PN81165_READY FOR ADVERTISEMENT_VOL2.pdf

PDF 42 MB Posted

Attached to
PN 81165 SOF Human Platform FORGE Federal contract opportunity
Solicitation number
W912PM20R0001
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

This solicitation is for the construction of a training facility at Fort Bragg, North Carolina. The U.S. Army Corps of Engineers, Wilmington District is seeking a contractor to construct a cardio/strength/nutrition training facility, physical/hydro therapy space, special operations cognitive enhancement and human engagement training space, and shower and locker room. The facility will include built-in fire alarm, fire suppression, energy management control, communications networks, cable TV, security systems, and electrical and mechanical infrastructure. Supporting site work will include utilities, lighting, parking, access roads, storm drainage, landscaping, and demolition of existing facilities. The construction is valued between $25-100 million and will follow LEED Silver standards. The NAICS code is 236220 and size standard is $39.5 million. The solicitation is posted on beta.SAM.gov under number W912PM20R0001 and is 100% unrestricted.

View the file

Other files for this federal contract opportunity

Other files attached to PN 81165 SOF Human Platform FORGE, newest first.
File Type Posted
Bidder Site Visit Sign In PN81165 6August2020.pdf PDF
W912PM20R0001 Amendment 0006 Conformed Copy.docx.pdf PDF
W912PM20R0001 Amendment 0006.docx.pdf PDF
W912PM20R0001 Amendment 0005 Conformed Copy.docx.pdf PDF
W912PM20R0001 Amendment 0005.pdf PDF
PN81165_RTA_SPECS_Vol IV of IV no pricing_Redacted.pdf PDF
W912PM20R0001 Amendment 0004.pdf PDF
20R0001 Amendment 0004 Conformed Copy.docx.pdf PDF
PN81165_RTA_SPECS_Vol I of IV_0004.pdf PDF
PN81165_RTA_SPECS_Vol IV of IV.pdf PDF
Summary of Changes__PN81165_Amdt0004.pdf PDF
PN81165_RTA_SPECS_Vol II of IV_0004.pdf PDF
W912PM20R0001 Amendment 0001.pdf PDF
PN81165_RTA_SPECS_Vol III of IV_0004.pdf PDF
W912PM20R00010003_Amendment.docx.pdf PDF
W912PM20R00010003_Conformed.docx.pdf PDF
W912PM20R00010002 Amendment.pdf PDF
W912PM20R00010002 Conformed.pdf PDF
Conformed Solicitation PN 81165.pdf PDF
FY20PN81165-C-001 C-001.pdf PDF
Amendment 0001 Wage Determination .pdf PDF
Summary of Changes__PN81165_Amdt0001.pdf PDF
PN81165_READY FOR ADVERTISEMENT_VOL 1(locked).pdf PDF
PN81165_RTA_SPECS_Vol III of III.pdf PDF
PN81165_RTA_SPECS_Vol II of III.pdf PDF
Attachment 5 NAVFAC_USACE PPQ.pdf PDF
PN81165_RTA_SPECS_Vol I of III.pdf PDF
W912PM20R0001 PN81165 Human Performance FORGE.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F I L E

N

A M

E

D R

A W

N

B

Y

D E

S I G

N E

D

B

Y

D E

S C

R I P

T I O

N

A

M A

R K

S U

B M

I T

T E

D

B

Y

D A

T E

C H

E C

K E

D

B

Y

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

US Army Corps of Engineers

S I Z

E x

U S

A

R M

Y

C

O R

P S

O

E

N G

I N

E E

R S

W I L M

I N

G T

D

I S

T R

I C

T

D

A R

L I N

G T

V E

N U

E

W I L M

I N

G T

O N

N

O R

T H

C

R

O L I N

A

G-000

C O

V E

R

S

H E

E T

US Army Corps of Engineers

Wilmington District

S.

S

U R

R

AT

T

S.

S

U R

R

AT

T

J

M A

N N

I N

G

A w d C o v e r d w g

C O

N T

R A

FOUO

FOUO

F O

R

O

F F

I C

I A

L

U

L Y

D R

A W

I N

G

C

O D

E

S O

L I C

I T

A T

I O

N

N

W P

M R

W

A R

D

D

A T

E

J U

Y

B

D

P N

C

O N

S T

R U

F

H U

M A

N

P

E R

F O

R M

A N

C E

T R

A I N

I N

G

C

E N

T E

R

H

P T

C

F T

B

R A

G G

N

O R

R

O L

I N

A

V O

L U

M

A

F E

L I C

I A

N O

G

R A

N D

A

PN81165 CONSTRUCT SOF

HUMAN PERFORMANCE

TRAINING CENTER (HPTC)

FT. BRAGG, NORTH CAROLINA

SOLICITATION NO: W912PM20R0001

CONTRACT NO: TBD

AWARD DATE: JULY 2020

VOLUME 2 OF 2

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I

D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

US Army Corps of Engineers ®

SOLICITATION NO.:

CONTRACT NO.:

ISSUE DATE:

VOLUME:

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

A/E CONTRACT NO.:

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\roldach\Documents\8471_SOF Human Performance Center_A18_roldach@clarknexsen.com.rvt

7/22/2020 7:32:35 AM

G-001B

C O

V E

R S

H E

E T

V

O L

U M

E

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D A

R L

IN

G

T O

N A

V E

C L

A R

K N

E X

S E

N

M

A

IN

S T

R E

E T

S U

IT

E

A

J E

N K

IN

S

R

O L

D A

C H

S

B E

N N

E T

T

W

C O

O P

E R

/J U

L /2

W

P M

-2

-R -0

S O

F H

U M

A N

P L

A T

F O

R M

-F O

R C

E G

E N

E R

A T

IO

N

F

O R

G E

F

A C

IL

IT

Y

P N

WILMINGTON DISTRICT

W912PM-20-R-0001

TBD

23/JUL/2020

FORT BRAGG, NORTH CAROLINA

SOF HUMAN PLATFORM-FORCE GENERATION

(FORGE) FACILITY

PN81165

W912PM-19-D-0002, DO W912PM19F0044

G -0

B .p d f

VOLUME 2 OF 2

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I

D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\roldach\Documents\8471_SOF Human Performance Center_A18_roldach@clarknexsen.com.rvt

7/22/2020 7:32:40 AM

G-002B

S H

E E

T I

N D

E X

V

O L

U M

E

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D A

R L

IN

G

T O

N A

V E

C L

A R

K N

E X

S E

N

M

A

IN

S T

R E

E T

S U

IT

E

A

J E

N K

IN

S

R

O L

D A

C H

S

B E

N N

E T

T

W

C O

O P

E R

/J U

L /2

W

P M

-2

-R -0

S O

F H

U M

A N

P L

A T

F O

R M

-F O

R C

E G

E N

E R

A T

IO

N

F

O R

G E

F

A C

IL

IT

Y

P N

G -0

B .p d f

SHEET ID. TITLE

T-001 TELECOMMUNICATIONS LEGEND AND GENERAL NOTES

TN101 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN - PART A1

TN102 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN - PART A2

TN103 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN - PART A3

TN104 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN - PART A4

TN105 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN - PART B

TN106 PARTIAL FIRST FLOOR TELECOMMUNICATIONS PLAN - PART C

TN107 SECOND FLOOR TELECOMMUNICATIONS PLAN - PART C

TN401 ENLARGED TELECOMMUNICATIONS PLANS

TN402 ENLARGED TELECOMMUNICATIONS PLANS

TN403 ENLARGED TELECOMMUNICATIONS PLANS

TN404 ENLARGED TELECOMMUNICATIONS PLANS

TN405 ENLARGED TELECOMMUNICATIONS PLANS

TN406 ENLARGED TELECOMMUNICATIONS PLANS

TN501 TELECOMMUNICATIONS DETAILS

TN502 TELECOMMUNICATIONS DETAILS

TN601 TELECOMMUNICATIONS RISER DIAGRAMS

TN602 TELECOMMUNICATIONS RISER DIAGRAMS

TN603 TELECOMMUNICATIONS RISER DIAGRAMS

TY101 PARTIAL FIRST FLOOR SECURITY PLAN - PART A1

TY102 PARTIAL FIRST FLOOR SECURITY PLAN - PART A2

TY103 PARTIAL FIRST FLOOR SECURITY PLAN - PART A3

TY104 PARTIAL FIRST FLOOR SECURITY PLAN - PART A4

TY105 PARTIAL FIRST FLOOR SECURITY PLAN - PART B

TY106 PARTIAL FIRST FLOOR SECURITY PLAN - PART C

TY107 SECOND FLOOR SECURITY PLAN - PART C

TY401 ENLARGED SECURITY PLANS

TY501 SECURITY DETAILS

TY502 SECURITY DETAILS

TY601 SECURITY RISER DIAGRAMS

TA001 AUDIOVISUAL GENERAL NOTES

TA002 AUDIOVISUAL SYMBOLS AND LEGENDS

TA100 FIRST FLOOR AUDIOVISUAL PLAN - COMPOSITE

TA101 PARTIAL FIRST FLOOR AUDIOVISUAL PLAN - PART A1

TA102 PARTIAL FIRST FLOOR AUDIOVISUAL PLAN - PART A2

TA103 PARTIAL FIRST FLOOR AUDIOVISUAL PLAN - PART A3

TA104 PARTIAL FIRST FLOOR AUDIOVISUAL PLAN - PART A4

TA105 PARTIAL FIRST FLOOR AUDIOVISUAL PLAN - PART B

TA106 PARTIAL FIRST FLOOR AUDIOVISUAL PLAN - PART C

TA107 SECOND FLOOR AUDIOVISUAL PLAN - PART C

TA121 FIRST FLOOR AUDIOVISUAL CEILING PLAN - PART A1

TA122 FIRST FLOOR AUDIOVISUAL CEILING PLAN - PART A2

TA123 FIRST FLOOR AUDIOVISUAL CEILING PLAN - PART A3

TA124 FIRST FLOOR AUDIOVISUAL CEILING PLAN - PART A4

TA125 FIRST FLOOR AUDIOVISUAL CEILING PLAN - PART B

TA126 FIRST FLOOR AUDIOVISUAL CEILING PLAN - PART C

TA127 SECOND FLOOR AUDIOVISUAL CEILING PLAN - PART C

TA201 TYPICAL ELEVATIONS

TA211 FIRST FLOOR DISPLAY ELEVATIONS

TA221 SECOND FLOOR DISPLAY ELEVATIONS

TA611 FIRST FLOOR RISER DIAGRAMS

TA621 SECOND FLOOR RISER DIAGRAMS

TA711 FIRST FLOOR SIGNAL LINE DIAGRAMS

TA712 FIRST FLOOR SIGNAL LINE DIAGRAMS

TA721 SECOND FLOOR SIGNAL LINE DIAGRAMS

SHEET ID. TITLE

M-001 HVAC LEGEND, ABBREVIATIONS, GENERAL NOTES

M-101 PARTIAL FIRST FLOOR HVAC PLAN - A1

M-102 PARTIAL FIRST FLOOR HVAC PLAN - A2

M-103 PARTIAL FIRST FLOOR HVAC PLAN - A3

M-104 PARTIAL FIRST FLOOR HVAC PLAN - A4

M-105 PARTIAL FIRST FLOOR HVAC PLAN - B

M-106 PARTIAL FIRST FLOOR HVAC PLAN - C

M-107 SECOND FLOOR HVAC PLAN

M-111 FIRST FLOOR PIPING PLAN - A1

M-112 FIRST FLOOR PIPING PLAN - A2

M-113 FIRST FLOOR PIPING PLAN - A3

M-114 FIRST FLOOR PIPING PLAN - A4

M-115 FIRST FLOOR PIPING PLAN - B

M-116 FIRST FLOOR PIPING PLAN - C

M-117 SECOND FLOOR PIPING PLAN

M-301 BUILDING SECTIONS

M-302 BUILDING SECTIONS

M-401 HVAC ENLARGED PLANS

M-402 HVAC ENLARGED PLANS

M-501 HVAC DETAILS

M-502 HVAC DETAILS

M-503 HVAC DETAILS

M-504 HVAC DETAILS

M-601 HVAC SCHEDULES

M-602 HVAC SCHEDULES

M-701 HVAC FLOW DIAGRAMS

M-801 HVAC CONTROLS LEGEND AND INSTRUCTIONS

M-802 HVAC CONTROLS CHILLED WATER SYSTEM SEQUENCE OF OPERATION

M-803 HVAC CONTROLS CHILLED WATER SYSTEM CONTROL POINTS LIST

M-804 HVAC CONTROLS HOT WATER SYSTEM SEQUENCE OF OPERATION

M-805 HVAC CONTROLS HOT WATER SYSTEM CONTROLS POINTS LIST

M-806 HVAC CONTROLS ENERGY RECOVERY VENTILATOR SEQUENCE OF OPERATION

M-807 HVAC CONTROLS ENERGY RECOVERY VENTILATOR CONTROL POINTS LIST

M-808 HVAC CONTROLS SINGLE ZONE VAV AIR HANDLING UNIT SEQUENCE OF OPERATION

M-809 HVAC CONTROLS SINGLE ZONE VAV AIR HANDLING UNIT CONTROL POINTS LIST

M-810 HVAC CONTROLS ENERGY RECOVERY VENTILATOR SEQUENCE OF OPERATION

M-811 HVAC CONTROLS ENERGY RECOVERY VENTILATOR CONTROL POINTS LIST

M-812 HVAC CONTROLS VAV AIR HANDLING UNIT SEQUENCE OF OPERATION

M-813 HVAC CONTROLS VAV AIR HANDLING UNIT CONTROL POINTS LIST

M-814 HVAC CONTROLS MISCELLANEOUS SYSTEMS SEQUENCE OF OPERATION

M-815 HVAC CONTROLS MISCELLANEOUS SYSTEMS CONTROL POINTS LIST

M-816 CONTROLS - PLUMBING SYSTEMS

M-817 HVAC CONTROLS MISCELLANEOUS SCHEDULES

E-001 ELECTRICAL LEGEND, ABBREVIATIONS, GENERAL NOTES

E-101 PARTIAL FIRST FLOOR POWER PLAN - PART A1

E-102 PARTIAL FIRST FLOOR POWER PLAN - PART A2

E-103 PARTIAL FIRST FLOOR POWER PLAN - PART A3

E-104 PARTIAL FIRST FLOOR POWER PLAN - PART A4

E-105 PARTIAL FIRST FLOOR POWER PLAN - PART B

E-106 PARTIAL FIRST FLOOR POWER PLAN - PART C

E-107 SECOND FLOOR POWER PLAN - PART C

E-110 LIGHTNING PROTECTION AND GROUNDING PLAN

E-121 PARTIAL FIRST FLOOR LIGHTING PLAN - PART A1

E-122 PARTIAL FIRST FLOOR LIGHTING PLAN - PART A2

E-123 PARTIAL FIRST FLOOR LIGHTING PLAN - PART A3

E-124 PARTIAL FIRST FLOOR LIGHTING PLAN - PART A4

E-125 PARTIAL FIRST FLOOR LIGHTING PLAN - PART B

E-126 PARTIAL FIRST FLOOR LIGHTING PLAN - PART C

E-127 SECOND FLOOR LIGHTING PLAN - PART C

E-131 ELECTRICAL SITE DEMOLITION PLAN AREA A

E-132 TELECOMMUNICATIONS SITE DEMOLITION PLAN AREA A

E-133 ELECTRICAL SITE PLAN AREA A

E-134 ELECTRICAL SITE PLAN AREA B

E-135 ELECTRICAL SITE PLAN KENNEDY HALL

E-401 ENLARGED POWER PLANS

E-402 ENLARGED POWER PLANS

E-501 LIGHTNING PROTECTION DETAILS

E-502 LIGHTNING PROTECTION DETAILS

E-503 ELECTRICAL DETAILS

E-601 POWER RISER DIAGRAM

E-602 GROUNDING RISER DIAGRAM

E-603 EQUIPMENT CONNECTION SCHEDULE

E-604 PANELBOARD SCHEDULES

E-605 PANELBOARD SCHEDULES

E-606 PANELBOARD SCHEDULES

E-607 PANELBOARD SCHEDULES

E-608 LIGHT FIXTURE SCHEDULE

E-609 LIGHT FIXTURE DETAILS

E-610 LIGHT FIXTURE DETAILS

E-611 LIGHT FIXTURE DETAILS

SHEET ID. TITLE

G-001B COVER SHEET - VOLUME 2

G-002B SHEET INDEX - VOLUME 2

G-003 GENERAL NOTES, ABBREVIATIONS

F-001 FIRE PROTECTION LEGEND AND GENERAL NOTES

F-002 FIRE ALARM LEGEND AND OPERATIONS MATRIX

F-101 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A1

F-102 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A2

F-103 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A3

F-104 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A4

F-105 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - B

F-106 PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - C

F-107 SECOND FLOOR FIRE PROTECTION PLAN

F-501 FIRE PROTECTION DETAILS I

F-502 FIRE PROTECTION DETAILS II

F-503 FIRE PROTECTION DETAILS III

F-601 FIRE ALARM AND MNS DIAGRAM

P-001 PLUMBING LEGEND

P-101 PARTIAL FIRST FLOOR PLUMBING PLAN - PART A1 - PRESSURE PIPING

P-101A PARTIAL FIRST FLOOR PLUMBING PLAN - PART A1 - SANITARY PIPING

P-102 PARTIAL FIRST FLOOR PLUMBING PLAN - PART A2 - PRESSURE PIPING

P-102A PARTIAL FIRST FLOOR PLUMBING PLAN - PART A2 - SANITARY PIPING

P-103 PARTIAL FIRST FLOOR PLUMBING PLAN - PART A3 - PRESSURE PIPING

P-103A PARTIAL FIRST FLOOR PLUMBING PLAN - PART A3 - SANITARY PIPING

P-104 PARTIAL FIRST FLOOR PLUMBING PLAN - PART A4 - PRESSURE PIPING

P-104A PARTIAL FIRST FLOOR PLUMBING PLAN - PART A4 - SANITARY PIPING

P-105 PARTIAL FIRST FLOOR PLUMBING PLAN - PART B - PRESSURE PIPING

P-105A PARTIAL FIRST FLOOR PLUMBING PLAN - PART B - SANITARY/STORM PIPING

P-106 PARTIAL FIRST FLOOR PLUMBING PLAN - PART C - PRESSURE PIPING

P-106A PARTIAL FIRST FLOOR PLUMBING PLAN - PART C - SANITARY/STORM PIPING

P-107 SECOND FLOOR PLUMBING PLAN - PART C - PREESSURE PIPING

P-107A SECOND FLOOR PLUMBING PLAN - PART C - SANITARY/STORM PIPING

P-301 PLUMBING SECTIONS

P-401 PLUMBING ENLARGED PLANS

P-401A PLUMBING ENLARGED PLANS SANITARY

P-501 PLUMBING DETAILS

P-601 PLUMBING SCHEDULES

P-701 SANITARY RISERS

P-702 WATER RISERS

P-703 STORM RISERS

P-704 GAS RISER

INDEX OF DRAWINGS - VOLUME 2 OF 2

DRAWING ABBREVIATIONS

INDEX OF DRAWINGS SHEET LOGIC

MATERIALS

NUMBERING SYSTEM:

XX100

DISCIPLINE:

G - GENERAL

C - CIVIL

L - LANDSCAPE

S - STRUCTURAL

A - ARCHITECTURE

I - INTERIORS

F - FIRE PROTECTION

P - PLUMBING

M - MECHANICAL

E - ELECTRICAL

T - TELECOMMUNICATIONS

DISCIPLINE MODIFIER

GENERAL NOTES

A ---------------------

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AB ANCHOR BOLT

ACC ACCESSIBLE

ACS AUTOMATIC CONTROL SYSTEM

ACS DR ACCESS DOOR

ACS PNL ACCESS PANEL

ACT ACOUSTICAL CEILING TILE

ADA AMERICANS WITH DISABILITIES ACT

ADMIN ADMINISTRATION

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGGR AGGREGATE

AHU AIR HANDLING UNIT

AIB AIR INFILTRATION BARRIER

ALT ALTERNATE

ALUM ALUMINUM

ANOD ANODIZE

APC ACOUSTICAL PANEL CEILING

APPROX APPROXIMATE

AR AS REQUIRED

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

ASSY ASSEMBLY

ATC ACOUSTICAL TILE CEILING

AVG AVERAGE

AW ARCHITECTURAL WOODWORK

AWT ACOUSTICAL W ALL TREATMENT

B ---------------------

B LABEL CLASS B DOOR

BALC BALCONY

BB BASEBOARD

BC BOOKCASE

BD BOARD

BDRY BOUNDARY

BFF BELOW FINISH FLOOR

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BN BULLNOSE

BOS BOTTOM OF STEEL

BOT BOTTOM

BP BUILDING PAPER

BRKT BRACKET

BSMT BASEMENT

BTWN BETWEEN

BUR BUILT-UP ROOFING

C ---------------------

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

CAB CABINET

CATW CATWALK

CAV CAVITY

CBB CEMENTITIOUS (BACKER) BOARD

CD CONSTRUCTION DOCUMENTS

CDW CHILLED DRINKING WATER

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/

CONTRACTOR INSTALLED

CFE CONTRACTOR FURNISHED

EQUIPMENT

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CI CAST IRON

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLG DIFF CEILING DIFFUSER

CLG HT CEILING HEIGHT

CLL COLUMN LINE

CLO CLOSET

CLR COLOR

CLRM CLASSROOM

CMU CONCRETE MASONRY UNIT

CNDS CONDENSATE

CDR CARD READER

CO CLEANOUT

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONC FLR CONCRETE FLOOR

CONF CONFERENCE

CONT CONTINUE

COORD COORDINATE

CORR CORRIDOR

CP CONCRETE PIPE

CPT CARPET

CR CONTROL ROOM

CS CAST STONE

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTR CENTER

CU FT CUBIC FEET

CW CASEMENT W INDOW

D ---------------------

D DEPTH

D LABEL CLASS D DOOR

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

E ---------------------

E LABEL CLASS E DOOR

EA EACH

EF EACH FACE

EIFS EXTERIOR INSULATION AND

FINISH SYSTEM

EJ EXPANSION JOINT

ES EACH SIDE

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EWC ELECTRIC WATER COOLER

EXP EXPOSED

EXT EXTERIOR

EXT EXTINGUISHER

EXT GR EXTERIOR GRADE

F ---------------------

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FAS BD FASCIA BOARD

FC BRK FACE BRICK

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF INSUL FOIL BACKED INSULATION

FGL FIBERGLASS

FH FIRE HOSE

FHP FULL HEIGHT PARTITION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FM FACTORY MUTUAL

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FR FIRE RESISTANT

FRG FIBER REINFORCED GYPSUM

FRMG FRAMING

FRP FIBERGLASS REINFORCED PLASTIC

FRTW FIRE RETARDANT TREATED WOOD

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET

FTG FOOTING

FW C FABRIC WALLCOVERING

G ---------------------

G NATURAL GAS

GALV GALVANIZED

GB GRAB BAR

GFCI GOVERNMENT FURNISHED

CONTRACTOR INSTALLED

GFGI GOVERNMENT FURNISHED

GOVERNMENT INSTALLED

GFRG GLASS-FIBER-REINFORCED

GYPSUM

GLZ GLAZING

GR FL GROUND FLOOR

GUT GUTTER

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H ---------------------

HB HOSE BIBB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR

(FILTER)

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HORIZ HORIZONTAL

HP HUMAN PERFORMANCE AREA

HT HEIGHT

HYDR HYDRAULIC

I ---------------------

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J ---------------------

JAN JANITOR

K ---------------------

KPD KEYPAD

KIT KITCHEN

KPL KICKPLATE

L ---------------------

LAM LAMINATE

LAV LAVATORY

LBR LUMBER

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIB LIBRARY

LIN LINEAR

LKR LOCKER

LOC LOCATION

LT LIGHT

LVDR LOUVER DOOR

LVR LOUVER

M ---------------------

MACH RM MACHINE ROOM

MATL MATERIAL

MAX MAXIMUM

MC MOISTURE CONTENT

MD METAL DECK

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MEMB MEMBRANE

MF MILL FINISH

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM, MINUTE

MIRR MIRROR

MISC MISCELLANEOUS

MLDG MOLDING (MOULDING)

MO MASONRY OPENING

MOD MODIFY

MB MOISTURE BARRIER

MTG MOUNTING

MTL METAL

MVBL MOVABLE

MWP MEMBRANE WATERPROOFING

N ---------------------

N NORTH

NA NOT APPLICABLE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NP NO PAINT

NRC NOISE REDUCTI

O -------------------

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OFD OVERFLOW DRAIN

OFF OFFICE

OGL OBSCURE GLASS

OH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPQ OPAQUE

OWSJ OPEN WEB STEEL JOIST

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P --------------------

PA PUBLIC ADDRESS

PAR PARAPET

PAT PATTERN

PB PULL BOX

PBD PARTICLEBOARD

PCC PRECAST CONCRETE

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PH PHASE

PIL PILASTER

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLG PILING

PLYW D PLYWOOD

PNL PANEL

POLYISO POLYISOCYANURATE

PP PL PUSH/PULL PLATE

PR PAIR

PRCST PRECAST

PRKG PARKING

PS CONC PRESTRESSED CONCRETE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTDR PAPER TOWEL DISPENSER AND

RECEPTACLE

PTN PARTITION

PWR POWER

Q --------------------

QT QUARRY TILE

QTY QUANTITY

R --------------------

R & T REHABILITATION AND TRAINING

RB RESILIENT BASE

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REINFORCED CONCRETE

RCP REFLECTED CEILING PLAN

RD/OD ROOF DRAIN / OVERFLOW DRAIN

RDG INS RIGID INSULATION, SOLID

REC RECESSED

REC ROOM RECREATION ROOM

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

REST RESTROOM

RF RESILIENT FLOORING

RFG ROOFING

RH ROOF HATCH

RHR RIGHT HAND REVERSE

RL ROOF LEADER

RLG RAILING

RM ROOM

RO ROUGH OPENING

RSD ROLLING STEEL DOOR

RV ROOF VENT

RVL REVEAL

REVISION TAG

NORTH ARROW w/

TRUE NORTH

INDICATION

ROOM NAME/NUMBER

ELEVATION NUMBER

SECTION

EXTERIOR ELEVATION

NUMBER

SPOT ELEVATION

REFERENCE LEVEL

SHEET NUMBER

SHEET NUMBER

SHEET NUMBER

A SHEET KEYNOTE

INTERIOR ELEVATION SYMBOL

SHEET NUMBER

N

S --------------------

SB SPLASH BLOCK

SCHED SCHEDULE

SD SMOKE DETECTOR

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGL SINGLE

SHT MTL SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SKLT SKYLIGHT

SLNT SEALANT

SMK SMOKE

SMLS SEAMLESS

SP EL SPOT ELEVATION

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SST STAINLESS STEEL

ST STAIRS

STD STANDARD

STL JST STEEL JOIST

STL RF DK STEEL ROOF DECK

STOR STORAGE

STR STRINGERS

STRB/HRN STROBE/HORN

SUB FL SUBFLOOR

SV SHEET VINYL

SW SIDEWALK

T --------------------

T TREAD

T/S TUB/SHOWER

TC TERRA COTTA

TD TRENCH DRAIN

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TFF TOP OF FINISH FLOOR

THK THICKNESS

TK BD TACKBOARD

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TOF TOP OF FOOTING

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOPO TOPOGRAPHY

TOS TOP OF SLAB

TRANS TRANSOM

TRTD TREATED

TV TELEVISION

TYP TYPICAL

U --------------------

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER LABORATORIES

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SYSTEM

V --------------------

VAV VARIABLE AIR VOLUME/UNIT

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VTR VENT THRU ROOF

W --------------------

W/ WITH

WC WATER CLOSET

WD WOOD

WDW WINDOW

W/O WITHOUT

WWF WELDED W IRE FABRIC

X ---------------------

XFMR TRANSFORMER

SHEET NUMBER WITHIN SERIES

ROOM NAME

11' - 4"

1. THESE LEGENDS ARE COMPOSED OF STANDARD SYMBOLS AND ARE PERTINENT TO THE

CONDITIONS ON THIS SET OF DRAWINGS TO THE EXTENT APPLICABLE.

2. ADDITIONAL LEGENDS AND/OR ABBREVIATIONS MAY APPEAR IN THIS SET OF DRAWINGS TO

INDICATE SPECIFIC CONDITIONS IN LIEU OF SYMBOLS SHOWN ON THIS SHEET.

3. REFER TO SHEET A-701 FOR CODE ANALYSIS, SHEET A-702 FOR FIRST FLOOR LIFE SAFETY PLAN, AND SHEET A-703 FOR SECOND FLOOR LIFE SAFETY PLAN.

SYMBOLS

EXTERIOR ELEVATION SYMBOL

SECTION SYMBOL

CALLOUT SYMBOL

PLAN, BLOW UP

DETAIL NUMBER

VIEW TITLE BAR

VIEW NAME

SCALE: 1/2" = 1'-0"1

SCALE BAR

164 8268

SCALE: 1/8"=1'-0"

ELEVATION SYMBOL

LEVEL SYMBOL

MATCHLINE INDICATOR

GENERAL SYMBOLS

NAME

ELEVATION

MATCHLINE

CENTERLINE INDICATOR

GRID/COLUMN LINE DESIGNATOR0

EARTH

SAND

CONCRETE/PRECASE CONCRETE

STONE

BRICK

CMU

RIGID INSULATION

GYPSUM BOARD, PLASTER

EIFS

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I

D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\roldach\Documents\8471_SOF Human Performance Center_A18_roldach@clarknexsen.com.rvt

7/22/2020 7:32:44 AM

G-003

G E

N E

R A

L N

O T

E S

A

B B

R E

V

IA

T

IO

N S

F O

R T

B R

A G

G

N O

R T

H C

A R

O L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D A

R L

IN

G

T O

N A

V E

C L

A R

K N

E X

S E

N

M

A

IN

S T

R E

E T

S U

IT

E

A

J E

N K

IN

S

R

O L

D A

C H

A

J E

N K

IN

S

W

C O

O P

E R

/J U

L /2

W

P M

-2

-R -0

S O

F H

U M

A N

P L

A T

F O

R M

-F O

R C

E G

E N

E R

A T

IO

N

F

O R

G E

F

A C

IL

IT

Y

P N

G -0

.p d

LOCATION

STATIC PRESSURE: 48 PSI

RESIDUAL PRESSURE: 46 PSI

FLOW: 699 GPM

P R

E S

S U

R E

P

S I)

FLOW RATE (GPM)

50MOSBY ST.

TEST TIME 0930 HRS

TEST HYDRANT 3458

FLOW HYDRANT 3461

TEST DATE 20 NOV 2019

FIRE FLOW TEST DATA

FLOW AT 20 PSI: 2908 GPM

FIRE PROTECTION SYMBOL LEGEND

SYMBOL ITEM

UNION

REDUCER

WALL MTD FIRE DEPT CONN

GLOBE VALVE

GATE VALVE

BALL VALVE

TEE, OUTLET TURNED UP

ELBOW, 90°, OUTLET TURNED UP

ELBOW, 90° OUTLET TURNED DOWN

TEE, OUTLET TURNED DOWN

SPRINKLER RISER

INSPECTOR'S TEST CONNECTION

FIRE PUMP CONTROL PANEL

JOCKEY PUMP CONTROL PANEL

FPCP

JPCP

TEST HEADER

CHECK VALVE

ALARM CHECK VALVE

TC

SPRINKLER, UPRIGHT ON SPRIG WITH GUARD

SPRINKLER, UPRIGHT ON SPRIG

SPRINKLER, PENDANT ON DROP

SPRINKLER, UPRIGHT

SPRINKLER, HORIZONTAL SIDEWALL

SPRINKLER, HORIZONTAL SIDEWALL WITH GUARD

LH LIGHT HAZARD SPRINKLER CLASSIFICATION

OH ORDINARY HAZARD SPRINKLER CLASSIFICATION

Light

Design 0.1/1500

K-factor 5.6

0.1/1500

5.6

0.2/2500

11.2

0.2/3500 0.2/250 0.2/3500

11.2 11.2 11.2

12 @ 7 psi

25.2

N/A

N/A

Ordinary

Extra

Design

K-factor

Design

K-factor

0.2/2500 0.2/3500

8.0 8.0

0.2/2500 0.2/3500

11.2 11.2

0.2/2500 0.2/3500

11.2 11.2

0.3/2500 0.3/3500

11.2 11.2

0.3/3600 0.3/4600

11.2 11.2

0.5/3000 0.5/4000

11.2 11.2

12 @ 7 psi

25.2

12 @ 7 psi

25.2

N/A

N/A

N/A

N/A

Wet Dry Wet Dry Wet Dry Wet Dry

Note:

1. For Ceiling heights > 60 feet, the design demand is based on the number of sprinklers at an end sprinkler pressure (i.e. 12 sprinklers at 7 psi end pressure).

2. All areas not indicated as Ordinary or Extra Hazard are Light Hazard.

Hazard Classification

Ceiling height up to 30 ft Ceiling height > 30 - 45 ft

Ceiling height > 45 - 60 ft

Ceiling height > 60 - 100 ft

SPRINKLER DESIGN DEMAND AND MINIMUM K-FACTOR

Light

Ordinary

Extra

Hazard Category Ceilings 60 ft or less Ceilings greater than 60 ft Duration, min

500 60

Hose Demand, gpm

HOSE STREAM DEMAND AND DURATION

FIRE PUMP

JOCKEY PUMP

SYSTEM HP VOLT/PHASE

480/3

480/3

MOTOR

FIRE PUMP SCHEDULE

FLOW RATE

GPM

RPM

PRESSURE

PSI

HORIZONTAL

SPLITCASE

MULTISTAGE

OR

REGENERATIVE

TURBINE

TYPE

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:49:47 AM

F-001

F

IR

E P

R O

T E

C T

IO

N

L E

G E

N D

A N

D G

E N

E R

A L

N O

T E

S

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -0

.p d f

FIRE PROTECTION GENERAL NOTES

1 THE HUMAN PERFORMANCE TRAINING CENTER SHALL BE PROTECTED BY AN AUTOMATIC WET PIPE SPRINKLER SYSTEM DESIGNED AND INSTALLED IN ACCORDANCE WITH UFC 3-600-01 (CHANGE 3, DATED 20 MAY 2019) AND THE ADDITIONAL

STANDARDS AND CRITERIA REFERENCED THERE-IN.

2 THE SPRINKLER SYSTEM DESIGN DENSITY, AREA OF OPERATION, AND HOSE STREAM ALLOWANCE SHALL BE AS REQUIRED

BY SECTION 9-7 OF UFC 3-600-01 (CHANGE 3, DATED 10 MAY 2019).

3 BACKFLOW PREVENTER ASSEMBLIES SHALL BE REDUCED-PRESSURE ZONE TYPE AND SHALL BE LOCATED OUTSIDE OF THE BUILDING WITHIN HEATED ENCLOSURES. OLD NORTH UTILITIES SERVICES (O.N.U.S.) SHALL PROVIDE THE BACKFLOW PREVENTER ASSEMBLIES AND THEIR ASSOCIATED TAMPER SWITCHES AS WELL AS THE HEATED ENCLOSURE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE ALARM CIRCUITS TO CONNECT THE TAMPER SWITCHES TO THE FIRE ALARM CONTROL PANEL (FACP), AS WELL AS THE 120 VOLT POWER CIRCUIT TO THE HEATERS.

4 THE POST INDICATOR VALVE (PIV) AND ITS ASSOCIATED TAMPER SWITCH SHALL BE PROVIDED BY O.N.U.S. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING THE ALARM CIRCUIT TO CONNECT THE TAMPER SWITCH TO THE

FACP.

5 ACTIVATION OF THE FLOW SWITCH SHALL RESULT IN ACTIVATION OF THE BUILDING GENERAL EVACUATION ALARM AND THE TRANMISSION OF AN ALARM SIGNAL TO THE BASE MONITORING STATION. ACTIVATION OF A TAMPER SWITCH SHALL RESULT IN A SUPERVISORY SIGNAL AT THE FACP AND THE TRANSMISSION OF A SUPERVISORY SIGNAL TO THE BASE MONITORING

STATION.

6 PROVIDE AUXILIARY DRAINS FOR ALL TRAPPED PIPING. AUXILIARY DRAIN LINES SHALL BE PROVIDED WITH SIGNS AS REQUIRED BY NFPA 13, AND SHALL BE PIPED TO THE BUILDING EXTERIOR OR TO AN APPROPRIATELY SIZED BUILDING DRAIN.

7 SPRINKLERS IN FINISHED AREAS SHALL BE SEMI-RECESSED, WHITE PENDANT TYPE HEADS WITH WHITE ESCUTCHEONS.

8 SPRINKLERS IN UNFINISHED AREAS SHALL BE BRASS FINISH UPRIGHT TYPE HEADS.

9 SEE PLATE M-001 FOR ADDITIONAL SYMBOLS AND GENERAL NOTES.

10 SOME SYMBOLS INDICATED ON THIS LEGEND PLATE MAY NOT APPEAR ON THE DRAWINGS.

11 SEISMICALLY PROTECT THE SYSTEM PIPING AGAINST DAMAGE FROM EARTHQUAKES. THIS REQUIREMENT IS NOT SUBJECT TO DETERMINATION UNDER NFPA 13. INSTALL THE SEISMIC PROTECTION OF THE SYSTEM PIPING IN ACCORDANCE WITH UFC

3-600-01 AND NFPA 13.

A AMPERE

AFF ABOVE FINISHED FLOOR

C CONDUIT

COR CONTRACTING OFFICER'S REPRESENTATIVE

CU COPPER

FAMNSCP FIRE ALARM AND MASS NOTIFICATION SYSTEM

CONTROL PANEL

GFCI GOVERNMENT FURNISHED, CONTRACTOR INSTALLED

FADS FIRE ALARM AND DETECTION SYSTEM

FEB FIRE EXTINGUISHER BRACKET

FEC FIRE EXTINGUISHER CABINET

HZ HERTZ

IDS INTRUSION DETECTION SYSTEM

LED LIGHT EMITTING DIODE

MFR MANUFACTURER

MH MOUNTING HEIGHT

MNS MASS NOTIFICATION SYSTEM

NEC NATIONAL ELECTRICAL CODE

NO. NUMBER

PAF PAINTED AFTER FABRICATION

PIR PASSIVE INFRARED

R/W RACEWAY

SPD SURGE PROTECTIVE DEVICE

TR TRANSFORMER

TVSS TRANSIENT VOLTAGE SURGE SUPRESSOR

TYP TYPICAL

UL UNDERWRITERS LABORATORY

UOI UNLESS OTHERWISE INDICATED

UON UNLESS OTHERWISE NOTED

V VOLT

W, WP WEATHERPROOF

1. ALL FIRE ALARM AND MASS NOTIFICATION CONDUIT SHALL BE

FACTORY COATED RED.

2. CONDUITS SHALL BE CONCEALED IN CEILINGS AND WALLS.

3. MOUNT OUTLET BOXES SO THAT NONE OCCUR BACK TO BACK IN

WALLS.

4. SEAL PENETRATIONS THROUGH FLOORS OR FIRE WALLS TO

MAINTAIN THE INTEGRITY OF THE FIRE AND ACOUSTIC RATINGS OF

THE WALLS AND FLOORS.

5. RACEWAYS CROSSING STRUCTURAL EXPANSION JOINTS OR

SEISMIC JOINTS SHALL BE PROVIDED WITH SUITABLE EXPANSION

FITTINGS OR OTHER SUITABLE MEANS TO COMPENSATE FOR THE

BUILDING EXPANSION AND CONTRACTION AND TO PROVIDE FOR

CONTINUITY OF GROUNDING.

FIRE DETECTION AND MASS NOTIFICATION SYMBOLS

FIRE ALARM GENERAL NOTES

ABBREVIATIONS

MANUAL PULL STATION.

SPEAKER - CEILING MOUNTED

SPEAKER/STROBE W/CANDELA - CEILING MOUNTED

SPEAKER - WALL MOUNTED

WHERE PRESENT, 'WP' INDICATES WEATHERPROOF

SPEAKER/STROBE W/CANDELA - WALL MOUNTED

STROBE W/CANDELA RATING - WALL MOUNTED.

SMOKE DETECTOR, CEILING MOUNTED, WHITE.

CARBON MONOXIDE DETECTOR

DUCT SMOKE DETECTOR.

SPRINKLER SYSTEM FLOW SWITCH.

SPRINKLER SYSTEM TAMPER SWITCH.

FIRE ALARM CONTROL PANEL.

MASS NOTIFICATION SYSTEM AUTONOMOUS CONTROL UNIT

FIRE ALARM TRANSMITTER

MASS NOTIFICATION REMOTE TERMINAL UNIT

FIRE ALARM REMOTE ANNUNCIATOR PANEL, RECESS FLUSH MOUNTED.

MASS NOTIFICATION SYSTEM "LOCAL OPERATOR CONSOLE", RECESS FLUSH

MOUNTED.

MASS NOTIFICATION LED TEXT SIGN

FIRE ALARM CONTROL INTERFACE

FIRE ALARM MONITOR MODULE

FIRE PUMP RUNNING

FIRE PUMP POWER FAILURE

FIRE PUMP PHASE REVERAL

SURGE SUPPRESSION

FACP

NOTES, FIRE ALARM & MASS NOTIFICATION SYSTEM SEQUENCE OF OPERATION:

1A. SUBSEQUENT ACTUATION OF OTHER INITIATING DEVICES OR SUPERVISORY SIGNALS AFTER THE INITIAL ALARM OR SUPERVISORY SIGNAL HAS BEEN

SILENCED SHALL CAUSE THE NOTIFICATION APPLIANCES TO REACTIVATE.

1B. IF AN AUDIBLE TROUBLE SIGNAL HAS BEEN SILENCED, IT SHALL COMPLY WITH THE FOLLOWING:

i. THE AUDIBLE TROUBLE SHALL RE-SOUND EVERY 24 HOURS OR LESS UNTIL FAULT CONDITIONS ARE RESTORED TO NORMAL.

ii. THE RE-SOUNDED AUDIBLE TROUBLE SIGNAL SHALL SOUND UNTIL IT IS MANUALLY SILENCED OR ACKNOWLEDGED.

iii. THE RE-SOUNDED AUDIBLE TROUBLE SIGNAL SHALL ALSO BE AUTOMATICALLY RETRANSMITTED TO THE BASE FIRE DEPARTMENT.

1C. WHEN THE SILENCE SWITCH IS LEFT IN THE "OFF" POSITION AND THERE IS NO ALARM, SUPERVISORY, OR TROUBLE SIGNAL, AN AUDIBLE TROUBLE SIGNAL AND A VISUAL INDICATOR SHALL BE ACTIVATED UNTIL THE SWITCH IS RESTORED TO ITS NORMAL POSITION.

2. THE MASS NOTIFICATION SYSTEM SHALL TEMPORARILY INTERRUPT THE FIRE ALARM AUDIBLE MESSAGE AND VISUAL NOTIFICATION APPLIANCES DURING SIMULTANEOUS FIRE AND MASS EVACUATION EVENTS. ALL OTHER FEATURES OF THE FIRE ALARM SYSTEM SHALL FUNCTION PROPERLY.

DURING THE INTERRUPTION OF THE FIRE ALARM AUDIBLE AND VISUAL SIGNALS, A DISTINCT SUPERVISORY SIGNAL SHALL BE ANNUNCIATED (BOTH AUDIBLY AND VISUALLY) AT THE FACP (AND REMOTE FIRE ALARM ANNUNCIATORS) AND SHALL BE TRANSMITTED TO THE CENTRAL FIRE ALARM SYSTEM.

3. DUCT DETECTORS IN ALARM MODE SHALL CAUSE THE AIR HANDLER UNIT PROTECTED BY THE DETECTOR TO SHUT DOWN AND SHALL CAUSE THE ASSOCIATED SMOKE DAMPERS TO CLOSE. OTHER AIR HANDLERS PROTECTED BY NON-ALARMED DUCT DETECTORS SHALL REMAIN IN OPERATION.

D

IS

P L A

Y M

E S

S A

C E

O N

F A

C P

D

IS

P L A

Y M

E S

S A

G E

O N

F

IR

E A

L A

R M

A N

N U

N C

IA

T

O R

R E

C O

R D

E V

E N

T I N

T H

E H

IS

T

O R

Y L

O G

T R

A N

S M

IT

A

L A

R M

T O

C E

N T

R A

L F

IR

E

A L A

R M

S Y

S T

E M

T R

A N

S M

IT

S

U P

E R

V

IS

O R

Y S

IG

N

A L T

O C

E N

T R

A L F

IR

E

A L A

R M

S Y

S T

E M

T R

A N

S M

IT

T

R O

U B

L E

S

IG

N A

L T

O C

E N

T R

A L F

IR

E

A L A

R M

S Y

S T

E M

A C

T

IV

A T

E F

IR

E

A L A

R M

/M N

S

S

T R

O B

IL

U

M

IN

A T

E L

E D

S

IG

N

"A

N N

O U

N C

E M

E N

T

IL

L U

M

IN

A T

E L

E D

S

IG

N

"E

V A

C U

A T

E T

B R

O A

D C

A S

T F

IR

E

A L A

R M

M E

S S

A G

E

D

IS

P L A

Y

F

IR

E

A L A

R M

T R

O U

B L E

S

IG

N A

L

B R

O A

D C

A S

T R

E C

O R

D E

D O

R L

IV

E

M A

S S

N O

T

IF

IC

A

T

IO

N M

E S

S A

G

U T

D O

W N

P R

O T

E C

T E

D A

IR

-H

A N

D L

IN

G U

N

IT

(S

(N O

T E

E L E

V A

T O

R R

E C

A L L

P

R

IM

A R

Y F

L O

O R

F

IR

S

T F

L O

O R

E L E

V A

T O

R R

E C

A L L

S

E C

O N

D A

R Y

F L O

O R

S

E C

O N

D F

L O

O R

C O

N T

IN

U

O U

S L Y

I L L U

M

IN

A T

E F

IR

E

F

IG

H T

E R

S E

R V

IC

E

L

IG

H T

I N

E L E

V A

T O

R C

A B

F L A

S H

F

IR

E F

IG

H

T E

R S

E R

V

IC

E I N

D

IC

A T

O R

I N

E L E

V A

T O

R C

A B

S H

U N

T -T

R

IP

D

IS

C O

N N

E C

T O

F E

L E

V A

T O

R E

Q U

IP

M

E N

T

C L O

S E

F

IR

E R

A T

E D

S H

U T

T E

R

MANUAL FIRE ALARM PULL STATION

SPRINKLER WATER FLOW SWITCH - ELEVATOR EQUIPMENT ROOM

SPRINKLER WATER FLOW SWITCH - OTHER

SPRINKLER VALVE TAMPER SWITCH AND PIV

SMOKE DETECTOR - ELEVATOR EQUIPMENT ROOM

SMOKE DETECTOR - FIRST FLOOR ELEVATOR LOBBY

SMOKE DETECTOR - SECOND FLOOR ELEVATOR LOBBY

SMOKE DETECTOR - FIRST FLOOR ELECTRICAL ROOM

SMOKE DETECTOR - FIRE RATED SHUTTER

DUCT SMOKE DETECTOR

FACP TROUBLE

FACP SILENCE SWITCH (NOTES 1A, 1B, AND 1C)

MNS ACTIVATION (NOTE 2)

FIRE PUMP RUNNING, POWER FAILURE, PHASE REVERSAL, OR CONTROLLER

CONNECTED TO ALTERNATE SOURCE

FAAP

LOC

P

LED

CO

CI

CM

PR

PF

PH

SS

ACU

TRANS

RTU

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:49:47 AM

F-002

F

IR

E A

L A

R M

L E

G E

N D

A N

D O

P E

R A

T

IO

N S

M A

T R

IX

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -0

.p d

ELEC

EQUIPMENT

101M

MECHANICAL

A1/F-101

A1/F-103

A /F

-1

A /F

-1

A /F

-1

A /F

-1

OH

OH

OH

OH

WP

WP

LED

EQUIPMENT

101L

FORKLIFT

101K

HUMAN

PERFORMANCE

EQUIPMENT

101N

EQUIPMENT

101P

JAN

101Q

WP

OH

OH

OH

OH

OH

AHU-1

ERV-1

LE

D

LOC

P1 P2 P3 P4 P5 P6

PE

PF

PG

PH

PE.8

PE.2

PD.9

PF.1

PF.6

PG.4

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:49:49 AM

F-101

P A

R T

IA

L F

IR

S

T F

L O

O R

F

IR

E P

R O

T E

C T

IO

N

P L A

N

P A

R T

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -1

.p d f

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A1

A1 A2

A3 A4

CB

N

KEY PLAN

GRAPHIC SCALE(S)

164 8268

SCALE: 1/8"=1'-0"

GENERAL SHEET NOTES

1 SEE SHEETS F-001 AND F-002 FOR GENERAL NOTES

HUMAN

PERFORMANCE

A1/F-102

A1/F-104

SUPPLY

101J

RECOVERY

101H

A /F

-1

A /F

-1

A /F

-1

A /F

-1

75 75

OH

WP

WP

STAFF

101G

LED

LE

D

OH

LH

LH

P6 P7 P8 P9 P10 P11 P12

PE

PF

PG

PH

P13

PE.8

PE.2

PD.9

PF.1

PD.5

PF.6

PG.4

P10.6 P11.1

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:49:52 AM

F-102

P A

R T

IA

L F

IR

S

T F

L O

O R

F

IR

E P

R O

T E

C T

IO

N

P L A

N

P A

R T

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -1

.p d f

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A2

A1 A2

A3 A4

CB

KEY PLAN

GRAPHIC SCALE(S)

164 8268

SCALE: 1/8"=1'-0"

GENERAL SHEET NOTES

A1/F-101

A1/F-103

A1/F-103

A1/F-105

A /F

-1

A /F

-1

OH

WP

LED

P1 P2 P3 P4 P5 P6

PC

PD

PBPA

PD.5

PC.6

PB.9

PB.3

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:49:53 AM

F-103

P A

R T

IA

L F

IR

S

T F

L O

O R

F

IR

E P

R O

T E

C T

IO

N

P L A

N

P A

R T

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -1

.p d f

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A3

A1 A2

A3 A4

CB

KEY PLAN

GRAPHIC SCALE(S)

164 8268

SCALE: 1/8"=1'-0"

GENERAL SHEET NOTES

SUPPLY

101D

CORRIDOR

A1/F-102

A1/F-104

OFFICE

101B

OFFICE

101A

A /F

-1

A /F

-1

HUMAN

PERFORMANCE

A1/F-104

A1/F-106

A1/F-104

A1/F-105

75 75 110

OH

OH

OH

ELEC

101C

R

R

NIPRNET TR

101E

COMMERCIAL TR

101F

OH

OH

LH

LH

LOC

P6 P7 P8 P9 P10 P11 P12

PC

PD

PB

PA

P13

PD.5

PC.6

PB.9

PB.3

4.1

P10.6 P11.1

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:49:56 AM

F-104

P A

R T

IA

L F

IR

S

T F

L O

O R

F

IR

E P

R O

T E

C T

IO

N

P L A

N

P A

R T

A

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -1

.p d f

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - PART A4

A1 A2

A3 A4

CB

KEY PLAN

GRAPHIC SCALE(S)

164 8268

SCALE: 1/8"=1'-0"

GENERAL SHEET NOTES

SHEET KEYNOTES

N

1 FIRE ALARM RELAY FOR FIRE CURTAIN CLOSURE

2 SMOKE DETECTOR FOR FIRE CURTAIN CLOSURE

SPORTS SCIENCE

LAB

102E

WOMEN

MEN

LOCKERS

117A

WC

119A

SHOWERS

119B

LOCKERS

119C

SHOWERS

117B

JAN

LACTATION ROOM

SUPPLY

102EB

LAUNDRY/ICE

102EA

A1/F-105

A1/F-103

A1/F-105

A1/F-103

A /F

-1

A /F

-1

1515 15

WP

WP

WP

WP

WP

WP WP

WP

WP

WP

WP

OH

OH

WP

WP

SUPPLY

102EC

WP

OH OH

LED CORRIDOR

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LE

D

P1 P2 P3 P4 P5 P6 P7 P8

G.1

A.4

4.1

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:50:19 AM

F-105

P A

R T

IA

L F

IR

S

T F

L O

O R

F

IR

E P

R O

T E

C T

IO

N

P L A

N

B

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -1

.p d f

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - B

A1 A2

A3 A4

CB

KEY PLAN

GRAPHIC SCALE(S)

164 8268

SCALE: 1/8"=1'-0"

GENERAL SHEET NOTES

N

1 SEE SHEETS F-001 AND F-002 FOR GENERAL NOTES

SHEET KEYNOTES

5 PROVIDE CORROSION RESISTANT SPRINKLERS IN THIS AREA

9 10 11 12 13

B

C

D

E

G

H

I

K

L

M

FIRE PUMP

PHYSICAL

THERAPY

COMMERCIAL TR

CLASSROOM

TEST

NIPRNET TR

OFFICE

110A

OFFICE

110B

RECEP/WAIT

CLASS/BREAK

MEN

WOMEN

STAIR 2

MECHANICAL

SEC/AV TR

BEHAVIORAL

HEALTH

STAIR 1

CLASSROOM

ELEC

TREATMENT/

LASER

102B

ENTRY

LOBBY

CORRIDOR

CORRIDOR

CORRIDOR

CORRIDOR

JAN

STAFF

102C

VENDING

135A

OFFICE

113A

OFFICE

113B

OFFICE

113C

OFFICE

113DOFFICE

113E

OFFICE

113F

RECORDS

113H

OFFICE

102A

OFFICE

113G

MR

A1/F-104

A1/F-106

A /F

-1

A /F

-1

15 30

30 30

15 1515

30 30

OH

OH

OH

OH

OH OH

OH

OH

OH

F-501

A1

FACP

WP

WP

WPWPWP

LE

D

LE

D

LED LED LED

FAAPLOC

WP

LH

LH

LH

LH

LH

LH

LH

LH LH

LH LH

LH

LH

LH LH

LHLH

LH LH

LH

LH

LH

LH

LH

LH

LH

LH

LH LH

OH

OH

RECYCLING

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CM

CMCM

ERV-2

LED

AHU-2

LED

P9 P10 P11 P12 P13

G.1

A.4

P10.6

CI

CO

CO

SS

TRANS

ACU

RTU

PH PF

PR

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:50:22 AM

F-106

P A

R T

IA

L F

IR

S

T F

L O

O R

F

IR

E P

R O

T E

C T

IO

N

P L A

N

C

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -1

.p d f

SCALE: 1/8" = 1'-0"

A1

PARTIAL FIRST FLOOR FIRE PROTECTION PLAN - C

A1 A2

A3 A4

CB

KEY PLAN

GRAPHIC SCALE(S)

164 8268

SCALE: 1/8"=1'-0"

GENERAL SHEET NOTES

SHEET KEYNOTES

N

4 PIV TAMPER SWITCH. CONTRACTOR RESPONSIBLE FOR

LABOR TO WIRE TAMPER SWITCH.

1 SEE SHEETS F-001 AND F-002 FOR GENERAL NOTES

3 TAMPER SWITCH FOR KNOX BOX SUPERVISION.

6 ELEVATOR SPRINKLER PROTECTION FLOW/TAMPER SWITCH

SEE DETAIL D5 SHEET F-502.

7 FIRE ALARM CONTROL INTERFACE FOR CLASSROOM A/V

INTERRUPTION.

8 CONTRACTOR TO PROVIDE 120V CIRCUIT FOR THE

HEATERS WITHIN THE BACKFLOW PREVENTER ENCLOSURE

AND FIRE ALARM CIRCUITS TO CONNECT THE BACKFLOW

PREVENTER VALVE TAMPER SWITCHES AND LOW-

TEMPERATURE WARNING SWITCH TO THE FIRE ALARM

CONTROL PANEL.

BACKFLOW PREVENTER, ENCLOSURE, AND TAMPER

SWITCHES TO BE PROVIDED BY ONUS.

9 SURGE SUPPRESSION FOR SLC CIRCUIT LEAVING BUILDING.

18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

B

C

D

E

G

M

MECHANICAL

OBSERVATION

213F

NIPRNET TR

RACKS

BREAK

MEN

WOMEN

STAIR 2

ELEC

STAIR 1

HUMAN

DYN./PERFORM.

CONFERENCE

204A

DIRECTOR

204C

OFFICE

213A

INTERVIEW

213C

INTERVIEW

213D

INTERVIEW

213E

INTER-PERS.

JAN

SYNTHETIC

TRAINING

PROGRAM

DIRECTOR

211A

LEAD

211B

MASTERY

211C

COGNIT-PERF.

MASTERY

211D

MASTERY

211E

CONTROL

205B

CORRIDOR

CORRIDOR

CORRIDOR

DEPUTY

DIRECTOR

204D

NCOIC

204B

COMMERCIAL TR

AIR

205A

PROGRAM

DIRECTOR

213B

RECYCLING

151515

OHOH

OH OH

OH

OH

OH

OH

OH

LED

LED

LH

LH

LH

LH

LH

LH

LH

LH

LH LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

LH

ERV-3

AHU-3

LOC

G.1

A.4

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:50:24 AM

F-107

S E

C O

N D

F L O

O R

F

IR

E P

R O

T E

C T

IO

N

P L A

N

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -1

.p d f

SCALE: 1/8" = 1'-0"

A1

SECOND FLOOR FIRE PROTECTION PLAN

N

A1 A2

A3 A4

CB

GRAPHIC SCALE(S)

164 8268

SCALE: 1/8"=1'-0"

GENERAL SHEET NOTES

FROM FIRE

DEPARTMENT

CONNECTION

TO HEADER IN

VALVE ROOM

AUTOMATIC DRIP CHECK

DRAIN

/2

/4

CONCRETE FLOOR SLAB

RIGID INSULATION

RADON / VAPOR BARRIER

CAPILLARY WATER BARRIER

FINISHED FLOOR

ELASTOMERIC SEALANT. MINIMUM 1/2" THICKNESS.

GRAVEL FILL

THRUST

RESTRAINT

RODS

M

IN

M

IN

PIPE SLEEVE

A3

F-501

C3

F-501

THRUST BLOCK. REFER TO SHEET FX503 FOR

DETAILS REGARDING THRUST BLOCK

MATERIALS AND SIZING.

F

IR

E P

U M

P

R

O O

M W

A L L

THRUST

RESTRAINT

RODS

A SINGLE-PIECE IN-BUILDING RISER SHALL BE ALLOWED IN LIEU OF THE CONVENTIONAL

PIPING AND THREADED RESTRAINING RODS.

' D

E M

A R

C A

T

IO

N L

IN

E

CONTRACTOR PIPING W/ THRUST RESTRAINT RODS

NOTE:

O.N.U.S PIPING

C3

F-501

7 8 7

TO SECOND

FLOOR

SPRINKLERS

TO FIRST

FLOOR HPC

SPRINKLERS

(AREAS A1-A4)

TO FIRST

FLOOR R&T

SPRINKLERS

(AREAS B&C)

TO

FDC

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:51:05 AM

F-501

F

IR

E P

R O

T E

C T

IO

N

D E

T A

IL

S

I

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -5

.p d f

NTS

E1

CHECK VALVE WITH AUTOMATIC

DRIP ACCESSORIES (TYP.)

NTS

E7

RISER PENETRATION THROUGH SLAB ON GRADE (TYP.)

NTS

A1

FIRE PUMP ROOM

NTS

A6

FIRE SYSTEM RISER DETAIL (TYP.)

NTS

A3

FIRE PUMP ROOM SECTION

NTS

C3

SPRINKLER RISER SECTION

FIRE PUMP - 750 GPM, 50 PSI ELECTRIC HORIZONTAL SPLIT CASE

FIRE PUMP CONTROLLER

JOCKEY PUMP

JOCKEY PUMP CONTROLLER

FIRE PUMP TEST HEADER

WATERFLOW ALARM BELL

CONTROL VALVE W/ TAMPER SWITCH

CHECK VALVE

OS&Y GATE VALVE W/ TAMPER SWITCH

FLOW METER

FIRE PUMP TEST HEADER

FIRE DEPARTMENT CONNECTION

RISER CHECK VALVE W/ FLOW SWITCH

MAIN DRAIN

EQUIPMENT IDENTIFICATION

RETAINER STRAP

HANGER RING

3/8" A.T.R. FOR 1" - 4" PIPE

L E

N G

T H

S E

E P

L A

N R

O D

TOP BEAM

CLAMP

RETAINER CLIP

RETAINER CLIP IS DESIGNED TO RESTRICT THE UPWARD

MOVEMENT OF PIPE THAT COMMONLY OCCURS DURING

SPRINKLER HEAD ACTIVATION OR SEISMIC ACTIVITY.

45º ELBOW

BUILDING EXTERIOR WALL

PROVIDE WALL SLEEVE AND

SEAL PER SPECIFICATIONS

PROVIDE 2' x 2' CONCRETE

SPLASH BLOCK IF OUTLET DOES

NOT DISCHARGE OVER PAVED

AREA

ELEVATOR

CAB

SD

SD

SD

FS

TEST

NO MORE THAN 24" ABOVE

PIT FLOOR

ELEVATOR LOBBY

ELEVATOR LOBBY

MACHINE ROOM

HYDRAULIC

PIPING

NOTE : ROUTE TEST CONNECTION PIPING TO A FLOOR DRAIN THAT CAN ACCEPT FULL FLOW OR WHERE WATER MAY BE DISCHARGED WITHOUT PROPERTY DAMAGE.

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:51:05 AM

F-502

F

IR

E P

R O

T E

C T

IO

N

D E

T A

IL

S

I I

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -5

.p d f

NTS

A1

PIPE HANGER DETAIL (TYP.)

NTS

A3

END OF LINE RESTRAINT (TYP.)

NTS

D1

DRAIN PENETRATION THROUGH EXTERIOR WALL (TYP.)

NTS

D5

DIRECT PLUNGER HYDRAULIC ELEVATOR DETAIL

REQUIRED AREA IS BASED ON A TEST PRESSURE OF 150

PSI AND A SOIL BEARING CAPACITY OF 3,000 POUNDS PER

SQUARE FOOT (PSF).

SHEET.

3. "C" DIMENSIONS SHALL BE AS NOTED OR LARGE ENOUGH TO MAKE

ANGLE O EQUAL TO OR LARGER THAN 45°.

4. ANGLE O SHALL BE EQUAL TO OR SMALLER THAN 45°.

1. WHERE A HORIZONTAL BEND IS MADE, THE PIPING SHALL BE

RESTRAINED BY MEANS OF A THRUST BLOCK AS DETAILED ON THIS

2. "A","B" AND "D" DIMENSIONS SHALL BE AS NOTED WITHOUT

5. "B" AND "D" DIMENSIONS SHALL BE AS NOTED.

6. CONCRETE SHALL BEAR ON THE CONCRETE QUADRANT OF PIPE AS A MINIMUM,

SEE DETAIL ABOVE.

SOIL BEARING CAPACITY IS AVAILABLE, THE CONTRACTOR MAY,

AFTER REVIEW BY THE ENGINEER, REDUCE THE THRUST BLOCK

AREAS SHOWN ON TABLE I. THE THRUST BLOCK AREA SHALL BE

INCREASED IF THE SOIL IS NOT CAPABLE OF PROVIDING 3000 PSF

SOIL BEARING CAPACITY.

8. THE CONCRETE FOR BUTTRESSES SHALL HAVE A MINIMUM

COMPRESSIVE STRENGTH OF 3000 PSI.

9. IF THE CONTRACTOR DESIRES TO USE ALTERNATE METHODS OF

RESTRAINT, HE SHALL SUBMIT A RESTRAINT SCHEDULE TO THE ENGINEER

FOR REVIEW, DETAILING THE SYSTEM THAT HE PROPOSES TO USE.

INTERFERING WITH THE MECHANICAL JOINTS OR THE M.J. BOLTS.

7. THE THRUST BLOCK AREAS SHOWN IN TABLE I ARE CALCULATED

USING A SOIL BEARING CAPACITY OF 3000 PSF. IF GREATER

PROTECT MECHANICAL JOINTS AND FITTINGS WITH POLYETHYLENE

WRAP.

D

D

PLAN - 90° BEND

SECTION D-D

D

D

D

D

E E

PLAN SECTION E-E

NOTES:

PLAN - 45° BEND

PLAN - 11 1/4° & 22 1/2° BENDS

THRUST BLOCK REQUIREMENTS FOR TEES

THRUST BLOCK REQUIREMENTS FOR 90° ELLS

THRUST BLOCK REQUIREMENTS FOR 45° ELLS

THRUST BLOCK REQUIREMENTS FOR 22-1/2° ELLS

THRUST BLOCK REQUIREMENTS FOR 11-1/4° ELLS

THRUST BLOCK REQUIREMENTS FOR PLUGS

C

A

SEE NOTE 3

C

A

SEE NOTE 3

C

A

B

SEE NOTE 3

D

BEDDING

MATERIA

L

APPROX. 1:1 SLOPE

WHERE DEPTH

BELOW

PIPE EXCEEDS 6"

SEE NOTE 7

SEE NOTE 4

B

C

BRANCH

SEE NOTE 3

A

D

BEDDING

MATERIA

L

SEE NOTE 4

BRANCH

M A

X

M A

X

B B

NOM.

PIPE

DIA.

0.9

2.1

3.8

5.9

8.585.5

8 44 18 40

10 46 18 42

13 49 18 44

15 1851

NOM.

PIPE

DIA.

0.7

1.6

2.9

4.5

6.5

4 40 18 40

6 42 18 42

7 43 18 44

9 1845

NOM.

PIPE

DIA.

1.3

3.0

5.3

8.3

12.0

8 44 18 40

10 46 18 42

13 49 18 44

15 1851

NOM.

PIPE

DIA.

0.4

0.8

2.3

3.3

5.9

3 39 18 22

4 40 18 24

5 41 18 26

6 1842

NOM.

PIPE

DIA.

0.2

0.4

0.7

1.2

1.7

3 21 18 22

3 21 18 24

4 22 18 26

4 1822

66 24

55 24

29 24

REQ'D

AREA

(SQ. FT)

REQ'D

AREA

(SQ. FT)

REQ'D

AREA

(SQ. FT)

A (in)

B (in)

C (in)

D (in)

A (in)

B (in)

C (in)

D (in)

A (in)

B (in)

C (in)

D (in)

A (in)

B (in)

C (in)

D (in)

A (in)

B (in)

C (in)

D (in)

REQ'D

AREA

(SQ. FT)

REQ'D

AREA

(SQ. FT)

o o

NOM.

PIPE

DIA.

4 40 18 40

6 42 18 42

8 44 18 44

10 1846

6060 24

A (in)

B (in)

C (in)

D (in)

REQ'D

AREA

(SQ. FT)

0.9

2.1

3.8

5.9

8.5

THRUST BLOCK DETAIL FOR BENDS

THRUST BLOCK DETAIL

FOR TEES

NTS

NOTE:

THIS BUILDING IS PROTECTED BY A

HYDRAULICALLY DESIGNED

AUTOMATIC SPRINKLER SYSTEM

SECURE SYSTEM

SIGN TO ALARM

VALVE WITH CHAIN.

THE IDENTIFICATION

SIGN SHALL BE IN

ACCORDANCE WITH

NFPA 13.

HYDRAULIC SYSTEM

LOCATION

NO. OF SPRINKLERS

BASIS FOR DESIGN

1.

SYSTEM DEMAND

WATER FLOW RATE

DESIGNED AREA

OF DISCHARGE

RESIDUAL PRESSURE

AT THE BASE OF THE

RISER

3.

2.

DENSITY

2.

1.

STATIC PRESSURE

NOTE:

FASTNERS

(SEE NOTE 2)

RESTRAINT

ROD (l/r =400)

BAND HANGER

SURGE RESTRAINT

SEE NOTE 2 SEE NOTE 2

MINIMUM NO. 12, 440LB

HANGER WIRE

BAND

HANGER

HANGER ROD

HANGER ROD

CLEVIS HANGER

SWIVEL

ATTACHMENT

SURGE

RESTRAINT

NOTES:

BRANCH LINES SHALL BE RESTRAINED IN

ACCORDANCE WITH THE REQUIREMENTS OF

SECTION 9.3.6 OF NFPA 13.

1.

2. THESE DRAWINGS DEPICT TWO APPROVED

METHODS OF SEISMIC RESTRAINT FOR BRANCH

LINES. OTHER METHODS ARE ALSO ACCEPTABLE,

PROVIDED THEY MEET NFPA REQUIREMENTS

AT LEAST 45°

US Army Corps of Engineers ®

SHEET ID

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

G

2 3 4 5 6 7 8 9 10

F

E

D

C

B

A

D A

T E

File Path:

Plot Date:

M A

R K

D E

S C

R

IP

T

IO

N

FOR OFFICIAL USE ONLY (FOUO)

F O

R O

F F

IC

IA

L U

S E

O N

L Y

F

O U

O

W

IL

M

IN

G T

O N

N

C

V

IR

G

IN

IA

B

E A

C H

V

A

READY FOR ADVERTISEMENTFOR OFFICIAL USE ONLY (FOUO)

C A

T E

G O

R Y

C O

D E

F

IL

E N

A M

E

C:\Users\kcrane\Documents\8471_SOF Human Performance Center_F18_kcrane@clarknexsen.com.rvt

7/22/2020 5:51:06 AM

F-503

F

IR

E P

R O

T E

C T

IO

N

D E

T A

IL

S

I

II

F O

R T

B R

A G

G N

O R

T H

C A

R O

L

IN

A

W

IL

M

IN

G T

O N

D

IS

T R

IC

T

D

A R

L

IN

G T

O N

A V

E

C L A

R K

N E

X S

E N

M

A

IN

S T

R E

E T

S U

IT

E

K C

R A

N E

E A

L L E

N

K C

R A

N E

C B

O R

N

/J

U L /2

W P

M -2

-R

-0

S O

F H

U M

A N

P L A

T F

O R

M -F

O R

C E

G E

N E

R A

T

IO

N

F O

R G

E

F A

C

IL

IT

Y

P N

F -5

.p d f

NTS

A1

THRUST BLOCK DETAILS (TYP.)

NTS

F6

SYSTEM IDENTIFICATION SIGN (TYP.)

NTS

A6

SEISMIC RESTRAINT DETAILS (TYP.)

(NOT TO SCALE)

120V CKT

(2) 4-PAIR

CAT 6 IN 1"C

TO FIRST FLOOR

TELECOM RM

TRANSMITTER

HVAC

SHUTOFF

SIGNAL

ELEVATOR

CONTROL

PANEL

FIRE ALARM

CONTROL PANEL

(FACP)

NOTE 10

NOTES 8,9

F

NOTE 12

PIV

MOV

WP

NOTES 8,L,M

ACU LOC

MASS

NOTIFICATION

SYSTEM

AUTONOMOUS

CONTROL UNIT

(ACU)

MNS RTU

BATTERY

BACKUP

BATTERY

BACKUP

NOTE 11

NOTES 8,9

120V CKT

120V CKT

TO FIRST FLOOR

TELECOM RM

BATTERY

BACKUP

1. (GENERAL) THE FIRE ALARM SYSTEM SHALL BE A COMPLETELY SUPERVISED

SYSTEM EMPLOYING ANALOG ADDRESSABLE INITIATING DEVICES AND MULTIPLEX

COMMUNICATION TECHNIQUES. EACH DETECTION, MONITORING, AND CONTROL

DEVICE SHALL BE INDIVIDUALLY ADDRESSABLE. DEVICES WHICH ARE NOT

INHERENTLY ADDRESSABLE (I.E. TAMPER, FLOW SWITCHES, DOOR HOLDERS, ETC.)

SHALL BE EQUIPPED WITH ADDRESSABLE MONITOR AND CONTROL MODULES.

2. THE CONTRACTOR MUST TIE INTO THE EXISTING HONEYWELL EBI OR MONACO D21 SYSTEM.

3. THE FIRE ALARM SYSTEM AND THE FA/MNS/PA SYSTEM SHALL HAVE SEPARATE

CONTROL PANELS.

4. (GENERAL) REFER TO THE FIRE ALARM AND MASS NOTIFICATION SPECIFICATIONS

FOR ADDITIONAL INTERFACE REQUIREMENTS BETWEEN THE FIRE ALARM AND MASS

NOTIFICATION SYSTEMS.

5. (GENERAL) AN ALARM CONDITION ON ANY DEVICE SHALL AUTOMATICALLY INITIATE

THE CONDITION FOUND IN THE SPECIFICATIONS AND STILL ALLOW FOR ADDITIONAL

ALARMS AND TROUBLES TO BE REPORTED TO THE CENTRAL RECEIVING UNIT.

6. (GENERAL) THE CONTRACTOR SHALL INSTALL CONDUIT AND WIRING IN

ACCORDANCE WITH THE FIRE ALARM MANUFACTURER'S SHOP DRAWINGS AND

REQUIREMENTS AND NFPA STANDAR DS. THE SYSTEM SHALL BE A CLASS A, FOUR

WIRE, TWO CONDUIT LOOP SYSTEM. CONDUIT SHALL BE RED OR SHALL BE MARKED

WITH A RED STRIPE EVERY 10 FEET. ALL JUNCTION OR PULLBOXES SHALL BE PAINTED

RED.

7. (GENERAL) PROVIDE A CABINET…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .