A21 - BEJ ADAS Trenching Layout.pdf
PDF 566 KB Posted
- Attached to
- BEJ ADAS Piezometer Federal contract opportunity
- Solicitation number
- W912PM25Q0031
About this file
The image is an ADAS Draft Layout map for the B. Everett Jordan Dam, dated 1/21/2025, using imagery from 2/27/2018. The map shows a geographic layout with multiple piezometers (yellow points) and data loggers (red and blue points) across a terrain that includes a dam, water body, roads, and grassy/rocky areas. The legend indicates two types of data loggers (1-channel and 5-channel) and shows blue lines representing ADAS trenching locations. A scale and compass rose are included, along with a U.S. Army Corps of Engineers logo, suggesting this is a technical site mapping document for a geotechnical or hydraulic monitoring project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A21- Questions and Responses.pdf | ||
| A23 - Site Visit Sign in Sheet.pdf | ||
| A21 - W912PM25Q0031.pdf | ||
| A2 - SOW_BEJ_ADAS (Final).pdf | ||
| A21 - Piezometer Location Map.pdf | ||
| A21 - BEJ Dam PZ-AsBuilts.pdf | ||
| A12 - Brand Name JA_BEJ Dam ADAS_KO signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .