This document includes a solicitation for construction services and a related project description. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to construct a cardio/strength/nutrition training, physical/hydro therapy, special operations cognitive enhancement for performance training, human engagement and adaptive thinking training, and shower/locker space facility at Fort Bragg, North Carolina. The scope of work includes site preparation, utilities installation, building construction with various integrated systems, landscaping, and demolition of existing facilities. The project is to be designed and built according to LEED Silver standards. The estimated value is between $25-100 million. The NAICS code is 236220 and size standard is $39.5 million. The solicitation is unrestricted and offers are due through the beta.SAM website. The contracting office contact information is provided.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GRADING NOTES
US Army Corps of Engineers ®
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
File Path:
Plot Date:
SHEET ID
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
S O
L I C
I T
A T
I O
N
N
O
D A
T E
M A
R K
D E
S C
R I P
T I O
N
C A
T E
G O
R Y
C
O D
E
F I L E
N
A M
E
C O
N T
R A
T
J U
L
W P
M R
C L A
K
X
S E
N
M
A I
S
R
E E
T
S U
I T
E
V I R
G I N
B
A
C H
V
A
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
W I L M
I N
G T
D
S
T R
I C
T
D
A R
L I N
G T
V E
N U
E
W I L M
I N
G T
O N
N
C
F O
B
A
G G
N
O R
H
R
O L I N
A
S O
F
H
U M
P
A
T F
O R
M F
O R
G
N
E R
A T
I O
N
F
O R
G E
F
A C
I L I T
Y
P N
FOR OFFICIAL USE ONLY (FOUO)
F O
R
O
F F
I C
I A
L
U
Y
F
O U
O
READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)
1. FIELD VERIFY THE ACTUAL AND EXACT LOCATION, SIZE AND MATERIAL COMPOSITION OF
EXISTING UTILITY SERVICE SHOWN FOR CONNECTION OR USE ON THIS PROJECT. THE
RELOCATION OF UTILITY SERVICES REQUIRED TO COMPLETE PORTIONS OF THESE
CONSTRUCTION PLANS MUST BE PROVIDED BY THE CONTRACTOR.
2. A NORTH CAROLINA LICENSED UTILITY CONTRACTOR MUST PERFORM UTILITY WORK
INVOLVED IN CONSTRUCTING THIS PROJECT.
3. EXISTING UTILITIES MUST BE PROTECTED DURING CONSTRUCTION. HAND EXCAVATE WITHIN 2
FEET OF EXISTING UTILITIES.
4. THE GAS UTILITY LAYOUT DOES NOT SHOW EVERY OFFSET, TRANSITION, AND FITTING THAT
MAY BE REQUIRED. CONTRACTOR IS RESPONSIBLE FOR DETERMINATION OF AND PROVIDING
FITTINGS NECESSARY FOR COMPLETION OF THE SYSTEM.
5. DESIGN AND CONSTRUCTION OF THE WATER DISTRIBUTION SYSTEM TO SERVICE THE FACILITY
- INCLUDING FIRE HYDRANTS, WILL BE PROVIDED BY AMERICAN STATES UTILITY SERVICE
(ASUS). REFER TO PLUMBING PLANS FOR CONNECTION LOCATION.
6. DESIGN AND CONSTRUCTION OF THE SANITARY SEWER COLLECTION SYSTEM FOR THE
FACILITY WILL BE PROVIDED BY AMERICAN STATES UTILITY SERVICE (ASUS). REFER TO
PLUMBING PLANS FOR CONNECTION LOCATION.
7. NATURAL GAS SERVICE TO THE FACILITY WILL BE DESIGNED AND INSTALLED BY GAS UTILITY
PROVIDER. REFER TO PLUMBING PLANS FOR THE BUILDING CONNECTION LOCATION.
8. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF UTILITY CONSTRUCTION.
9. AMERICAN STATES UTILITY SERVICE POINT OF CONTACT:
WESLEY HOLMES
910-237-8680
WESLEY.HOLMES@ASUSINC.COM
SANDHILLS UTILITY SERVICE POINT OF CONTACT:
DARYL MCLELLAN
OFFICE: 910-496-2222
CELL: 910-818-0112
DMCLELLAN@SANDHILLSUTILITY.COM
1. ADJUST RIMS TO FINISHED GRADE UNLESS OTHERWISE SPECIFIED. THE RIM IS THE TOP
OF A MANHOLE, CATCH BASIN, OR OTHER ASSEMBLY THAT IS INSTALLED IN THE GROUND,
AND IS NORMALLY USED FOR STORM WATER COLLECTION OR SANITARY PURPOSES.
2. REFER TO ARCHITECTURAL PLANS FOR DETAILS OF BUILDING AND BUILDING DIMENSIONS.
3. FIELD VERIFY DIMENSIONS INDICATED AND NOTIFY CONTRACTING OFFICER OF
DISCREPANCIES.
4. NORTHING AND EASTING COORDINATES FOR UTILITY AND DRAINAGE STRUCTURES
INDICATE CENTER OF STRUCTURE SYMBOL ON THE SITE PLAN. FIELD ADJUST STRUCTURE
LOCATIONS BASED ON THE ACTUAL DIMENSIONS OF THE STRUCTURE.
5. UTILITIES AND STRUCTURES NOT INDICATED FOR REMOVAL OR MODIFICATION ARE TO
REMAIN AND BE PROTECTED FROM DAMAGE.
6. FEATURES SHOWN OUTSIDE THE SURVEY LIMITS ARE BASED ON THE MASTER PLAN
DRAWINGS FROM THE U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT.
1. THE FOLLOWING NOTES APPLY AT ALL TIMES FOR THE DURATION OF THE PROJECT, EXCEPT
WHEN OTHERWISE NOTED IN THE PLAN, OR DIRECTED BY THE ENGINEER.
2. SIGNAGE, STRIPING, AND MARKING NOTES MUST BE IN CONFORMANCE WITH NCDOT ROAD AND
BRIDGE STANDARDS, AND THE FHWA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD), INCLUDING NCDOT AND MUTCD SUPPLEMENTS.
3. TIE PROPOSED PAVEMENT MARKINGS TO EXISTING PAVEMENT MARKING LINES.
4. REMOVE/REPLACE ANY CONFLICTING OR DAMAGED PAVEMENT MARKINGS.
5. INSTALL PAVEMENT MARKINGS ON THE FINAL PAVEMENT SURFACE.
6. ALL PAVEMENT MARKING MATERIALS, INSTALLATION, AND QUALITY CONTROL REQUIREMENTS
SHALL BE IN ACCORDANCE WITH THE 2018 EDITION OF THE NCDOT STANDARD SPECIFICATIONS
FOR ROADS AND STRUCTURES, DIVISION 1087 AND DIVISION 12.
7. ALL TEMPORARY MARKINGS AND WORK ZONE SIGNAGE MUST ALSO CONFORM TO THE
REQUIREMENTS OF DIVISION 11 - WORK ZONE TRAFFIC CONTROL.
8. SIGNAGE MUST CONFORM TO DIVISION 9 AND DIVISION 10 OF THE 2018 EDITION OF THE NCDOT
STANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES.
9. SIGN POSTS AND THE BACKSIDE OF ALL SIGNAGE SHALL BE PAINTED FS-20059 (MISSION BROWN).
10. ALL SIGNAGE MUST HAVE A HIGH INTENSITY TYPE 3 OR GREATER SHEETING.
11. ALL PRODUCTS USED FOR MARKING AND SIGNAGE MUST BE ON THE NORTH CAROLINA DOT
QUALIFIED PRODUCT LIST (QPL).
1. VERIFY AND COORDINATE DIMENSIONS SHOWN, INCLUDING THE HORIZONTAL AND VERTICAL
LOCATION OF STORM STRUCTURES AND INLETS AND UTILITIES CROSSING THE STORM SEWER.
2. THE LOCATIONS OF STORM SEWER STRUCTURES SHOWN ON THESE PLANS ARE
APPROXIMATE. WHERE NEW STORM SEWERS TIE TO EXISTING SWALES, FIELD ADJUST NEW
STORM SEWERS TO MATCH THE LOCATIONS OF THESE EXISTING FEATURES.
3. REINFORCED CONCRETE PIPE SHALL BE CLASS III UNLESS OTHERWISE NOTED.
4. OPEN STORM PIPES MUST BE PROTECTED WITH STONE FILTER PROTECTION AFTER WORK
STOPPAGE EACH DAY UNTIL CONNECTING STRUCTURES ARE CONSTRUCTED.
5. STORMWATER WILL BE ROUTED TO THE PREVIOUSLY PERMITTED UNDERGROUND DETENTION
BASIN AND INFILTRATION SYSTEM.
CIVIL GENERAL NOTES
DEMOLITION NOTES
STORM DRAINAGE NOTES
MARKING AND SIGNAGE NOTES
UTILITY NOTES
1. PRIOR TO DEMOLISHING EXISTING STRUCTURES, INSPECT FOR HAZARDOUS MATERIALS.
CONTACT CONTRACTING OFFICER IMMEDIATELY IF HAZARDOUS MATERIALS ARE DISCOVERED.
2. DEMOLITION OF EXISTING UTILITIES MUST BE COORDINATED WITH THE FORT BRAGG PUBLIC
WORKS DEPARTMENT AND THE UTILITY PROVIDER(S).
3. UTILITIES LOCATED IN AREAS OF DEMOLITION OR SUBSEQUENT CONSTRUCTION MUST BE
PROTECTED FROM DAMAGE AND ACCESS CASTING MUST BE ADJUSTED TO FLUSH WITH NEW
GRADE.
4. WHERE ASPHALT/CONCRETE SECTION IS TO BE REMOVED, PROVIDE A SAW CUT AT THE LIMITS
OF DEMOLITION OR NEAREST JOINT TO OBTAIN A CLEAN VERTICAL EDGE.
5. SAW CUT SIDEWALKS AND CURB AND GUTTER AT THE NEAREST JOINT TO PROVIDE A
SMOOTH TIE-IN OF PROPOSED SIDEWALKS AND CURB AND GUTTER TO EXISTING.
DAMAGED EDGES SHALL BE RE-SAWED TO PROVIDE ONE UNIFORM EDGE AT NO
ADDITIONAL COST.
6. THE GOVERNMENT WILL SALVAGE ANY EQUIPMENT, FURNISHINGS, STORAGE BUILDINGS,
AND OTHER REAL PROPERTY BOTH INSIDE AND OUTSIDE OF THE BUILDINGS PRIOR TO
BEGINNING DEMOLITION. THE CONTRACTOR WILL BE RESPONSIBLE FOR DEMOLISHING AND
DISPOSAL OF ALL ITEMS REMAINING IN THE BUILDINGS AND ON SITE - SUCH AS FURNITURE, AND EQUIPMENT.
1. ENSURE POSITIVE DRAINAGE AWAY FROM NEW AND EXISTING BUILDINGS THROUGHOUT
CONSTRUCTION.
2. ALL EXCAVATION SHALL BE PERFORMED SO THAT THE SITE AND THE AREAS IMMEDIATELY
SURROUNDING THE SITE WHICH AFFECTS OPERATION SHALL BE CONTINUALLY AND
EFFECTIVELY DRAINED DURING ALL PHASES OF CONSTRUCTION.
3. THE CONTRACTOR SHALL COORDINATE ALL GRADING OPERATIONS WITH OTHER UTILITIES
TO BE INSTALLED. WHERE EARTHWORK CUT IS TO BE ACCOMPLISHED, ALL NEW UTILITIES
SHALL BE CONSTRUCTED WITH THE REQUIRED COVER AND COORDINATION WITH
PRIVATIZED UTILITIES OF OTHER DISCIPLINES.
4. EXISTING STORM DRAINAGE PIPE TO BE UTILIZED AS PART OF NEW STORM DRAINAGE
NETWORK SHALL BE FIELD VERIFIED. IF CONFLICTS ARE FOUND, NOTIFY THE
CONTRACTING OFFICER.
1. THE CONTRACTOR SHALL MAINTAIN TRAFFIC DURING CONSTRUCTION AND PROVIDE, INSTALL, AND
MAINTAIN ALL TRAFFIC CONTROL DEVICES IN ACCORDANCE WITH THESE PROJECT GUIDELINES, THE
PROJECT SPECIAL PROVISIONS, NORTH CAROLINA DEPARTMENT OF TRANSPORTATION STANDARD
DRAWINGS, THE CURRENT EDITION OF NCDOT STANDARD SPECIFICATIONS FOR ROADS AND
STRUCTURES, AND THE CURRENT EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES
(MUTCD).
2. THE CONTRACTOR SHALL UTILIZE COMPLETE AND PROPER TRAFFIC CONTROLS AND TRAFFIC CONTROL
DEVICES DURING ALL OPERATIONS. ALL TRAFFIC CONTROL AND TRAFFIC CONTROL DEVICES REQUIRED
FOR ANY OPERATION SHALL BE FUNCTIONAL AND IN PLACE PRIOR TO THE COMMENCEMENT OF THAT
OPERATION. SIGNS FOR TEMPORARY OPERATIONS SHALL BE REMOVED DURING PERIODS OF INACTIVITY.
THE CONTRACTOR IS REQUIRED TO LEAVE THE PROJECT IN A MANNER THAT WILL BE SAFE TO THE
TRAVELING PUBLIC AND WHICH WILL NOT IMPEDE MOTORISTS.
3. TRAFFIC MOVEMENTS THROUGH LANE CLOSURES ON ROADS WITH TWO-WAY TRAFFIC SHALL BE
CONTROLLED BY FLAGGERS STATIONED AT EACH END OF THE WORK ZONE. IN SITUATIONS WHERE SIGHT
DISTANCE IS LIMITED, THE CONTRACTOR SHALL PROVIDE ADDITIONAL MEANS OF CONTROLLING TRAFFIC, INCLUDING, BUT NOT LIMITED TO, TWO-WAY RADIOS, PILOT VEHICLES, OR ADDITIONAL FLAGGERS.
FLAGGERS SHALL BE COMPETENT PERSONNEL, ADEQUATELY TRAINED IN FLAGGING PROCEDURES, AND
FURNISHED WITH PROPER SAFETY DEVICES AND EQUIPMENT, INCLUDING, BUT NOT LIMITED TO, SAFETY
VESTS AND STOP/SLOW PADDLES. ALL PERSONNEL WHEN WORKING IN TRAFFIC AREAS OR AREAS IN
CLOSE PROXIMITY TO TRAFFIC SHALL WEAR AN APPROVED SAFETY VEST, OR SHIRT OR JACKET WHICH
MEETS THE COLOR REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
4. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE FEDERAL, STATE, AND LOCAL LAWS, ORDINANCES, AND REGULATIONS GOVERNING SAFETY, HEALTH, AND SANITATION, AND SHALL PROVIDE
ALL SAFEGUARDS, SAFETY DEVICES, AND PROTECTIVE EQUIPMENT, AND SHALL TAKE ANY OTHER
NEEDED ACTIONS, ON HIS OWN RESPONSIBILITY THAT ARE REASONABLY NECESSARY TO PROTECT THE
LIFE AND HEALTH OF EMPLOYEES ON THE JOB AND THE SAFETY OF THE PUBLIC, AND TO PROTECT
PROPERTY IN CONNECTION WITH THE PERFORMANCE OF THE WORK COVERED BY THE CONTRACT. WORK
ON ANY ROADWAY, PARKING LOT OR EXPOSED TRAFFIC MOVEMENT AREA MAY REQUIRE A TRAFFIC
CONTROL PLAN. THE PLAN SHALL INCORPORATE THE APPLICABLE MUTCD AND NCDOT STANDARDS AND
SEALED BY A PROFESSIONAL TRAFFIC ENGINEER LICENSED IN THE STATE OF NORTH CAROLINA. A
DEVIATION FROM THIS DIRECTIVE, REQUIRING A SEALED TRAFFIC CONTROL PLAN CAN BE MADE BASED
ON EMERGENCY, SAFETY AND ROADWAY CONDITIONS BY THE FORT BRAGG - DPW CIVIL AND OR TRAFFIC
ENGINEER.
5. THE FORT BRAGG CIVIL AND OR TRAFFIC ENGINEERS AT DPW REQUIRE A TEN DAY (WORKING DAYS)
NOTICE TO BEGIN WORK FOR SECURITY AND INTER-AGENCY APPROVALS. EXCEPTIONS TO THE
SCHEDULE MAY BE GRANTED FOR EMERGENCY SITUATIONS. AN APPROVED TRAFFIC CONTROL PLAN BY
DPW BUT NOT SUBMITTED FOR AN APPROVED WORK START DATE MAY BE CONSIDERED NULL AND VOID
AFTER SIXTY CALENDAR DAYS OF THE PLAN APPROVAL DATE IF NO ACTION IS TAKEN TO INITIATE THE
WORK. THE CONTRACTOR SHALL PROVIDE WRITTEN NOTICE TO THE FORT BRAGG CIVIL AND OR TRAFFIC
ENGINEER AT THE START AND PROJECTED COMPLETION DATE TO THIS WORK. ANY DEVIATION FOR THIS
SCHEDULE SHALL BE APPROVED BY THE FORT BRAGG CIVIL AND OR TRAFFIC ENGINEER.
6. OPEN CUTS ON ASPHALT ROADWAYS WILL REQUIRE FULL DEPTH PATCHING WITH APPLICABLE BASE, FULL
DEPTH PATCHING WITH ASPHALT CONCRETE SURFACE COURSE TYPE SF9.5A IN 2-INCH LIFTS IF
APPLICABLE, THE SAME DAY. THE WORK SHALL ALSO COMPLY WITH NCDOT STANDARD ROADWAY
REPAIR AND PATCHING POLICIES AND TECHNIQUES.
FORT BRAGG TRAFFIC CONTROL AND
WORKZONE SAFETY POLICY
1. THESE REQUIREMENTS APPLY TO ALL CONSTRUCTION AND ALTERATIONS GREATER THAN
200 FEET IN HEIGHT. THESE REQUIREMENTS ALSO APPLY TO ALL CRANES USED ON FORT
BRAGG.
2. POPE ARMY AIRFIELD HAS REQUESTED THAT NOTICES OF PROPOSED CONSTRUCTION OR
ALTERATION ON FT. BRAGG BE FILED DIRECTLY WITH FAA. THIS INCLUDES NOTICES FOR
CONSTRUCTION CRANES.
3. IN A MEETING 25 MARCH 04 BETWEEN USACE AND POPE ARMY AIRFIELD REPRESENTATIVES
IT WAS AGREED THAT CONTRACTORS WOULD FILE THE REQUIRED FAA FORM 7460-1.
APPLICATION COULD BE FILED ELECTRONICALLY VIA THE FAA WEB SITE:
HTTPS://OEAAA.FAA.GOV/OEAAA/EXTERNAL/PORTAL.JSP.
4. APPLICABLE REGULATIONS AR 95-2 PARA 8.6:
HTTP://WWW.USAPA.ARMY.MIL/PDFFILES/R95_2.PDF AND FAA 7400.2E, CHAPTERS 5 & 6 AND
7 HTTP://WWW.FAA.GOV/ATPUBS/AIR/INDEX.HTM.
5. FAA FORM 7460-1 IS AVAILABLE ON THE FAA WEB SITE HTTP://WWW.FAA.GOV. THIS WEB
SITE AND THE FORM DETAIL THE SPECIFIC CONDITIONS REQUIRING NOTICE AND
INSTRUCTIONS ON HOW TO APPLY VIA THE FAA WEB PORTAL
HTTPS://OEAAA.FAA.GOV/OEAAA/EXTERNAL/PORTAL.JSP. NOTICES ARE REQUIRED TO BE
FILED A MINIMUM OF 30 DAYS PRIOR TO THE PROPOSED CONSTRUCTION OR ALTERATION
IS TO BEGIN.
6. THE FT. BRAGG POINT OF CONTACT FOR THESE ACTIONS IS THE INSTALLATION ATC
CHIEF/AIR TRAFFIC & AIRSPACE MANAGER (AT&A), MR. LEE VALLIANT 910-396-7725 OR
E-MAIL: LEE.VALLIANT@US.ARMY.MIL. COPIES OF ALL NOTICES SHOULD BE PROVIDED TO
MR. VALLIANT.
FEDERAL AVIATION ADMINISTRATION (FAA)
REQUIRED NOTICES
C I V
G
N
E R
T
E
C-001
J O
N E
S
N
J O
N E
S
L
H
U T
C H
I N
S
L
H
U T
C H
I N
S
1. THERE ARE NO WETLANDS OR RIPARIAN BUFFERS IDENTIFIED WITHIN THE LIMITS OF
DISTURBANCE.
WETLANDS
1. THE FORT BRAGG BORROW PIT IS CLOSED. THE CONTRACTOR MUST PROVIDE ANY MATERIAL
REQUIRED FOR CONSTRUCTION FROM SOURCES OFF POST.
2. NEITHER THE FORT BRAGG BORROW PIT NOR THE LANDFILL CAN ACCEPT DISPOSAL MATERIAL.
3. EXCESS BORROW MATERIAL SHALL BE DISPOSED OF OFF POST.
BORROW MATERIAL
1. FEATURES SHOWN OUTSIDE THE SURVEY LIMITS ARE BASED ON THE MASTER PLAN DRAWINGS
FROM THE U.S. ARMY CORPS OF ENGINEERS SAVANNAH DISTRICT. PLEASE COORDINATE WITH
THE USACE COR FOR ANY SURVEY INFORMATION REQUIRED FROM ADJACENT PROJECT PRIOR
TO CONSTRUCTION COMMENCEMENT.
SURVEY NOTES
7. NO MATERIAL STORAGE SHALL BE ALLOWED ALONG THE SHOULDERS OF THE ROADWAY, PARKING LOTS
OR AREAS WITH ACTIVE TRAFFIC DURING NON-WORKING HOURS. EQUIPMENT SHALL BE PARKED AWAY
FROM ACTIVE TRAFFIC AREAS AND SHALL BE PROPERLY BARRICADED TO PREVENT EQUIPMENT
OBSTRUCTION WITHIN THE CLEAR RECOVERY AREA. THE CONTRACTOR SHALL COMPLY WITH ALL OSHA
REQUIREMENTS AND PROVIDE A COMPETENT PERSON ON SITE TO SUPERVISE ALL PHASES OF THIS TYPE
OF WORK.
8. THE CONTRACTOR SHALL COMPLY WITH ALL FEDERAL, STATE, AND FORT BRAGG ENVIRONMENTAL
REGULATIONS AND SHALL OBTAIN ALL NECESSARY FEDERAL, STATE, AND FORT BRAGG ENVIRONMENTAL
PERMITS, INCLUDING BUT NOT LIMITED TO, THOSE RELATED TO SEDIMENT CONTROL, STORM WATER, WETLAND, STREAMS, ENDANGERED SPECIES, AND HISTORICAL SITES.
9. THE FORT BRAGG DIRECTORATE OF PUBLIC WORKS SHALL BE NOTIFIED PRIOR TO BEGINNING WORK
THAT AFFECTS PERMANENT TRAFFIC CONTROL DEVICES. THE CONTRACTOR SHALL BE RESPONSIBLE TO
RELOCATE, MODIFY, REPAIR, OR REPLACE TRAFFIC SIGNALS AND COMPONENT EQUIPMENT, TRAFFIC
SIGNS AND PAVEMENT MARKINGS IN COMPLIANCE WITH NCDOT CURRENT EQUIPMENT AND STANDARDS
WHERE APPLICABLE. THE CONTRACTOR MAY BE REQUIRED TO INSTALL TEMPORARY TRAFFIC SIGNALS, PAVEMENT MARKINGS, RAISED PAVEMENT MARKERS AND SIGNING TO ACCOMPLISH THE WORK. THESE
TASKS SHALL BE NOTED IN THE APPROVED TRAFFIC CONTROL PLAN.
10. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE THE LOCATION OF THE OTHER
UTILITIES WITHIN THE WORK ZONE AREA. THIS SHALL ALSO INCLUDE THE LOCATION OF THE WATER, SEWER, AND DRAINAGE SYSTEMS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING OTHER
UTILITY OWNERS AND PROVIDING PROTECTION AND SAFEGUARDS TO PREVENT DAMAGE OR
INTERRUPTIONS TO EXISTING FACILITIES AND TO MAINTAIN ACCESSIBILITY TO THE EXISTING UTILITIES.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OR REPLACEMENT OF THESE UTILITIES
BECAUSE OF HIS WORK. ALL PIPE REPAIR WORK SHALL BE IN COMPLIANCE WITH THE NCDOT STANDARD
DRAWINGS AND SPECIFICATIONS, CURRENT EDITION. EXCAVATED AREA ADJACENT TO PAVEMENT OR
ACTIVE TRAFFIC AREAS HAVING MORE THAN A 2-INCH DROP SHALL BE SHAPED UP AT A 6:1 OR FLATTER
SLOPE AND DESIGNATED BY APPROPRIATE DELINEATION DURING PERIODS OF INACTIVITY, INCLUDING, BUT NOT LIMITED TO, NIGHT AND WEEKEND HOURS. PRE-CAST CONCRETE MANHOLES, CATCH BASINS, OR
DRAINAGE STRUCTURES SHALL BE THE TYPE PRE-APPROVED BY NCDOT. MANHOLE RINGS AND COVERS, VALVE COVERS AND STORM DRAINAGE GRATES AND FRAMES SHALL BE OF THE TRAFFIC BEARING TYPE
APPROVED BY NCDOT.
11. ALL WORK PERFORMED UNDER THIS POLICY SHALL BE CONTRACTED TO AN NCDOT LICENSED OR
CERTIFIED CONTRACTOR (BONDED IN THE STATE OF NORTH CAROLINA).
C P
D F
AutoCAD SHX Text Spell checked by TWEAVER on 06/30/2020 12:09pm
| Sheets and Views |
| C-001 CIVIL GENERAL NOTES |
| Sheet 1 |
File details come from the government source that posted it. Updated .