SC-00009-19_Renovate Building 3-3045 JSOC-RTA Plans (Unlocked).pdf
PDF 19 MB Posted
- Solicitation number
- W912PM22B0034
About this file
This document provides details on a federal contract solicitation for construction and renovation services. The Army Corps of Engineers, Wilmington District is seeking a contractor to provide construction and renovation work within building 3-3045 at Fort Bragg in North Carolina. Renovations include wall, floor and ceiling repairs, removal and replacement of non-load bearing walls, door reconfigurations, a complete renovation of existing latrines, fire sprinkler and HVAC system reconfigurations, implementation of natural gas, and replacement of electrical and plumbing systems. The North American Industry Classification System code is 236220 and the contract value is estimated between $1 million to $5 million. This acquisition is set aside as 100% competitive for small businesses. The Corps is seeking a single firm fixed price contract. The solicitation number is W912PM22B0034 and interested parties should register in the System for Award Management to receive solicitation documents and stay updated on any amendments.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F I L E
N
A M
E
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S U
B M
I T
T E
D
B
Y
D A
T E
C H
E C
K E
D
B
Y
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
US Army Corps of Engineers
S I Z
E x
U S
A
R M
Y
C
O R
P S
O
E
N G
I N
E E
R S
W I L
M I N
G T
D
S
T R
I C
T
D
A R
L I N
G T
V E
N U
E
W I L M
I N
G T
O N
N
O R
T H
C
R
O L
I N
A
G-000
C O
V E
R
S
H E
E T
US Army Corps of Engineers
Wilmington District
S
S
U R
R A
T T
S
S
U R
R A
T T
J
M
A N
N I N
G
A w d C o v e r d w g
C O
N T
R A
F O
R
O
F F
I C
I A
L
U
L Y
D R
A W
I N
G
C
O D
E
S O
L I C
I T
A T
I O
N
N
W
2P M
B0
A W
A R
D
D
A T
E
A U
G U
W
2P M
X-
XX
XX
S C
R E
N O
V A
B
D
G
J S
O C
F T
B
R A
G G
N
O R
R
O L
I N
A
A
F
E L
I C
I A
N O
G
R A
N D
A
SC-00009-19
RENOVATE BLDG.
3-3045, JSOC
FT. BRAGG, NORTH CAROLINA
SOLICITATION NO: W912PM22B0034
CONTRACT NO W912PM22X-XXXX
AWARD DATE: TBD
A U
G U
J O
N E
S
F
R A
N K
L
R
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
U I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A U
G U
P
M B
W P
M X
X
X X
X
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
US Army Corps of Engineers
READY TO ADVERTISE
FORT BRAGG, NORTH CAROLINA
RENOVATE BUILDING 3-3045, JSOC
FY19, SC-00009-19
ISSUE DATE: AUGUST 2022
WILMINGTON DISTRICT
LOCATION MAP
ROCKINGHAM
LAURINBURG
FAYETTEVILLE
FORT BRAGG
VICINITY MAP
PROJECT SITE
P
R
A
COLLINS ST.
L
O
N
G
S
T
R
E
B
U
T
N
A
R
D
E
N
N
G
U
R
B
W
O
M
A
K
M
Y
M
E
D
I C
N
T
E
R
ARCHITECTURAL MECHANICAL
PLUMBING
ELECTRICALCIVIL
CONTRACT NO.: W912PM22X-XXXX
SOLICITATION NO.: W912PM22B0034
801 JONES FRANKLIN ROAD, SUITE 300
RALEIGH, NC 27606-3394
(919) 851-6866
(919) 851-7024 FAX
LICENSE # F-0672
FIRE
PROTECTION
M
C
K
E
L
L
A
C O
V E
R
S
H E
E T
G D
W G
D
S
A L T
S M
A N
N
J O
H N
S O
N
D
S
A L T
S M
A N
R
D
O W
N S
G-001
TELECOMMUNICATIONS
CHARLOTTE | 704.295.4263
705 EAST MOREHEAD STREET, 28202
NC License No: C-2848
8/03/2020 08/04/2020
FOR OFFICIAL USE ONLY
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
TITLESHEET ID. SHEET ID. SHEET ID.
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
ARCHITECTURE
AD101 FIRST FLOOR PLAN - DEMOLITION
AD102 SECOND FLOOR PLAN - DEMOLITION
AD103 FIRST FLOOR REFLECTED CEILING PLAN - DEMOLITION
AD104 SECOND FLOOR REFLECTED CEILING PLAN - DEMOLITION
A-101 FIRST FLOOR PLAN - CONSTRUCTION
A-102 SECOND FLOOR PLAN - CONSTRUCTION
A-103 FIRST FLOOR REFLECTED CEILING PLAN - CONSTRUCTION
A-104 SECOND FLOOR REFLECTED CEILING PLAN - CONSTRUCTION
A-301 BUILDING SECTION: STAIR 102
A-302 BUILDING SECTIONS AND DETAILS AT EXTERIOR ENTRY
A-401 RESTROOM RENOVATION PLANS
A-402 RESTROOM RENOVATION DETAILS
A-403 RESTROOM RENOVATION ELEVATIONS
A-404 RESTROOM RENOVATION ELEVATIONS
A-601 DOOR SCHEDULE
A-602 ROOM FINISH SCHEDULE AND FINISH LEGEND
A-603 EXISTING FURNITURE SCHEDULE
PLUMBING
P-001 PLUMBING - GENERAL NOTES AND LEGENDS
PD101 PLUMBING - FIRST FLOOR PLAN - DEMOLITION
PD102 PLUMBING - SECOND FLOOR PLAN - DEMOLITION
PL121 PLUMBING - FIRST FLOOR PLAN
PL122 PLUMBING - SECOND FLOOR PLAN
P-501 PLUMBING - DETAILS
P-601 PLUMBING - SCHEDULES
MECHANICAL
M-001 MECHANICAL - GENERAL NOTES AND LEGENDS
MD101 MECHANICAL - FIRST FLOOR PLAN - DEMOLITION
MD102 MECHANICAL - SECOND FLOOR PLAN - DEMOLITION
MH101 MECHANICAL - FIRST FLOOR PLAN - NEW WORK
MH102 MECHANICAL - SECOND FLOOR PLAN - NEW WORK
MP101 MECHANICAL - FIRST FLOOR PLAN - PIPING
MP102 MECHANICAL - SECOND FLOOR PLAN - PIPING
M-501 MECHANICAL - DETAILS
M-502 MECHANICAL - DETAILS
M-503 MECHANICAL - DETAILS
M-504 MECHANICAL - DETAILS
M-601 MECHANICAL - SCHEDULES
M-602 MECHANICAL - SCHEDULES
M-701 MECHANICAL - DDC CONTROLS COVER SHEET
M-702 MECHANICAL - DDC CONTROLS
M-703 MECHANICAL - DDC CONTROLS
M-704 MECHANICAL - DDC CONTROLS
M-705 MECHANICAL - DDC CONTROLS
M-706 MECHANICAL - DDC CONTROLS
M-707 MECHANICAL - DDC CONTROLS
M-708 MECHANICAL - OUTDOOR AIR CALCULATIONS
ELECTRICAL
E-001 ELECTRICAL - GENERAL NOTES AND LEGENDS
E-002 ELECTRICAL - GENERAL NOTES AND LEGENDS
E-003 ELECTRICAL - GENERAL NOTES AND LEGENDS
ED101 ELECTRICAL - FIRST FLOOR PLAN - DEMOLITION - LIGHTING
ED102 ELECTRICAL - FIRST FLOOR PLAN - DEMOLITION - POWER
ED103 ELECTRICAL - SECOND FLOOR PLANS - DEMOLITION
EL101 ELECTRICAL - FIRST FLOOR PLAN - LIGHTING
EL102 ELECTRICAL - SECOND FLOOR PLAN - LIGHTING
EP101 ELECTRICAL - FIRST FLOOR PLAN - POWER
EP102 ELECTRICAL - SECOND FLOOR PLAN - POWER
E-501 ELECTRICAL - DETAILS
E-502 ELECTRICAL - DETAILS
E-503 ELECTRICAL - DETAILS
E-601 ELECTRICAL - DEMOLITION RISER
E-602 ELECTRICAL - NEW RISER
E-603 ELECTRICAL - SCHEDULES
E-604 ELECTRICAL - SCHEDULES
E-605 ELECTRICAL - SCHEDULES
E-606 ELECTRICAL - SCHEDULES
TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS - GENERAL NOTES AND LEGENDS
TD101 TELECOMMUNICATIONS - FIRST FLOOR PLAN - DEMOLITION
TD102 TELECOMMUNICATIONS - SECOND FLOOR PLAN - DEMOLITION
TN101 TELECOMMUNICATIONS - FIRST FLOOR PLAN - DATA NETWORK
TN102 TELECOMMUNICATIONS - SECOND FLOOR PLAN - DATA NETWORK
T-501 TELECOMMUNICATIONS - DETAILS
T-502 TELECOMMUNICATIONS - DETAILS
T-503 TELECOMMUNICATIONS - DETAILS
T-601 TELECOMMUNICATIONS - RISER DIAGRAM
G-002
I N
D E
X
O
F
D
R A
W I N
G S
D
S
A L T
S M
A N
N
J O
H N
S O
N
R
D
O W
N S
D
S
A L T
S M
A N
G D
G N
GENERAL
G-001 COVER SHEET
G-002 INDEX OF DRAWINGS
G-003 FORT BRAGG CANTONMENT AND PROJECT LOCATION MAP
G-004 GENERAL CONSTRUCTION NOTES
G-005 GENERAL CONSTRUCTION NOTES
GC001 LIMITS OF CONSTRUCTION AND STAGING/LAYDOWN AREA PLAN
TITLE TITLE
CIVIL
VF101 EXISTING CONDITIONS PLAN
CG101 EROSION AND SEDIMENT CONTROL PLAN
C-501 SITE DETAILS
C-502 SITE DETAILS
GENERAL INFORMATION
GI001 LIFE SAFETY CODE REVIEW
GI002 LIFE SAFETY PLAN
FIRE PROTECTION
FP101 FIRST FLOOR - EXISTING FIRE PROTECTION PLAN
FP102 SECOND FLOOR - EXISTING FIRE PROTECTION PLAN
8/03/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
ROAD CLOSED WITH GATES
OR BARRIERS
MAJOR ROADS
STREETS
RAILROADS
INSTALLATION BOUNDARIES
INTERSTATE ROUTE
U. S. ROUTE
STATE ROUTE
LAKES
ACP ACCESS CONTROL POINT
LEGEND:
FORT BRAGG CANTONMENT
NOT TO SCALE
A 24 M
B
A 24 M
B
C
A
C
B
U
T
N
L
O
N
G
S
T
R
E
G
R
U
B
A
M
E
R
I
C
E
E
W
A
Y
Y
A
D
K
G
R
U
B
L
O
N
G
S
T
R
E
B
U
T
N
H
O
N
E
Y
C
U
H
O
N
E
Y
C
U
B
R
A
G
V
D
B
R
A
V
D
G
R
U
B
M
U
R
C
H
S
R
A
N
D
O
L
K
N
K
N
SIMMONS AIRFIELD
R
E
I L
Y
R
E
I L
R
E
I L
L
A
M
O
C
H
I
C
K
A
D
C
H
I
C
K
A
D
P
L
A
A
D
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
M
I
L
I
T
A
S
E
R
V
A
T
I
U
N
D
A
R
Y
B
A
S
T
O
G
I
V
E c
D
A
D c
D
A
D
N
O
R
M
A
N
A
R
D
E
N
N
S
P
O
O
N
M A
IN
E
N T
R A
N C
E
A
R
M
I S
T
E
L
I
T
A
S
E
R
V
A
T
I
O
N
B
O
U
N
D
A
R
Y
POPE ARMY AIRFIELD
ACP #1
ACP #13
ACP #10
ACP #11
B
R
A
V
D
J
A
C
K
S
O
N
ACP #5 ALL AMERICAN VISITOR
CONTROL CENTER
M
C
K
E
L
L
E
ACP #2
USACE SOCOM RESIDENT OFFICE
BLDG. NO. 2-2414 WOODRUFF ST.
FT. BRAGG, NC 28310 (910)-432-8121
C
O
O
L
Y
C
O
N
ACP #3
ACP #4
ACP #2A
ACP #8
ACP #16 TRUCK PLAZA AND
VISITOR CONTROL CENTER
W
O
M
A
M
Y
M
E
D
I C
N
T
E
R
ACP #18
B R
A G
G
B
L V
D
M
A
N
C
H
E
S
T
DIRECTORATE OF PUBLIC WORKS,
BUILDING NO. 3-1631
L
I
L
L
I
N
G
T
Y
ACP #12
LAMONT ROAD
BORROW PIT
FORT BRAGG LAMONT
RD SOLID WASTE AND
RECYCLING FACILITY
W
O
O
D
R
U
F
F
MUNICIPALSOLID
WASTE TRANSFER
STATION
ACP #8A
PROJECT LOCATION
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
ACCESS/HAUL ROUTE
B
U
T
N
M
A
L
V
E
S
T
I
S
T
M
A
L
V
E
S
T
I
S
T
PROJECT
LOCATION
ACCESS/HAUL
ROUTE
G
O
R
D
PROJECT LOCATION MAP
N
NOTE:
CONTRACTOR SHALL TAKE CARE
WHEN TRAVERSING FORT BRAGG
PROPERTY TO BE MINDFUL OF ALL
POSTED SIGNAGE, ONE-WAY
STREETS, AND TRAFFIC PATTERNS.
G-003
F O
A
N
T O
N M
E N
T
A
N D
P R
O J E
C
A T
I O
N
M
A P
D
S
A L T
S M
A N
N
J O
H N
S O
N
R
D
O W
N S
D
S
A L T
S M
A N
G D
G N
8/03/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
A. CONTRACTOR SHALL COMPLY WITH CURRENT NORTH CAROLINA DEPARTMENT OF
ENVIRONMENTAL QUALITY (DEQ) EROSION AND SEDIMENT CONTROL PLANNING AND
DESIGN MANUAL AND FORT BRAGG WATER MANAGEMENT BRANCH (WMB) STANDARDS FOR
EROSION CONTROL WORK, IF APPLICABLE.
B. ALL NCDOT STANDARDS REFERENCES WILL BE THE LATEST EDITION. CONTRACTOR MAY
REFER TO HTTPS://CONNECT.NCDOT.GOV, IF APPLICABLE.
C. CONTRACTOR SHALL COMPLY WITH CURRENT UFC, NC BUILDING CODE AND OTHER
APPLICABLE REQUIREMENTS AS INDICATED ON THESE CONTRACT DOCUMENTS.
7. DEMOLITION AND CONSTRUCTION
A. ALL CONSTRUCTION AFFECTING TRAFFIC SHALL COMPLY WITH THE FORT BRAGG TRAFFIC
CONTROL IDC, MUTCD, AND NCDOT STANDARD DRAWINGS AND SPECIFICATIONS - LATEST
EDITION. AN ALTERNATE EMERGENCY TRAFFIC CONTROL DETOUR MAY BE REQUIRED.
8. TRAFFIC CONTROL
A. UNLESS SPECIFICALLY NOTED TO BE REMOVED, ALL EXISTING BUILDING COMPONENTS
AND OTHER SITE ITEMS SHALL REMAIN INTACT AND BE PROTECTED AGAINST DAMAGE
DURING THE CONSTRUCTION PERIOD.
B. THE CONTRACTOR SHALL EXERCISE CAUTION DURING DEMOLITION OPERATIONS. THE
CONTRACTOR SHALL REPAIR AND RESTORE ALL EXISTING MATERIAL TO REMAIN THAT IS
DAMAGED. MATERIAL REPAIRS SHALL MATCH EXISTING ADJACENT FINISHED SURFACES
DAMAGES REQUIRING REPLACEMENT WILL BE COORDINATED WITH THE GOVERNMENT,
PRIOR TO REPLACEMENT, AT NO COST TO THE GOVERNMENT.
C. NO KNOWN ASBESTOS EXISTS WITHIN THIS PROJECT AREA. IF CONTRACTOR SUSPECTS
ASBESTOS OR OTHER HAZARDOUS MATERIALS ARE PRESENT HE SHALL NOTIFY THE
CONTRACTING OFFICER'S REPRESENTATION IMMEDIATELY.
6. STANDARDS
9. EXISTING UTILITY INTERRUPTIONS
A. EXISTING UTILITIES MAY BE INTERRUPTED FOR A MAXIMUM OF 12 HOURS AT A TIME.
CONTRACTOR IS REQUIRED TO CONTACT THE COR AND OBTAIN APPROVAL PRIOR TO
ANTICIPATED INTERRUPTION. SEE SPECIFICATIONS FOR PER-APPROVAL REQUIREMENTS.
B. ALL UTILITY INTERRUPTIONS AND DURATIONS SHALL BE INDICATED ON THE
CONTRACTOR'S SCHEDULE AND COORDINATED WITH THE COR.
C. FIRE ALARM INTERRUPTIONS SHALL BE SCHEDULED IN WRITING WITH THE COR A MINIMUM OF
14 DAYS IN ADVANCE.
10. EXTERIOR UTILITY WORK
A. ANY EXTERIOR ELECTRICAL WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED
WITH SANDHILLS UTILITY SERVICE (SUS). CONTACT MR. BILL CANNON AT (910) 818-3204.
B. ANY EXTERIOR WATER OR SANITARY SEWER WORK PERFORMED BY THE CONTRACTOR SHALL
BE COORDINATED WITH AMERICAN STATES UTILITY SERVICES (ASUS). CONTACT ALLEN
FORRESTER AT (910) 495-1311.
C. ANY EXTERIOR GAS WORK PERFORMED BY THE CONTRACTOR SHALL BE COORDINATED WITH
PEIDMONT NATURAL GAS (PNG). CONTACT CLAYTON PARKER AT (910) 247-7992.
11. SECURITY PROCEDURES FOR ACCESS
A. CONTRACTOR SHALL FOLLOW JSOC SECURITY REQUIREMENTS AT ALL TIMES.
REFER TO SPECIFICATION SECTION 01 00 60 FOR ADDITIONAL INFORMATION.
B. CONTRACTOR SHALL FOLLOW JSOC SECURITY POLICIES ON SITE AT ALL TIMES.
IN GENERAL, THE CONTRACTOR WILL BE GIVEN FULL ACCESS TO THE PROJECT SITE AS
SHOWN ON THE PLANS, HOWEVER, PERIODS MAY BE ENCOUNTERED WHEN NO CONTRACTOR OR
SUBCONTRACTOR PERSONNEL WILL BE ALLOWED ON THE CONSTRUCTION SITE. WORK
STOPPAGES DUE TO THOSE EVENTS WILL BE HELD TO AN ABSOLUTE MINIMUM, AND THE
CONTRACTOR WILL BE GIVEN AS MUCH ADVANCED NOTICE AS POSSIBLE. NOTICE OF THE WORK
STOPPAGE AND RESUMPTION WILL BE RELAYED THROUGH THE COR WHO WILL COMMUNICATE
THIS INFORMATION TO CONTRACTOR. SUCH WORK STOPPAGE WILL NOT BE THE BASIS FOR A
CLAIM AGAINST THE GOVERNMENT. THE GOVERNMENT HAS THE RIGHT TO INSTRUCT THE
CONTRACTOR TO EVACUATE THE SITE WITHOUT PRIOR NOTIFICATION AT ANY TIME AND MAY
REFUSE ENTRY OF ANY OR ALL CONTRACTOR PERSONNEL.
C. THE CONTRACTOR'S PERSONNEL MUST WEAR IDENTIFICATION IN ACCORDANCE WITH
JSOC SECURITY POLICIES AT ALL TIMES.
D. ACCESS TO THE PROJECT AREA IS LIMITED TO NORMAL WORK HOURS (0730 TO 1600)
UNLESS SPECIFICALLY APPROVED BY THE COR FOR SPECIFIED PERIODS OF TIME OUTSIDE THE
NORMAL WORK HOURS. EXCLUDES FEDERAL HOLIDAYS.
E. IT IS A CRIME UNDER 18 USC 795 TO PHOTOGRAPH DEFENSE INSTALLATIONS WITHOUT
FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION. IT IS ALSO A CRIME UNDER 18 USC 797 TO REPRODUCE, PUBLISH SELL OR GIVE
AWAY ANY PHOTOGRAPH, PICTURE OR GRAPHIC REPRESENTATION OF A DEFENSE INSTALLATION
WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY
INSTALLATION AND JSOC.
F. DESIGNATE THE INSTALLATION AS A RESTRICTED AREA. RESTRICTED AREA POSTING RESTRICTS
PERSONS GAINING ACCESS TO MILITARY INSTALLATION FROM CONDUCTING IMAGERY
SURVEILLANCE, PHOTOGRAPHY AND VIDEO RECORDING WITHOUT THE INSTALLATION
COMMANDERS AND JSOC CONSENT.
G. THE INTRODUCTION OF WEAPONS, AMMUNITION, EXPLOSIVES OR OTHER PROHIBITED ITEMS AND
PHOTOGRAPHY OF THE FACILITIES IS PROHIBITED WITHOUT SPECIFIC AUTHORIZATION FROM THE
JSOC COMMANDER.
2. CONSTRUCTION PHASING & PROJECT SCHEDULES
A. THE CONTRACTOR SHALL ENSURE THAT HIS ACTIVITIES SHALL NOT INTERFERE WITH THE
OPERATIONS CONDUCTED AT SURROUNDING BUILDINGS AND WORK AREAS.
B. CONTRACTOR SHALL NOT BLOCK ACCESS TO EXISTING BUILDINGS, ROADS AND/OR FACILITIES.
C. PROJECT CONSTRUCTION SHALL BE PHASED BY FLOOR. CONTRACTOR SHALL START SECOND
FLOOR IMPROVEMENTS FIRST AND SHALL ENSURE SAFE EGRESS AT ALL TIMES FOR ALL
PERSONNEL ENTERING AND EXITING THE BUILDING. CONTRACTOR SHALL PROVIDE A PROJECT
SCHEDULE TO THE COR PRIOR TO CONSTRUCTION AND MOBILIZATION. CONTRACTOR SHALL
PROVIDE WEEKLY UPDATES ON THE PROJECT SCHEDULE FOR FULL DURATION OF PROJECT.
THE WEEKLY UPDATES SHALL BE PROVIDED SHOWING THE SCHEDULE FOR THE UPCOMING 2
WEEKS INCLUDE UPDATES REGARDING THE PHASING OF CONSTRUCTION.
D. ADJACENT AREAS WILL BE OCCUPIED BY GOVERNMENT PERSONNEL THROUGHOUT THE
CONSTRUCTION PERIOD. CONTRACTOR SHALL NOT ALLOW CONSTRUCTION ACTIVITIES TO
DISRUPT ON-GOING GOVERNMENT OPERATIONS DURING DEMOLITION AND CONSTRUCTION.
3. CONTRACTOR STAGING AREA
A. SEE EROSION AND SEDIMENT CONTROL SHEET CG101.
A. THE LAMONT ROAD BORROW PIT IS ANTICIPATED TO BE CLOSED DURING THE ENTIRE
CONSTRUCTION PHASE OF THIS PROJECT FOR OBTAINING FILL MATERIAL. NO DISPOSAL
ALLOWED.
B. FORT BRAGG LANDFILL IS CLOSED AND CAN NO LONGER ACCEPT/DISPOSE OF BORROW.
C. EXCESS BORROW MATERIAL SHALL BE DISPOSED OFF OF FORT BRAGG.
A. CONTRACTOR, IF HE SO CHOOSES, SHALL BE PERMITTED TO INSTALL TEMPORARY FENCING
WITHIN THE GENERAL PROJECT SITE. THE TYPE, MATERIAL, HEIGHT, AND LOCATION OF THE
FENCE SHALL BE IN ACCORDANCE WITH SPECIFICATIONS AND APPROVED BY THE
GOVERNMENT PRIOR TO INSTALLATION.
B. ALL WORK ACTIVITIES AND STORAGE SHALL BE CONFINED WITHIN THE ESTABLISHED
PROJECT LIMITS UNLESS SPECIFICALLY AUTHORIZED BY THE COR FOR SPECIFIED PERIODS
OF TIME.
C. THE CONTRACTOR MUST HAVE AT LEAST ONE EMPLOYEE ONSITE TO RECEIVE AND DIRECT
PLACEMENT OF DELIVERED MATERIALS AND SUPPLIES.
1. CONSTRUCTION METHODS AND PROCEDURES & CONTRACTOR ACCESS
A. THE CONTRACTOR SHALL PROVIDE SANITARY FACILITIES FOR HIS WORKERS DURING THE
ENTIRE CONSTRUCTION PHASE. COORDINATE LOCATION WITH COR. SANITARY FACILITIES
SHOULD BE PROVIDED IN ACCORDANCE WITH THE USACE SAFETY AND HEALTH REQUIREMENTS
MANUAL EM 385-1-1.
B. THE WORK FOR THIS PROJECT CONSISTS OF FURNISHING ALL LABOR, EQUIPMENT,
TRANSPORTATION, AND MATERIALS NECESSARY TO PERFORM ALL WORK IN STRICT
ACCORDANCE WITH THE PROJECT SPECIFICATIONS, APPLICABLE DIRECTORATE OF PUBLIC
WORKS (DPW) DRAWINGS, UNIFIED FACILITIES CRITERIA (UFC), JOINT SPECIAL OPERATIONS
(JSOC) STANDARDS, FORT BRAGG INSTALLATION DESIGN GUIDELINES (IDG) AND OTHER
CONTRACT DOCUMENTS. THE SCOPE OF WORK OF THIS CONTRACT IS REFERENCED IN
PROJECT SPECIFICATIONS SECTION 01 00 05.
C. THE CONTRACTOR SHALL REFER TO THE PROJECT SPECIFICATIONS IN ALL SITUATIONS. THE
CONTRACTOR SHALL BRING CONFLICTS BETWEEN PROJECT SPECIFICATIONS AND PLANS TO
THE ATTENTION OF THE CONTRACTING OFFICER REPRESENTATIVE (COR) FOR RESOLUTION. ALL
MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE PROJECT SPECIFICATIONS.
D. ALL DIMENSIONS AND CONDITIONS TIED TO OR OTHERWISE RELATED TO EXISTING
CONSTRUCTION ARE SUBJECT TO FIELD VERIFICATION BY THE CONTRACTOR. VERIFICATION
SHALL BE MADE PRIOR TO ORDERING, FABRICATING, OR CONSTRUCTING ANY RELATED
STRUCTURAL COMPONENTS. WHERE DISCREPANCIES OCCUR, THE CONTRACTOR SHALL ADVISE
THE COR IMMEDIATELY AND PROVIDE THE COR WITH THE CORRECT DIMENSIONS AND
CONDITIONS.
E. THE CONTRACTOR SHALL ADEQUATELY PROTECT ALL EXISTING SITE FEATURES AND FACILITIES
DURING DEMOLITION AND CONSTRUCTION.
F. PRIOR TO ANY DEMOLITION OR NEW WORK COMMENCING THE ELECTRICAL CONTRACTOR
SHALL ARRANGE A MEETING WITH THE COR AND JSOC REPRESENTATIVE TO DISCUSS ALL
ELECTRICAL OUTAGE PROCEDURES FOR SHUTDOWN OF ANY ELECTRICAL PANELS. THE
ELECTRICAL CONTRACTOR MUST NOTIFY THE COR, IN WRITING, AT LEAST 7 DAYS PRIOR TO
ANY ELECTRICAL SHUTDOWN DURING DEMOLITION OR NEW CONSTRUCTION.
4. LAMONT ROAD BORROW PIT
5. EROSION AND SEDIMENT CONTROL
GENERAL NOTES:
12. PERMITS
D. PERMITS, AS LISTED ABOVE, ARE NOT INTENDED TO BE A COMPLETE LIST. CONTRACTORS ARE TO ADD
ADDITIONAL PERMITS, AS THEY BECOME KNOWN. PERMIT SUBMITTALS ARE TO BE SUBMITTED TO THE
GOVERNMENT FOR REVIEW AND APPROVAL. AVOID OMISSIONS.
INSTALLATION:
· AIR QUALITY (GENERATORS) - DPW-ECB AIR QUALITY PROGRAM MANAGER
· ARMY RADIATION PERMIT (ARP) - INSTALLATION RADIATION SAFETY OFFICER - VICTOR D. WOOTEN, 910-9088-4138
· BOILERS & GENERATORS PERMIT - DPW-ECB AIR QUALITY - MIKE FISHER, REM
· BORROW PIT PERMIT - DPW - ENVIRONMENTAL BRANCH (SUBMIT 14 CALENDAR DAYS PRIOR TO WORK) -
BORROW PIT HAS BEEN CLOSED BY DPW UNTIL FURTHER NOTICE.
· CONSTRUCTION AND DEMOLITION (C&D) WASTE PERMIT - FOR FORT BRAGG LAMONT ROAD
CONSTRUCTION AND DEMOLITION LANDFILL FACILITY - DPW - ENVIRONMENTAL BRANCH. LANDFILL HAS
REACHED ITS CAPACITY TO ACCEPT CONSTRUCTION AND DEMOLITION WASTE AND WILL NO LONGER
ACCEPT CONSTRUCTION AND DEMOLITION WASTE (TO INCLUDE FRIABLE ASBESTOS CONTAINING
MATERIALS). SEE DPW'S SOLID WASTE AND RECYCLING REQUIREMENTS, DATED 6 OCT 2016, OR
CONTACT JEFF SLOOP AT JEFFERY.W.SLOOP.CTR@MAIL.MIL OR FAX TO (910)396-4188, ATTN: SOLID
WASTE OFFICE.
· DIGGING/EXCAVATION PERMIT (FB FORM 1605-E) - DPW - FACILITIES ENGINEER (SUBMIT 15 CALENDAR
DAYS PRIOR TO WORK)
· ENVIRONMENTAL PERMITS (POSSIBLE 180 DAY PROCESS). SEE SPEC SECTION 01 57 19.
·· REGULATORY PERMITS
·· CLEAN AIR ACT (CAA) [FEDERAL, STATE AND LOCAL] - DPW - INSTALLATION ENVIRONMENTAL OFFICE
(AIR PROGRAM MANAGER)
·· GENERAL USE PERMITTED EQUIPMENT (SEE FAR 52.236-7.)
·· STREAM CROSSING PERMIT (SEE CLEAN WATER ACT SECTION 404 AND SECTION 401 (WATER QUALITY)).
·· TITLE V AIR PERMITS (BASED ON TYPE OF MATERIAL DUST, BOILERS AND DOMESTIC WATER HEATERS) -
DPW - ENVIRONMENTAL BRANCH, ENVIRONMENTAL COMPLIANCE BRANCH (ECB)
·· TRANSPORTER AND DISPOSAL FACILITIES PERMITS
·· EXCAVATION
· IRRIGATION PERMIT - DPW WATER QUALITY PROGRAM MANAGER, 910-907-3214.
· STORAGE TANKS AND WATER QUALITY PROGRAM, FORT BRAGG-DPW-ECB, 910-907-3214.
· LANDFILL DISPOSAL PERMIT - DPW-ENVIRONMENTAL SUSTAINMENT DIVISION (ESD), 910-396-3372.
· PHOTOGRAPHY - INSTALLATION PERMIT - DIRECTOR OPERATIONS DIRECTORATE DCS G3/5/7 - POC IS
MR. DREDDRICK BROWN, DSN 225-8469 OR COM (703) 695-8469.
· TRAFFIC CONTROL PERMIT - DPW TRANSPORTATION ENGINEER, RAY GOFF, 910-907-1759
· UTILITY CONNECTION
· UTILITY OUTAGE REQUESTS - FT BRAGG DPW
COUNTY
· WATER WELL
FEDERAL
· NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION - FAA FORM 7460-1
NC STATE:
· ASBESTOS REMOVAL FOR DEMOLITION/RENOVATION - NCPH, RALEIGH (10 WORKING DAYS PRIOR TO
REMOVAL)
· AIR QUALITY
· DEMOLITION
· EROSION & SEDIMENT CONTROL (E&SC) CERTIFICATE OF APPROVAL/PERMIT - DEQ (FORMALLY
NCDENR) DEPT OF WATER QUALITY (DWQ), UNDER GENERAL PERMIT NO. NCG010000 FOR
"CONSTRUCTION ACTIVITIES THAT ARE ALSO SUBJECT TO THE NORTH CAROLINA SEDIMENTATION
POLLUTION CONTROL ACT OF 1973."
· GENERAL STORMWATER DISCHARGE
· GEOTHERMAL (POSSIBLE COUNTY INVOLVEMENT)
· SEPTIC SYSTEM (POSSIBLE COUNTY INVOLVEMENT)
· STORMWATER MANAGEMENT - NCDEQ AND FT BRAGG WATER MANAGEMENT BRANCH
· WATER SYSTEM SERVICE (FIRE PROTECTION AND DOMESTIC WATER SERVICE) - NCDEQ.
ASUS (AMERICAN STATES UTILITY SERVICES) :
· WATER AND SANITARY SEWER
COE SAFETY:
· CONFINED SPACE ENTRY PERMIT - (SEE EM 385-1-1, DATED 30 NOV 2014, SECTION 34 (STARTING ON
PAGE 34-1)
· ENERGIZED WORK PERMIT - MUST BE SUBMITTED TO THE COR IN ADVANCE FOR ACCEPTANCE. (SEE
EM 385-1-1, DATED 30 NOV 14, PARAGRAPH 11.A.02C).
· HOT WORK PERMIT - DEFINED AS HOT RIVETING, WELDING, BURNING, ABRASIVE BLASTING, OR OTHER
FIRE- OR SPARK-PRODUCING OPERATIONS. (SEE EM 385-1-1, DATED 30 NOV 2014, PARA 09.A.04 (PAGE
9-1 & 2) & PAGE Q-29. THE FORT BRAGG FIRE DEPARTMENT REQUIRES NOTICE 14 CALENDAR DAYS
PRIOR TO WORK, FOR:
·· WELDING
·· CUTTING
·· HEATING
A. CONTRACTOR SHALL SECURE ALL PERMITS NECESSARY FOR CONSTRUCTION OF THE PROJECT.
DETERMINE FEE BASIS AS APPROPRIATE AND PAY ALL FILING FEES AT NO ADDITIONAL COST TO THE
GOVERNMENT. CONSTRUCTION SHALL NOT BEGIN ON ANY PHASE WITHOUT APPROPRIATE PERMITS.
B. PERMITS ARE TO BE MAINTAINED IN THE CONTRACTOR'S ONSITE CONSTRUCTION OFFICE, ORGANIZED
IN A 3 RING BINDER, TABBED AND WITH A TABLE OF CONTENTS FOR INSPECTION BY THE GOVERNMENT.
C. THE FOLLOWING PERMITS MAY BE REQUIRED FOR PROJECTS AT FORT BRAGG.
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L M
I N
G T
S
T R
I C
T
G-004
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
D
S
A L T
S M
A N
N
J O
H N
S O
N
R
D
O W
N S
D
S
A L T
S M
A N
G D
G N
8/03/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X X
X k7ecpss9 Line
THE FORT BRAGG LAMONT CONSTRUCTION AND DEMOLITION (C&D)
LANDFILL IS CLOSED AND WILL NOT BE ACCEPTING ANY C&D WASTE
AND, ASBESTOS WASTE. THE MUNICIPAL SOLID WASTE (MSW)
TRANSFER STATION AT THE LAMONT LANDFILL FACILITY IS CLOSED
AND WILL NOT ACCEPT MSW AT THE FACILITY.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, AND MSW.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR
SUB TITLE “D” LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF
C&D, ASBESTOS WASTE, MSW, AND ALL OTHER FORMS OF
HAZARDOUS OR HARMFUL MATERIALS INCLUDING BUT NOT LIMITED
TO SLURRY FROM HORIZONTAL DIRECTIONAL DRILLING.
THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN DATA OF ALL
WASTE DISPOSED AND MATERIALS RECYCLED OFF FORT BRAGG.
THE DEPARTMENT OF THE ARMY (DA) AND THE NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY (NC DEQ) REQUIRES
MONTHLY AND ANNUAL REPORTING OF ALL MATERIALS (WASTE AND
RECYCLABLES) MANAGED BY FORT BRAGG. THE FORT BRAGG
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
OFFICE IS RESPONSIBLE FOR COMPILING DATA INTO MONTHLY
DIRECTORATE REPORTS TO BE CONSOLIDATED INTO REPORTS FOR
THE DA AND THE NC DEQ. A PROVIDED FORM FROM THE SOLID
WASTE/RECYCLING OFFICE OR A CONTRACTOR FORM SHALL BE
FILLED OUT WITH THE TYPE OF WASTE OR RECYCLED MATERIAL, THE
WEIGHT OF THE WASTE/MATERIAL (TONS OR POUNDS) AND THE
FACILITY THE WASTE OR RECYCLABLES WERE DELIVERED. THIS
INFORMATION IS REQUIRED TO BE SENT TO THE FORT BRAGG SOLID
WASTE/RECYCLING OFFICE BY THE SECOND FRIDAY OF EACH
MONTH. EMAIL TO JEFF SLOOP AT JEFFERY.W.SLOOP.CTR@MAIL.MIL
OR FAX TO (910)396-4188, ATTN: SOLID WASTE OFFICE.
THE LAMONT LANDFILL FACILITY WILL ACCEPT RECYCLABLES ITEMS.
1) CONCRETE, BRICK AND BLOCK
- SHALL BE TESTED AND FREE OF ASBESTOS AND LEAD BASED
PAINT TO BE RECYCLED
- SHALL BE NO LARGER THAN 2' BY 2' PIECES OR EQUIVALENT
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD
- SHALL HAVE NO REBAR PROTRUDING OUT OF THE CONCRETE
2) TREES, LIMBS AND STUMPS
- SHALL BE CUT TO 6 FEET OR LESS IN LENGTH
- IF THE TREE HAS A LARGE DIAMETER (EXAMPLE 3 FT. DIA.) IT
SHALL BE CUT TO LENGTHS OF 3 FEET OR LESS
- SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD OR IN STUMP
ROOTS
- WILL EXCEPT GROUND WOOD CHIPS
- LOADS SHALL BE FREE OF TRASH
3) PALLETS
- SERVICEABLE AND NON-SERVICEABLE PALLETS
4) SCRAP STEEL
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
5) SCRAP ALUMINUM
- NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
- NO ITEMS WITH LIQUIDS IN THEM
6) CARDBOARD TO BE RECYCLED
- A 40 YARD DUMPSTER IS AVAILABLE FOR CARDBOARD
- ALSO CARDBOARD CAN BE TAKEN TO THE FORT BRAGG
RECYCLING CENTER AT BLDG 3-1240, BUTNER AND REILLY
ROAD
- SHALL BE CLEAN OF PLASTICS, STYROFOAM, WOOD, METAL,
TRASH, ETC.
7) ALL RECYCLABLE MATERIALS FROM A CONSTRUCTION OR
DEMOLITION JOB IS PROPERTY OF THE GOVERNMENT UNLESS
THE CONTRACT SPECIFIES THAT THE CONTRACTOR CAN OBTAIN
THE MATERIALS. ITEMS SUCH AS HVAC UNITS (FREON REMOVED),
AIR HANDLERS, PIPING, METAL BEAMS, MOTORS, VALVES, COPPER
WIRE, ETC. THESE TYPES OF ITEMS SHALL BE TRANSPORTED TO
DPW RECYCLING CENTER OR THE RECYCLING AREA AT THE
LAMONT LANDFILL FACILITY.
A LANDFILL USAGE PERMIT, FOR CONTRACTORS, SHALL BE
OBTAINED FROM THE DIRECTORATE OF PUBLIC WORKS,
ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING
PROGRAM AT BLDG 3-1137, (910) 432-6412.
STATE LAW AND FORT BRAGG REGULATIONS REQUIRES COVERING
OF LOADS OF WASTE OR RECYCLABLES TO PREVENT LITTER.
ALL WASTE OR RECYCLABLE MATERIAL LOADS ARE SUBJECT TO BE
INSPECTED OF THEIR CONTENTS WHILE BEING PRESENT ON FORT
BRAGG.
SOLID WASTE AND RECYCLING NOTES
APPLY FERTILIZER/LIME AT RATES AS DETERMINED BY LABORATORY SOIL
ANALYSIS OF SOILS AT THE JOB SITE. IN THE ABSENCE OF THE SOIL ANALYSIS,
APPLY SOIL AMENDMENTS AT THE RATES INDICATED IN STEPS 2 AND 3.
1. AREA WILL BE TILLED TO 4" DEPTH.
2. APPLY LIME AT 70 POUNDS PER 1000 SQUARE FEET, OR 1.5 TONS PER
ACRE.
3. APPLY 10-20 FERTILIZER AT A RATE OF 850 POUNDS PER ACRE OR 20
POUNDS PER 1000 SQUARE FEET. THE FERTILIZER SHOULD BE EITHER
SLOW TIME RELEASE OR APPLIED IN TWO APPLICATIONS, HALF AT TIME OF
PLANTING AND THE SECOND HALF AFTER PERMANENT SEED GERMINATES.
4. THE LIME AND FERTILIZER WILL BE WORKED INTO THE TOP 2 TO 4 INCHES
OF SOIL PRIOR TO SEEDING.
5. SEED MIX AND RATE:
FORT BRAGG SEEDING SPECIFICATION
SITE AREA
DESCRIPTION
1) GROUND STABILIZATION *
STABILIZATION
TIME FRAME
PERIMETER DIKES,
SWALES, DITCHES
AND SLOPES
7 DAYS
STABILIZATION TIME
FRAME EXCEPTIONS
NONE
HIGH QUALITY
WATER (HQW)
ZONES
7 DAYS NONE
SLOPES STEPPER
THAN 3:1
7 DAYS
IF SLOPES ARE 10' OR LESS IN
LENGTH AND ARE NOT STEEPER
THAN 2:1, 14 DAYS ARE
ALLOWED.
SLOPES 3:1 OR
FLATTER
14 DAYS
7-DAYS FOR SLOPES GREATER
THAN 50 FEET IN LENGTH AND
WITH SLOPES STEEPER
THAN 4:1
ALL OTHER AREAS
WITH SLOPES
FLATTER THAN 4:1
14 DAYS
NONE (EXCEPT FOR
PERIMETERS AND
HQW ZONES)
* "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY
BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE
COMPLIANCE IMPRACTICABLE." (SECTION II.B(2)(b))
MAINTENANCE DURING ESTABLISHMENT PERIOD
MAINTENANCE OF THE SEEDED AREAS SHALL INCLUDE PROTECTING
EMBANKMENTS AND DITCHES FROM SURFACE EROSION; MAINTAINING EROSION
CONTROL MATERIALS AND MULCH; PROTECTING INSTALLED AREAS FROM
TRAFFIC; MOWING; WATERING; AND POST-FERTILIZATION.
MOWING
A. TURF AREAS; TURF AREAS SHALL BE MOWED TO A MINIMUM 3-INCH
HEIGHT WHEN THE TURF IS A MAXIMUM 4 INCHES HIGH. CLIPPINGS
SHALL BE REMOVED WHEN THE AMOUNT CUT PREVENTS SUNLIGHT
FROM REACHING THE GROUND SURFACE.
B. EROSION CONTROL AREAS: EROSION CONTROL AREAS SHALL BE
MOVED TO A MINIMUM 4 INCH HEIGHT WHEN THE PLANTS ARE
MAXIMUM 8 INCHES HIGH. CLIPPINGS SHALL BE REMOVED WHEN THE
AMOUNT CUT PREVENTS SUNLIGHT FROM REACHING THE GROUND
SURFACE.
POST-FERTILIZATION
AFTER THE PERMANENT GRASS HAS BEEN ACCEPTED, AND BETWEEN
THE DATES OF APRIL 15 AND OCTORBER 15, APPLY 425 POUNDS OF
FERTILIZER PER ACRE.
REPAIR OF REINSTALL
UNSATISFACTORY STAND OF GRASS PLANTS AND MULCH SHALL BE
REPAIRED OR REINSTALLED, AND ERODED AREAS SHALL BE REPAIRED
UNTIL A SATISFACTORY STAND OF GRASS RESULTS.
(Rv. 9 JUNE 2017)
TEMPORARY SEEDING
"COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER AND 28 FEBRUARY 120 POUNDS
PER ACRE WINTER WHEAT (TRITICUM SPELTA)
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 65 POUNDS PER
ACRE GERMAN (SETARIA ITALICA), BROWN TOP (SETARIA ITALICA), OR FOX TAIL
MILLET (BRACHIARIA RAMOSUM)
PERMANENT SEEDING "COOL SEASON": PLANTED BETWEEN 1 SEPTEMBER
AND 28 FEBRUARY 50 POUNDS PER ACRE KENTUCKY 31 TALL FESCUE
(FESTUCA ARUNDINACEA) 25 POUNDS PER ACRE COMMON ZOYSIA
"WARM SEASON": PLANTED BETWEEN 1 MARCH AND 31 AUGUST 50 POUNDS
PER ACRE KENTUCKY 31 TALL FESCUE (FESTUCA ARUNDINACEA) 25 POUNDS
PER ACRE COMMON ZOYSIA
STRAW MULCH: APPLY 4,000 POUNDS PER ACRE; LEAVING NO BARE SPOT LARGER
THAN A QUARTER. STRAW MUST BE STABILIZED BY EITHER USE OF EMULSIFIED
ASPHALT OR BY CRIMPING THE STRAW INTO THE GROUND.
EMULSIFIED ASPHALT: EMULSIFIED ASPHALT SHALL BE APPLIED AT A RATE
HEAVY ENOUGH THAT THE ENTIRE AREA APPEARS BLACK IN COLOR; WITH
PARTICULAR ATTENTION PAID TO THE EDGES OF AREAS, CRESTS OF RIDGES,
AND BANKS TO PREVENT WIND DAMAGE.
CRIMPING: STRAW MAY BE CRIMPED WITH A MULCH ANCHORING TOOL OR A
WHEEL DISK WITH DULL BLADES SET NEARLY STRAIGHT MAY BE USED AS A
MULCH ANCHORING TOOL. CRIMPING IS NOT PERMITTED ON SLOPES
STEEPER THAN 3:1.
HYDROSEEDING: HYDROSEEDING SHALL ONLYBE ALLOWABLE ON SLOPES
STEEPER THAN 1 HORIZONTAL TO 1 VERTICAL. STEPS 1 THROUGH 4 MUST BE
COMPLETED PRIOR TO HYDROSEEDING. HYDROSEEDING SHOULD BE APPLIED IN
TOW APPLICATIONS. THE FIRST APPLICATION WILL CONSIST OF
OF THE MULCH
AND
OF THE SEED AND THE SECOND APPLICATION WILL CONSIST OF
OF THE
MULCH AND
OF THE SEED. THE MULCH WILL INCLUDE A TRACKIFIER AND WILL BE
APPLIED AT A RATE OF 2,000 POUNDS PER ACRE OR THE MANUFACTURER'S
RECOMMENDATION, WHICHEVER IS HIGHER.
6. EXEMPTIONS: SPECIAL USE AREAS, SUCH AS WETLANDS, RIPARIAN AREAS,
FLOODPLAINS, GENERAL OFFICER QUARTERS AND HISTORIC DISTRICT. CONTACT
THE FORT BRAGG WATER MANAGEMENT BRANCH (WMB) AT 910-396-2301/2823
WHEN SEEDING THESE AREAS.
7. UPON COMPLETION OF THE PROJECT, PRIOR TO LEAVING THE SITE, THE WATER
MANAGEMENT BRANCH SHALL BE NOTIFIED TO INSPECT THE PROJECT. POC MR.
JACK WILSON AT 910-396-2301/2823.
NOTE: G.S. 113A-57 NO LAND-DISTURBING ACTIVITY SUBJECT TO THIS ARTICLE
SHALL BE UNDERTAKEN EXCEPT IN ACCORDANCE WITH THE FOLLOWING
MANDATORY REQUIREMENTS:
(1) PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS SHALL BE PROVIDED
WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER)
FOLLOWING THE COMPLETION OF CONSTRUCTION OR DEVELOPMENT (FINAL
GRADE).
(2) THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE
ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE
EROSION-CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT
EXPOSED WILL, WITHIN 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF
GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR
PERMANENT GROUND COVER, DEVICES, OR STRUCTURES SUFFICIENT TO
RESTRAIN EROSION.
ALL PERIMETER DIKES, DITCHES, SWALES PERIMETER SLOPES OR SLOPES
STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED
TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS
PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS.
FORT BRAGG SEEDING SPECIFICATION (CONT.)
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
G-005
G E
N E
R A
L
C
O N
S T
R U
C T
I O
N
N
O T
E S
D
S
A L T
S M
A N
N
J O
H N
S O
N
R
D
O W
N S
D
S
A L T
S M
A N
G D
G N
8/03/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
LP
BLDG. 3-3045
PROJECT LIMITS
STAGING/LAYDOWN
AREA
BLDG. 3-3046
BLDG. 3-2847
BLDG.
3-2647
BLDG. 3-2744
BLDG.
3-3242
G
G
G
G
G
G
G
M
A
L
V
E
S
T
I
S
T
R
E
E
T
PROPOSED GAS,
SEE CG101
GENERATOR, SEE
ELECTRICAL PLANS EP101
CHILLER, SEE MECHANICAL
PLANS MH101
TRANSFORMER PAD, SEE
ELECTRICAL PLANS EP101
G
O
R
D
A
D
G
G
50'
50' 150'
1"=50' N
SHEET NOTES:
1. CONTRACTOR IS RESPONSIBLE FOR REMOVING EXTERIOR LIGHTING
CIRCUITS FROM THE INTERIOR PANEL TO 5 FEET OUTSIDE OF BUILDING
FOOTPRINT. THE REMAINING EXTERIOR ELECTRICAL WORK WILL BE
PERFORMED BY SANDHILLS UTILITY SERVICE (SUS). SUS SHALL REMOVE
THE EXISTING PARKING LOT LIGHTING TO INCLUDED POLES AND
FIXTURES TO BE REPLACED WITH NEW POLES, FIXTURES AND LED
LIGHTS.
2. CONTRACTOR SHALL FILE A SERVICE REQUEST TO FORT BRAGG DPW
AT 910-396-0325 TO HAVE UNDERGROUND UTILITIES LOCATED AND
DIGGING PERMIT(S) PRIOR TO DIGGING.
3. EXISTING CONDITIONS SHOWN PER GIS ARE APPROXIMATE. GIS DATA IS
FROM THE FORT BRAGG GIS DATABASE. CONTRACTOR SHALL FIELD
VERIFY THE LOCATION OF ALL EXISTING UNDERGROUND UTILITIES
PRIOR TO START OF ANY CONSTRUCTION WORK.
4. SITE DISTURBANCE CAUSED BY SUS SHALL BE COORDINATED
SEPARATELY BY THOSE ENTITIES WITH DPW WATER MANAGEMENT
BRANCH.
5. SEE VF101 AND CIVIL DRAWINGS FOR GAS LINE EXISTING CONDITIONS
SURVEY AND CONSTRUCTION, RESPECTIVELY.
LIMITS OF CONSTRUCTION AND STAGING/LAYDOWN AREA PLAN
SCALE: 1"=50'
B3
SHEET LEGEND:
ASPHALT
LIGHT POLELP
PROJECT LIMITS
STAGING/LAYDOWN AREA
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
GC001
L I M
I T
S
O
F
C
O N
S T
R U
C T
I O
N
A
N D
S T
A G
I N
G L
A Y
D O
E
A
P
L A
N
D
S
A L T
S M
A N
N
J O
H N
S O
N
R
D
O W
N S
D
S
A L T
S M
A N
G C
D
G N
8/03/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
1. APPLICABLE CODES AND STANDARDS
ABBREVIATIONS TITLE EDITION
IBC INTERNATIONAL BUILDING CODE 2018
NFPA 13 STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS 2019
NFPA 70 NATIONAL ELECTRICAL CODE 2017
NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE 2019
NFPA 101 LIFE SAFETY CODE 2018
UFC 1-200-01 GENERAL BUILDING REQUIREMENTS JUNE 2016
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES CHANGE 2,
25-MAR-2018
UFC 4-010-01 DoD MINIMUM ANTITERRORISM STANDARDS FOR BUILDINGS 12 DEC 2018
UFC 4-021-01 DESIGN AND O&M; MASS NOTIFICATION SYSTEMS CHANGE 1
JAN 2010
2. TYPE OF CONSTRUCTION (IBC 601)
BUILDING ELEMENT
TYPE OF
CONSTRUCTION
FIRE RESISTANCE
RATING
PRIMARY STRUCTURAL FRAME IIB 0 HR
BEARING EXTERIOR WALL IIB 0 HR
BEARING INTERIOR WALL IIB 0 HR
NON-BEARING EXTERIOR WALL IIB 0 HR
NON-BEARING INTERIOR WALL IIB 0 HR
FLOOR CONSTRUCTION INCLUDING SUPPORTING BEAMS
AND JOISTS
IIB 0 HR
ROOF CONSTRUCTION INCLUDING SUPPORTING BEAMS
AND JOISTS
IIB 0 HR
3. CLASSIFICATION OF OCCUPANCY - MIXED WITHOUT SEPARATION
AREAS* OCCUPANCY IBC NFPA 101
CONFERENCE ROOM ASSEMBLY, GROUP A-3 303.1 6.1.2
OFFICES BUSINESS, GROUP B 304.1 6.1.11
5. MODIFIED ALLOWABLE HEIGHT (IBC 504)
OCCUPANCY BUILDING FACTOR MODIFIED ALLOWABLE HEIGHT (FT / STORY)
B A 75 / 3
4. BUILDING ALLOWABLE AREA - NONSEPARATED (IBC 506.2)
FLOOR /
USE
TABLE 506.2 (SF)
ACTUAL(SF)
RESTRICTING
OCCUPANCY
1 - BUSINESS 92,000 8,487
6. INCIDENTAL USE AND OTHER PASSIVE FIRE PROTECTION
AREA REQUIRED RATING CODE
CORRIDOR NO RATING NFPA 101 SECTION 12.3.6 AND
39.3.6
BOILER/MECH. ROOM 0 HR SMOKE PARTITON NFPA 101 SECTION 12.3.2.1.2
7. BUILDING SEPARATION (IBC TABLE 602)
OCCUPANCY ELEVATION
RESTRICTIVE FIRE
SEPARATION
DISTANCE (FT)
FIRE RESISTIVE
RATING OF
EXTERIOR WALL
B, A, S NORTH/SOUTH/WEST/EAST > 30 NO RATING
8. OPENING PROTECTION FOR FIRE AND SMOKE RESISTIVE CONSTRUCTION
COMPONENT
FIRE DOOR
DUCT PENETRATIONS
OTHER
PENETRATIONS
NFPA 101
TABLE 8.3.3.2.2
/NFPA 90
1 HR FIRE BARRIER 3/4 HR 1-1/2 HR FIRE DAMPER ONLY ON
TRANSFER DUCTS IN H OCCUPANCIES
1 HR NFPA 101 TABLE
8.3.3.2.2 /NFPA 90
5.3
9. OCCUPANT LOAD SUMMARY (UFC 3-600 -01 10.3 NFPA 101 TABLE 7.3.1.2)
FLOOR FUNCTION OF SPACE AREA (SF)
REFERENCE
OCCUPANTS
LEVEL 1 BUSINESS 8,487 SEE GI002 57
LEVEL 2 BUSINESS 7,515 SEE GI002 50
BUILDING 16,974 172
11. OCCUPANT LOAD SUMMARY AND MINIMUM EXITS FROM FLOOR
FLOOR GROSS AREA (SF) OCCUPANTS
REQUIRED EXITS
(NFPA 101)
REQUIRED EXIT SEPARATION
(NFPA 101 7.5.1.3.3)
DIAGONAL /
DIAGONAL / PROVIDED
LEVEL 1 8,487 57 2 (7.4.1.2) 194' / 65' / 66'
12. COMMON PATH, DEAD-END, AND TRAVEL DISTANCE LIMITS (NFPA 101, TABLE A7.6)
OCCUPANCY COMMON PATH LIMIT (FT) DEAD END LIMIT (FT) TRAVEL DISTANCE LIMIT (FT)
ASSEMBLY 20 FOR > 50 PERSONS
75 FOR < = 50 PERSONS
20 250
BUSINESS 100 50 300
13. MINIMUM EGRESS WIDTHS
COMPONENT REQUIREMENT WIDTH (IN) NFPA 101
DOORS IN EGRESS ACCESS PER COMPONENT 32 SECTION 7.2.1.2.3.2
CORRIDOR SERVING 50 OR MORE OCCUPANTS MINIMUM 44 SECTION 12.2.3.8
CORRIDOR SERVING LESS THAN 50 OCCUPANTS MINIMUM 36
OTHER LEVEL EGRESS COMPONENTS PER PERSON 0.2 TABLE 7.3.3.1
14. MINIMUM INTERIOR FINISH RATINGS (NFPA, TABLE A.10.2.2)
OCCUPANCY EXITS
EXIT ACCESS
CORRIDORS
OTHER SPACES
BUSINESS CLASS C CLASS C CLASS C
ASSEMBLY CLASS B CLASS C CLASS C
15. FIRE SUPPRESSION REQUIREMENTS (UFC 3-600-01 9-7.2, 9-10, 9-17)
SPRINKLERS STANDPIPE FIRE EXTINGUISHERS
SPRINKLERS PROVIDED
THROUGHOUT THE BUILDING
NOT REQUIRED NOT REQUIRED
16. FIRE ALARM REQUIREMENTS (UFC 3-600-01, 9-18)
MANUAL INITIATION AUTOMATIC INITIATION OCCUPANT NOTIFICATION
MANUAL FIRE ALARM PULL
STATIONS PROVIDED AT EXITS
FLOW AND TAMPER SWITCHES,
SPOT SMOKE DETECTORS AT
ALARM PANELS AND DUCT SMOKE
DETECTORS PROVIDED
VOICE MESSAGING, WHITE FIRE
ALARM/MASS NOTIFICATION
STROBES
17. SMOKE MANAGEMENT SYSTEMS
SMOKE CONTROL SYSTEM SMOKE AND HEAT VENTS PASSIVE SMOKE MANAGEMENT
NOT REQUIRED NOT REQUIRED SMOKE PARTITIONS WHERE
NOTED
2 - ASSEMBLY
28,500 1,771
ASSEMBLY
TOTAL 8,487
STAIRS
1 HR
1 HR N/A N/A NFPA 101 TABLE
8.3.3.2.2 /NFPA 90
5.3
ELEV. / ELEV. MACHINE
ROOM
1 HR
1 HR N/A N/A NFPA 101 TABLE
8.3.3.2.2 /NFPA 90
5.3
LEVEL 2 8.487 115 2 (7.4.1.2) 194' / 65' / 66'
SLOPED EGRESS COMPONENTS PER PERSON 0.3 TABLE 7.3.3.1
2 - BUSINESS 92,000 7,515
2 TOTAL 8,487
TOTAL 16,974BUILDING
10. EXIT CAPACITY
EXIT NO. COMPONENT PERSONS USING REQUIRED WIDTH (IN) PROVIDED
WIDTH (IN) CAPACITY (PERSONS)
FIRST FLOOR:
E1 DOOR 33 32 CLEAR 32 CLEAR 160
E2 DOOR 15 32 CLEAR 32 CLEAR 160
E3 DOOR 15 32 CLEAR 32 CLEAR 160
E4 DOOR 15 32 CLEAR 32 CLEAR 160
E5 DOOR 12 32 CLEAR 32 CLEAR 160
E6 DOOR 31 32 CLEAR 32 CLEAR 160
E7 DOOR 51 32 CLEAR 32 CLEAR 160
SECOND FLOOR:
E1 DOOR 33 32 CLEAR 32 CLEAR 160
STAIR 33 36 52 173
E2 DOOR 51 32 CLEAR 32 CLEAR 160
STAIR 51 36 45 150
E3 DOOR 19 32 CLEAR 32 CLEAR 160
STAIR 31 36 52 173
E4 DOOR 12 32 CLEAR 32 CLEAR 160
BUSINESS
LEVEL 2 ASSEMBLY 972 SEE GI002 65
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
W P
M R
GI001
J M
M
J M
M
J M
M
A
U G
U S
T
W H
N D
L I F
E
S
A F
E T
Y
C
O D
E
R
E V
I E
W
G I D
G N
D
S
A L T
S M
A N
08/04/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
E2
E3
E4
E5
E1
E6
E7
OCCUPANT LOAD = 12OCCUPANT LOAD = 45
TD 65'
CPT 27'
TD 64'
CPT 28'
TD 61'
CPT 38'
TD 69'
CPT 15'
OCCUPANT LOAD = 12OCCUPANT LOAD = 38
E1
E2
E3
E4
TD 42'
CPT 25'
TD 54'
CPT 31'
CPT 37'
TD 58'
CPT,TD 51'
LIFE SAFETY LEGEND:
EGRESS TRAVEL PATH
EXIT SIGN
1-HOUR FIRE WALL
SPACE OCCUPANT CAPACITY
DENOTES DEAD END
DENOTES COMMON PATH
DENOTES TRAVEL DISTANCE
EXIT NUMBER
TRAVEL START
CPT STOPS
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
W P
M R
GI002
L I F
E
S
A F
E T
Y
P
L A
N
J M
M
J M
M
J M
M
A
U G
U S
T
W H
N D
G I D
G N
D
S
A L T
S M
A N
08/04/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
CO
CO
CO
S
S
S
W
CO
CO
CO
CO
BUILDING
3-3045
ELB
ELB
ELB
ELB
ELB
ELB
ELB
ELB
ELB
ELB
AC
AC
AC
AC
AC
CHILLER
AC UNIT
OIL TANK
DIESEL TANK
CONC
CONC
CONC
CONC
CONC
ICV
FDC
FILTER TANK
RIPRAP
WOODS
GENERATOR
CONC
CONC
ASPHALT
OEU
OEU
OEU
TOP=244.86'
INV=242.38'-4"PVC
INV=241.43'-6"PVC
DROP INSIDE
TOP INV=241.41'-6"PVC
BOTTOM INV=237.99'
I, BRUCE D. BEAVERS, CERTIFY THAT THIS PROJECT WAS COMPLETED UNDER
MY DIRECT AND RESPONSIBLE CHARGE FROM AN ACTUAL FIELD SURVEY MADE UNDER
MY SUPERVISION; THAT THIS GROUND SURVEY WAS PERFORMED AT THE 95% PERCENT
CONFIDENCE LEVEL TO MEET FEDERAL GEOGRAPHIC DATA COMMITTEE STANDARDS;
THAT THIS SURVEY WAS PERFORMED TO MEET THE REQUIREMENTS FOR A
TOPOGRAPHIC/PLANIMETRIC SURVEY TO THE ACCURACY OF CLASS AA, AND THAT THE
FIELD DATA WAS COMPLETED ON JUNE 17, 2020; THAT THE SURVEY MAPPING WAS
COMPLETED ON JUNE 19, 2020; AND ALL COORDINATES ARE BASED ON NC GRID
'NAD 83'/2011 AND ALL ELEVATIONS ARE BASED ON NAVD 88.
BRUCE D. BEAVERS PLS L-3451
NOTES:
1. THE PURPOSE OF THIS MAP IS TO SHOW TOPOGRAPHIC FEATURES AND
INFORMATION ONLY AND IS NOT TO BE USED FOR BOUNDARY OR PROPERTY
OWNERSHIP INFORMATION.
2. THIS DRAWING REPRESENTS THE EXISTING CONDITIONS AS OF JUNE 17, 2020.
3. SURVEYED BY: STANTEC CONSULTING SERVICES INC.
4. SURVEY DATE: JUNE 19, 2020
5. HORIZONTAL DATUM: NAD83/2011 NC STATE PLANE US SURVEY FEET.
6. VERTICAL DATUM: NAVD 88, GEOID 12A.
7. THIS MAP DOES NOT VERIFY THE EXISTENCE OF, NOR CERTIFY THE LOCATION
OF ANY JURISDICTIONAL WETLANDS THAT MAY EXIST ON OR NEAR THE PROPERTY.
WETLAND FLAGS LOCATED WERE PLACED BY OTHERS.
SURVEY CONTROL:
1-SPIKE NAIL
N=514,082.706'
E=1,997,218.679'
EL=241.309'
2-SPIKE NAIL
N=514,357.758'
E=1,997,115.070'
EL=238.031'
CONTROL POINT
ELECTRIC BOX
TRANSFORMER
BOLLARD
POWER POLE
GROUNDING ROD
SANITARY SEWER MANHOLE
CLEAN OUT
STORM MANHOLE
WATER METER
IRRIGATION CONTROL VALVE
FIRE DEPARTMENT CONNECTION
AIR CONDITIONER UNIT
CONCRETE
INVERT ELEVATION
REINFORCED CONCRETE PIPE
POLYVINYL CHLORIDE PIPE
OTHER END UNKNOWN
FIRE DEPARTMENT CONNECTION
IRRIGATION CONTROL VALVE
SANITARY SEWER FORCE MAIN
WOODS
CENTERLINE ROAD
SURVEY LEGEND:
CONC
INV
RCP
PVC
OEU
FDC
ICV
SSFM
S
D
S
D
S
D
S
D
S D
S D
ELB
SSFM VAULT
TOP=245.48'
SSFM VAULT
TOP=246.11'
S
CO
D
W
AC
TOP=240.01'
INV=236.37'
TOP=239.82'
INV=234.99'-18"RCP
INV=235.64'-18"RCP
INV=237.60'-6"PVC
INV=237.67'-4"PVC
OEU
OEU
TOP=243.19'
INV=238.72'-18"RCP
OEU
OEU
OEU
INV=234.48'-18"RCP
INV=229.40'-36"RCP
INV=236.55'-24"RCP
MALVESTI STREET
EXISTING CONDITIONS PLAN
SCALE: 1"=20'
B1
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
VF101
E X
I S
T I N
G
C
O N
D I T
I O
A
N
D
S A
L T
S M
A N
M
M I L E
Y
M
B A
R T
O N
D
S A
L T
S M
A N
V F
D
G N
020' 20' 60'
1"=20'
7/30/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
CO
CO
CO
S
S
S
W
CO
CO
CO
CO
BUILDING
3-3045
ELB
ELB
ELB
ELB
ELB
ELB
ELB
ELB
ELB
ELB
AC
AC
AC
AC
AC
CHILLER
AC UNIT
OIL TANK
DIESEL TANK
CONC
CONC
CONC
CONC
CONC
ICV
FDC
FILTER TANK
RIPRAP
WOODS
GENERATOR
CONC
CONC
ASPHALT
OEU
OEU
OEU
TOP=244.86'
INV=242.38'-4"PVC
INV=241.43'-6"PVC
DROP INSIDE
TOP INV=241.41'-6"PVC
BOTTOM INV=237.99'
S
D
S
D
S D
S D
SSFM VAULT
TOP=245.48'
SSFM VAULT
TOP=246.11'
TOP=240.01'
INV=236.37'
TOP=239.82'
INV=234.99'-18"RCP
INV=235.64'-18"RCP
INV=237.60'-6"PVC
INV=237.67'-4"PVC
OEU
OEU
MALVESTI STREET
G
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
S
F
L O
D
L O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
L
O
D
G
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
A
S
G
AS
G
EROSION AND SEDIMENT CONTROL PLAN
SCALE: 1"=20'
B1
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L
M I N
G T
O N
N
O R
R
O L
I N
A
W I L
M I N
G T
S
T R
I C
T
CG101
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
O L
P
L A
N
D
S
A L T
S M
A N
M
M
I L E
Y
M
B
A R
T O
N
D
S
A L T
S M
A N
C G
D
G N
KEY NOTES :
1. PROJECT LIMITS, TYPICAL.
2. LIMITS OF DISTURBANCE, TYPICAL.
3. GAS METER, SEE DETAIL D8 ON SHEET C-502.
4. GAS PIPE INSTALLATION, SEE DETAIL E4 ON SHEET
C-502.
5. PIPING INSTALLATION, SEE DETAIL C2 ON SHEET
C-502. CONTRACTOR SHALL HORIZONTAL
DIRECTIONAL DRILL UNDER MALVESTI PER
SPECIFICATIONS.
6. 2" PE GAS PIPING.
7. NATURAL GAS VALVE BOX. SEE DETAIL C2 ON SHEET
C-502
8. 3" TO 2" TEE HOT TAP CONNECTION AND EXCESS
FLOW VALVE.
9. EXISTING 3" GAS LINE, CONTRACTOR TO VERIFY
LOCATION BEFORE INSTALLATION OF PROPOSED
GAS LINE.
10. SEDIMENT FENCE, SEE DETAIL A1 ON SHEET C-501.
11. SEDIMENT FENCE OUTLET, SEE DETAIL A4 ON SHEET
C-501.
12. INLET PROTECTION, SEE DETAIL D7 ON SHEET C-501.
13. COORDINATE GAS PIPING INSTALLATION WITH
EXISTING WATER AND SANITARY SEWER PIPING, SEE
DETAIL E1 ON SHEET C-502.
20'
20' 60'
1"=20' FOR NATURAL GAS ONLY
08-03-2020
8/03/2020
A U
G U
P
M B
C O
N T
R A
W P
M X
X
X X
X
C O
N T
R A
W P
M X
X
X
C-501
I T
E
D
E T
A I L
S
D
S
A L T
S M
A N
M
M
I L E
Y
M
B
A R
T O
N
D
S
A L T
S M
A N
C D
G N
8' 8'
4"
8" MIN.
4" MIN.
3'-0"
M
I N
ELEVATION
3'-0" 3'-0"
3'-0"
8' 8'
3'-0"
PLAN VIEW
SECTION
4'
4'
GROUND LINE
STEEL POST
2x4
3'
3'
NOTES:
1. SEDIMENT FENCE SHALL BE INSTALLED OUTSIDE TOE OF
EARTHFILL EMBANKMENTS.
2. WIRE SHALL BE A MINIMUM OF 32" IN WIDTH AND SHALL
HAVE A MIN. OF 6 LINE WIRES WITH 12" STAY SPACING.
3. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND
SHALL BE FASTENED SECURELY TO THE WIRE.
4. THE FILTER FABRIC SHALL MEET THE FOLLOWING
REQUIREMENTS:
A) EOS IS NOT LARGER THAN U.S. STANDARD SIEVE NO. 70
B) GRAB STRENGTH 90-120 LB
C) CONFORM TO ASTM D-1682 OR ASTM D-177
5. STEEL POSTS SHALL BE 6'-0" IN HEIGHT AND BE OF
SELF-FASTENER ANGLE STEEL TYPE.
MAINTENANCE:
1. REPLACE STONE AS NEEDED TO ENSURE DEWATERING.
2. SEDIMENT MUST BE REMOVED WHEN HALF OF STONE
OUTLET IS COVERED.
3. ANY SEDIMENT FENCING WHICH HAS BEEN UNDERMINED
OR TOPPED MUST BE REPLACED IMMEDIATELY.
#57 WASHED STONE OVER
CLASS B RIP RAP FRONT
SIDE/ CLASS B RIP RAP
ONLY BACK SIDE
TOP STRAND
MIN. NO. 10
GAUGE
BOTTOM STRAND
MIN. NO. 10 GAUGE
12" MAX WEIR
HEIGHT
FLOW
DIRECTION
EXTRA LAYER FILTER
FABRIC @ SEDIMENT
FENCE OUTLET
ANCHOR FILTER FABRIC MIN. 8"
DEEP AND KEY IT IN 4"
HORIZONTALLY EACH SIDE
COMPACTED FILL EACH SIDE
FLOW
DIRECTION
SEDIMENT FENCE OUTLET DETAIL
SCALE: NOT TO SCALE
A4
FILL SLOPE
GROUND LINE
4" MIN.
8" MIN
COMPACTED FILL (8" MIN.)
8' W/STANDARD
FABRIC WITH
WIRE FENCE
MIN. 14 GAUGE
WIRE FENCE
6' W/HIGH
STRENGTH
FABRIC WITHOUT
WIRE FENCE
S T
E E
L
P O
S T
ANCHOR FILTER
FABRIC MIN. 8" DEEP
AND KEY IT IN 4"
HORIZONTALLY
N
5' LONG MIN.
FILTER FABRIC
ELEVATION
SECTION
NOTES:
1. USE A SYNTHETIC FILTER FABRIC OF AT LEAST 95% BY WEIGHT OF POLYOLEFINS OR
POLYESTER, WHICH IS CERTIFIED BY THE MANUFACTURER OR SUPPLIER AS CONFORMING
TO THE REQUIREMENTS IN ASTM D 6461. SYNTHETIC FILTER FENCE SHOULD CONTAIN
ULTRAVIOLET RAY INHIBITORS AND STABILIZERS TO PROVIDE A MINIMUM OF 6 MONTHS OF
EXPECTED USABLE CONSTRUCTION LIFE AT A TEMPERATURE RANGE OF 0 TO 120 DEG F.
2. STEEL POSTS SHALL BE 5'-0" MIN. IN HEIGHT, 1.33 LB/LINEAR FT STEEL AND SHALL HAVE
PROJECTIONS TO FACILITATE FASTENING TO FABRIC.
3. WIRE FENCE SHALL BE MINIMUM 14 GAUGE AND MAXIMUM MESH SPACING OF 6 INCHES,
FOR USE WITH STANDARD STRENGTH FILTER FABRIC.
MAINTENANCE
1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE
ANY REQUIRED REPAIRS IMMEDIATELY.
2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME
INEFFECTIVE, REPLACE IT PROMPTLY.
3. ANY SEDIMENT FENCING WHICH HAS BEEN UNDERMINED OR TOPPED MUST BE REPLACED
IMMEDIATELY.
4. REMOVE SEDIMENT DEPOSITS AS NECESSARY AND AT A MINIMUM WHERE
ACCUMULATIONS REACH 1/2" ABOVE GROUND HEIGHT AT SEDIMENT FENCING TO PROVIDE
ADEQUATE STORAGE VOLUME FOR THE NEXT RAINFALL AND TO REDUCE PRESSURE ON THE
FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT.
5. REMOVE ALL SEDIMENT FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND
BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA
HAS BEEN PROPERLY STABILIZED, ONLY AFTER THE PROJECT INSPECTOR HAS APPROVED
THE SEDIMENT FENCING REMOVAL.
CONSTRUCTION NOTES FOR SEDIMENT FENCE FABRIC
1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH
SYNTHETIC FILTER FABRICS.
2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES
ABOVE THE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER
SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE.)
3. CONSTRUCT THE FILTER FABRIC FROM CONTINUOUS ROLL CUT TO THE LENGTH OF THE
BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER
CLOTH ONLY AT SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST.
4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO
THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF
THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF
THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE
STRENGTH.
5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET
APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF
24 INCHES.
6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE
MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE
OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH.
7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE
PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER.
8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH.
9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT.
THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SEDIMENT SILT FENCE
PERFORMANCE.
10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES.
STEEL POST
M I N
SEDIMENT FENCE
SCALE: NOT TO SCALE
A1
J O
N E
S
F
R A
N K
L
S
U I T
E
R A
L E
I G
H
N
C
F
A X
L I C
E N
FOR OFFICIAL USE ONLY
FOR OFFICIAL USE ONLY
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
US Army Corps of Engineers
F O
A
G G
N
O R
R
O L I N
A
R E
N O
V A
I L D
I N
G
J S
O C
F Y
S
C
READY TO ADVERTISE
A
U G
U S
T
W P
M R
W H
N D
F I
M
E
A N
S I
D
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
R
L I N
G T
E
W I L M
I N
G T
O N
N
O R
R
O L I N
A
W I L M
I N
G T
S
T R
I C
T
DROP INLET SECTION
12" COMPOST SOCK
STORM GRATE
WIRE TIES, (TYP.)
DROP INLET PLAN
DROP
INLET
12" COMPOST
SOCK
NOTES:
1. MATERIALS TO BE FILTREXX OR APPROVED EQUAL.
2. ALL MATERIAL AND INSTALLATION TO MEET STATE AND LOCAL SPECIFICATIONS.
3. 2"X2" OAK OR OTHER DURABLE HARDWOOD STAKES SHALL BE USED. STAKES SHALL
BE PLACES AT A MAXIMUM INTERVAL OF 4 FEET. STAKES SHALL BE DRIVEN TO A
MINIMUM DEPTH OF 12 INCHES, WITH A MINIMUM OF 3 INCHES PROTRUDING ABOVE
THE COMPOST SOCKS.
4. IN THE EVENT STAKING IS NOT POSSIBLE (I.E., WHEN SOCKS ARE USED ON
PAVEMENT) HEAVY CONCRETE BLOCKS OR SAND BAGS SHALL BE USED…