VOLUME 1 OF 3 - CONSTRUCTION SOLICITATION AND SPECIFICATIONS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Am5_W912PL-12-R-0003.pdf | ||
| Am4_W912PL-12-R-0003.pdf | ||
| Squad Ops AMU Attendance List.pdf | ||
| Am3_W912PL-12-R-0003.pdf | ||
| Am2_W912PL-12-R-0003.pdf | ||
| Am1_W912PL-12-R-0003.pdf | ||
| SPL012-11.pdf | ||
| SPL012-12.pdf | ||
| SPL012-10REVISED.pdf | ||
| SPL012-9.pdf | ||
| SPL12-10.pdf | ||
| SPL012-12.pdf | ||
| SPL012-11.pdf | ||
| SPL012-9.pdf | ||
| Spec_W912PL-12-R-0003V2.pdf | ||
| Drawings_W912PL12R0003_SQ_OPS_VOL_2 .pdf | ||
| Spec_W912PL-12-R-0003V3.pdf | ||
| Drawings_W912PL12R0003_ADAL AMU.pdf | ||
| Drawings_W912PL12R0003_SQ_OPS_VOL_1.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For the best experience, open this PDF portfolio in Acrobat 9 or Adobe Reader 9, or later.
Get Adobe Reader Now!
http://www.adobe.com/go/reader
01 45 02-1
SECTION 01 45 02
QUALITY CONTROL SYSTEM (QCS)
PART 1 - GENERAL
1.1 CONTRACT ADMINISTRATION
The Government will use the Resident Management System for Windows (RMS) to assist in its monitoring and administration of this contract. The Contractor shall use the Government-furnished Construction Contractor Module of RMS, referred to as QCS, to record, maintain, and submit various information throughout the contract period. The Contractor module, user manuals, updates, and training information can be downloaded from the RMS web site (http://www.rmssupport.com). This joint Government-Contractor use of RMS and QCS will facilitate electronic exchange of information and overall management of the contract. QCS provides the means for the Contractor to input, track, and electronically share information with the Government in the following areas:
Administration Finances Quality Control Submittal Monitoring Scheduling Import/Export of Data
1.1.1 Correspondence and Electronic Communications
For ease and speed of communications, both Government and Contractor will, to the maximum extent feasible, exchange correspondence and other documents in electronic format. Correspondence, pay requests and other documents comprising the official contract record shall also be provided in paper format, with signatures and dates where necessary. Paper documents will govern, in the event of discrepancy with the electronic version.
1.1.2 Other Factors
Particular attention is directed to Contract Clause, "Schedules for Construction Contracts", Contract Clause, "Payments", Section 01 32 01, PROJECT SCHEDULE, Section 01 33 00, SUBMITTAL PROCEDURES, and Section 01 45 01, QUALITY CONTROL, which have a direct relationship to the reporting to be accomplished through QCS. Also, there is no separate payment for establishing and maintaining the QCS database; all costs associated therewith shall be included in the contract pricing for the work.
1.2 QCS SOFTWARE
QCS is a Windows-based program that can be run on a stand-alone personal computer or on a network. The Government will make available the QCS software to the Contractor after award of the construction contract. Prior http://www.rmssupport.com/�
01 45 02-2 to the Pre-Construction Conference, the Contractor shall be responsible to download, install and use the latest version of the QCS software from the Government's RMS Internet Website. Upon specific justification and request by the Contractor, the Government can provide QCS on CD-ROM. Any program updates of QCS will be made available to the Contractor via the Government RMS Website as they become available.
1.3 SYSTEM REQUIREMENTS
The following is the minimum system configuration that the Contractor shall have to run QCS:
Hardware
IBM-compatible PC with 1000 MHz Pentium or higher processor
256+ MB RAM for workstation / 512+ MB RAM for server
1 GB hard drive disk space for sole use by the QCS system
Compact Disk (CD) Reader 8x speed or higher
SVGA or higher resolution monitor (1024x768, 256 colors)
Mouse or other pointing devise
Windows compatible printer (Laser printer must have 4 MB+ of RAM)
Connection to the Internet, minimum 56k BPS
Software
MS Windows 2000 or higher
Word Processing software compatible with MS Word 2000 or newer
Latest version of: Netscape Navigator, Microsoft Internet Explorer, or other browser that supports HTML 4.0 or higher
Electronic mail (E-mail), MAPI compatible
Virus protection software that is regularly upgraded with all issued manufacturer's updates
1.4 RELATED INFORMATION
1.4.1 QCS User Guide
After contract award, download instructions for the installation and use of QCS from the Government RMS Internet Website. In case of justifiable difficulties, the Government will provide the Contractor with a CD-ROM containing these instructions.
01 45 02-3
1.4.2 Contractor Quality Control (CQC) Training
The use of QCS will be discussed with the Contractor's QC System Manager during the mandatory CQC Training class.
1.5 CONTRACT DATABASE
Prior to the pre-construction conference, the Government shall provide the Contractor with basic contract award data to use for QCS. The Government will provide data updates to the Contractor as needed, generally by using the Government’s SFTP repository built into QCS import/export function.
These updates will generally consist of submittal reviews, correspondence status, QA comments, and other administrative and QA data.
1.6 DATABASE MAINTENANCE
Establish, maintain, and update data in the QCS database throughout the duration of the contract at the Contractor’s site office. Submit data updates to the Government (e.g., daily reports, submittals, RFI’s, schedule updates, payment requests, etc.) using the Government’s SFTP repository built into QCS export function. If permitted by the Contracting Officer, CD-ROM may be used instead of E-mail (see Paragraph DATA SUBMISSION VIA COMPUTER CD-ROM). The QCS database typically includes current data on the following items:
1.6.1 Administration
1.6.1.1 Contractor Information
Contain within the database the Contractor’s name, trade, address, telephone numbers, management staff, and other required items. Within 14 calendar days of receipt of QCS software from the Government, deliver Contractor administrative data in electronic format.
1.6.1.2 Subcontractor Information
Contain within the database the name, trade, address, phone numbers, and other required information for all subcontractors. A subcontractor must be listed separately for each trade to be performed. Assign each subcontractor/trade a unique Responsibility Code, provided in QCS. Within 14 calendar days of receipt of QCS software from the Government, deliver subcontractor administrative data in electronic format.
1.6.1.3 Correspondence
Identify all Contractor correspondence to the Government with a serial number. Prefix correspondence initiated by the Contractor's site office with "S". Prefix letters initiated by the Contractor's home (main) office with "H". Letters shall be numbered starting from 0001 (e.g., H-0001 or S-0001). The Government's letters to the Contractor will be prefixed with "C".
01 45 02-4
1.6.1.4 Equipment
Contain within the Contractor’s QCS database a current list of equipment planned for use or being used on the jobsite, including the most recent and planned equipment inspection dates.
1.6.1.5 Management Reporting
QCS includes a number of reports that Contractor management can use to track the status of the project. The value of these reports is reflective of the quality of the data input, and is maintained in the various sections of QCS.
Among these reports are: Progress Payment Request worksheet, QA/QC comments, Submittal Register Status, Three-Phase Inspection checklists.
1.6.1.6 Request for Information (RFI)
Exchange all Requests For Information (RFI) using the built-in RFI generator and tracker in QCS.
1.6.2 Finances
1.6.2.1 Pay Activity Data
Include within the QCS database a list of pay activities that the Contractor shall develop in conjunction with the construction schedule. The sum of all pay activities shall be equal to the total contract amount, including modifications. Group pay activities Contract Line Item Number (CLIN); the sum of the activities shall equal the amount of each CLIN. The total of all CLINs equals the Contract Amount.
1.6.2.2 Payment Requests
Prepare all progress payment requests using QCS. Complete the payment request worksheet, prompt payment certification, and payment invoice in QCS.
Update the work completed under the contract, measured as percent or as specific quantities, at least monthly. After the update, generate a payment request report using QCS. Submit the payment requests, prompt payment certification, and payment invoice with supporting data using the Government’s SFTP repository built into QCS export function. If permitted by the Contracting Officer, e-mail or a CD-ROM may be used. A signed paper copy of the approved payment request is also required, which will govern in the event of discrepancy with the electronic version.
1.6.3 Quality Control (QC)
QCS provides a means to track implementation of the 3-phase QC Control System, prepare daily reports, identify and track deficiencies, document progress of work, and support other Contractor QC requirements. Maintain this data on a daily basis. Entered data will automatically output to the QCS generated daily report. Provide the Government a Contractor Quality Control (CQC) Plan within the time required in Section 01 45 01, QUALITY
01 45 02-5
CONTROL. Within seven calendar days of Government acceptance, submit a QCS update reflecting the information contained in the accepted CQC Plan:
schedule, pay activities, features of work, submittal register, QC requirements, and equipment list.
1.6.3.1 Daily Contractor Quality Control (CQC) Reports
QCS includes the means to produce the Daily CQC Report. The Contractor may use other formats to record basic QC data. However, the Daily CQC Report generated by QCS shall be the Contractor's official report. Summarize data from any supplemental reports by the Contractor and consolidate onto the QCS-generated Daily CQC Report. Submit daily CQC Reports as required by Section 01 45 01, QUALITY CONTROL. Electronically submit reports to the Government within 24 hours after the date covered by the report. Also provide the Government a signed, printed copy of the daily CQC report.
1.6.3.2 Deficiency Tracking
Use QCS to track deficiencies. Deficiencies identified by the Contractor will be numerically tracked using QC punch list items. Maintain a current log of its QC punch list items in the QCS database. The Government will log the deficiencies it has identified using its QA punch list items. The Government's QA punch list items will be included in its export file to the Contractor. Regularly update the correction status of both QC and QA punch list items.
1.6.3.3 QC Requirements
Develop and maintain a complete list of QC testing and required structural and life safety special inspections required by the International Code Council (ICC), transferred and installed property, and user training requirements in QCS. Update all data on these QC requirements as work progresses, and promptly provide this information to the Government via QCS.
1.6.3.4 Three-Phase Control Meetings
Maintain scheduled and actual dates and times of preparatory and initial control meetings in QCS.
1.6.3.5 Labor and Equipment Hours
Log labor and equipment exposure hours on a daily basis. This data will be rolled up into a monthly exposure report.
1.6.3.6 Accident/Safety Reporting
The Government will issue safety comments, directions, or guidance whenever safety deficiencies are observed. The Government's safety comments will be included in its export file to the Contractor. Regularly update the correction status of the safety comments. In addition, utilize QCS to advise the Government of any accidents occurring on the jobsite. This brief
01 45 02-6 supplemental entry is not to be considered as a substitute for completion of mandatory reports, e.g., ENG Form 3394 and OSHA Form 300.
1.6.3.7 Features of Work
Include a complete list of the features of work in the QCS database. A feature of work may be associated with multiple pay activities. However, each pay activity (see subparagraph "Pay Activity Data" of paragraph "Finances") will only be linked to a single feature of work.
1.6.3.8 Hazard Analysis
Use QCS to develop a hazard analysis for each feature of work included in the CQC Plan. Address any hazards, or potential hazards, that may be associated with the work.
1.6.4 Submittal Management
The Government will provide the initial submittal register in electronic format. Thereafter, maintain a complete list of all submittals, including completion of all data columns. Dates on which submittals are received and returned by the Government will be included in its export file to the Contractor. Use QCS to track and transmit all submittals. ENG Form 4025, submittal transmittal form, and the submittal register update shall be produced using QCS. QCS and RMS will be used to update, store and exchange submittal registers and transmittals, but will not be used for storage of actual submittals.
1.6.5 Schedule
Develop a construction schedule consisting of pay activities, in accordance with Section 01 32 01, PROJECT SCHEDULE. Input and maintain this schedule in the QCS database either manually or by using the Standard Data Exchange Format (SDEF) (see Section 01 32 01 PROJECT SCHEDULE). Include the updated schedule with each pay request.
1.6.6 Import/Export of Data
QCS includes the ability to export Contractor data to the Government and to import submittal register and other Government-provided data from RMS, and schedule data using SDEF.
1.7 IMPLEMENTATION
Contractor use of QCS as described in the preceding paragraphs is mandatory.
Ensure that sufficient resources are available to maintain its QCS database, and to provide the Government with regular database updates. QCS shall be an integral part of the Contractor's management of quality control.
01 45 02-7
1.8 DATA SUBMISSION VIA CD-ROM
The Government-preferred method for Contractor's submission of QCS data is by using the Government’s SFTP repository built into QCS export function.
Other data should be submitted using e-mail with file attachment(s). For locations where this is not feasible, the Contracting Officer may permit use of CD-ROM for data transfer. Export data onto CDs using the QCS built-in export function. If used, submit CD-ROMs in accordance with the following:
1.8.1 File Medium
Submit in English required data on CD-ROM conforming to industry standards used in the United States.
1.8.2 CD-ROM Labels
Affix a permanent exterior label to each CD-ROM submitted. Indicate on the label in English, the QCS file name, full contract number, contract name, project location, data date, name and telephone number of person responsible for the data.
1.8.3 File Names
The files will be automatically named by the QCS software. The naming convention established by the QCS software shall not be altered.
1.9 MONTHLY COORDINATION MEETING
Update the QCS database each workday. At least monthly, generate and submit an export file to the Government with schedule update and progress payment request. As required in Contract Clause "Payments", at least one week prior to submittal, meet with the Government representative to review the planned progress payment data submission for errors and omissions.
Make all required corrections prior to Government acceptance of the export file and progress payment request. Payment requests accompanied by incomplete or incorrect data submittals will be returned. The Government will not process progress payments until an acceptable QCS export file is received.
1.10 NOTIFICATION OF NONCOMPLIANCE
The Contracting Officer will notify the Contractor of any detected noncompliance with the requirements of this specification. Take immediate corrective action after receipt of such notice. Such notice, when delivered to the Contractor at the work site, shall be deemed sufficient for the purpose of notification.
01 45 02-8
PART 2 - PRODUCTS
Not used.
PART 3 - EXECUTION
Not used.
-- End of Section --
PART 1 - GENERAL
1.1 CONTRACT ADMINISTRATION
1.1.1 Correspondence and Electronic Communications
1.1.2 Other Factors
1.2 QCS SOFTWARE
1.3 SYSTEM REQUIREMENTS
1.4 RELATED INFORMATION
1.4.1 QCS User Guide
1.4.2 Contractor Quality Control (CQC) Training
1.5 CONTRACT DATABASE
1.6 DATABASE MAINTENANCE
1.6.1 Administration
1.6.1.1 Contractor Information
1.6.1.2 Subcontractor Information
1.6.1.3 Correspondence
1.6.1.4 Equipment
1.6.1.5 Management Reporting
1.6.1.6 Request for Information (RFI)
1.6.2 Finances
1.6.2.1 Pay Activity Data
1.6.2.2 Payment Requests
1.6.3 Quality Control (QC)
1.6.3.1 Daily Contractor Quality Control (CQC) Reports
1.6.3.2 Deficiency Tracking
1.6.3.3 QC Requirements
1.6.3.4 Three-Phase Control Meetings
1.6.3.5 Labor and Equipment Hours
1.6.3.6 Accident/Safety Reporting
1.6.3.7 Features of Work
1.6.3.8 Hazard Analysis
1.6.4 Submittal Management
1.6.5 Schedule
1.6.6 Import/Export of Data
1.7 IMPLEMENTATION
1.8 DATA SUBMISSION VIA CD-ROM
1.8.1 File Medium
1.8.2 CD-ROM Labels
1.8.3 File Names
1.9 MONTHLY COORDINATION MEETING
1.10 NOTIFICATION OF NONCOMPLIANCE
PART 2 - PRODUCTS
PART 3 - EXECUTION
01 51 00-1
SECTION 01 51 00
UTILITIES
1.1 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
All utilities required to complete tests of equipment or systems installed under this contract will be furnished to the Contractor without charge if connections to utility lines are installed under the contract.
1.2 WATER FOR CONSTRUCTION PURPOSES
The Government will furnish to the Contractor all water for construction purposes at no charge to the Contractor if the Contractor chooses to connect to LAFB utility lines. The Contractor shall install and maintain necessary supply connections and piping for same, but only at such locations and in such manner as may be approved by the Contracting Officer. All water shall be carefully conserved. Before final acceptance, temporary connections and piping installed by the Contractor shall be removed in a manner satisfactory to the Contracting Officer.
1.3 ELECTRIC POWER
The Government will furnish electricity to the Contractor at no charge if connections to LAFB utility lines are installed. The Contractor shall provide all backup power supply, temporary electric power lines and equipment required under this contract. All temporary electrical installations shall be subject to the approval of the Contracting Officer. All temporary lines shall be furnished, installed, connected, and maintained by the Contractor in a workmanlike manner satisfactory to the Contracting Officer and shall be removed by the Contractor in like manner prior to final acceptance of the construction. If additional electrical power is required for construction the Contractor shall provide generators. The Contractor’s equipment shall be provided with adequate fault protection to insure electrical equipment faults will not adversely affect the site electrical system or the utility system.
1.3.1 Batch Plant Electrical Power
LAFB will not provide electrical power for the Contractor batch plant. The Contractor shall provided batch plant electrical power from an electrical utility source outside LAFB.
1.4 TEMPORARY ELECTRIC WIRING
1.4.1 Temporary Power and Lighting
The Contractor shall provide construction power facilities in accordance with the safety requirements of the National Electrical Code NFPA No. 70 and the SAFETY AND HEALTH REQUIREMENTS MANUAL EM 385-1-1. The Contractor shall enforce all the safety requirements of electrical extensions for the work of
01 51 00-2 all subcontractors. All work shall be accomplished by skilled electrical tradesmen in a workmanlike manner, as approved by the Contracting Officer.
1.4.2 Construction Equipment
In addition to the requirements of EM 385-1-1, SAFETY AND HEALTH REQUIREMENTS MANUAL, all temporary wiring conductors installed for operation of construction tools and equipment shall be either Type TW or THW contained in metal raceways, or may be multiconductor cord. Temporary wiring shall be secured above the ground or floor in a workmanlike manner and shall not present an obstacle to persons or equipment. Open wiring may only be used outside of buildings, and then only in strict accordance with the provisions of the National Electrical Code.
1.4.3 Circuit Protection
In addition to the present requirements in EM 385-1-1 and the National Electrical Code, all 15 and 20-ampere receptacle outlets used for obtaining power during construction shall have ground fault circuit interrupters (GFCI) for personnel protection. Block and brick saws shall also be equipped with GFCI. The Contracting Officer may allow an exception to this requirement for circuits for concrete vibrators or circuits operating at other than 60 Hertz normal (in both cases an assured grounding program as described in the National Electrical Code, except utilizing the daily inspection frequency of the grounding means of such equipment, may be permitted). The assured grounding program will not be permitted as a substitute for usage of GFCI'S except as described above. All generator-powered 15- and 20-ampere, 60 Hertz receptacle outlets shall have GFCI'S, and shall be properly grounded. A testing means shall be provided which will impose a measured fault of 5 milliamperes and result in tripping the GFCI unit.
1.5 ELECTRICAL UTILITIES NOT SHOWN
If the Contractor encounters, within the construction limits of the entire project, electrical utilities not shown on the plans and not visible as to the date of this contract and such utilities will interfere with construction operations, he shall immediately notify the Contracting Officer in writing to enable a determination by the Contracting Officer as to the necessity for removal or relocation. If such utilities are removed or relocated as directed by the Contracting Officer, the Contractor shall be entitled to equitable adjustment for any additional pertinent work or delay.
1.6 PLANNED ELECTRICAL UTILITY OUTAGES AND STREET CLOSURES
All utility outages and street closures shall be of as short a duration as possible and shall be scheduled as far in advance as possible with the Contracting Officer, in no case less than 30 days before the outage or closure. Electrical utility outages shall not exceed 4 hours duration in a 24 hour period. Outages shall be scheduled on weekends only, or as approved by the Contracting Officer. The Contractor shall obtain in writing from the Contracting Officer a statement or schedule giving the permissible times of outages or closures for particular installations. The Contractor shall
01 51 00-3 strictly observe such schedules and will be held responsible for any violations.
1.6.1 Street Closure
The Contractor shall obtain approval in writing from the Contracting Officer before he can close any street or parking lot access. The request for closure shall be submitted in writing to the Contracting Officer 21 working days prior to planned closing and shall include the section to be closed and length of time of closure.
1.7 WASTE MATERIAL
Unless otherwise specified, waste material shall be disposed of by the Contractor at a licensed off site sanitary landfill or sewage disposal plant.
Permission to use the off-site sanitary landfill or sewage disposal plant shall be obtained by the Contractor and any costs attendant thereto shall be borne by the Contractor.
1.8 TEMPORARY TELEPHONE SERVICE
If temporary telephone service is needed, the Contractor is required to determine line availability and to make arrangements for installation of telephone lines and instruments with the telephone company. All costs associated with telephone installation and service shall be the responsibility of the Contractor.
1.9 SEWAGE DISPOSAL FOR TEMPORARY FACILITIES
A sewage disposal location is not available at the site for use under this contract.
1.10 INTERRUPTION OF EXISTING UTILITIES SERVICES
The Contractor shall perform the work under this contract with a minimum of outage time for all utilities. In some cases, the Contractor may be required to perform the work while the existing utility is in service. The existing utilities services may be interrupted only when approved by the Contracting Officer. When it is necessary to interrupt the existing utilities, the Contractor shall notify the Contracting Officer in writing at least 14 calendar days in advance of the time the Contractor desires the existing service to be interrupted. The interruption time shall be kept to a minimum.
Depending upon the activities at the facility which require continuous service from the existing utility, an interruption may not be subject to schedule at the time desired by the Contractor. In such cases the interruption may have to be scheduled at a time of minimum requirement of demand for the utility.
The amount of time requested by the Contractor for interruption of existing utility service shall be as approved by the Contracting Officer.
01 51 00-4
1.11 REQUIREMENTS CONCERNING EXISTING UNDERGROUND UTILITIES
The drawings indicate known, existing, underground utilities which are located in areas requiring work under this contract. The locations shown are approximate and the depths are not indicated. The Contractor shall contact the utility companies or agencies which furnish utilities in the area where the project is located to determine if there are other known, new, or suspected additional underground utilities in the work areas other than those shown on the drawings. Prior to commencement of any excavation in areas where there are known utilities, it shall be the responsibility of the Contractor to contact the installation or the owner of each known utility and request that the owner mark the location of the utility and also obtain information as to the depth of the utility. The Contractor shall submit proof to the Contracting Officer that the Contractor has contacted the owners of known utilities and has obtained the location, including depth below grade, for such utilities. The Contractor shall protect all existing utilities in accordance with the Contract Clause entitled, PROTECTION OF EXISTING VEGETATION, EQUIPMENT, STRUCTURES, UTILITIES, AND IMPROVEMENTS. In addition, the Contractor shall take all the necessary precautions to prevent harm to personnel and damage to equipment and existing construction from utilities which conduct electricity or transmit combustible gases.
1.11.1 Utility Location Marking
All underground utilities in the work area shall be positively identified and coordinated with the installation. Any markings made during the utility investigation shall be maintained by the Contractor for the duration of the contract. Identified utilities will also be captured and included in As-built documents.
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
PART 1 - GENERAL
1.1 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
1.2 WATER FOR CONSTRUCTION PURPOSES
1.3 ELECTRIC POWER
1.3.1 Batch Plant Electrical Power
1.4 TEMPORARY ELECTRIC WIRING
1.4.1 Temporary Power and Lighting
1.4.2 Construction Equipment
1.4.3 Circuit Protection
1.5 ELECTRICAL UTILITIES NOT SHOWN
1.6 PLANNED ELECTRICAL UTILITY OUTAGES AND STREET CLOSURES
1.6.1 Street Closure
1.7 WASTE MATERIAL
1.8 TEMPORARY TELEPHONE SERVICE
1.9 SEWAGE DISPOSAL FOR TEMPORARY FACILITIES
1.10 INTERRUPTION OF EXISTING UTILITIES SERVICES
1.11 REQUIREMENTS CONCERNING EXISTING UNDERGROUND UTILITIES
1.11.1 Utility Location Marking
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
01 53 00-1
SECTION 01 53 00
TEMPORARY FENCING
1.1 FENCING
The Contractor shall install and maintain temporary fencing around the construction site, the Contractor's staging and storage areas, and areas hazardous to personnel as identified by the Contracting Officer. The temporary fencing shall be eight (8) feet in height and of sufficient strength to keep personnel out and away from all construction activities.
Upright support poles shall be buried to a sufficient depth to resist wind loads. The fencing shall have Sierra Tan colored, fabric-mesh screening material approved by the Contracting Officer. It shall remain in place and be maintained for the duration of the contract and be removed at the end of the contract at the Contractor’s expense.
1.2 SUBMITTALS
Government approval is required for submittals with a “G” designation;
submittals not having a “G” designation are for information only. When used, a designation following the “G” designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Temporary Fencing; G
The procedures proposed for the accomplishment of the installation and maintenance of the temporary fence and area lighting shall be submitted for approval. Temporary fencing and area lighting will be approved by the Contracting Officer, in writing, 48 hours prior to commencement of installation.
PART 1 - GENERAL
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
01 20 00-1
SECTION 01 20 00
INTERFACE WITH OTHER WORK
1.1 GENERAL REQUIREMENTS
The Contractor shall make a special effort to fully cooperate with other Contractors and Government employees engaged in other work on and adjacent to the work to be performed under this contract. The Contractor shall coordinate the work herein and the concurrent use of haul roads, aggregate sources and utilities shall become a joint responsibility. Any damage resulting from the use of facilities of other Contractors shall immediately be repaired to the satisfaction of or as directed by the Contracting Officer. If required and allowed, the Contractor shall construct and maintain a temporary detour around any road that is obstructed in the performance of work under this contract.
1.1.1 Meetings
The Contractor shall meet weekly or bi-weekly with the Government along with any other Contractors working in the area to discuss and coordinate work activities. The Contractor shall prepare and present at the meeting a 2 to 3 week window from the NAS of major activities to be performed and coordinated.
1.1.2 Coordination With Other Work
Due to the congested and confined work area at Luke Air Force Base and the requirement for contractors and Government personnel to be working in the same general area of the work to be performed under this contract, the Contractor shall carefully coordinate the work with any ongoing or additional construction in the area, as may be directed by the Contracting Officer. The Contractor shall not commit or permit any act which will interfere with the performance of work by any other Contractor or by Luke Air Force Base personnel. The Contractor shall be liable for any costs incurred by the Government including those associated with settlement of disputes or claims by others due to or arising from the failure of the Contractor to comply with this provision.
1.2 SUBMITTALS
Government approval is required for submittals with a “G” designation;
submittals not having a “G” designation are for information only. When used, a designation following the “G” designation identifies the office
01 20 00-2
Area Use Plan; G, The Contractor shall submit to the Contracting Officer's representative for approval within ten (10) calendar days after receipt of the Notice to Proceed, an Area Use Plan designating proposed intended use of all areas at the project site and staging area. This plan shall include, but not be limited to the following: borrow removal plan and access roads to the site(s);
drawings showing proposed road detours; drawings showing temporary telephone and electrical installations; temporary water and sewage disposal installations; construction plant and building installations, if any; concrete truck washout area; material storage area; and office or administration facilities.
Construction of any fencing will be the responsibility of the Contractor and performed at no additional cost to the Government.
The Contractor staging area shall be the location of all offices and storage trailers, parking area for company and privately owned vehicles; storage of materials and equipment; storage and disbursement of fuel, oil and gas; maintenance of equipment and fabrication of materials.
PART 1 - GENERAL
PART 2 - PRODUCTS (NOT USED)
PART 3 - EXECUTION (NOT USED)
01 54 00-1
SECTION 01 54 00
SECURITY
1.1 SITE SECURITY
The Contractor shall provide site security (e.g., fencing or guard service) as required. However, as a minimum the Contractor shall maintain the site and all other Contractor controlled areas in such a manner as to minimize the risk of injury or accident to site personnel or others who may be in the area. Work on or near roadways shall be carefully marked with lights and barricades meeting State and local regulations or where such regulations are not applicable and adequate to minimize the risk of an accident. Open excavations which pose a danger to site personnel or others shall be fenced to prevent accidental entry.
Side slopes of excavations shall be shored or left at a safe angle repose as defined by EM 385-1-1, Section 25. All equipment, when not in operation, shall be left in a safe manner (e.g., wheels blocked and buckets on the ground).
Near residential areas where there may be children, special consideration will be given to site security/safety needs.
1.2 SECURITY AT AN INSTALLATION OR FACILITY
When work is performed at a Federal, State, or local installation or facility, the Contractor shall comply with all security requirements of that installation or facility.
1.3 BASE SECURITY
1.3.1 Background Checks
All Contractor personnel including subcontractors and delivery companies requiring entry into Luke AFB shall obtain an access badge. It shall take twenty-one (21) calendar days ) from the date of submittal to the 56th SFS/SFAB for an individual, if approved, to receive an access badge The process will need to be done as follows:
(1) A Background package will need to be completed for each individual as follows:
(A) Luke Base Access Form and the Base Access Vetting Transmittal Sheet
(B) Legible photo copies of two types of personal identification. The only acceptable types of identification allowed are those listed on the Department of Homeland Security Form I-9, Employment Eligibility Verification (one ID must be from List A, Documents that Establish Both Identity and Employment Authorization; the second ID can be from either List B or List C).
01 54 00-2
(C) Verification of Employee's E-Verify status; "Case Detail by Individual" Employer must have a F.A.R. (Federal Acquisition Ruling) with E-Verify. Employer generates this report within E-Verify; report will list employee's name, DOB, and results of E-Verify.
(2) Once the Background Package is completed, the Prime Contractor will turn it into 56 SFS/SFAB located at the South Visitors Center.
(3) Once completed, the 56 SFS/SFAB will contact the Prime Contractor that their Background Package is ready to be picked up.
(4) The Prime Contractor will provide the approved Background Package to the Contracting Officer Representative (COR) and a Sponsor letter will be sent to 56 SFS/SFAB for the approved individual to obtain an access badge.
(5) The individual will need to be present to go pick up their badge.
Expect a 30 to 45 minute wait at the South Visitors Center. All individuals will need to provide one form of individual as identified above. Those requiring a vehicle pass will also need to provide their driver's license and show proof of vehicle registration and valid insurance.
(6) The approved access badge will be valid for up to 1 year from approval of their Background Package. Any individuals requiring access for more than 1 year must go fill out the forms and go thru a full background check again.
(7) No individuals will be issued temporary passes.
(8) The Government will not escort any Contractor personnel.
(9) The Visitor Center is open Monday thru Friday from 7:30 am to 4:30
pm. The Visitor Center is closed on holidays and weekends.
(10) The Contractor is cautioned to expect a half-hour delay, minimum, to go thru the entry point onto Luke AFB.
PART 1 - GENERAL
1.1 SITE SECURITY
1.2 SECURITY AT AN INSTALLATION OR FACILITY
1.3 BASE SECURITY
1.3.1 Background Checks
01 57 20-1
SECTION 01 57 20
ENVIRONMENTAL PROTECTION
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
U.S. AIR FORCE (USAF)
AFI 32-1053 (2009) Integrated Pest Management Program
U.S. ARMY (DA)
DA AR 200-1 (2007) Environmental Protection and Enhancement
U.S. ARMY CORPS OF ENGINEERS (USACE)
EM 385-1-1 (2008; Errata 1-2010; Changes 1-3 2010;
Changes 4-6 2011) Safety and Health Requirements Manual
WETLANDS DELINEATION MANUAL (1987) Corps of Engineers Wetlands Delineation
Manual
U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)
33 CFR 328 Definitions of Waters of the United States
40 CFR 150 – 189 Pesticide Programs
40 CFR 260 Hazardous Waste Management System: General
40 CFR 261 Identification and Listing of Hazardous Waste
40 CFR 262 Standards Applicable to Generators of Hazardous
Waste
40 CFR 279 Standards for the Management of Used Oil
40 CFR 302 Designation, Reportable Quantities, and
Notification
40 CFR 355 Emergency Planning and Notification 40 CFR 68 Chemical Accident Prevention Provisions
49 CFR 171 – 178 Hazardous Materials Regulations
01 57 20-2
1.2 DEFINITIONS
1.2.1 Environmental Pollution and Damage
Environmental pollution and damage is the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances of importance to human life;
affect other species of importance to humankind; or degrade the environment aesthetically, culturally and/or historically.
1.2.2 Environmental Protection
Environmental protection is the prevention/control of pollution and habitat disruption that may occur to the environment during construction. The control of environmental pollution and damage requires consideration of land, water, and air; biological and cultural resources; and includes management of visual aesthetics; noise; solid, chemical, gaseous, and liquid waste; radiant energy and radioactive material as well as other pollutants.
1.2.3 Contractor Generated Hazardous Waste
Contractor generated hazardous waste means materials that, if abandoned or disposed of, may meet the definition of a hazardous waste. These waste streams would typically consist of material brought on site by the Contractor to execute work, but are not fully consumed during the course of construction. Examples include, but are not limited to, excess paint thinners (i.e. methyl ethyl ketone, toluene etc.), waste thinners, excess paints, excess solvents, waste solvents, and excess pesticides, and contaminated pesticide equipment rinse water.
1.2.4 Installation Pest Management Coordinator
Installation Pest Management Coordinator (IPMC) is the individual officially designated by the Installation Commander to oversee the Installation Pest Management Program and the Installation Pest Management Plan.
1.2.5 Project Pesticide Coordinator
The Project Pesticide Coordinator (PPC) is an individual that resides at a Civil Works Project office and that is responsible for oversight of pesticide application on Project grounds.
1.2.6 Land Application for Discharge Water
The term "Land Application" for discharge water implies that the Contractor shall discharge water at a rate which allows the water to percolate into the soil. No sheeting action, soil erosion, discharge into storm sewers, discharge into defined drainage areas, or discharge into the "waters of the United States" shall occur. Land Application shall be in compliance with all applicable Federal, State, and local laws and regulations.
01 57 20-3
1.2.7 Pesticide
Pesticide is defined as any substance or mixture of substances intended for preventing, destroying, repelling, or mitigating any pest, or intended for use as a plant regulator, defoliant or desiccant.
1.2.8 Pests
The term "pests" means arthropods, birds, rodents, nematodes, fungi, bacteria, viruses, algae, snails, marine borers, snakes, weeds and other organisms (except for human or animal disease-causing organisms) that adversely affect readiness, military operations, or the well-being of personnel and animals; attack or damage real property, supplies, equipment, or vegetation; or are otherwise undesirable.
1.2.9 Surface Discharge
The term "Surface Discharge" implies that the water is discharged with possible sheeting action and subsequent soil erosion may occur. Waters that are surface discharged may terminate in drainage ditches, storm sewers, creeks, and/or "waters of the United States" and would require a permit to discharge water from the governing agency.
1.2.10 Waters of the United States
All waters which are under the jurisdiction of the Clean Water Act, as defined in 33 CFR 328.
1.2.11 Wetlands
Wetlands means those areas that are inundated or saturated by surface or ground water at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wetlands generally include swamps, marshes, and bogs. Official determination of whether or not an area is classified as a wetland must be done in accordance with the WETLAND
MANUAL.
1.3 GENERAL REQUIREMENTS
The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract. The Contractor shall comply with all applicable environmental Federal, State, and local laws and regulations. The Contractor shall be responsible for any delays resulting from failure to comply with environmental laws and regulations.
1.4 SUBCONTRACTORS
The Contractor shall ensure compliance with this section by subcontractors.
01 57 20-4
1.5 PAYMENT
No separate payment will be made for work covered under this section. The Contractor shall be responsible for payment of fees associated with environmental permits, application, and/or notices obtained by the Contractor. All costs associated with this section shall be included in the contract price. The Contractor shall be responsible for payment of all fines/fees for violation or non-compliance with Federal, State, Regional and local laws and regulations.
1.6 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be
Environmental Protection Plan; G, EE
The environmental protection plan.
Stormwater Pollution Prevention Plan; G, EE
NPDES Notice of Intent
NPDES Notice of Termination
SD-06 Test Reports
Borrow Site Testing; G, EE
Phase 1 ESA of Borrow Site; G, EE
1.7 ENVIRONMENTAL PROTECTION PLAN
Prior to commencing construction activities or delivery of materials to the site, the Contractor shall submit an Environmental Protection Plan for review and approval by the Contracting Officer. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction. Issues of concern shall be defined within the Environmental Protection Plan as outlined in this section. The Contractor shall address each topic at a level of detail commensurate with the environmental issue and required construction task(s). Topics or issues which are not identified in this section, but which the Contractor considers necessary, shall be identified and discussed after those items formally identified in this section. Prior to submittal of the Environmental Protection Plan, the Contractor shall meet with the Contracting Officer for
01 57 20-5 the purpose of discussing the implementation of the initial Environmental Protection Plan; possible subsequent additions and revisions to the plan including any reporting requirements; and methods for administration of the Contractor's Environmental Plans. The Environmental Protection Plan shall be current and maintained onsite by the Contractor.
1.7.1 Compliance
No requirement in this Section shall be construed as relieving the Contractor of any applicable Federal, State, and local environmental protection laws and regulations. During Construction, the Contractor shall be responsible for identifying, implementing, and submitting for approval any additional requirements to be included in the Environmental Protection Plan.
1.7.2 Contents
The environmental protection plan shall include, but shall not be limited to, the following:
a. Name(s) of person(s) within the Contractor's organization who is (are) responsible for ensuring adherence to the Environmental Protection
b. Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site, if applicable.
c. Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel.
d. Description of the Contractor's environmental protection personnel training program.
e. An erosion and sediment control plan which identifies the type and location of the erosion and sediment controls to be provided. The plan shall include monitoring and reporting requirements to assure that the control measures are in compliance with the erosion and sediment control plan, Federal, State, and local laws and regulations. A Storm Water Pollution Prevention Plan (SWPPP) may be substituted for this plan.
f. Drawings showing locations of proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials including methods to control runoff and to contain materials on the site.
g. Traffic control plans including measures to reduce erosion of temporary roadbeds by construction traffic, especially during wet weather. Plan shall include measures to minimize the amount of mud transported onto paved public roads by vehicles or runoff.
01 57 20-6
h. Work area plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas including methods for protection of features to be preserved within authorized work areas.
i. Drawing showing the location of borrow areas.
j. The Spill Control plan shall include the procedures, instructions, and reports to be used in the event of an unforeseen spill of a substance regulated by 40 CFR 68, 40 CFR 302, 40 CFR 355, and/or regulated under State or Local laws and regulations. The Spill Control Plan supplements the requirements of EM 385-1-1. This plan shall include as a minimum:
1. The name of the individual who will report any spills or hazardous substance releases and who will follow up with complete documentation. This individual shall immediately notify the Contracting Officer and Luke AFB Fire Department and the Luke AFB Air Program Manager in addition to the legally required Federal, State, and local reporting channels (including the National Response Center 1-800-424-8802) if a reportable quantity is released to the environment. The plan shall contain a list of the required reporting channels and telephone numbers.
2. The name and qualifications of the individual who will be responsible for implementing and supervising the containment and cleanup.
3. Training requirements for Contractor's personnel and methods of accomplishing the training.
4. A list of materials and equipment to be immediately available at the job site, tailored to cleanup work of the potential hazard(s) identified.
5. The names and locations of suppliers of containment materials and locations of additional fuel oil recovery, cleanup, restoration, and material-placement equipment available in case of an unforeseen spill emergency.
6. The methods and procedures to be used for expeditious contaminant cleanup.
k. A non-hazardous solid waste disposal plan identifying methods and locations for solid waste disposal including clearing debris. The plan shall include schedules for disposal. The Contractor shall identify any subcontractors responsible for the transportation and disposal of solid waste. Licenses or permits shall be submitted for solid waste disposal sites that are not a commercial operating facility. Evidence of the disposal facility's acceptance of the solid waste shall be attached to this plan during the construction. The Contractor shall attach a copy of each of the Non-hazardous Solid Waste Diversion Reports to the
01 57 20-7 disposal plan. The report shall be submitted on the first working day after the first quarter that non-hazardous solid waste has been disposed and/or diverted and shall be for the previous quarter (e.g. the first working day of January, April, July, and October). The report shall indicate the total amount of waste generated and total amount of waste diverted in cubic meters yards or tons along with the percent that was diverted.
l. A recycling and solid waste minimization plan with a list of measures to reduce consumption of energy and natural resources. The plan shall detail the Contractor's actions to comply with and to participate in Federal, State, Regional, and local government sponsored recycling programs to reduce the volume of solid waste at the source.
m. An air pollution control plan detailing provisions to assure that dust, debris, materials, trash, etc., do not become air borne and travel off the project site.
n. A contaminant prevention plan that: identifies potentially hazardous substances to be used on the job site; identifies the intended actions to prevent introduction of such materials into the air, water, or ground; and details provisions for compliance with Federal, State, and local laws and regulations for storage and handling of these materials.
In accordance with EM 385-1-1, a copy of the Material Safety Data Sheets (MSDS) and the maximum quantity of each hazardous material to be on site at any given time shall be included in the contaminant prevention plan. As new hazardous materials are brought on site or removed from the site, the plan shall be updated.
o. A waste water management plan that identifies the methods and procedures for management and/or discharge of waste waters which are directly derived from construction activities, such as concrete curing water, clean-up water, dewatering of ground water, disinfection water, hydrostatic test water, and water used in…