SC-00009-19_Bldg 3-3045 Asbestos Report.pdf

PDF 1 MB Posted

Attached to
SC-00009-19 Renovate Bldg. 3-3045, JSOC, Fort Bragg, Cumberland County, North Carolina
Solicitation number
W912PM22B0034
Issued by

About this file

This solicitation and supporting asbestos report provide details for a renovation project at Building 3-3045 at Fort Bragg, North Carolina. The Army Corps of Engineers seeks a contractor to complete construction and renovation work including wall, floor and ceiling repairs, selective non-load bearing wall removal and replacement, door reconfigurations, latrine renovations, fire sprinkler and communication system work, HVAC system replacement including ductwork on both floors, natural gas implementation, upgraded mechanical and electrical/plumbing systems replacement. The contractor must have a NAICS code of 236220 and be registered in SAM. The project value is between $1,000,000 to $5,000,000 and will be awarded as a 100% small business set-aside firm fixed price contract.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(Photo Not Available Due to National Security)

Signature

Solomon Locklear, Carolina Environmental Design, LLC NC License # 12601

Asbestos Survey for Renovation of

Building 3-3045 Fort Bragg, North Carolina

Prepared by Solomon Locklear, Carolina Environmental Design, LLC for the

Directorate of Public Works, Ft .Bragg, North Carolina

Table of Contents

Asbestos Inspection Report………………………………………………………...1

List of Tables

Table 1 Asbestos Table

Table 2 Carolina Environmental Inc. Analytical Report…………………..…….7

Table 3 Asbestos Samples Chain of Custody Forms

Appendices

Appendix A. Certifications and Accreditations…………………. ......... ………13

Asbestos Inspection Report

Introduction

Scope of the Investigation

This report documents the asbestos inspection and survey of Building 3-3045 at Ft. Bragg, North Carolina conducted on 03/04/2013.

Background

Building 3-3045 is a two story structure that is used by JSOC and the building is used specifically for office space. Due to national security concerns, the asbestos inspector was not allowed in the office areas of Building 3-3045. Most of the samples collected were collected from the hallways, mechanical rooms, electrical closets, janitorial closets and latrines. The outside of the building is constructed out of concrete. The windows of the building are constructed out of aluminum, held in place with rubber/silicone caulking. The roof is constructed from the top down with concrete surfaced expandable polystyrene foam insulation over single ply membrane over several inches of foam insulation over a metal roof deck. The inside walls are constructed out of both CMU (block) and drywall/joint compound. The ceilings of the building have drywall/joint compound that is covered with white 2’x2’ drop ceiling. The flooring system is constructed out of concrete. White 12”x12” floor tile is present in the hallways and offices on the first floor and 12”x12” floor tile and ceramic tile is present on the 2 nd floor. Due to not being able to assess all of the offices, it was not able to be determined if floor tile was present in each and every office. There is a mechanical room present on the outside of the building as well as on each floor. The pipes and elbows running throughout the mechanical room and building are covered with yellow fiberglass material, covered with a white thermal insulation wrap.

Description of study

Investigation

Areas of Building 3-3045 were visually inspected for suspected asbestos containing materials (ACM) by North Carolina accredited inspectors. A copy of the inspector’s accreditation certificate is included in Appendix A. Bulk samples of all suspect ACM’s were collected. This report details ACM as identified at the time of inspection only. Please be advised that if the building in to undergo demolition or renovation, additional sampling maybe required for hidden materials that were not accessible of sampling when the initial asbestos inspection was done. A focused inspection was conducted for the presence of asbestos containing building materials (ACBM). Laboratory results indicated that ASBESTOS WAS NOT DETECTED.

These results pertain only to that portion of the building for which renovation (work) actions are proposed and is not applicable to the remaining spaces in the building.

Carolina Environmental Inc. analyzed the bulk samples. The laboratory is accredited by the

National Voluntary Laboratory Accredited Program (NVLAP Accreditation sponsored by the

National Institute of Standards and Technology (NIST)). A Copy of their accreditation certificate is included in Appendix A. The samples were analyzed by the accepted method of polarized light microscopy (PLM) using EPA’s “Method For the Determination of Asbestos In Bulk Building

Materials”, EPA/600/R-93/116. The laboratories’ analytical report is included in Appendix A.

In compliance with the AHERA regulations, material is considered an Asbestos Containing

Material (ACM) when it contains greater than one percent asbestos. Likewise, in this report, any material containing concentrations greater than one percent asbestos will be considered

“positive”. Occasionally, materials containing less than one percent asbestos, or not sampled, are assumed to be a “positive” asbestos containing material at the discretion of the inspectors. A narrative discussion of the AHERA ACM types (i.e., thermal systems insulation, miscellaneous and surfacing materials) found in Building No. 3-3045 is included in this report where relevant.

Bulk sample information, estimated quantities of individual asbestos containing materials, and material characterization of asbestos containing materials appears on Table 1. The approximate location where each bulk sample was obtained is shown on the building floor plans, Figure 1.

Conclusions

ASBESTOS-CONTAINING MATERIAL NOT DETECTED.

Thermal System Insulation

TSI is insulation material applied to pipes, fittings, tanks, ducts, or on other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

There was not any asbestos containing TSI materials detected in Building 3-3045.

Miscellaneous Materials

Miscellaneous materials include building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and do not include surfacing or TSI. There was not any asbestos containing miscellaneous material found in Building 3-3045 at the time of sampling.

Surfacing

Surfacing material is friable material that is sprayed on, troweled on, or otherwise applied to surfaces for decorative or other purposes. No surfacing material was found to contain asbestos located in Building 3-3045 at the time of sampling.

TABLE 1

ASBESTOS TABLE

FORT BRAGG, BUILDING 3-3045

Date of Inspection: March 4 th , 2013

Inspector: Solomon Locklear

Inspector Certification Number: NC Number 12601

MATERIAL CHARACTERISTICS ASSESSMENT

Type Description/Location % Asbestos

Yes/No/Presumed

Quantity/Type

(If ACM)

Friable /

Non-

Friable

Condition Disturbance

Potential

MISCELLANEOUS

White 12”x12” Floor Tile

With Glue None Detected

MISCELLANEOUS Drywall/Joint Compound None Detected

MISCELLANEOUS 2’x2’ White Drop Ceiling None Detected

TSI Pipe Insulation None Detected

Sq. Ft.-Square Foot, Ln. Ft.-Linear Foot, C. Ft.-cubic Foot

Materials Containing Asbestos are in Bold Print.

Table 2

Table 3 Chain of Custody

Appendix A

SC-00009-19_Execution Memo
SC-00009-19_4283
SC-00009-19 FY22 OPSEC form
SC-00009-19_SCAF
SC-00009-19_SCAF
SC-00009-19

Building 3-3045 Asbestos Report

File details come from the government source that posted it. Updated .