W912PM19R0012

Amendment 0003

Technical Summary of Changes

SPECIFICATIONS:

GEOTECHNICAL REPORT

ADD Geotechnical Report in its entirety – Appendices.

NOTE:

The text changes may have necessitated reformatting of subsequent Text or pages. If this is the case, those pages have also been issued as amended pages but are not underlined or bold text.

DRAWINGS

(1) ADD: Stormwater as-built drawings

(2) Delete existing Sheet CU101 in its entirety and replace with revised enclosed sheet.

-- End of Summary of Changes- -

Encls As Stated