SOLICITATION_W912PF-18-R-0010_-_CLARIFICATIONS.pdf
PDF 111 KB Posted
- Solicitation number
- W912PF-18-R-0010
About this file
FORM "SOLICITATION W912PF-18-R-0010 - CLARIFICATIONS"
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Attachment2PastPerformanceQuest.pdf | ||
| Attachment3RequisitiGenerali.pdf | ||
| Attachment4RequisitiGeneraliBIS.pdf | ||
| W912PF18R0010.pdf | ||
| Attachment1PastExperienceQuest.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION W912PF-18-R-0010
“INTERNAL AND EXTERNAL PREPARATION AND PAINTING OF VARIOUS
BUILDINGS”
CLARIFICATIONS
QUESTION:
In the line items indicated at Section B (from item 0001 to 0028) some of them specify the maximum height of the work to be performed while others do not specify any height (for example line item 0005 Internal Civil plaster). Please let us know which is the maximum height to be taken into consideration, for these items, for a correct preparation of the offer.
REPLY:
Where no specified, the maximum height is 4.50 m. If walls exceed this limit the use of scaffolding or platform (items 26 and 27) will be counted.
QUESTION:
Reference the material inside the building where the work has to be performed I would like to know if the removal of this stuff is at Contractor’ expense.
REPLY:
Except for sensitive or particular stuff that will be moved from User, the rest of stuff inside the rooms will be moved out and back in place by the painting Contractor.