CLIENTE
CANTIERE
Rev.00 del 26 Agosto 2019
“Project EA 00235-9 Install Salt Barrier Gate, ASA”
ALLEGATO 4
CRONOPROGRAMMA
Department of the Army U.S.
Camp Darby - Livorno
LUN
MON
MAR
TUE
MER
WED
GIO
THU
VEN
FRI
SAB
SAT
DOM
SUN
LUN
MON
MAR
TUE
MER
WED
GIO
THU
VEN
FRI
SAB
SAT
DOM
SUN
LUN
MON
MAR
TUE
MER
WED
GIO
THU
VEN
FRI
SAB
SAT
DOM
SUN
LUN
MON
MAR
TUE
MER
WED
GIO
THU
VEN
FRI
SAB
SAT
DOM
SUN
LUN
MON
MAR
TUE
MER
WED
GIO
THU
VEN
FRI
SAB
SAT
DOM
SUN
Apprestamento area di cantiere realizzazione well point e altre opere propedeutiche scavi potatura e sitsemazione a verde per lavorazioni con mezzi movimentazione terra e tiri in quota movimento terra scavi a sezione ristretta opere di carpenteria setsura ferri armatura getti e realizzazione fondazioni movimentazione meccanica e tiri in quota saldature e lavorazioni di carpenteria metallica realizazione scavi a sezione obbligata realizzaizone cavidotti per corrugati realizzazione impianto elettrico
Pozzetti ripristino pavimentazioni ove necessario
Smobilizzo cantiere
ALLEGATO 3
CRONOPROGRAMMA
WEEK 4
Camp Darby – Livorno
WEEK 3WEEK 2WEEK 1 WEEK 5
"Project EA 00235-9 Install Salt Barrier Gate, ASA”