- Solicitation number
- W912PL-13-B-0001
About this file
Amendment 1 - Specification sections and SF-1442 which extends the bid opening to January 29th 2013.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICAITON NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicble)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICIATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a)By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPIRATION DATA (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION ( Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
0001 Jan 16, 2013
W912PL
USACE-LOS ANGELES DISTRICT
CONTRACTING DIVISION, WEST REGION BRANCH
P.O. BOX 532711
LOS ANGELES CA 90053-2325
SEE ITEM 6
W912PL-13-B-0001
Dec 21, 2012
Bradley Canyon Levee Extension, Santa Maria River and Tributaries, Santa Barbara County, CA
The bid opening date is extended to January 29th, 2013. See SF-1442.
Please see Standard Form 30 Continuation Page for the other details of this amendment.
Bradley Canyon Levee Extension W912PL‐13‐0001 Santa Maria River and Tributaries
SF‐30 Continuation Page Amendment 0001
Standard Form 30 Continuation Page
Changes to Specification:
Replace the following sections:
Table of Contents
SF-1442
00 00 10 - Bid Schedule - Description and Estimated Quantity for item numbers 0005 and 0006 00 08 50 - Wage Rates for current wage decision dated 01/11/2013
01 11 00 - Summary of Work 01 22 00 - Measurement and Payment 01 33 00a – Submittal Register 01 50 00 – Temporary Construction Facilities and Controls 01 57 20 - Environmental Protection 01 78 00 - Closeout Submittals
03 25 00 - Soil Cement
31 00 00 - Earthwork 31 11 00 - Clearing and Grubbing 31 41 16 - Metal Sheet Piling
Changes to Drawings
Replace the following drawings:
T-02 INDEX TO CONTRACT DRAWINGS
C-03 SOIL CEMENT – PLAN AND PROFILE STA 365+20.00 TO STA 364+00.00
S-02 SHEET PILE WALL DETAILS
M-01 SIGNAGE, HYDRO-SEEDING AND MISC
Bradley Canyon Levee Extension W912PL-13-B-0001
TOC - 1 Amendment 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - BIDDING REQUIREMENTS, CONTRACT FORMS AND CONTRACT CONDITIONS
SF-1442 SOLICITATION, OFFER AND AWARD Am1 00 00 10 BID SCHEDULE Am1
00 01 00 INSTRUCTIONS TO BIDDERS
00 06 00 REPRESENTATIONS AND CERTIFICATIONS
00 07 00 CONTRACT CLAUSES
00 08 00 SPECIAL CONTRACT REQUIREMENTS
00 08 50 WAGE RATES Am1
DIVISION 01 – GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK Am1 01 22 00 MEASUREMENT AND PAYMENT Am1
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 00a SUBMITTAL REGISTER Am1
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 45 02 QUALITY CONTROL SYSTEM (QCS)
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS Am1 01 57 20 ENVIRONMENTAL PROTECTION Am1
01 57 23 TEMPORARY STORM WATER POLLUTION CONTROL
01 58 00 PROJECT IDENTIFICATION
01 62 35 RECYCLED / RECOVERED MATERIALS
01 78 00 CLOSEOUT SUBMITTALS Am1
01 80 00 AS-BUILT DRAWINGS
DIVISION 02 – EXISTING CONDITIONS
02 13 00 DIVERSION AND CONTROL OF WATER
02 41 00 DEMOLITION
DIVISION 03 – CONCRETE
03 25 00 SOIL CEMENT Am1
03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE
DIVISION 05 - METALS
05 50 12 MISCELLANEOUS METAL
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK Am1 31 11 00 CLEARING AND GRUBBING Am1
31 24 00 STONE PROTECTION
31 41 16 METAL SHEET PILING Am1
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 11 23 AGGREGATE AND/OR GRADED-CRUSHED AGGREGATE BASE COURSE
32 12 10 BITUMINOUS TACK AND PRIME COATS
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 92 21 HYDROSEEDING
32 98 00 TYPE-2 CABLE FENCE
TOC - 2 Amendment 1
DIVISION 33 – UTILITIES
33 40 00 STORM DRAINAGE UTILITIES
-- End of Project Table of Contents –
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED PAGE OF PAGES
IMPORTANT - The "offer" section on the reverse must be fully completed by the offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO
9. FOR INFORMATION CALL
A. NAME B. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date):
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See .)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12B. CALENDAR DAYS
YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee is, is not required.
C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212
Designed using Perform Pro, WHS/DIOR, Oct 96
1442-103 STANDARD FORM 1442 (REV. 4-85) (EG)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
Amendment 0001
W912PL-13-B-0001 X 21 DEC 2012 1 OF 2
USACE, Los Angeles District Contracting Division, West Region Branch 915 Wilshire Blvd.
P. O. Box 532711, Los Angeles, CA 90053-2325
See Item 7
Cynthia H. McManus 213.452.2347
BRADLEY CANYON LEVEE EXTENSION, SANTA MARIA RIVER AND TRIBUTARIES, SANTA BARBARA COUNTY, CA.
Construction services include strengthening a 3,380-foot section of the Bradley Canyon Levee.
The levee will be strengthened by two methods: installing a steel combi-wall and construction of a soil revetment.
The estimated cost range of this project is $5,000,000.00 - $10,000,000.00.
Please Note: This project is a 100% Small Business Set-Aside.
IAW Contract Clause No. FAR 52.219-6, "Notice of Total Small Business Set-Aside," offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected. Any award resulting from this solicitation will be made to a small business concern.
This project may be delayed, cancelled or revised at any time prior to award.
10 *See 00800
X X *Section 00800
X 10
0 1:00 PM
January 29,2013
X
OFFER (Must be fully completed by offeror)
STANDARD FORM 1442 BACK (REV. 4-85)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal or greater than the minimum requirement stated in 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print) 20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24.SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BYCODE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return copies to the issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and
(c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD. (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
30B. SIGNATURE 30C. DATE
31A. NAME OF CONTRACTING OFFICER (Type or print)
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
Amendment 0001
DUNS NO.: TAX ID NO.:
CAGE CODE NO.:
( ) - ; FAX ( ) -
SEE PRICING SCHEDULE
Vandenberg AFB Resident Office 1318 New Mexico Ave Building 9360, Room 201 Vandenberg AFB, CA 93437
USACE, Finance Center
ATTN: CEFCO-AO-D
5722 Integrity Drive Millington, TN 38054-5005
Santa Maria River and Tributaries, Santa Barbara County, CA
00 00 10 - 1 Amendment No. 0001
CERTIFICATE OF CORPORATE PRINCIPAL
1) IF THE OFFEROR IS A JOINT VENTURE, COMPLETE THE FOLLOWING:
(Company Name) (Signature) (Title)
(Company Name) (Signature) (Title)
(Company Name) (Signature) (Title)
2) IF THE OFFEROR IS A PARTNERSHIP, LIST FULL NAME OF ALL PARTNERS:
(Company Name) (Signature) (Title)
(Company Name) (Signature) (Title)
(Company Name) (Signature) (Title)
3) IF THE OFEROR IS A CORPORATION, THE FOLLOWING CERTIFICATION SHOULD BE
COMPLETED:
CERTIFICATION AS TO CORPORATE PRINCIPAL
I, certify that I am Secretary of the corporation named as principal in the within contract; that
___________________, who signed said contract on behalf of the principal, was the ________________ of the Corporation; that I know his/her signature and that his/her signature is genuine; and that said contract was duly signed, sealed and attested for in behalf of said corporation by authority of its governing body.
CORPORATE PRINCIPAL
SECRETARY
CORPORATE SEAL
00 00 10 - 2
BID SCHEDULE
IFB NO. W912PL-13-B-0001
BRADLEY CANYON LEVEE EXTENSION FOR SANTA MARIA RIVER AND TRIBUTARIES
The contractor shall furnish all plant, labor, material, equipment, etc. necessary to perform all work in strict accordance with the terms and conditions set forth in the contract to include all attachments thereto.
Estimated Unit of Unit Total Item No. Description Quantity Measure Price Price
0001 Mobilization and Demobilization 1 Job Lump Sum $
0002 Diversion and Control of Water 1 Job Lump Sum $
0003 Temp Low Flow Channel – Excavation 5,625 Cubic Yard $ $
0004 Temp. Low Flow Channel – Fill 3,175 Cubic Yard $ $
0005 Channel and Staging Area - Clearing 5.4 Acre $ $
0006 Channel and Staging Area – Grubbing 6.5 Acre $ $
0007 Sheet Pile – Combination Wall System 1,025 Linear Feet $ $ (Complete)
0008 Soil Cement Levee Toe – Excavation 81,275 Cubic Yard $ $
0009 Soil Cement Levee Toe – Miscellaneous Fill 51,275 Cubic Yard $ $
0010 Install Soil Cement Section (Complete) 29,500 Cubic Yard $ $
0011 Imported Fill 2,000 Cubic Yard $ $
0012 18” Riprap 200 Cubic Yard $ $
0013 Levee Road – Excavation 7,200 Cubic Yard $ $
0014 Levee Road – Regrade & Compacted Fill 4,800 Cubic Yard $ $
0015 4” Aggregate Base Course 780 Cubic Yard $ $
0016 Existing Ramps – Remove and Rebuild 1 Job Lump Sum $
0017 Local Access Road – Remove, Relocate And reinstall 1 Job Lump Sum $
0018 Restoration – Staging and Disturbance Area 5.4 Acre $ $
0019 Install Survey Markers 5 Each $ $
00 00 10 - 3
Estimated Unit of Unit Total Item No. Description Quantity Measure Price Price
0020 Install 48” RCP with End Sections 60 Linear Feet $ $
0021 Hydro-seeding 5.5 Acre $ $
0022 Hot Mix Asphalt 65 Cubic Yard $ $
0023 Type-2 Cable Fence 2,650 Linear Feet $ $
0024 Remove and Dispose of Existing Irrigation Pipe 1 Job Lump Sum $
0025 Road Signs 4 Each $ $
0026 As Built Drawings 1 Job Lump sum $
TOTAL AMOUNT (Line items 0001-0026): $
00 00 10 - 4
SECTION 00 00 10 Bidders Notes/Bid Schedule
1. All extensions of the unit prices shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.
2. If a modification to a bid based on unit prices is submitted which provides for a lump sum adjustment to the total estimated amount, the application of the lump sum adjustment to each unit price in the Bid Schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to every unit price in the Bid Schedule.
3. Prices must be submitted on all individual items of the Bid Schedule; otherwise the bid will be considered non-responsive and will be rejected.
4. For the purpose of initial evaluation of bids, the following will be utilized in resolving arithmetic discrepancies found on the face of the Bid Schedule as submitted by the bidder:
a. Obviously misplaced decimal points will be corrected;
b. In case of discrepancy between the unit price and the extended price, the unit price will govern;
c. Apparent errors in extensions of unit prices will be corrected;
d. Apparent errors in addition of lump sum and extended prices will be corrected.
For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on the basis of unit prices the totals arrived at by the resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.
5. The lump sum “LS” line items in the Bid Schedule are not “Estimated Quantity” line items and are not subject to the “Variation in Estimated Quantity” contract clause.
6. The Contract Clause 52.232-27, “Prompt Payment for Construction Contracts” requires that the name and address of the contractor official, to whom payment is to be sent, be the same as that in the contract or in a proper Notice of Assignment.
7. Procuring Contracting Officer. The Contracting Officer who signs this contract will be the Procuring Contracting Officer for this contract. However, any Contracting Officer assigned to the Los Angeles District, contracting within his authority, may take formal action on this contract when the Procuring Contracting Officer is unavailable and the action needs to be taken.
8. Amounts and prices shall be indicated in either words or figures, NOT BOTH.
9. Payment of Electronic Funds Transfer (EFT) is the mandatory method of payment. The bidders’ attention is directed to Contract Clause No. 52.232-33 “Payment by Electronic Funds Transfer – Central Contactor Registration” and Contract Clause No. 52.232-34, “Payment by Electronic Funds Transfer – Other Than Central Contractor Registration” located in Section 00 07 00.
10. The bidder shall distribute his indirect costs (overhead, profit, bond, etc.,) over all items in the Price Schedule. The Government will review all submitted Bid Schedules for any unbalancing of the items. Any submitted Bid Schedule determined to be unbalanced may be considered non-responsive and cause the bidder to be ineligible for contract award.
00 00 10 - 5
11. The bidder shall furnish all plant, labor, material, equipment, etc., necessary to perform all work in strict accordance with the terms and conditions set forth in the contract in include all attachments thereto.
13. Some quantities are ESTIMATED, the bidders prices MUST BE FIRM.
13. Bidder is cautioned to check his/her Bid Schedule carefully prior to submission.
14. Bidders attention is directed to Section 00 01 00 “Instructions to Bidders” Clause No. 52.0214-5001, entitled “Directions for Submitting Bids”. Please note that there is Special Instructions Pertaining to Hand-Carried Bids.
15. PLEASE NOTE: All inquiries must be submitted in accordance with the instructions found in the Solicitation, Section 00 01 00, Provision No. 52.0000-5001, entitled, “Inquiries.” The Bidder Inquiry System will be unavailable for new inquiries five (5) business days prior to bid submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
16. The Geotechnical Appendix, Design Documentation Report, Bradley Canyon Extension, dated August 2012, is posted on the project’s bid package website. This Geotechnical Report is made available for information purposes. All bidders are responsible for downloading the report, for their use, prior to bid opening.
00 08 50 - 1 Amendment No. 0001
General Decision Number: CA130023 01/11/2013 CA23
Superseded General Decision Number: CA20120023
State: California
Construction Types: Building, Heavy (Heavy and Dredging) and Highway
County: Santa Barbara County in California.
BUILDING, DREDGING (does not include hopper dredge work), HEAVY (does not include water well drilling), AND HIGHWAY
CONSTRUCTION PROJECTS
Modification Number Publication Date 0 01/04/2013 1 01/11/2013
ASBE0005-002 06/28/2010
Rates Fringes
Asbestos Workers/Insulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ 32.79 16.31 Fire Stop Technician (Application of Firestopping Materials for wall openings and penetrations in walls, floors, ceilings and curtain walls)...........................$ 24.21 13.76
ASBE0005-004 06/28/2010
Rates Fringes
Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not)....$ 18.70 8.65
BOIL0092-003 05/01/2011
Rates Fringes
00 08 50 - 2 Amendment No. 0001
BOILERMAKER......................$ 41.26 25.27
BRCA0004-003 05/01/2012
Rates Fringes
Bricklayer; Marble Setter........$ 36.20 12.35
BRCA0018-008 06/01/2012
Rates Fringes
MARBLE FINISHER..................$ 27.04 10.66
TILE FINISHER....................$ 22.37 9.19
BRCA0018-010 09/01/2009
Rates Fringes
TERRAZZO FINISHER................$ 26.59 9.62
TERRAZZO WORKER/SETTER...........$ 33.63 10.46
BRCA0018-011 06/01/2012
Rates Fringes
TILE LAYER.......................$ 33.55 13.55
CARP0409-001 07/01/2010
Rates Fringes
CARPENTER
(1) Carpenter, Cabinet Installer, Insulation Installer, Hardwood Floor Worker and acoustical installer...................$ 37.35 11.08
(2) Millwright..............$ 37.85 11.08
(3) Piledriver/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 37.48 10.58
(3) Piledrivermen/Derrick Bargeman, Bridge or Dock Carpenter, Heavy Framer, Rock Bargeman or Scowman, Rockslinger, Shingler (Commercial)................$ 37.48 11.08
(4) Pneumatic Nailer, Power Stapler...............$ 37.60 11.08
(5) Sawfiler...............$ 37.44 11.08
(6) Scaffold Builder.......$ 28.55 11.08
(7) Table Power Saw Operator....................$ 37.45 11.08
00 08 50 - 3
FOOTNOTE: Work of forming in the construction of open cut sewers or storm drains, on operations in which horizontal lagging is used in conjunction with steel H-Beams driven or placed in pre- drilled holes, for that portion of a lagged trench against which concrete is poured, namely, as a substitute for back forms (which work is performed by piledrivers): $0.13 per hour additional.
CARP0409-002 07/01/2008
Rates Fringes
Diver
(1) Wet.....................$ 663.68 9.82
(2) Standby.................$ 331.84 9.82
(3) Tender..................$ 323.84 9.82
(4) Assistant Tender........$ 299.84 9.82
Amounts in "Rates' column are per day
CARP0409-005 07/01/2010
Rates Fringes
Drywall
DRYWALL INSTALLER/LATHER....$ 37.35 11.08
STOCKER/SCRAPPER............$ 10.00 6.67
CARP0409-008 08/01/2010
Rates Fringes
Modular Furniture Installer......$ 17.00 7.41
* ELEC0011-002 11/26/2012
COMMUNICATIONS AND SYSTEMS WORK
Rates Fringes
Communications System Installer...................$ 27.25 12.25 Technician..................$ 29.05 12.30
SCOPE OF WORK:
Installation, testing, service and maintenance of systems utilizing the transmission and/or transference of voice, sound, vision and digital for commercial, educational, security and entertainment purposes for the following: TV monitoring and surveillance, background-foreground music, intercom and telephone interconnect, inventory control systems, microwave transmission, multi-media, multiplex, nurse call systems, radio page, school intercom and sound, burglar alarms, fire alarm (see last paragraph below) and low voltage master clock systems in commercial buildings.
Communication Systems that transmit or receive information
00 08 50 - 4 Amendment No. 0001 and/or control systems that are intrinsic to the above listed systems; inclusion or exclusion of terminations and testings of conductors determined by their function;
excluding all other data systems or multiple systems which include control function or power supply; excluding installation of raceway systems, conduit systems, line voltage work, and energy management systems. Does not cover work performed at China Lake Naval Ordnance Test Station. Fire alarm work shall be performed at the current inside wireman total cost package.
ELEC0413-001 01/01/2012
Rates Fringes
Electricians:....................$ 38.29 3%+17.40
CABLE SPLICERS: $2.00 additional per hour.
ALL WORK AT VANDENBERG AFB: $3.75 additional per hour.
FOOTNOTE: Work from trusses, swinging scaffolds, open ladders, scaffolds, bosun's chairs, stacks, or the maintenance of towers or open platforms where the worker is subject to a direct fall or where the worker has to work from a ladder or other support from a platform within 5 ft.
of any direct fall a distance of 50 ft. from the ground floor or supporting structure: double the regular straight-time rate of pay. Safety nets, if used, will not invalidate this.
ELEC1245-001 06/01/2012
Rates Fringes
LINE CONSTRUCTION
(1) Lineman; Cable splicer..$ 48.95 14.05
(2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment)...........$ 39.09 12.97
(3) Groundman...............$ 29.91 12.70
(4) Powderman...............$ 43.71 13.15
HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day
ELEV0018-001 01/01/2012
Rates Fringes
ELEVATOR MECHANIC................$ 47.73 23.535
00 08 50 - 5
FOOTNOTE:
PAID VACATION: Employer contributes 8% of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6% for 6 months to 5 years of service.
PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.
ENGI0012-003 07/01/2012
Rates Fringes
OPERATOR: Power Equipment (All Other Work)
GROUP 1....................$ 37.40 20.00
GROUP 2....................$ 38.18 20.00
GROUP 3....................$ 38.47 20.00
GROUP 4....................$ 39.96 20.00
GROUP 5....................$ 41.06 20.00
GROUP 6....................$ 40.18 20.00
GROUP 8....................$ 41.39 20.00
GROUP 9....................$ 40.41 20.00
GROUP 10....................$ 40.41 20.00
GROUP 11....................$ 40.58 20.00
GROUP 12....................$ 40.58 20.00
GROUP 13....................$ 40.68 20.00
GROUP 14....................$ 40.71 20.00
GROUP 15....................$ 40.79 20.00
GROUP 16....................$ 40.91 20.00
GROUP 17....................$ 41.08 20.00
GROUP 18....................$ 41.18 20.00
GROUP 19....................$ 41.29 20.00
GROUP 20....................$ 41.41 20.00
GROUP 21....................$ 41.58 20.00
GROUP 22....................$ 41.68 20.00
GROUP 23....................$ 41.79 20.00
GROUP 24....................$ 41.91 20.00
GROUP 25....................$ 42.08 20.00
OPERATOR: Power Equipment (Cranes, Piledriving & Hoisting)
GROUP 1....................$ 38.75 20.00
GROUP 2....................$ 39.53 20.00
GROUP 3....................$ 39.82 20.00
GROUP 4....................$ 39.96 20.00
GROUP 5....................$ 40.18 20.00
GROUP 6....................$ 40.29 20.00
GROUP 7....................$ 40.41 20.00
GROUP 8....................$ 40.58 20.00
GROUP 9....................$ 40.75 20.00
GROUP 10....................$ 41.75 20.00
GROUP 11....................$ 42.75 20.00
GROUP 12....................$ 43.75 20.00
GROUP 13....................$ 44.75 20.00
OPERATOR: Power Equipment (Tunnel Work)
00 08 50 - 6 Amendment No. 0001
GROUP 1....................$ 39.25 20.00
GROUP 2....................$ 40.03 20.00
GROUP 3....................$ 40.32 20.00
GROUP 4....................$ 40.46 20.00
GROUP 5....................$ 40.68 20.00
GROUP 6....................$ 40.79 20.00
GROUP 7....................$ 40.91 20.00
PREMIUM PAY:
$3.75 per hour shall be paid on all Power Equipment Operator work on the followng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton
Workers required to suit up and work in a hazardous material environment: $2.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator.
SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator-inside; Engineer Oiler; Forklift operator (includes loed, lull or similar types under 5 tons;
Generator operator; Generator, pump or compressor plant operator; Pump operator; Signalman; Switchman
GROUP 2: Asphalt-rubber plant operator (nurse tank operator);
Concrete mixer operator-skip type; Conveyor operator;
Fireman; Forklift operator (includes loed, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd.
without attachment); Tar pot fireman; Temporary heating plant operator; Trenching machine oiler
GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragtype attachments); Helicopter radioman (ground);
Stationary pipe wrapping and cleaning machine operator
GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator;
Concrete cleaning decontamination machine operator;
Concrete Pump Operator (small portable); Drilling machine operator, small auger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types -drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Hydra-hammer-aero stomper; Micro Tunneling
00 08 50 - 7 Amendment No. 0001
(above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck
GROUP 5: Equipment Greaser (Grease Truck/Multi Shift).
GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator;
Derrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types
- Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechanical finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted);
Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms);
Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuum blasting machine operator
GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphalt paving machine operator (Barber Greene or similar type); Asphalt-rubber distribution operator;
Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Drill Doctor;
Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types -drilling depth of 60' maximum); Elevating grader operator;
Grade checker; Gradall operator; Grouting machine operator;
Heavy-duty repairman; Heavy equipment robotics operator;
Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing
00 08 50 - 8 Amendment No. 0001 machine operator (Hackley-Presswell or similar type);
Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired earth-moving equipment operator (single engine, caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu.
yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck);
Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self-propelled curb and gutter machine operator; Shuttle buggy;
Skiploader operator (crawler and wheel type over 1-1/2 yds.
up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator;
Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure waterjet cutting tool system mechanic; Water pull (compaction) operator
GROUP 9: Heavy Duty Repairman
GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Monorail locomotive operator (diesel, gas or electric); Motor patrol-blade operator (single engine); Multiple engine tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator;
Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment)
GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified.
GROUP 12: Auto grader operator; Automatic slip form operator;
Drilling machine operator, bucket or auger types (Calweld, auger 200 CA or similar types - Watson, auger 6000 or similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); Hoe ram or similar with compressor; Mass excavator operator less tha 750 cu.
yards; Mechanical finishing machine operator; Mobile form traveler operator; Motor patrol operator (multi-engine);
00 08 50 - 9 Amendment No. 0001
Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units)
GROUP 13: Rubber-tired earth-moving equipment operator operating equipment with push-pull system (single engine, up to and including 25 yds. struck)
GROUP 14: Canal liner operator; Canal trimmer operator;
Remote- control earth-moving equipment operator (operating a second piece of equipment: $1.00 per hour additional);
Wheel excavator operator (over 750 cu. yds.)
GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine-up to and including 25 yds. struck)
GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck);
Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type)
GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units -single engine, up to and including 25 yds. struck)
GROUP 19: Rotex concrete belt operator (or similar types);
Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds.and up to and including 50
cu. yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, up to and including 25 yds. struck)
GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units -single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem
00 08 50 - 10 Amendment No. 0001
(scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck)
GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units -multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)
GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, up to and including 25 yds. struck)
GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck)
GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds.
struck)
GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck)
CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS
GROUP 1: Engineer oiler; Fork lift operator (includes loed, lull or similar types)
GROUP 2: Truck crane oiler
GROUP 3: A-frame or winch truck operator; Ross carrier operator (jobsite)
GROUP 4: Bridge-type unloader and turntable operator;
Helicopter hoist operator
GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum)
GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boom and similar type); Lift mobile operator; Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar
00 08 50 - 11 Amendment No. 0001 gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator
GROUP 7: Pedestal crane operator; Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane repair; Tugger hoist operator (3 drum)
GROUP 8: Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.)
GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator;
Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons
GROUP 10: Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry
GROUP 11: Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc)
GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc)
GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons);
Mobile tower crane operator (over 300 tons)
TUNNEL CLASSIFICATIONS
GROUP 1: Skiploader (wheel type up to 3/4 yd. without attachment)
GROUP 2: Power-driven jumbo form setter operator
00 08 50 - 12 Amendment No. 0001
GROUP 3: Dinkey locomotive or motorperson (up to and including 10 tons)
GROUP 4: Bit sharpener; Equipment greaser (grease truck);
Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum);
Tunnel locomotive operator (over 10 and up to and including 30 tons)
GROUP 5: Backhoe operator (up to and including 3/4 yd.);
Small Ford, Case or similar; Drill doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson;
Loader operator (Athey, Euclid, Sierra and similar types);
Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum);
Tunnel locomotive operator (over 30 tons)
GROUP 6: Heavy Duty Repairman
GROUP 7: Tunnel mole boring machine operator
ENGINEERS ZONES
$1.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDINO Counties as defined below:
That area within the following Boundary: Begin in San Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the northwest quarter of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the western half of the northern quarter of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 34, T24S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE quarter of Section 32, T24S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner of T32S, R31E, MDM. Continue W to SW corner of SE quarter of Section 34, T32S, R30E, MDM.
Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7W, SBM.
Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM.
Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south
00 08 50 - 13 Amendment No. 0001 boundary of T1s, SBM (Riverside County Line) to SW corner of T1S, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM.
Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM
$1.00 additional per hour for portions of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below:
That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Obispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Continue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17E, MDM. Continue E to SW corner of T31S, R18E, MDM.
Continue S along West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM.
Continue E along the south edge of T9N, SBM to the Santa Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE quarter of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of T8N, R21W.
Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM]. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM.
$2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below:
That area within the following Boundary: Begin at the intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it
00 08 50 - 14 Amendment No. 0001 reaches Inyo County at the point which is the NE corner of the Western half of the NW quarter of Section 2, T8S, R29E, MDM.
Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE 1/4 of Section 32, T24S, R37E, MDM.
Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T24S, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the Western half of the NW quarter of Section 6, T25S, R42E, MDM. Continue S to that point which is the SW corner of the NW quarter of Section 6, T27S, R42E, MDM.
Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R14E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM.
REMAINING…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .