Am6_W912PL-10-R-0025.pdf

PDF 693 KB Posted

Attached to
FY 10 Personnel Recovery Center of Excellence, Davis Monthan Air Force Base, Pima County, Arizona
Solicitation number
W912PL-10-R-0025
Issued by

View the file

Other files

File Type Posted
Am9.pdf PDF
Am8.pdf PDF
Am7.pdf PDF
Am5_W912PL-10-R-0025.pdf PDF
10R0025Am4.pdf PDF
10R0025Am3.pdf PDF
10R0025Am2.pdf PDF
10R0025Am1.pdf PDF
W912PL-10-R-0025 Vol 3.pdf PDF
W912PL-10-R-0025 Vol 1.pdf PDF
HC-130J_RQS_SQUADRON_OPERATIONS.zip ZIP file
HC-130J_SIMULATOR_FACILITY.zip ZIP file
HC-130J_INFRASTRUCTURE.zip ZIP file
W912PL-10-R-0025 Vol 2.pdf PDF
W912PL-10-R-0025 Vol 4.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PROJECT: FY 10 PERSONNEL RECOVERY CENTER OF EXCELLENCE - PRCOE HC-130 J SIMULATOR FACILITY, PRCOE HC-130J RQS OPERATIONS FACILITY, PRCOE HC-130J INFRASTRUCTURE, DAVIS-MONTHAN AIR FORCE BASE, PIMA

COUNTY, ARIZONA.

1. This is Amendment No. 0006 to Solicitation No. W912PL-10-R-0025; 16 APRIL 2010. The following revisions shall be incorporated into the solicitation. All other provisions shall remain unchanged.

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

MODIFICATION OF CONTRACTS/ORDER

NO.

E. IMPORTANT: Contractor

15B. CONTRACTOR/OFFEROR

is not, copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer tended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDG- MENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

is extended, B.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CON-

TRACT ORDER NO. IN ITEM 10A.

2. AMENDMENT/MODIFICATION NO.

6. ISSUED BY

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) is required to sign this document and return

15A. NAME AND TITLE OF SIGNER (Type or print)

PAGE OF PAGES 1. CONTRACT ID CODE

5. PROJECT NO. (If applicable) 4. REQUISITION/PURCHASE REQ. NO. 3. EFFECTIVE DATE

7. ADMINISTERED BY (If other than Item 6)

15C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16B. UNITED STATES OF AMERICA

BY

16C. DATE SIGNED

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

10B. DATED (SEE ITEM 13)

CODE CODE

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

is not ex-copies to the issuing office.

NSN 7540-01-152-8070

PREVIOUS EDITION UNUSABLE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

(Signature of person authorized to sign) (Signature of Contracting Officer)

USAPPC V1.00

10A.

30-105-02

U.S. ARMY ENGINEER DISTRICT, ALBUQUERQUE

CORPS OF ENGINEERS

4101 JEFFERSON PLAZA, N.E.

ALBUQUERQUE, NEW MEXICO 87109-3435

CODE

FACILITY CODE

J 1 2

0006 25 MAY 2010

W912PL-10-R-0025

16 APRIL 2010

Amendment No. 0006

2. SPECIFICATIONS: Delete the following listed pages and substitute the pages attached hereto. On the revised pages, for convenience, changes are emphasized by the amendment number in parentheses before and after changes from the previous issue. All portions of the revised (or new) pages shall apply whether or not changes have been indicated.

Delete Page

Insert Page

Volume 1

Submittal Register – Flight Submittal Register – Flight Simulator, pgs. 20 – 60 Simulator, pgs. 20 - 60

Volume 2

Table of Contents, entire Table of Contents, entire Document document

31 00 00, pgs. 1, 2, 3, 6 & 9 31 00 00, pgs. 1, 2, 3, 6 & 9

Volume 3

31 00 00, pgs. 1-3, 5, 6, 12, & 15 31 00 00, pgs. 1-3, 5, 6, 12, & 15

Volume 4

31 00 00, pgs. 1 & 9 31 00 00, pgs. 1 & 9

3. DRAWING CHANGES: The following drawings shall be revised as stated below.

Bidders are requested to change their drawings for bidding purposes. Successful bidder drawings will be issued to the successful bidder.

a. Change the specification section reference on Sheet C-103, Key Note 10, from “34 71 13.19” to “02 84 00.”

////////LAST ITEM////////

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 60 PAGES

HC-130J Simulator Facility, Davis-Monthan AFB, AZ

09 65 00 SD-11 Closeout Submittals 1.6.1Local/Regional Materials 2.9Resilient Flooring and

Accessories 2.5Adhesives

Sheet Linoleum Linoleum Tile Cork

09 67 00 SD-02 Shop Drawings 2.1Flooring

SD-03 Product Data

2.3 GSealer and Resin

3.3.2 GFloor Surfacing

3.2 GMixing

SD-04 Samples 2.2Flooring Systems

SD-07 Certificates

1.6 GQualifications of Installer

SD-08 Manufacturer’s Instructions

3.3 GApplication

SD-10 Operation and Maintenance Data

2.2 GFlooring Systems

09 68 00 SD-02 Shop Drawings

3.4Installation 2.6Molding

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Amendment 6

L4ECSSEP

Text Box (6)

L4ECSSEP

Text Box (6)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 60 PAGES

09 68 00 SD-03 Product Data

2.1 GCarpet

2.3Carpet Pads 2.4Carpet Moldings

Base 3.1Surface Preparation 3.4Installation 1.3Regulatory Requirements

SD-04 Samples

2.1 GCarpet

2.6 GMolding

SD-06 Test Reports 3.2Moisture and Alkalinity Tests

SD-07 Certificates 2.1Carpet 1.3Regulatory Requirements

SD-10 Operation and Maintenance Data

2.1Carpet 3.5Cleaning and Protection

Operational Service SD-11 Closeout Submittals

1.6.1Local/Regional Materials 2.1Carpet 2.1Carpet 2.1Carpet

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

Amendment 6

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 60 PAGES

09 68 00 2.5Adhesives and Concrete Primer 09 90 00 SD-02 Shop Drawings

3.9Piping identification 3.9stencil

SD-03 Product Data

2.1 GCoating

2.1Manufacturer's Technical Data

Sheets SD-04 Samples

1.10 GColor

SD-07 Certificates

1.3Applicator's qualifications 1.4.1.2Qualification Testing

SD-08 Manufacturer’s Instructions Application instructions

3.5.2Mixing 1.7.2Manufacturer's Material Safety

Data Sheets SD-10 Operation and Maintenance Data

2.1Coatings:

SD-11 Closeout Submittals

1.9.1Local/Regional Materials 2.1Materials

10 10 00 SD-03 Product Data

1.3 GVisual Display Boards

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 60 PAGES

10 10 00 SD-04 Samples 2.2.6Aluminum 2.2.1Porcelain Enamel 2.2Materials

SD-07 Certificates 1.3Visual Display Boards

10 14 01 SD-02 Shop Drawings

3.1 GApproved Detail Drawings

SD-03 Product Data Modular Exterior Signage System

3.1Installation

1.3 GExterior Signage

1.4Wind Load Requirements

SD-04 Samples

1.3 GExterior Signage

SD-10 Operation and Maintenance Data

3.1.2Protection and Cleaning 10 14 02 SD-02 Shop Drawings

3.1 GDetail Drawings

SD-03 Product Data

3.1 GInstallation

SD-04 Samples

1.3 GInterior Signage

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 60 PAGES

10 14 02 3.1Approved Manufacturer's Instructions

3.1.2Protection and Cleaning 10 21 13 SD-02 Shop Drawings

3.3 GInstallation Drawings

1.3Fabrication Drawings

SD-03 Product Data

1.3 GToilet Partition System

1.3Cleaning and Maintenance

Instructions 2.6Colors And Finishes 2.1.1Galvanized Steel Sheet 2.1.2Sound Deadening Cores 2.2Partition Panels and Doors 2.1.3Anchoring Devices and

Fasteners 2.1.5Hardware and Fittings 2.1.4Brackets 2.1.6Door Hardware

Ceiling-Hung Partitions Floor-Anchored Partitions

2.3Overhead-Braced Partitions SD-04 Samples

2.6 GColors and Finishes

2.2Partition Panels 3.2Partition Panels

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 60 PAGES

10 21 13 2.1.5Hardware and Fittings 2.1.3Anchoring Devices and

Fasteners SD-07 Certificates

1.7Certification SD-10 Operation and Maintenance Data

3.9Waste Management 10 26 13 SD-02 Shop Drawings

2.2Corner Guards SD-03 Product Data

2.2Corner Guards SD-04 Samples

2.3 GFinish

SD-06 Test Reports

2.2Corner Guards SD-07 Certificates

2.2Corner Guards 10 28 13 SD-03 Product Data

2.1.2Finishes

2.2 GAccessory Items

SD-04 Samples 2.1.2Finishes 2.2Accessory Items

SD-07 Certificates 2.2Accessory Items

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 60 PAGES

10 28 13 SD-10 Operation and Maintenance Data

2.2.18Electric Hand Dryer 10 44 16 SD-01 Preconstruction Submittals

2.1Manufacturer's Data SD-02 Shop Drawings

2.1Fire Extinguishers 2.4Accessories 2.5Cabinets 2.6Wall Brackets

SD-03 Product Data 2.1Fire Extinguishers 2.4Accessories 2.5Cabinets 2.6Wall Brackets 3.2.1Replacement Parts

SD-04 Samples 2.1Fire Extinguisher 2.1Cabinet 2.6Wall Brackets 2.4Accessories

SD-07 Certificates 2.1Fire Extinguishers 2.1Manufacturer's Warranty with

Inspection Tag 12 21 00 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 27 OF 60 PAGES

12 21 00 2.1 GHardware 3.2Installation

SD-03 Product Data

2.1 GWindow Blinds

2.1 GHardware

3.2Installation

SD-04 Samples

2.1 GWindow Blinds

2.1 GHardware

SD-06 Test Reports 2.1Window Blinds

SD-08 Manufacturer’s Instructions 2.1Window Blinds

SD-10 Operation and Maintenance Data

2.1Window Blinds 12 36 00 SD-02 Shop Drawings

2.3Fabrication 3.1Installation Drawings

SD-03 Product Data 2.2Corrosion-Resistant Steel 2.2Plywood 2.2Hardwood 2.3Granite 2.3Granite 2.3Marble

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 28 OF 60 PAGES

12 36 00 2.3Marble 2.3Synthetic resins 2.3Synthetic resins 2.3Stainless steel 2.3Stainless steel 2.3Tile 2.3Tile

2.3FRP

2.3FRP

2.2Adhesives 2.2Filler Material 2.2Particle Board 2.2Turpentine 2.2Varnish 2.2Fasteners 2.2Steel Sinks 2.2Service Fixtures 2.5Accessories and Hardware 2.2Softwoods 2.2Plastic Laminate

SD-04 Samples 2.3Counter Top 2.3Back Splash, 2.5Accessories and Hardware 2.1Manufacturer's Standard Color

Charts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 29 OF 60 PAGES

12 36 00 SD-07 Certificates 2.2Corrosion-Resistant Steel 2.2Plywood 2.2Hardwood 2.2Adhesives 2.2Filler Material 2.2Particle Board 2.2Turpentine 2.2Varnish 2.2Fasteners 2.2Steel Sinks 2.2Service Fixtures 2.5Accessories and Hardware

SD-08 Manufacturer’s Instructions 2.1Manufacturer's Instructions

12 48 13.13 SD-03 Product Data 2.1recycled material content

Entrance and Floor Mats 2.1protective flooring materials 2.1protective flooring materials

SD-04 Samples manufacturer's standard color charts

Entrance and Floor Mats 12 93 00 SD-02 Shop Drawings

2.5 GBenches

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 30 OF 60 PAGES

12 93 00 2.6 GBicycle Racks GBollards

1.5.3Assembly Instruction Drawings SD-03 Product Data

2.5Benches 2.6Bicycle Racks

Bollards 2.7Waste Receptacles

SD-04 Samples GFinish

SD-06 Test Reports 2.1.7Recycled Materials 3.3Testing

SD-07 Certificates 1.5.4Primer certificate 1.5.5Powder coatings certificate

21 13 13 SD-02 Shop Drawings

1.11 GShop Drawings

3.10 GAs-Built Drawings

SD-03 Product Data

3.1 GFire Protection Related

Submittals

3.4.1 G DOSway Bracing

2.3 GMaterials and Equipment

1.2.1.3 GHydraulic Calculations

1.10 GSpare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 31 OF 60 PAGES

21 13 13 Posted Instructions; G

3.9 GPreliminary Tests

3.10 GFinal Acceptance Test

3.11 GOn-site Training

1.7 G DOFire Protection Specialist

1.8 G DOSprinkler System Installer

SD-06 Test Reports

3.10 GPreliminary Test Report

3.10 GFinal Acceptance Test Report

SD-07 Certificates

3.3 GInspection by Fire Protection

Specialist SD-10 Operation and Maintenance Data

3.11Operating and Maintenance Instructions

21 30 00 SD-02 Shop Drawings

3.4 GInstallation Requirements

3.9.4 GAs-Built Drawings

1.3 GPiping Layout and Sensing piping

Arrangement SD-03 Product Data Fire Pump Installation Related Submittals; G

3.4 GInstallation Requirements

1.3Spare Parts

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 32 OF 60 PAGES

21 30 00 Preliminary Tests; G

3.9 GField Tests

1.7.1 GFire Protection Specialist

1.8 GManufacturer's Representative

3.10 GField Training

SD-06 Test Reports

3.9.2 GPreliminary Tests

SD-07 Certificates

1.7.1 GFire Protection Specialist

1.7.3 GQualifications of Installer

1.7.4 GPreliminary Test Certification

SD-10 Operation and Maintenance Data Fire Pumps; G

2.11 GFlow Meter

22 00 00 SD-02 Shop Drawings

3.9.1 GPlumbing System

SD-03 Product Data

2.4 GFixtures

2.4.1 GFlush valve water closets

2.4.2 GFlush valve urinals

Flush tank water closets

2.4.3 GCountertop lavatories

2.4.4 GKitchen sinks

2.4.5 GService sinks

2.4.6 GDrinking-water coolers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 33 OF 60 PAGES

22 00 00 2.8 GWater heaters

3.9.1.1 GBackflow prevention assemblies

3.4 GVibration-Absorbing Features

3.9.1Plumbing System

SD-06 Test Reports 3.9Tests, Flushing and Disinfection

3.9.1.1 GTest of Backflow Prevention

Assemblies SD-07 Certificates

1.3Materials and Equipment 2.1.1Bolts

SD-10 Operation and Maintenance Data

3.9.1 GPlumbing System

23 00 00 SD-02 Shop Drawings

1.4.5 G DODetail Drawings

SD-03 Product Data Metallic Flexible Duct

2.9.1.1Insulated Nonmetallic Flexible Duct Runouts

2.9.1.1Duct Connectors 2.9.2.1Duct Access Doors 2.9.2.2Fire Dampers 2.9.2.3Manual Balancing Dampers 2.9.4Sound Attenuation Equipment 2.9.4Acoustical Duct Liner

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 34 OF 60 PAGES

23 00 00 Diffusers Registers and Grilles

2.9.5Louvers 2.9.6Air Vents, Penthouses, and

Goosenecks 2.10.1.1In-Line Centrifugal Fans

2.11 G DOAir Handling Units

G DOEnergy Recovery Devices SD-06 Test Reports

3.12Performance Tests 3.14Performance Tests

3.10 GDamper Acceptance Test

SD-08 Manufacturer’s Instructions 3.2Manufacturer's Installation

Instructions SD-10 Operation and Maintenance Data

3.14Operation and Maintenance Manuals

2.9.2.2 GFire Dampers

2.10.1.1 GIn-Line Centrifugal Fans

2.11 G DOAir Handling Units

G DOEnergy Recovery Devices 23 05 93 SD-02 Shop Drawings

3.3TAB Schematic Drawings and Report Forms

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 35 OF 60 PAGES

23 05 93 SD-03 Product Data 3.2TAB Related HVAC Submittals

3.5.1 GTAB Procedures

1.4Calibration 3.5.2Systems Readiness Check 3.5.1TAB Execution

3.5.4 GTAB Verification

SD-06 Test Reports

3.1 GDesign Review Report

3.5.2 GSystems Readiness Check

3.5.3 GTAB Report

3.5.4 GTAB Verification Report

SD-07 Certificates 3.4Ductwork Leak Testing

1.5.1 GTAB Firm

1.5.2 GTAB Specialist

23 07 00 SD-02 Shop Drawings

3.2.2.4 GMica Plates

SD-03 Product Data 2.1General Materials 2.1.1Adhesives 2.1.13Sealants 2.3.1Duct Insulation 2.3.3Duct Insulation Jackets 2.2Pipe Insulation Materials 2.1.8Jackets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 36 OF 60 PAGES

23 08 00 SD-02 Shop Drawings

1.6 GCommissioning Plan

SD-03 Product Data

3.2.1 GPre-Functional Performance Test

Checklists

3.2.2 GFunctional Performance Tests

SD-06 Test Reports

3.3 GCommissioning Report

SD-07 Certificates 1.5.1Commissioning Firm 1.5.2Commissioning Specialist

23 09 23 SD-02 Shop Drawings

3.2.1 GDDC Contractor Design Drawings

3.2.2 GDraft As-Built Drawings

3.2.3 GFinal As-Built Drawings

SD-03 Product Data

2.1.1 GManufacturer's Catalog Data

SD-06 Test Reports

3.5 GStart-Up and Start-Up Testing

Report

3.6.1 GPVT Procedures

3.6.3 GPVT Report

1.6Pre-Construction QC Checklist 1.6Post-Construction QC Checklist

SD-10 Operation and Maintenance Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 37 OF 60 PAGES

23 09 23 1.8 GOperation and Maintenance (O&M) Instructions

23 36 00 SD-02 Shop Drawings 2.1Single-Duct Air Terminal Units 1.3Record Drawings 1.3Spare Parts

SD-03 Product Data 2.1Single-Duct Air Terminal Units

SD-10 Operation and Maintenance Data

3.3Operation and Maintenance Manuals

23 37 13 SD-02 Shop Drawings 2.1Fabrication Drawings

SD-03 Product Data 1.3Equipment and Performance

Data 23 52 00 SD-02 Shop Drawings

3.3Piping Installation 3.3.4.3Installation 3.3.7Installation

SD-03 Product Data 2.1.1Materials and Equipment 1.5Spare Parts 2.13Water Treatment System 2.13Boiler Water Treatment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 38 OF 60 PAGES

23 52 00 3.9Heating System Tests 3.12Fuel System Tests 2.7Unit Heaters 1.3Welding 3.9Qualifications 3.11Field Instructions 3.4Tests

SD-06 Test Reports 3.9Heating System Tests 3.12Fuel System Tests 3.9.1Water Treatment Testing

SD-07 Certificates Continuous Emissions Monitoring

2.1.3Energy Star SD-10 Operation and Maintenance Data

3.11Operation and Maintenance Instructions

2.13Water Treatment System 23 64 26 SD-03 Product Data

2.3.6 G DOCalibrated Balancing Valves

2.3.7 G DOAutomatic Flow Control Valves

Pump Discharge Valve 2.3.9Pressure Relief Valve 2.3.10Combination Pressure and

Temperature Relief Valves

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 39 OF 60 PAGES

23 64 26 2.5 G DOPumps 2.4.3Combination Strainer and Pump

Suction Diffuser 2.6Expansion Tanks 2.7Air Separator Tanks

2.8 GWater Treatment Systems

SD-06 Test Reports 3.1.1.3Piping welds NDE report

3.4.2 GPressure tests reports

SD-07 Certificates 3.1.1.1Employer's Record Documents

(For Welding) 3.1.1.2Welding Procedures and

Qualifications Fittings Unions Flanges Gaskets Bolting

SD-10 Operation and Maintenance Data

2.8 GWater Treatment Systems

2.3.6 G DOCalibrated Balancing Valves

2.3.7 G DOAutomatic Flow Control Valves

GPump Discharge Valve

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 40 OF 60 PAGES

23 64 26 2.3.10 GCombination Pressure and Temperature Relief Valves

2.5 G DOPumps

2.4.3 GCombination Strainer and Pump

Suction Diffuser

2.6 G DOExpansion Tanks

2.7 G DOAir Separator Tanks

23 81 23.00 20 SD-03 Product Data

2.1 GComputer room air conditioning

units

2.2.2 GSpace temperature control

system drawings SD-06 Test Reports

GField test schedule GManufacturer's field test plans

3.3.3 GField test reports

2.1.2Aquatic toxicity

SD-07 Certificates GCertificate of Specification

Compliance GCredentials of the manufacturer's field test representative SD-08 Manufacturer’s Instructions

3.1.2Installation manual for each type of CRACU

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 41 OF 60 PAGES

23 81 23.00 20 SD-10 Operation and Maintenance Data

2.1 GComputer room air conditioning

units

23 82 19 SD-02 Shop Drawings 1.3Fabrication Drawings 3.1Installation Drawings

SD-03 Product Data 1.3Equipment and Performance

Data 2.4Coils 2.2Casing

Enclosure 2.7Motors 2.3Fan 2.5Drain Pans 2.6Filters 2.8Controls 1.3Vibration Isolation

SD-07 Certificates 1.3Listing of Product Installations 2.4Coils 2.2Casing

Enclosure 2.7Motors 2.3Fan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 42 OF 60 PAGES

23 82 19 2.5Drain Pans 2.6Filters 2.8Controls

SD-10 Operation and Maintenance Data

3.3Operation and Maintenance Manuals

26 05 48 SD-02 Shop Drawings 3.2Lighting Fixtures in Buildings 1.4Equipment Requirements

SD-03 Product Data

3.2 GLighting Fixtures in Buildings

1.4 GEquipment Requirements

1.3.4 GContractor Designed Bracing

26 20 00 SD-02 Shop Drawings

2.15 GPanelboards

2.19 GTransformers

2.4 GBusway

2.5 GCable trays

2.32 GWireways

SD-03 Product Data

2.14 GReceptacles

2.15.3 GCircuit breakers

2.16.2 GCircuit breakers

2.12 GSwitches

2.19 GTransformers

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 43 OF 60 PAGES

26 20 00 2.17 GEnclosed circuit breakers

2.21 GMotor controllers

2.23.2 GCombination motor controllers

2.22 GManual motor starters

2.33 GMetering

CATV outlets 2.26.3Grounding Busbar

2.34 GSurge protective devices

SD-06 Test Reports

3.5.2 G600-volt wiring test

3.5.5 GGrounding system test

3.5.3 GTransformer tests

3.5.4 GGround-fault receptacle test

SD-07 Certificates

2.13 GFuses

SD-09 Manufacturer’s Field Reports

2.36.1Transformer factory tests SD-10 Operation and Maintenance Data

1.5.1 GElectrical Systems

26 28 01 SD-03 Product Data

2.7Fault Current Analysis 2.7Protective Device Coordination

Study 2.1Equipment

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 44 OF 60 PAGES

26 28 01 1.4.1System Coordinator Protective Relays

3.2Installation 2.7.6Arc Flash Hazard Analysis

SD-06 Test Reports 3.3Field Testing

SD-07 Certificates 1.6Devices and Equipment

26 29 23 SD-02 Shop Drawings 1.5.1Schematic diagrams 1.5.2Interconnecting diagrams 1.5.3Installation drawings

SD-03 Product Data

2.1 GVariable frequency drives

2.3Wires and cables 1.5.4Equipment schedule

SD-06 Test Reports VFD Test

3.2.1Performance Verification Tests 3.2.2Endurance Test

SD-08 Manufacturer’s Instructions 1.5.5Installation instructions

SD-09 Manufacturer’s Field Reports VFD Factory Test Plan

1.5.6Factory test results

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 45 OF 60 PAGES

26 29 23 SD-10 Operation and Maintenance Data

2.1 GVariable frequency drives

26 32 15.00 10 SD-02 Shop Drawings

1.4.7 GDetailed Drawings

3.10 GAcceptance

SD-03 Product Data 1.2.10Harmonic Requirements 1.2.1Engine-Generator Parameter

Schedule 2.8.2Heat Exchanger 2.16Generator 2.5Manufacturer's Catalog 1.4.2Site Welding 1.6Spare Parts 3.7Onsite Training 1.2.7Vibration-Isolation

3.9 GPosted Data and Instructions

3.6.4.1 GInstructions

1.4.5Experience 1.4.6Field Engineer 3.2General Installation

SD-05 Design Data 2.16Performance Criteria

2.9 GSound Limitations

2.6.4Integral Main Fuel Storage Tank

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 46 OF 60 PAGES

26 32 15.00 10 Day Tank 3.6.1.2Power Factor 2.20.5Time-Delay on Alarms 2.14.3.2Battery Charger

SD-06 Test Reports 2.28Factory Inspection and Tests 2.28.2Factory Tests

3.6 GOnsite Inspection and Tests

SD-07 Certificates 2.8Cooling System 2.8Cooling System 1.2.7Vibration Isolation 2.28.2Prototype Test 1.2.5Reliability and Durability 2.13Emissions 2.9Sound Limitations 3.1Site Visit 2.16.1Current Balance 2.4Materials and Equipment 3.6.3Inspections

SD-10 Operation and Maintenance Data

3.7 GOperation and Maintenance

Manuals

3.7 GMaintenance Procedures

2.15Special Tools

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 47 OF 60 PAGES

26 32 15.00 10 2.7.2Filters 26 36 00.00 10 SD-02 Shop Drawings

1.3.1Detail Drawings 2.2Equipment 3.1Installation

SD-03 Product Data 2.2Material 2.2Equipment

SD-06 Test Reports 2.10Testing

SD-07 Certificates 2.2Equipment 2.2Material 1.3.2Switching Equipment

SD-10 Operation and Maintenance Data

1.3.2Switching Equipment 3.2Instructions

26 42 14 SD-02 Shop Drawings 1.3.8Drawings 1.3.2Contractor's Modifications

SD-03 Product Data

1.3 GEquipment

3.9Spare Parts

SD-06 Test Reports

3.5 GTests and Measurements

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 48 OF 60 PAGES

26 42 14 1.3.2 GContractor's Modifications SD-07 Certificates

1.3Cathodic Protection System

1.3.1 GServices of 'Corrosion Expert'

SD-10 Operation and Maintenance Data

1.3Cathodic Protection System 3.6Training Course

26 51 00 SD-03 Product Data

2.1 GFluorescent lighting fixtures

1.6.1 GFluorescent electronic ballasts

2.1.3 GFluorescent lamps

GHigh-pressure sodium (HPS) lamps

2.5.2 GDimmer switch

2.9 GPower hook fixture hangers

2.10 GExit signs

2.11 GEmergency lighting equipment

2.12 GOccupancy sensors

2.1.2 GElectronic dimming ballast

2.1.3 GDimming ballast controls

SD-06 Test Reports 3.3Operating test

SD-10 Operation and Maintenance Data

1.4.1 GLighting Control System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 49 OF 60 PAGES

26 56 00 SD-02 Shop Drawings

1.4.1.1 GLuminaire drawings

SD-03 Product Data 1.5.2Energy Efficiency

2.2 GLuminaires

2.2.1 GLamps

2.2.2 GBallasts

2.3 GLighting contactor

2.4 GTime switch

2.5 GPhotocell switch

2.6Brackets

SD-05 Design Data

1.4.2 GDesign Data for luminaires

SD-06 Test Reports 3.2Operating test

SD-08 Manufacturer’s Instructions Concrete poles Fiberglass poles

SD-10 Operation and Maintenance Data

1.8Operational Service 27 10 00 SD-01 Preconstruction Submittals

Communications Distribution System Drawings

SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 50 OF 60 PAGES

27 10 00 GCopper Wire and Fiber Optic Cable Test Reports

SD-07 Certificates 1.3Qualifications

Communications Distribution System

2.1Materials and Equipment

1.3.1 GInstallers

SD-08 Manufacturer’s Instructions Manufacturer's Recommendations

SD-11 Closeout Submittals Communications Distribution System Drawings

28 16 01 SD-03 Product Data GIntrusion Detection System and

Access Control 2.1.5.1Key Control Plan 1.3.15Spare Parts

3.1 GManufacturer's Instructions

1.4 GTesting

1.6Experience

SD-06 Test Reports 3.3.3Performance Verification Test 2.1.1Materials and Equipment

28 31 76 SD-02 Shop Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 51 OF 60 PAGES

28 31 76 3.2.1 GWiring Diagrams

1.4.1 GSystem Layout

2.2 GSystem Operation

2.16 GNotification Appliances

2.14 GAmplifiers

3.6.2As-Built Drawings

SD-03 Product Data

1.9 GTechnical Data And Computer

Software

2.12 GFire Alarm And Mass Notification

Control Panel (FACP/FMCP)

2.15 GManual stations

2.21 GTransmitters

2.11.1 GBatteries

2.11.2 GBattery chargers

2.9 GSmoke sensors

2.23 GWiring

2.16 GNotification appliances

2.6 GAddressable interface devices

GRemote annunciator

2.14 GAmplifiers

2.19 GWaterflow detectors

2.18 GTamper switches

2.21.1 GRadio transmitter and interface

panels SD-05 Design Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 52 OF 60 PAGES

28 31 76 2.2 GSystem Operation

2.11.1.2 GBattery power

2.21.1 GBattery power

SD-06 Test Reports 3.6Field Quality Control

3.6.1 GTesting Procedures

2.9.3 GSmoke sensor testing

SD-07 Certificates 1.5.1.4Installer

SD-09 Manufacturer’s Field Reports

1.5.3.2Mass Notification System SD-10 Operation and Maintenance Data

1.7 GOperation and Maintenance

(O&M) Instructions

3.7Instruction of Government Employees

31 00 00 SD-01 Preconstruction Submittals

3.4 GShoring

SD-03 Product Data 3.8Utilization of Excavated Materials 1.4.1.2Rock Excavation 3.3Opening of any Excavation or

Borrow Pit 3.14Shoulder Construction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 53 OF 60 PAGES

31 00 00 SD-06 Test Reports 3.17Testing 2.1Borrow Site Testing

SD-07 Certificates 3.17Testing

31 11 00 SD-03 Product Data

3.4.1 GNonsaleable Materials

32 01 19 SD-03 Product Data Manufacturer's Recommendations

1.3Equipment SD-04 Samples

1.5.2Materials 32 11 23 SD-03 Product Data

1.4Plant, Equipment, and Tools 1.1.4Waybills and Delivery Tickets

SD-06 Test Reports

1.6 GSampling and Testing

1.6.2.4 GField Density Tests

32 12 10 SD-03 Product Data 1.1.3Waybills and Delivery Tickets

SD-06 Test Reports 3.7Sampling and Testing

32 12 16 SD-03 Product Data

2.3 G DOMix Design

3.10 G POContractor Quality Control

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 54 OF 60 PAGES

32 12 16 G ROMaterial Acceptance and Payment

SD-04 Samples 2.2Asphalt Cement Binder 2.1Aggregates

SD-06 Test Reports

2.1 G DOAggregates

3.10.3.10QC Monitoring

SD-07 Certificates

2.2 G POAsphalt Cement Binder

3.6Testing Laboratory

32 13 13.03 SD-03 Product Data 1.9Equipment

1.10 GProposed Techniques

SD-05 Design Data

2.11.2 G DOProportioning Studies

SD-06 Test Reports

1.6 G DOSampling and Testing

3.12.2.2Concrete Slump 3.12.2.2Air Content 3.12.2.2Pavement Thickness 3.12.2.2Flexural Strength

Control Charts SD-07 Certificates

1.7.1 GContractor Quality Control Staff

1.7.3 GLaboratory Accreditation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 55 OF 60 PAGES

32 13 13.03 1.6 G EDCommercial Laboratory 32 15 00 SD-03 Product Data

1.3.4Equipment SD-06 Test Reports

1.3Sampling and Testing 3.12Density Tests

32 16 13 SD-03 Product Data 2.1Concrete

SD-06 Test Reports 3.8Field Quality Control

32 17 24 SD-03 Product Data

1.4 G REEquipment

2.2.1Composition Requirements

Qualifications SD-06 Test Reports

2.5Sampling and Testing SD-07 Certificates

2.2.3Volatile Organic Compound

(VOC)

32 31 00 SD-07 Certificates 2.1.1Chain Link Fence

32 84 23 SD-02 Shop Drawings 3.1Sprinkler System

SD-03 Product Data 3.3Framed Instructions 3.4Field Training

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 56 OF 60 PAGES

32 84 23 3.1Sprinkler System Spare Parts Design Analysis and Calculations

SD-06 Test Reports 3.2Field Tests

SD-07 Certificates 3.1Sprinkler System

SD-10 Operation and Maintenance Data

3.1Sprinkler System 32 93 00 SD-01 Preconstruction Submittals

1.4.3State Landscape Contractor's License

1.6Time Restrictions and Planting Conditions

SD-03 Product Data 1.8.1Local/Regional Materials 2.3.5Peat 2.3.8Composted Derivatives 2.3.11Rotted Manure 2.8.2Organic Mulch Materials 2.3.9Gypsum 2.7Drainage Pipe

2.8 GMulch

2.9.1.2Ground Stakes 2.9.1.2Ground Stakes

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 57 OF 60 PAGES

32 93 00 2.10.2Recycled Plastic Edging 2.14.1Hose 2.5Fertilizer

1.5.2.4 GWeed control fabric

1.5.2.4 GRoot control barrier

2.9.1Staking Material 2.10.1Wood Edging 2.9.7Metal anchors 2.11Antidesiccants 2.12Erosion control materials

1.4.4 GPhotographs

SD-04 Samples

2.8 GMulch

SD-06 Test Reports 1.4.1Topsoil composition tests 2.2.4Topsoil composition tests 1.4.5Percolation Test

SD-07 Certificates 1.8.3Forest Stewardship Council

(FSC) Certification 1.4.2Nursery certifications 2.1.1Nursery certifications

SD-10 Operation and Maintenance Data

1.8.2Plastic Identification 33 11 00 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 58 OF 60 PAGES

33 11 00 3.1Installation Waste Water Disposal Method Satisfactory Installation

SD-06 Test Reports Bacteriological Disinfection

SD-07 Certificates 1.3Manufacturer's Representative 3.1Installation 2.7.5Meters

33 30 00 SD-03 Product Data 2.1Pipeline materials

SD-07 Certificates Portland Cement Joints

33 40 01 SD-03 Product Data 3.2.2Placing Pipe

SD-07 Certificates 2.1.2Resin Certification

3.7 G REPipeline Testing

2.5 G REHydrostatic Test on Watertight

Joints

3.6.3 G REDetermination of Density

2.2.4Frame and Cover for Gratings

33 51 01 SD-02 Shop Drawings Gas Piping System; G

SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 59 OF 60 PAGES

33 51 01 1.3.1Welding SD-06 Test Reports

3.16Testing 3.16.1Pressure Tests

Pressure Tests for Liquified Petroleum Gas

3.16.2Test With Gas 33 51 03 SD-02 Shop Drawings

2.1Pipe, Fittings, and Associated Materials

SD-03 Product Data 1.3.3Materials and Equipment 1.3.6Spare Parts

3.11 G REConnections to Existing Lines

1.3.1 G REWelding Steel Piping

1.3.2 G REJointing Polyethylene Piping

G REConnection and Abandonment Plan

SD-06 Test Reports

3.13.2 G REPressure and Leak Tests

SD-07 Certificates 3.11.1Utility Work 1.3.2Training

SD-10 Operation and Maintenance Data

3.6Gas Distribution System

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 60 OF 60 PAGES

41 22 15 SD-02 Shop Drawings

1.3 GElectric Overhead Cranes

SD-03 Product Data 1.5.1.2Crane Design Criteria 3.2.1.4Hooks 1.3Electric Overhead Cranes 3.6Spare Parts 2.1.4Framed Instructions

SD-06 Test Reports 3.2Acceptance Testing

SD-10 Operation and Maintenance Data

3.5 GOperation and Maintenance

Manuals

48 14 00 SD-03 Product Data G DOPhotovoltaic Modules G DOPhotovoltaic Inverters G DOCheck Meters…