Enclosure_3_-_Cost_Submittal_Examples_&_Formats.pdf
PDF 258 KB Posted
- Attached to
- Indefinite Delivery Indefinite Quantity (IDIQ) contracts for Architect-Engineer (A-E) - Vertical Design Federal contract opportunity
- Solicitation number
- W912PM18R0006
About this file
Enclosure 3 - Cost Submittal Examples & Formats
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912PM18R0006_Amend_0004.pdf | ||
| W912PM18R0006_Amend_0004_-_conform.pdf | ||
| W912PM18R0006_Amend_0003_-_conform.pdf | ||
| W912PM18R0006_Amend_0003.pdf | ||
| W912PM18R0006-0002_Vertical_AE_Conformed.pdf | ||
| W912PM18R0006-0002_Vertical_AE_SF-30.pdf | ||
| W912PM18R0006-0001_Vertical_AE_Conformed.pdf | ||
| W912PM18R0006-0001_Vertical_AE_SF-30.pdf | ||
| Enclosure_2_-_Field_Trip_Report.pdf | ||
| W912PM18R0006_AE__IDIQ__Vertical_Design_Services_Wilmington_District.pdf | ||
| Enclosure_1_-_Checklist_for_A-E_Submittal_of_Final_Design.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Narrative Template Project Title
1. Project information
Project Location:
Owner:
Designer:
Estimator:
Estimate date:
Estimator System:
Date of Report:
Cost book:
Equipment Library:
2. Project Background
3. Project Markups Prime Contractor Field Office Overhead (FOOH) Calculated or % Home Office Overhead (HOOH):
Profit:
Bond:
Sub- Contractor Field Office Overhead (FOOH):
Home Office Overhead (HOOH):
Profit:
Bonds:
Construction Start Date:
Estimated Construction Midpoint:
Estimated Construction Duration (Days):
Escalation:
Design/Estimating Contingency:
Sales Tax:
Specialty Mark-ups (Example: high security):
4. Construction Duration.
How was it determined?
5. Cost Drivers Is there a secure area, etc.
6. Assumptions Please address Productivity
MCACES, MII Example
US Army Corps o f E n g i n e e r s Wilmington District
Cost Estimate
Submittal
Date
Project Location
U.S. ARMY ENGINEER DIVISION, WILMINGTON DISTRICT
CORPS OF ENGINEERS
DATE
DESIGN SUBMITTAL ESTIMATE OF TOTAL PROJECT COST FOR PROJECT NAME
CITY, STATE (PROJECT LOCATION)
This estimate is based on a design package prepared ________________________, dated ______________ and an MII cost estimate prepared by _____________________.
REPAIR NEW WORK TOTAL
PROGRAMMED AMOUNT
CONTRACT COST
TOTAL CURRENT CONTRACT COST (CCC)
ESCALATION TO CONSTRUCTION MIDPOINT
ESCALATED CONTRACT COST (ECC)
Contingencies……………………….………………….. %
SUBTOTAL…………………………………………………………….
S&A (SIOH)….…………………..……………………….. %
SUBTOTAL…………………………………………………………….
D‐B Design Fees…………..……………………………….. %
SUBTOTAL…………………………………………………………….
FF&E…………………….……………………………………….. %
SUBTOTAL…………………………………………………………….
CWE
CWE / PA % % %
BID OPTIONS
Bid Option No.
BID OPTIONS Bid Option No.
TOTAL CURRENT CONTRACT COST (CCC)
ESCALATION TO CONSTRUCTION MIDPOINT
ESCALATED CONTRACT COST (ECC)
Contingencies……………………….…………… %
S&A (SIOH)….…………………..……….…….. %
TOTAL…………………………………………………………….
ESTIMATED CONSTRUCTION TIME DAYS
PREPARED BY: SUBMITTED BY:
FOR OFFICIAL USE ONLY
Print Date Mon 25 April 2016 U.S. Army Corps of Engineers Time 15:47:06 Eff. Date 10/21/2014 Project : MII Example
MII Example Title Page
Labor ID: NLS2012 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.3
This report is not copyrighted, but the information contained herein is For Official Use Only.
Estimated Construction Time 180 Days Effective Date of Pricing 10/21/2014
Preparation Date 4/25/2016
Prepared by
Estimated by Designed by Wilmington District
MII Example
MII Example New Section Page 1
Description Quantity UOM ContractCost Escalation Contingency SIOH ProjectCost
New Section
Modernization (New Work)
SUBSTRUCTURE
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
SHELL
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
INTERIORS
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
SERVICES
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
EQUIPMENT & FURNISHINGS
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
Additional Folders as Necessary
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
Restoration (Repair Work)
SUBSTRUCTURE
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
SHELL
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
INTERIORS
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
SERVICES
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
EQUIPMENT & FURNISHINGS
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
Additional Folders as Necessary
Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00
Labor ID: NLS2012 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.3
MII Example Table of Contents
Description Page
New Section 1 Modernization (New Work) 1
SUBSTRUCTURE 1
SHELL 1
INTERIORS 1
SERVICES 1
EQUIPMENT & FURNISHINGS 1
Additional Folders as Necessary 1
Restoration (Repair Work) 1
SUBSTRUCTURE 1
SHELL 1
INTERIORS 1
SERVICES 1
EQUIPMENT & FURNISHINGS 1
Additional Folders as Necessary 1
Labor ID: NLS2012 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.3
Cost Works Example
Current Working Estimate (CWE)
U.S. ARMY ENGINEER DIVISION, WILMINGTON DISTRICT
Location Date
MODERNIZATION RESTORATION TOTAL
PROGRAMMED AMOUNT
CONTRACT COST
1 PRIMARY FACILITIES
2 UNIFORMED CONSTRUCTION ITEMS
BASE CONTRACT COST
ESCALATION TO CONSTRUCTION MIDPOINT
ESCALATED CONTRACT COST (ECC)………………… %
Contingencies……………………….……………… %
SUBTOTAL…………………………………………………………….
Design
Furniture
S&A (SIOH)….…………………..…………………… %
CWE
CWE / PA % % %
ESTIMATED CONSTRUCTION TIME DAYS
PREPARED BY: SUBMITTED BY:
Pricing data back up Company name
Project name
ITEM NO. ITEM DESCRIPTION Net Value
1 Division 01 - General Requirements #REF!
2 Division 02 - Existing Conditions #REF!
3 Division 03 - Concrete 0.00 4 Division 04 - Masonry #REF!
5 Division 05 - Metals #REF!
6 Division 06 - Wood, Plastics, and Composites #REF!
7 Division 07 - Thermal & Moisture Protection #REF!
8 Division 08 - Openings #REF!
9 Division 09 - Finishes #REF!
10 Division 10 - Specialties #REF!
11 Division 11 - Equipment #REF!
12 Division 12 - Furnishings #REF!
13 Division 21 - Fire Suppression #REF!
14 Division 22 - Plumbing #REF!
15 Division 23 - HVAC #REF!
16 Division 26 - Electrical/Comms #REF!
17 Division 27 - Communications #REF!
18 Division 28 - Electronic Safety and Security #REF!
19 Division 31 - Earthwork #REF!
20 Division 32 - Improvements #REF!
21 Assembly (if approved) #REF!
Subtotal: #REF!
Calculated Field Office OH: 0.00
Subtotal: #REF!
Home Office OH: 0.00% #REF!
Subtotal: #REF!
Bond: 0.00% #REF!
Subtotal: #REF!
Weighted Average Profit: 0.00% #REF!
#REF!
TOTAL
Qty CSI Number Description Unit Bare Mat. Bare Labor Bare Equip. Bare Total Total Incl. O&P Notes
Totals $0.00 $0.00 $0.00 $0.00 $0.00
Bare Mat. Subtotal 0.00 7% 0.00
Materials 0.00 with Sales Tax
Total Incl. O&P or Total Bare Cost $0.00 Materials Tax $0.00
Total $0.00
DIVISION 3 - Concrete
Plus Sales Taxes
| Cost Works Example.pdf |
| cost-Cover Sheet 1 |
| cost-Cover Sheet |
| cost-Concrete Sample |
File details come from the government source that posted it.