This document is Amendment 003 to Solicitation W912PM-24-R-0004 for the design and construction (D-B) of a barracks facility to accommodate 146 Soldiers at Fort Liberty, North Carolina. The project includes living and sleeping quarters, storage, service areas, information systems, fire protection, Physical Access Control Systems (PACS), Energy Monitoring Control Systems (EMCS), and Post Construction Award Services (PCAS). Supporting facilities include site development, utilities, lighting, paving, drainage, landscaping, and accessibility measures. The amendment revises specifications for bedrooms, telecommunications rooms, finishes, concrete thickness, storm drainage, and HVAC load calculations. It also modifies working hours and removes certain sections from the solicitation documents.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

file:///C/..._06.21_Amend%20003/DoD%20SAFE-gnNBKTm3uGnRhmVu/DoD%20SAFE-gnNBKTm3uGnRhmVu/PROJECT%20INFO.txt[6/21/2024 1:32:22 PM]

FORT LIBERTY, NORTH CAROLINA

USASOC - YARBOROUGH Q4 BARRACKS REPLACEMENT

W912PM-24-R-0004

CATEGORY CODE 721-11-48

DATE: 21 JUNE 2024

REVISION 0003

VOLUME 1 - SECTION 01 10 00

1. removed: 01 33 16.00, 3.10.1 removed "Interim" to provide the Government 28 calendar days after receipt of the submission to review and comment on the design submittal.

2. revised: 01 10 00 Bedrooms: Each dwelling unit shall have four bedrooms...Ten percent of bedrooms shall be 2- Bedroom modules.

3. Revised: 01 10 00 paragraph 6.10.7.8 There are no SIPRNET requirements for this facility.

4. Revised: 01 10 00 paragraph 6.10.7.9 Telecommunications Rooms shall be sized in accordance with UFC 3-580-01.

5. Revised: 01 10 00 3.5.1. FINISHES AND INTERIOR SPECIALITIES 4) Finish Table to include fitness room, special systems room, & etc.

6. Revised: 01 10 00 paragraph 3.4.2 - PCC thickness changed to 6 inches.

7. Revised: 01 10 00 paragraph 6.4.6.2(d) - All permanent storm pipes will be sized according to the UFC using a minimum 10-year storm event. All temporary storm pipes for erosion control will be sized using the 25-year storm event

8. Revised: 01 10 00 paragraph 6.11.3 - US Department of Energy website and a load calculation program Trane TRACE 700 or Trane TRACE 3D Plus or another approved program.

9. Revised: 01 14 00 Paragraph 1.3.2 - Working hours have been changed.

10. Removed : 01 00 60.40 from the volume and TOC

VOLUME 2 – Table of contents

1. Removed : 01 00 60.40 from the TOC

DRAWINGS

1. LP101: Removed sod and plants from the chiller enclosure.

2. LP103: Removed sod and plants from the chiller enclosure.