Enclosure_3_-_Cost_Submittal_Examples_&_Formats.pdf

PDF 258 KB Posted

Attached to
Indefinite Delivery Indefinite Quantity (IDIQ) contracts for Architect-Engineer (A-E) - Vertical Design Federal contract opportunity
Solicitation number
W912PM18R0006
Issued by
Department of the Army Corps of Engineers Engineering District Wilmington

About this file

Enclosure 3 - Cost Submittal Examples & Formats

View the file

Other files for this federal contract opportunity

Other files attached to Indefinite Delivery Indefinite Quantity (IDIQ) contracts for Architect-Engineer (A-E) - Vertical Design, newest first.
File Type Posted
W912PM18R0006_Amend_0004.pdf PDF
W912PM18R0006_Amend_0004_-_conform.pdf PDF
W912PM18R0006_Amend_0003_-_conform.pdf PDF
W912PM18R0006_Amend_0003.pdf PDF
W912PM18R0006-0002_Vertical_AE_Conformed.pdf PDF
W912PM18R0006-0002_Vertical_AE_SF-30.pdf PDF
W912PM18R0006-0001_Vertical_AE_Conformed.pdf PDF
W912PM18R0006-0001_Vertical_AE_SF-30.pdf PDF
Enclosure_2_-_Field_Trip_Report.pdf PDF
W912PM18R0006_AE__IDIQ__Vertical_Design_Services_Wilmington_District.pdf PDF
Enclosure_1_-_Checklist_for_A-E_Submittal_of_Final_Design.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cost Narrative Template Project Title

1. Project information

Project Location:

Owner:

Designer:

Estimator:

Estimate date:

Estimator System:

Date of Report:

Cost book:

Equipment Library:

2. Project Background

3. Project Markups Prime Contractor Field Office Overhead (FOOH) Calculated or % Home Office Overhead (HOOH):

Profit:

Bond:

Sub- Contractor Field Office Overhead (FOOH):

Home Office Overhead (HOOH):

Profit:

Bonds:

Construction Start Date:

Estimated Construction Midpoint:

Estimated Construction Duration (Days):

Escalation:

Design/Estimating Contingency:

Sales Tax:

Specialty Mark-ups (Example: high security):

4. Construction Duration.

How was it determined?

5. Cost Drivers Is there a secure area, etc.

6. Assumptions Please address Productivity

MCACES, MII Example

US Army Corps o f E n g i n e e r s Wilmington District

Cost Estimate

Submittal

Date

Project Location

U.S. ARMY ENGINEER DIVISION, WILMINGTON DISTRICT

CORPS OF ENGINEERS

DATE

DESIGN SUBMITTAL ESTIMATE OF TOTAL PROJECT COST FOR PROJECT NAME

CITY, STATE (PROJECT LOCATION)

This estimate is based on a design package prepared ________________________, dated ______________ and an MII cost estimate prepared by _____________________.

REPAIR NEW WORK TOTAL

PROGRAMMED AMOUNT

CONTRACT COST

TOTAL CURRENT CONTRACT COST (CCC)

ESCALATION TO CONSTRUCTION MIDPOINT

ESCALATED CONTRACT COST (ECC)

Contingencies……………………….………………….. %

SUBTOTAL…………………………………………………………….

S&A (SIOH)….…………………..……………………….. %

SUBTOTAL…………………………………………………………….

D‐B Design Fees…………..……………………………….. %

SUBTOTAL…………………………………………………………….

FF&E…………………….……………………………………….. %

SUBTOTAL…………………………………………………………….

CWE

CWE / PA % % %

BID OPTIONS

Bid Option No.

BID OPTIONS Bid Option No.

TOTAL CURRENT CONTRACT COST (CCC)

ESCALATION TO CONSTRUCTION MIDPOINT

ESCALATED CONTRACT COST (ECC)

Contingencies……………………….…………… %

S&A (SIOH)….…………………..……….…….. %

TOTAL…………………………………………………………….

ESTIMATED CONSTRUCTION TIME DAYS

PREPARED BY: SUBMITTED BY:

FOR OFFICIAL USE ONLY

Print Date Mon 25 April 2016 U.S. Army Corps of Engineers Time 15:47:06 Eff. Date 10/21/2014 Project : MII Example

MII Example Title Page

Labor ID: NLS2012 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.3

This report is not copyrighted, but the information contained herein is For Official Use Only.

Estimated Construction Time 180 Days Effective Date of Pricing 10/21/2014

Preparation Date 4/25/2016

Prepared by

Estimated by Designed by Wilmington District

MII Example

MII Example New Section Page 1

Description Quantity UOM ContractCost Escalation Contingency SIOH ProjectCost

New Section

Modernization (New Work)

SUBSTRUCTURE

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

SHELL

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

INTERIORS

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

SERVICES

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

EQUIPMENT & FURNISHINGS

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

Additional Folders as Necessary

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

Restoration (Repair Work)

SUBSTRUCTURE

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

SHELL

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

INTERIORS

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

SERVICES

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

EQUIPMENT & FURNISHINGS

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

Additional Folders as Necessary

Example 1.0000 EA 0.00 0.00 0.00 0.00 0.00

Labor ID: NLS2012 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.3

MII Example Table of Contents

Description Page

New Section 1 Modernization (New Work) 1

SUBSTRUCTURE 1

SHELL 1

INTERIORS 1

SERVICES 1

EQUIPMENT & FURNISHINGS 1

Additional Folders as Necessary 1

Restoration (Repair Work) 1

SUBSTRUCTURE 1

SHELL 1

INTERIORS 1

SERVICES 1

EQUIPMENT & FURNISHINGS 1

Additional Folders as Necessary 1

Labor ID: NLS2012 EQ ID: EP14R03 Currency in US dollars TRACES MII Version 4.3

Cost Works Example

Current Working Estimate (CWE)

U.S. ARMY ENGINEER DIVISION, WILMINGTON DISTRICT

Location Date

MODERNIZATION RESTORATION TOTAL

PROGRAMMED AMOUNT

CONTRACT COST

1 PRIMARY FACILITIES

2 UNIFORMED CONSTRUCTION ITEMS

BASE CONTRACT COST

ESCALATION TO CONSTRUCTION MIDPOINT

ESCALATED CONTRACT COST (ECC)………………… %

Contingencies……………………….……………… %

SUBTOTAL…………………………………………………………….

Design

Furniture

S&A (SIOH)….…………………..…………………… %

CWE

CWE / PA % % %

ESTIMATED CONSTRUCTION TIME DAYS

PREPARED BY: SUBMITTED BY:

Pricing data back up Company name

Project name

ITEM NO. ITEM DESCRIPTION Net Value

1 Division 01 - General Requirements #REF!

2 Division 02 - Existing Conditions #REF!

3 Division 03 - Concrete 0.00 4 Division 04 - Masonry #REF!

5 Division 05 - Metals #REF!

6 Division 06 - Wood, Plastics, and Composites #REF!

7 Division 07 - Thermal & Moisture Protection #REF!

8 Division 08 - Openings #REF!

9 Division 09 - Finishes #REF!

10 Division 10 - Specialties #REF!

11 Division 11 - Equipment #REF!

12 Division 12 - Furnishings #REF!

13 Division 21 - Fire Suppression #REF!

14 Division 22 - Plumbing #REF!

15 Division 23 - HVAC #REF!

16 Division 26 - Electrical/Comms #REF!

17 Division 27 - Communications #REF!

18 Division 28 - Electronic Safety and Security #REF!

19 Division 31 - Earthwork #REF!

20 Division 32 - Improvements #REF!

21 Assembly (if approved) #REF!

Subtotal: #REF!

Calculated Field Office OH: 0.00

Subtotal: #REF!

Home Office OH: 0.00% #REF!

Subtotal: #REF!

Bond: 0.00% #REF!

Subtotal: #REF!

Weighted Average Profit: 0.00% #REF!

#REF!

TOTAL

Qty CSI Number Description Unit Bare Mat. Bare Labor Bare Equip. Bare Total Total Incl. O&P Notes

Totals $0.00 $0.00 $0.00 $0.00 $0.00

Bare Mat. Subtotal 0.00 7% 0.00

Materials 0.00 with Sales Tax

Total Incl. O&P or Total Bare Cost $0.00 Materials Tax $0.00

Total $0.00

DIVISION 3 - Concrete

Plus Sales Taxes

Cost Works Example.pdf
cost-Cover Sheet 1
cost-Cover Sheet
cost-Concrete Sample

File details come from the government source that posted it.