W912PM24R00040002 Conformed PN92062.pdf
PDF 2 MB Posted
- Attached to
- SOF Barracks Federal contract opportunity
- Solicitation number
- W912PM24R0004
About this file
This document is a Request for Proposal (RFP) for the design and construction of a Special Operations Forces (SOF) Barracks at Fort Liberty, North Carolina. The project scope includes all labor, materials, equipment, and services required to design and construct a Barracks facility to accommodate 146 soldiers, with primary facilities such as living quarters, storage, service areas, information systems, fire protection, access control systems, and energy monitoring. Supporting facilities include site development, utilities, lighting, paving, drainage, landscaping, and antiterrorism/force protection measures. The contract will be a firm-fixed-price design-build requirement, with a period of performance of 1400 calendar days. The solicitation is being issued on an unrestricted basis using the Lowest Price Technically Acceptable source selection process, with proposals due by July 2, 2024. The estimated construction magnitude is between $30-70 million. Subcontracting goals, reporting requirements, and specific technical and past performance evaluation factors are provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PM-24-R-0004_DRAWINGS_AMD3_SAW.pdf | ||
| W912PM-24-R-0004 Amd 0003 Project Info.pdf | ||
| W912PM24R0004-0003 Conformed Amend 03.pdf | ||
| W912PM-24-R-0004_SPECS_VOL2_AMD2.pdf | ||
| W912PM-24-R-0004_SPECS_VOL1_AMD3.pdf | ||
| W912PM24R0004-0003 SF30 Amend 03.pdf | ||
| W912PM-24-R-0004_SPECS W SOC_AMD2_SAW.pdf | ||
| W912PM24R00040002 SF30 PN92062.pdf | ||
| W912PM24R00040001 PPQ - Corp Rel Exp Data Sheet.pdf | ||
| Attachment 4 Past Performance Questionare.pdf | ||
| Attachment 2 Corporate Relevant Experience Data Sheet.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W912PM24R0004
W912PM24R0004 SOF FY 24 Barracks, Fort Liberty, NC
See FAR provision 52.222-33, Notice of Requirement for Project Labor Agreement, and clause 52.222-34, Project Labor Agreement, for definitions and requirements pertaining to the use of a PLA for this contract.
This procurement is being solicited and procured using the Low est Price Technically Acceptable (LPTA) source selection process.
This Request for Proposal is issued in accordance w ith FAR Part 15.101-2. This is an unrestricted solicitation.
THE MAGNITUDE OF CONSTRUCTION FOR THIS PROJECT IS BETWEEN $30,000,000.00 AND $70,000,000.00.
FUNDS ARE NOT PRESENTLY AVAILABLE FOR THE ACQUISITION. NO CONTRACT AWARD WILL BE MADE UNTIL APPROPRIATE FUNDS ARE
MADE AVAILABLE.
VERBAL AND WRITTEN REQUESTS FOR INFORMATION MUST BE DIRECTED TO THE PERSON LISTED IN ITEM 9 ABOVE. INQUIRIES AND
REQUESTS THAT ARE DIRECTED TO ANY OTHER PERSON MAY NOT BE ANSWERED.
JASON S SMITH 910-251-4711
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
09-May-2024
(RFP)
(IFB)
X
CALL:
Design Build Barracks
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1400 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________00 73 00
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________02 Jul 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
U S ARMY CORPS OF ENGINEERS, WILMINGTON
WILMINGTON DISTRICT
ATTN: CONTRACTING DIVISION
69 DARLINGTON AVE
WILMINGTON NC 28403-1343
W912PM
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
92062
8. ADDRESS OFFER TO (If Other Than Item 7)
910-251-4454FAX:TEL: 910-251-4711 TEL: FAX:
W912PM24R0004 68
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 10 00 - Solicitation, Contract Line Item Number (CLIN) Schedule
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Design BarracksFFP
In accordance with the Scope of Work. Design must be accepted by the US Government before actual work has commenced.
FOB: Destination
PSC CD: Y1FC
NET AMT
0002 1 Job Construct Site DevelopmentFFP
Site development outside of Five Foot (5’) line In accordance with the Scope of Work.
0003 1 Job Construct BarracksFFP
In accordance with the Scope of Work Plans and Specifications .
0004 1 Job Payment and Performance BondsFFP
In accordance with the Scope of Work .
TOTALS & NOTICE TO OFFERORS
Total Bid Items (CLINS 0001 – 0004) $____________________
Period of Performance 1400 calendar days after Notice to Proceed.
NOTE 1:
Please be sure to include unit prices rounded to two (2) decimal places.
Section 00 21 00 - Instructions
PRE-AWARD INFORMATION
1.Contracts shall be awarded to responsible prospective contractors only. Before award, to be determined responsible, a prospective contractor must:
a. Have adequate financial resources to perform the contract, or the ability to obtain them;
b. Be able to comply with the required or proposed delivery or performance schedule, taking into consideration all existing commercial and government business commitments;
c. Have a satisfactory performance record;
d. Have a satisfactory record of integrity and business ethics;
e. Have the necessary organization, experience, accounting and operational controls, and technical skills, or theability to obtain them;
f. Have the necessary production, construction, and technical equipment and facilities, or the ability to obtain them; and
g. Be otherwise qualified and eligible to receive an award under applicable laws and regulations.
2. Each Bidder shall, upon request of the Contracting Officer, furnish information on any or all of the above areas sothat the Contracting Officer can make an affirmative determination of responsibility or nonresponsibility (End of information)
SOLICITATION/TECHNICAL INQUIRY
1. Solicitation/Technical Inquiries.
a. Inquiries are to be submitted via Bidder Inquiry at the ProjNet website at ttps://www.projnet.org <https://www.projnet.org> .
b. If you have technical problems accessing the Bidder Inquiry via the ProjNet website, contact the ProjNet Help Desk at 1-800-428-4357 (HELP). This number is for technical issues accessing the website ONLY.
2. Read this paragraph in conjunction with contract provision FAR 52.214-6, “Explanation to Prospective Bidders”.
3. Any prospective bidder/offeror desiring an explanation or interpretation of the solicitation, drawings specifications, etc., must request it in writing via Bidder Inquiry in ProjNet within no less than ten (10) calendar days prior to the date of bid opening or receipt of proposals. The Government reserves the right to decline addressing questions received less than ten (10) calendar days prior to receipt of bid opening or receipt of proposals.
4. No Inquiries will be accepted by the Bidder Inquiry system within ten (10) calendar days prior to the date of bidopening. However, you may still access the Bidder Inquiry system to view answers/replies to previous inquiries untilthe bid opening.
5. ProjNet – Bidder Inquiry module.
a. To submit and review bid inquiry items, bidders/offerors will need to be a current registered user or selfregister into system. To access Bidder Inquiry, go to the ProjNet web page at http://www.projnet.org <http://www.projnet.org> and click the “Quick Add” link. Once at the Quick Add screen, select agency USACE, enter Bidder Inquiry Key for this solicitation listed below, and bidder’s/offeror’s e-mail address, then click login. If this is bidder’s/offeror’s first time logging in they will be taken to the Bidder Inquiry Create Account screen to self-register. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. Please remember your Secret Question Answer and email address used for future access to this website.
b. From this page you may view all bidder/offeror inquiries under Reports or post a new inquiry under Submit.
c. Bidders/Offerors will receive an acknowledgement of their question via email, followed by another email notification that an answer to their question has been posted after it has been reviewed by our technical team and responded to by a Contracting Officer. It is the responsibility of the Bidder/Offeror to check their junk email and email delivery options to ensure delivery of these acknowledgement emails.
d. Bidders/Offerors are responsible for checking bid inquiry items.
e. Bidders/Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The name of the submitter or firm is not published for the public on the report of all Bidder Inquiries. Bidders/ Offerors are on notice of, and assumed to be aware of, all inquiries, responses, and information posted in the Bidder Inquiry System up to the date of bid submission, whether the inquiry was generated by the Bidder themselves or another potential Bidder/ Offeror. Bidders are responsible for incorporating all such information into their bid, or for requesting further clarification."
6. Solicitation Information:
Solicitation No: W912PM24R0012 Bidder Inquiry Key: 5GSG78-S48T96 (end of section)
SUBMISSION OF PROPOSALS
1. Do not hand carry, mail or email proposals. Original documents that carry a seal or require original signatures can be mailed to the Contracting Office at:
U. S. Army Corps of Engineers, Wilmington District, Attn: Mr. Jason Smith or Mr. John Hill 69 Darlington Avenue Wilmington, North Carolina, 28403.
All proposals must be received in the Contracting Office via the Procurement Integrated Enterprise Environment (PIEE) website not later than the exact due date and time specified for receipt of proposals. Proposals shall be submitted through the PIEE website at https://piee.eb.mil
2. Proposal due Date and Time:
Request for Proposal: W912PM24R0004 Title of Project: PN 92062 SOF FY24 Barracks Due Date of Proposal: 24 June 2024 Time by which Proposals are due: 2:00 P.M. (Eastern Time)
The Government will not be responsible for any portion of the proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf. Offerors are responsible for ensuring that proposals are submitted so as to reach the office designated for receipt of proposals. Offerors are responsible for allowing sufficient time for the proposal to be physically received.
(End)
INFORMATION TO OFFERORS
System for Award Management (SAM) and Electronic Funds Transfer (EFT)
1. All contractors must register in the System for Award Management (SAM) database before they can be awarded a contract. You may register at http://www.sam.gov. SAM information or help is also available by calling 866- 606-8220.
2. Public Law 104-134 requires the use of Electronic Funds Transfer (EFT) for all Federal payments. For contractor payments, EFT information will be pulled from your SAM by:
USACE FINANCE CENTER
5720 INTEGRITY DRIVE,
MILLINGTON, TN 38054-5005
(End of information)
SUBCONTRACTING PLAN GOALS
1. Attention is directed to Federal Acquisition Regulations (FAR) clause 52.219-9 “Small Business Subcontracting Plan” and Defense Federal Acquisition Regulations Supplement (DFARS) clause 252.219-7003 “Small Business Subcontracting Plan (DoD Contracts). Subcontracting plans will be evaluated in accordance with Army Federal Acquisition Regulations Supplement (AFARS) Appendix DD, (APDD) “Subcontracting Plan Evaluation Guide”. The guide is available at:
https://www.acquisition.gov/afars/subcontracting-plan-evaluation-guide
2. Acceptability of the plan will be one of the elements considered by the Contracting Officer when determining contractor responsibility prior to award of a contract.
3. Subcontracting plans should be realistic, challenging, and achievable, with positive percentage and dollar subcontracting goals with:
a. Small Business (SB)
b. Small Disadvantaged Business (SDB)
c. Women Owned Small Business (WOSB)
d. Service Disabled Veteran Owned Small Business (SDVOSB)
e. Veteran Owned Small Business (VOSB)
f. Historically Underuti28.4zed Business Zone (HUBZone)
g. Historically Black Colleges and Universities and Minority Institutions (HBCU/MI)
4. If the proposed subcontracting goals are lower than the below U. S. Army Corps of Engineers “targets” for subcontracting, you are required to provide written justification with your proposed subcontracting plan to fully support your rationale for using lower goals.
5. You are reminded that contractors are measured against the approved subcontracting plan goals and may be assessed liquidated damages if a good faith effort has not been made toward meeting the agreed-upon goals. (See FAR clause 52.219-16 “Liquidated Damages – Subcontracting Plan”.
6. The following subcontracting targets have been assigned to the U. S. Army Corps of Engineers
(USACE)
USACE Subcontracting Targets
a. Small Business (SB) 28.4%
b. Small Disadvantage Business (SDB) 10.67%
c. Women Owned Small Business (WOSB) 2.07%
d. HUBzone Small Business (HUBzone) 1.42%
e. Veteran-Owned Small Business (VOSB) 2.34%
f. Service Disabled Veteran Owned SB (SDVOSB) 2.34%
7. Stated percentages are based on the total amount of planned subcontracting.
8. Additional information concerning subcontracting plan requirements may be obtained from Ms. Andrea Green, Deputy for Small Business, Phone: 910-251-4774.
(End of Instruction)
REPORTING REQUIREMENTS
REPORTING REQUIREMENTS--SUBCONTRACTING PLAN
(a) Retainage will be withheld from progress payments in an amount sufficient to protect the Government's ability to assess Liquidated Damages in accordance with FAR clause 52.219-16 for failure to submit timely SF 294 and SF 295 Reports. The amount of retainage will be determined in accordance with the following formula:
(b) Total dollar amount proposed for subcontracting to small business multiplied by percentage of actual progress on the contract, up to a maximum of 10% of the given progress payment, shall be withheld from the next progress payment due after a contractor fails to submit a required report. If one or more reports have been submitted before such failure, formula for determining the amount of retainage will be adjusted by deducting any amounts reported as subcontracted to small business from the total dollar amount proposed to be subcontracted and the difference multiplied by the percent of actual progress, up to a maximum of 10% of the given progress payment.
(End)
CLAUSES INCORPORATED BY FULL TEXT
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
26.2% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Fort Liberty NC
(End of provision)
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00 whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
Section 00 21 16 - Instructions to Proposers
GENERAL PROPOSAL INSTRUCTIONS
GENERAL PROPOSAL SUBMISSION INSTRUCTIONS & REQUIREMENTS
PN 92062 SOF Barracks, at Fort Bragg Liberty, Cumberland County, North Carolina
1. OVERVIEW.
1.1 This Request for Proposal (RFP) solicits design and construction of a SOF Barracks at Fort Liberty, NC. The scope of work includes ALL labor, materials, equipment, incidentals, supervision, and transportation for work necessary to design and construct a Barracks to accommodate 146 Soldiers at Fort Liberty, NC (PN 92062 SOF Barracks). Primary facilities shall include living and sleeping quarters, storage, service areas, information systems, fire protection and alarm systems, Physical Access Control Systems (PACS) installation, Energy Monitoring Control Systems (EMCS) connection and Post Construction Award Services (PCAS). Heating and air conditioning are to be incorporated by a self-contained system for each living quarters unit along with a central system for common areas.
Supporting facilities shall include site development, utilities and utility connections, exterior lighting, paving, sidewalks, curbs and gutters, storm drainage, landscaping, pedestrian crosswalks, and signage. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards are to be incorporated. Comprehensive building and furnishings-related interior design services are required. Access for individuals with disabilities are to be incorporated. Cyber Security Measures are to be incorporated into this project.
Sustainability/Energy measures are to be incorporated. Facilities are to be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 250 Tons).
The period of performance is 1400 calendar days. Work location is Fort Liberty, North Carolina.
Antiterrorism/Force protection measures and sustainment mandates will be incorporated. The resultant contract will be Firm-Fixed Price (FFP).
1.2 The instructions and requirements contained herein establish uniform evaluation procedures for the technical evaluation of proposals by the Source Selection Evaluation Board (SSEB) and the development of the Best Value Decision by the Source Selection Authority (SSA) using the Lowest Price Technically Acceptable Source Selection Process (See Federal Acquisition Regulation 15.101-2). Proposals should be specific and complete in every detail as well as be prepared simply and economically, providing a straightforward and concise description of capabilities to satisfactorily perform the contract.
1.3 Each offeror must submit both a Price Proposal and Technical Proposal, in addition to Past Performance Questionnaires. The Price Proposal and Technical Proposal must be submitted as separate volumes/files. All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa.
The Price and the Technical Proposals in addition to the Past Performance Questionnaires must be received by the closing date and time set for receipt of proposals. No dollar amounts from the Price Proposal are to be included in the Technical proposal.
Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal.
Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.
The technical data criteria specified for each factor identified herein, shall be submitted as part of the proposal.
The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.
Failure to submit all the data required by the RFP and its Attachments, may be cause for determining a proposal incomplete and therefore may not be considered for award.
2. GENERAL INSTRUCTIONS.
In accordance with FAR Clause 52.215-1, Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to make award without discussions. Therefore, offerors should submit their best technical and price terms in their initial offer and not automatically assume that they will have an opportunity to participate in discussions or to submit a revised offer. The Government may make award of a conforming proposal without discussions, if deemed to be within the best interests of the Government.
In accordance with 15.306(c) (1) and FAR Clause 52.215-1(f) (4), Instructions to Offerors – Competitive Acquisitions, the Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
2.1 Contractor Team Arrangements. The Government will recognize the integrity and validity of contractor teaming arrangements, provided the arrangements are identified and company relationships are fully disclosed in the offer.
As further described in paragraph 2.3 below, the Government will only evaluate the information submitted by the legal entity with whom the Government would enter into a contract. This is the legal entity represented in Tab E, as registered in the System for Award Management (SAM) and identified by its specifically assigned CAGE Code.
2.2 If applicable, an 8(a) Joint Venture or SBA/DoD approved Mentor-Protégé must submit all required documentation with their offer to be considered responsive, IAW the requirements set forth in Title 13 Code of Federal Regulations (CFR) Part 125.8.
2.3 The Government will only evaluate the information submitted by the legal entity with whom the Government would enter a contract. This is the legal entity represented in Tab E, as registered in System for Award Management (SAM) and identified by its specifically assigned CAGE Code. However, IAW CFR 125.8(e), the Government will also evaluate past experience and past performance submitted by the individual firms that make up a joint venture.
2.4 Notwithstanding the specific requirements of any other area of the RFP, information submitted about any company other than the offeror, whether an affiliated company, subsidiary (including wholly owned subsidiaries), or subcontractor, WILL NOT be evaluated for any factor. Successor entities shall clearly demonstrate in Volume I, Tab A of their proposal the official legal means performed to transform the former Predecessor Company to its current Successor, legal business entity. Examples of substantive documentation may include but is not limited to Articles of Incorporation, Joint Venture Agreements, Novation Agreements, and Merger Documentation.
"Successor" means an entity that has replaced a predecessor by acquiring the assets and carrying out the affairs of the predecessor under a new name (often through acquisition or merger).
Note: The term ''successor'' does not include new offices/ divisions of the same company or a company that only changes its name.
2.5 Offerors shall submit their proposal in accordance with the Section 3. General Proposal Format, paragraph 3.4.
2.6 Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.
3. GENERAL PROPOSAL FORMAT.
3.1 Cover Page. Include the title of the solicitation, solicitation number, offeror name and date of the submittal.
3.2 Table of Contents. Each volume of the proposal shall contain a detailed table of contents. If more than one Adobe PDF file is used for a volume, the complete table of contents shall be included in each. Any materials submitted but not required by this solicitation (such as company brochures) shall be relegated to appendices.
3.3 All information intended to be evaluated as part of the Technical Proposal must be submitted as part of the Technical Proposal. Do not cross-reference similar material in the Price Proposal, or vice versa. No dollar amounts from the Price Proposal are to be included in the Technical proposal.
3.4 Each offeror must submit both a Price Proposal and a Technical Proposal via the Procurement Integrated Enterprise Environment (PIEE) at https://piee.eb.mil. Ensure the solicitation number is included in the subject line.
Ensure the solicitation number is included in the subject line of the email. Note that attachments exceeding 15 MB may not be accepted by the email server. No hard paper copies will be accepted or evaluated. Both the Price Proposal and the Technical Proposal must be received by the closing date and time set for receipt of proposals. In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically. All submissions shall be in Adobe PDF format and shall be on 8 ½ x 11 size pages in no less than a 10 pitch or 10 font. Page limitations, where specified in the RFP, shall be considered a maximum. Offerors may use compressions utility software such as WinZip or PKZip to reduce file size and facilitate transmission.
Title the file(s) in the following format:
W912PM24R0004_COMPANY NAME_VOLUME I
W912PM24R0004_COMPANY NAME_VOLUME II
Offerors shall submit bid bonds (Standard Form 24) in both electronic and hard copy format.
Electronic copies of bid bonds shall be included in Volume 1: Offerors Certifications and Price under Tab G. Hard copies of bid bonds shall be submitted via USPS, UPS, FedEx or DHL. Hand carried bid bonds will not be accepted.
Bid bond submissions shall be due by the proposal due date and time to the following address:
USACE-Wilmington Contracting Division Attn: Mr. John Hill 69 Darlington Avenue Wilmington, NC 28403 Proposal due Date and Time:
Request For Proposal No: W912PM24R0004 Due Date of Proposal: 24 June 02 July 2024 Time by which Proposals are due: 2:00 P.M. (Eastern Time) Title of Project: PN 92062 SOF Barracks, Fort Liberty, Cumberland County, North Carolina
The date and time of delivery will be established by the time of receipt by (time stamped by the system), not by the date and time the offeror sent the proposal into the website. Do not assume that electronic communication is instantaneous – in fact, it can take several minutes or even hours in some cases. Please make allowances for delays in transmittal. If an electronic submission is sent minutes before the deadline but notification is not actually received in PIEE until after the deadline, the submission will be considered late. The Government will not be responsible for proposals delivered to any location or to anyone other than those designated to receive proposals on its behalf.
Offerors are responsible for ensuring that proposals are submitted so as to reach the designated recipient of proposals. Offerors are responsible for allowing sufficient time for the proposal to be received in accordance with the instructions provided.
3.5 The offeror is responsible for including sufficient details in its proposal to permit a complete and accurate evaluation. Accordingly, the offeror shall be clear and concise in its proposal. The Government will not make assumptions concerning the offeror’s intent.
3.6 The technical data criteria specified for each factor identified herein and as described in these instructions shall be submitted as part of the proposal. Failure to submit all the data required by the RFP, and these instructions may be cause for determining a proposal incomplete and, therefore, not considered for award.
3.7 Do not include exceptions to the terms and conditions of the solicitation in either the technical or price proposal.
Should the offer include any standard company terms and conditions that conflict with the terms and conditions of the solicitation, the offer may be determined “unacceptable” and thus ineligible for award. Should the offeror have any questions related to specific terms and conditions, these should be resolved prior to the submission of the offer.
3.8 Tabs. Proposal shall be organized and tabbed as follows:
3.8.1 VOLUME I: OFFEROR’S CERTIFICATIONS AND PRICE (FACTOR 1)
One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted and one (1) original copy of the bid guarantee in both electronic and hardcopy shall be submitted.
TAB CONTENTS OF THE PRICE PROPOSAL
A The Proposal Cover Sheet
B Standard Form 1442
C Acknowledgement of Amendments (If Applicable)
D FACTOR 1: PRICE
E Section 00 45 00 – Representations and Certifications
F Teaming Arrangement (If Applicable)
G Bid Guarantee (Bid Bond)
H Financial Information and Bonding Capability
TAB A – The proposal cover sheet is required by FAR 52.215-1(c)(2) and must be submitted by all offerors.
The format for the proposal cover sheet is as follows:
PROPOSAL COVER SHEET
Offerors should ensure telephone number; fax number, e-mail address, Unique Entity ID and CAGE Code are all included. Unique Entity ID will be used to access Past Performance Information Retrieval System (PPIRS) data. Offerors should also provide any other assigned number that identifies them in the PPIRS database. If a separate Unique Entity ID has been created for a joint venture (J-V) it must be submitted. The offeror should also submit their Tax ID number on the proposal data Sheet.
TAB B - Standard Form 1442, completed and signed by authorized individual(s) of the offeror. Offers submitted in the name of a Joint Venture must be signed in accordance with the terms and conditions specified in the joint venture agreement as evidenced in the proposal.
TAB C - If applicable - All amendments must be acknowledged by all offerors and duly executed with an original signature by an official authorized to bind the company in accordance with FAR 4.102.
TAB D – Factor 1 - Price. Proposed price schedule is to be completed in its entirety by all offerors to include the Subtotals and Totals section as found in Section 00 10 00 - Solicitation, Contract Line-Item Number (CLIN) Schedule.
TAB E - Section 00 45 00 – Representations and Certifications. Offerors shall include any narratives as it pertains to the requirement at 2.2 to document any teaming arrangement the offeror has or will enter into.
TAB F - Teaming Agreement, if applicable. See paragraph 2.1 and 2.2 Note to 8(a)—SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture.
TAB G - Offerors shall provide a fully executed Bid Bond as required by FAR Clause 52.228-1, Bid Guarantee in both Hard copy and electronically in Tab G. Hard copies of Bid Guarantees (submitted via UPS, FedEx, USPS, etc.) shall be addressed to the Contracting Officer at:
USACE – Wilmington District Attention: John T. C. Hill
1. The solicitation number;
2. The name, address and telephone and facsimile numbers of the offeror (and electronic address if available);
3. A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
4. Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror’s behalf with the Government in connection with this solicitation; and
5. Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent’s authority, unless that evidence has been previously furnished to the issuing office.
69 Darlington Ave Wilmington NC 28403
For the purposes of this Request for Proposal, please note that in accordance with (IAW) FAR 28.001:
“Bond means a written instrument executed by a bidder or contractor (the “principal”), and a second party (the “surety” or “sureties”) (except as provided in 28.204), to assure fulfillment of the principal’s obligations to a third party (the “obligee” or “Government”), identified in the bond. If the principal’s obligations are not met, the bond assures payment, to the extent stipulated, of any loss sustained by the obligee.”
Bonds shall therefore be executed in the name of the legal entity, whether a joint venture, partnership or the Prime Contractor of an informal teaming arrangement, with whom the government would enter into a contract for a successful offeror. The entity named on the bond must be able to acquire bonding capacity on its own merits, and not as the result of indemnification from a subcontractor or third party.
TAB H - Financial Information & Bonding Capability (e.g. past three years financial statements, annual reports, Dun & Bradstreet Number and Ratings, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount.
3.8.2 VOLUME II: TECHNICAL PROPOSAL (FACTORS 3-4)
One (1) electronic copy Adobe PDF file as tabbed per the table below shall be submitted.
TAB CONTENTS OF THE TECHNICAL PROPOSAL
A Factor 2: Schedule
B Factor 3: Past Performance
C Factor 4: Project Labor Agreement (PLA)
Page Limitations: The following page limitations are established for each factor described above:
Factor 2: Schedule – Limited to eight (8) pages; three (3) pages for the Gantt chart and five
(5) pages for the narrative. See submission requirements under para. 4.1.
Factor 3: Past Performance – Limited to no fewer than three (3) and no more than five (5) projects. Individual project Past Performance Assessment Questionnaires shall not exceed four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages. A Corporate Relevant Project Experience Worksheets (Attachment #2) shall also be submitted limited to no fewer than three (3) and no more than five (5) projects. Individual Worksheets shall not exceed four (4) pages per project;
Government evaluators will review and evaluate only the information contained on the first four (4) pages. See submission requirements under para 5.1.
Factor 4: Project Labor Agreement (PLA): No page limits.
NOTE: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government.
Tables of content, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
Offerors are cautioned that “parroting” of the Technical requirements or the Scope of Work with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal.
Proprietary information shall be clearly marked.
4. SUBMISSION REQUIREMENTS & EVALUATION FACTORS
VOLUME II: TAB C—FACTOR 2 –SCHEDULE
4.1 SUBMISSION/MINIMUM REQUIREMENTS:
4.1.1 The offeror shall propose a detailed schedule which shall become the Contract Period of Performance.
4.1.2 Schedules must be deemed reasonable to be considered for this procurement. Reasonable Schedules are those schedules which meet all of the minimum criteria specified in paragraph
4.1.2.1. The Government will not consider multiple schedules. Projects which do not meet the minimum criteria specified shall be deemed “unacceptable” and will not be considered further.
4.1.2.1 The minimum requirement for a schedule is defined as having all of the following criteria:
- A Gantt chart that shows each major project milestone from mobilization through project turnover (Chart shall be no more than three (3) pages).
- Contractors shall identify the critical path.
- Schedules shall clearly show any planned long lead items.
- The Period of Performance shall not exceed 1,400 calendar days.
- Schedules shall comply with the hours of operation for construction as noted in the plans and specs.
Normal working hours are considered Monday through Friday, 0700-1530 hours. No work is to be conducted on federal holidays. Offerors may not shorten their proposed timeframes by utilizing overtime hours or working during non-work days or federal holidays except where specifically allowed in the plans and specs.
4.1.3 Schedules shall not exceed eight (8) pages in total.
4.1.4 Provide a schedule narrative not to exceed five (5) pages identifying schedule risks and how the contractor intends to mitigate those risks.
4.2 EVALUATION CRITERIA:
4.2.1 The Government will evaluate the schedule length offered by the contractor as identified in paragraph 4.1.2.
4.2.2 To be considered eligible for award, the Government will verify that each offeror has submitted a schedule which meets the minimum criteria of paragraph 4.1.2.1.
5. SUBMISSION REQUIREMENTS & EVALUATION FACTORS
VOLUME II: TAB C — FACTOR 3 - PAST PERFORMANCE.
5.1 SUBMISSION/MINIMUM REQUIREMENTS:
5.1.1 Past performance refers to the quality of recent and relevant project experience from the owner’s perspective.
The offeror shall complete and provide a Past Performance Assessment Questionnaire (Attachment #4) on no fewer than three (3) and no more than five (5) projects. This requirement also applies to the proposed designer of record.
A letter of commitment executed between the offeror and proposed designer of record specific to performance under this project must be included too. Should the offeror and proposed designer of record have performed on projects in the past, separate PPQs will be required unless those projects were Design-Build. If Design-Build, ensure both the offerors and proposed designer or records names both appear on the PPQ. Projects submitted under this factor must first be deemed recent and relevant.
5.1.1.1 Relevant: Offer must demonstrate experience as a prime contractor on projects of similar size, scope, or complexity. The minimum requirement for a project of similar size, scope, or complexity is defined as a requirement with all of the following:
Below Relevant Criteria apply to both Design and Construction Contractors
- Equal to or greater than $27,000,000.00 in value
- Equal to or greater than 45,000 square feet in renovation, new construction or both.
- At least one (1) project must be greater than 3 floors.
- At least two (2) of the selected projects must be at least LEED Silver Certifiable. The Contractor shall submit a LEED checklist for each project applicable, showing the project meets this criterion.
5.1.1.2 Recent: Projects of similar size, scope, and complexity that must have been completed (fully designed and at least 50% construction progress completed) within six (6) years preceding the date of the solicitation.
5.1.2 Individual project Past Performance Assessment Questionnaires shall not exceed four (4) pages; Government evaluators will review and evaluate only the information contained on the first four (4) pages. If any firm has multiple functions or divisions, limit the project examples to those performed by the division, unit or team member submitting the offer. The Government will call and confirm information provided by the offeror on the Past Performance Assessment Questionnaire with the points of contact, to the extent necessary to conduct a meaningful evaluation. The Government reserves the right to interview other individuals if the point of contact is not available.
5.1.3 The Government may contact sources other than those provided by the offeror for information with respect to past performance. These other sources may include but are not limited to: Contract Performance Assessment Reporting System (CPARS), other Government sources, and interviews with organizations or individuals familiar with the offeror’s performance.
5.1.4 Offerors shall utilize the Past Performance Assessment Questionnaire in Attachment #4.
5.1.4.1 The Past Performance Questionnaire (PPQ) included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for FACTOR 3 – PAST PERFORMANCE. Ensure correct phone numbers and email addresses are provided for the client point of contact.
Completed Past Performance Questionnaires should be submitted with your proposal. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment #4), which will provide contract and client information for the respective project(s). Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Jason S. Smith via email at jason.s.smith2@usace.army.mil prior to proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Also include performance recognition documents received within the last six (6) years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition. In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Contractor Performance Assessment Reporting System (CPARS), using all CAGE/SAM Unique Identifier numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
5.1.5 If the offeror is a Joint Venture (J-V), relevant project experience/past performance should be submitted for projects completed by the Joint Venture entity. Should the JV not have any prior experience/past performance, then experience/past performance of the individual firms that make up the JV will be considered. Offerors that are part of the DoD Mentor Protégé program may only submit two (2) recent and relevant project completed by the Mentor. Offerors are still limited to a total of five (5) projects. Experience of proposed subcontractors to be utilized on this project will not be considered.
5.1.5.1 The offeror shall complete a minimum of three (3), but no more than five (5), “Experience Information” forms, in response to this factor. All projects submitted must be at least 50% construction complete within the last six (6) years preceding the date of the solicitation.
5.1.5.2 Offerors shall utilize Experience Information Form in Attachment #2. This sheet is MANDATORY and SHALL be used to submit project information. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of this RFP. Except as specifically requested, the Government will not consider information submitted in addition to this form.
Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed FOUR (4) pages.
5.1.6 Offeror shall complete the latest version of the LEED checklist (see https://www.usgbc.org/leed for information on LEED certifications) to show a minimum of two (2) projects are at least LEED Silver Certifiable.
5.2 EVALUATION CRITERIA:
5.2.1 The Government will consider past performance of the prime construction contractor and proposed designer of record. If a firm has multiple functions or divisions, the Government will only evaluate the past performance of the unit or division submitting the offer. Where the Government views an offeror’s role, or that of its team members, if any, as not significant or as not clearly defined, the Government reserves the right to view this lack of involvement, or clarity, as a risk which may impact an offeror’s rating for this factor despite the quality of recent, relevant past performance information.
5.2.2 Past performance shall be initially evaluated to determine whether the offeror’s present/past performance is recent, and relevant to the effort to be acquired.
Rele…
This is the start of the file's text. The full file is on GovTribe.