits?
No response times are specified within the SOW for ongoing support, outside of one site visit 30 days after installation and one site visit within the contract period (as needed by the District). Please see paragraphs 4.4 "Signal Integrity and Testing Period" and 4.5 "ongoing Support" page 12.
Questions and Responses 5-Jun-25
Solicitation Number: W912PM25Q0031, BEJ ADAS Piezometer