AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Update paragraph 5.2.1 of PWS w ith Bldg. 181 chiller information

2) Include the updated Techincal Exhibit 1 CLIN pricing

3) Address Pre-Quote Inquiries

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

Y 1 21

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 14-Jun-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912PF19Q0031

X 9B. DATED (SEE ITEM 11)

21-May-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

12-Jun-2019

CODE

414TH CSB - PARC AFRICA

VIA DELLA PACE #197

VICENZA (VI) 36100

W912PF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912PF19Q0031

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

Q&A'S

QUESTIONS AND ANSWERS

Q1. Reference par. 1.5.8 Special Qualifications: “a) At least four Contractor’s employees shall possess a refrigeration license F-GAS…”. This specific requirement seems to exceed the actual needs for this contract since one (1) single employee with F-GAS refrigeration license allows a firm to perform labor works for an amount up to 200.000,00 € (as per ACCREDIA Technical Regulation RT-29 rev.02). Would the Government consider to revise this specific requirement reducing the number of employees in possess of F-GAS certification directly employed by the main contractor?

R1. The requirement remains unchanged.

Q2. Reference par. 5.5.5 Quality Standards, 5.5.5.1 states that the cleaning activities shall ensure a maximum limit of 0,075 g/mq of deposited particulate after the cleaning, detected with the method of “VACUUM TEST NADCA”. Based on technical reviews COLLOM or similar methods work very well on brand new ductwork where the main issue consists of dust deposited upon the inner surface of the ducts themselves.

COLLOM approach may result by far less effective in guaranteeing the level of results required by this SOW when it comes to thoroughly clean an older ductwork covered with multiple layers of dust, humidity and other foreign matters. A mechanical cleaning type of work is for sure more effective and long lasting than COLLOM and can for sure guarantee the required level of output required by this SOW. Can the Government allow other methodologies rather than just COLLOM?

R2. The requirement remains unchanged. Use of an air blade allows the removal of dirt while at the same time maintaining integrity of the ducts and their internal insulation where present.

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

LIST OF ATTACHMENTS

Attachment 1: Antimafia Self‐certification

Attachment 2: Past Performance Questionnaire

Attachment 3: Suitability of the contractor

Technical Exhibit 1 – CLIN Pricing_Updated31MAY19

PERFORMANCE WORK STATEMENT

PART 1

GENERAL INFORMATION

1. General: This is a non-personnel services contract to provide maintenance of chillers, absorbers, cooling towers and air ducts cleaning at USAG-Italy, Vicenza. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Services/Introduction: The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform the maintenance of chillers, absorbers, cooling towers and air ducts cleaning as defined in this PWS. The contractor shall perform to the standards in this contract.

1.2 Background: The requirement consists of the following:

- Maintenance of chillers at Ederle, Del Din and Villaggio;

- Maintenance of the Absorbers at Ederle and Del Din;

- Maintenance of the cooling towers at Ederle and Del Din;

- Cleaning of the air ducts at Ederle, Del Din and Villaggio.

1.3 Scope: The Contractor shall provide all the services necessary to perform the maintenance of the chillers, the Absorber, the cooling towers and air ducts.

1.4 Period of Performance: The period of performance shall be for a Base Period of 12 months and Two

(2) 12-month option periods.

1.5 General Information

1.5.1 Quality Control (DELIVERABLE 0005): The contractor shall develop and maintain an effective Quality Control Plan (QCP) to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s QCP is the means by which he assures himself that his work complies with the requirement of the contract. The contractor shall submit the QCP to the COR for approval within 7 (seven) calendar days after contract award. After acceptance of the QCP, the contractor shall receive the Contracting Officer’s (KO) acceptance, in writing, of any proposed change to the QCP.

1.5.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).

1.5.3 Recognized Holidays:

U.S. HOLIDAYs DATE New Year's Day January 1st Martin Luther King Memorial Day 3rd Monday in January Presidents' Day 3rd Monday in February Memorial Day Last Monday in May Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veterans' Day November 11t Thanksgiving Day 4th Thursday in November

Christmas Day December 25th

ITALIAN HOLIDAYS DATE

New Year's Day 1 January Epiphany Day 6 January Easter Monday Varies yearly Liberation Day 25 April Labor Day 1 May Republic Day 2 June Assumption Day 15 August Local Holiday * 8 September * All Saints’ Day 1 November Immaculate Conception Day 8 December Christmas Day 25 December Saint Stephen’s Day 26 December

Any routine service called for under this contract shall be performed during normal duty hours, 0800 through 1700 hours, Monday through Friday. Work shall not be performed either on Italian and American holidays or on local holidays occurring during the normal work week. When an American holiday occurs on a Saturday or a Sunday, the holiday is observed on the preceding Friday or following Monday, respectively. In exceptional circumstances only, the Government reserves the right to request service during other than normal duty hours, on Sunday or during Italian and American Holidays.

1.5.4 Hours of Operation: The Contractor is responsible for conducting business from 0800 through 1700, Monday thru Friday except for Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce to ensure the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.

1.5.5 Place of Performance: The work to be performed under this contract will be performed at USAG Italy, which includes the following installations: Camp Ederle (Vicenza), Villaggio della Pace Housing Area (Vicenza), and Del Din (Vicenza).

1.5.6 Type of Contract: The Government intends to award a combination Time and Materials and Firm Fixed Price contract.

1.5.7 Security Requirements- AT level 1 training: (DELIVERABLE 0003) . All Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, and controlled-access areas will complete AT Level 1 awareness training within 30 calendar days after the contract start-date or effective date, or incorporation of this requirement into the contract, whichever is applicable. The Contractor will submit certificates of completion of each affected Contractor’s employee and subcontractor’s employee to the contracting officer prior to issuance of installation access passes. AT Level 1 awareness training is availbale online at https://atlevel1.dtic.mil/at .

1.5.7.1 Access and General Protection/Security Policy and Procedures: The Contractor and all associated subcontractor employees shall comply with applicable installation, facility, and area commander installation/facility access and local security policy and procedures (provided by Government representative). The Contractor shall also provide all information required for background checks to meet installation-access requirements to be accomplished by the installation provost marshal office, director of emergency services, or security office. The Contractor workforce shall comply with all personal identity verification requirements as directed by DOD, HQDA, and local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the force protection condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

1.5.7.2 iWATCH/iSALUTE Training (DELIVERABLE 0002). The contractor and all associated subcontractors will brief all employees on the local iWATCH/iSALUTE program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training will be completed within 30 calendar days after the contract is awarded and within 30 calendar days after new employees commence contract performance, with the results reported to the COR.

1.5.7.3 PHYSICAL Security: The Contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.

1.5.7.4 Key Control N.A.

1.5.7.5 Lock Combinations N.A.

1.5.7.6 Combating Trafficking in Persons: Contractor shall maintain 100% compliance at all times with FAR clause 52.222-50, Combating Trafficking in Persons. Paragraph (e) of the clause provides the remedies available to the Government for Contractor failure to comply with the requirements of the clause. (Deliverables 4).

1.5.8. Special Qualifications:

a) At least four Contractor’s employees shall possess a refrigeration license F-Gas, at least two Contractor’s personnel shall possess license “PES”, certificate of compliance F-GAS for the firm in accordance with

CE#303/2008.

b) Contractor/Subcontractor shall be specialized in environmental reclaims related to mechanical ventilation systems and shall possess the following requirements:

- Being registered to the AIISA association (Associazione Igienisti sistemi Aeraulici);

- Being a member of the Associazione Americana NADCA (National Air Duct Cleaners Association);

- One technician, with the role of operative coordinator on-site, regularly employed by the Contractor, who owns the certification ASCS (Air Systems Cleaning Specialist) NADCA released after the completion of technical exham at the Association;

- ISO 9001:2008 certification related to the activity of reclaim of HVAC air ductworks;

- Minimum one employee Engineer or Perito or Geometra, in any case with mechanical specialization;

- Being registered to the Camera del Commercio as per “D.Lgs. n° 37 del 2008 della attività per la lettera C: Impianti di Climatizzazione e Condizionamento e Ventilazione ed Aereazione dei locali”;

c) Contractor/Subcontractor shall be registered to the “Albo Nazionale dei Gestori di Rifiuti Ambientali”.\

d) The contractor shall provide the list of equipment, with serial numbers including the equipment for microbiological sampling for review and approval by the COR.

1.5.9 Post Award Conference/Periodic Progress Meetings: The contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the Contractor to review the Contractor's performance. At these meetings the Contracting Officer will apprise the Contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

1.5.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:

perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.

1.5.11 Key Personnel (DELIVERABLE 0004): Provide contact information of Contractor’s key personnelno later than seven (7) calendar days after contract award.

1.5.12 Identification of Contractor Employees (DELIVERABLE 0001): All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that Contractor participation is appropriately disclosed. The Contractor shall furnish an identifying badge, which shall include at a minimum, the company’s name and the employee’s last name. The badge will be worn on an outer garment and be visible at all times.

1.5.13 Contractor Travel: N.A.

1.5.14 Other Direct Costs: N.A.

1.5.15 Data Rights: N.A.

1.5.16 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to, or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.

1.5.17 PHASE IN /PHASE OUT PERIOD : N.A.

PART 2

DEFINITIONS & ACRONYMS

2. DEFINITIONS AND ACRONYMS:

2.1. DEFINITIONS:

2.1.1. CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.

2.1.2. CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

2.1.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

2.1.4. DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.

2.1.5. DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.

2.1.6. KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

2.1.7. PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.

2.1.8. QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

2.1.9. QUALITY ASSURANCE Surveillance Plan (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

2.1.10. QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

2.1.11. SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.

2.1.12. WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.

2.1.12. WORK WEEK. Monday through Friday, unless specified otherwise.

2.2. ACRONYMS:

ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List

DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center

DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996 KO Contracting Officer OCI Organizational Conflict of Interest

OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit

PART 3

GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES

3. GOVERNMENT FURNISHED ITEMS AND SERVICES:

3.1. Services: The Government will provide fire protection. Contractor is responsible for coordinating with the COR to obtain a Hot Work permit from the Fire Department before starting any work with an open flame.

• FIRE PROTECTION:

PHONE # 0444-717092

DSN 117

• SECURITY POLICE:

PHONE # 0444-717114

DSN 114

3.2 Facilities: N.A.

3.3 Utilities: The Government will furnish sewage, water and electricity at no cost to the Contractor. The Contractor shall use Government furnished utilities in a prudent manner consistent with current energy conservation policies. The Contractor shall instruct employees in utilities conservation practices. The contractor shall be responsible for operating under conditions that preclude the waste of utilities, which include turning off the water faucets or valves after using the required amount to accomplish cleaning vehicles and equipment.

3.4 Equipment: The Government will not provide any equipment.

3.5 Materials: All material used, partially or totally, to perform works required in this contract and not furnished by the U.S. Government, shall be included in the total contract cost and are, in no case, to be reimbursed by the U.S. Government.

PART 4

CONTRACTOR FURNISHED ITEMS AND SERVICES

4. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:

4.1 General: The contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

4.2 Secret Facility Clearance: N.A.

4.3. Materials: All material used, partially or totally, to perform works required in this contract and not furnished by the U.S. Government, shall be included in the total contract cost and cannot be reimbursed by the U.S.

Government.

4.4. Equipment: The contractor shall furnish all necessary equipment, tools, supplies, and any other material necessary for the efficient, safe performance of this contract. Equipment shall be the type and size suitable for commercial operations.

4.5. Accidents: The contractor shall be responsible for complying with any, and municipal laws, codes and regulations applicable to the performance of the work. The contractor shall also be responsible for all damages to persons or property that occurs as a result of the contractor’s fault or negligence. The contractor shall be responsible for all materials delivered and work performed until completion and acceptance of the entire work, except for any completed unit of work which have been accepted under the contract.

4.6. Conduct of Operations and Personnel: The contractor shall ensure all the works are conducted in a manner that will minimize interference with the work of the Government personnel and other contractors.

4.7. Clean-up and Disposal: The contractor shall clean up the works area at the completion of the specific task, or at the close of each workday, whichever comes first, and dispose of waste generated in the performance of this contract in compliance with all applicable Italian laws and regulations.

4.8 Environmental reporting: The contractor shall provide the following information semi-annually to be used by the Government to address environmental performance relative to the goals of the USAG Italy Environmental Management System. Please note that the amounts reported are those used/generated by the contractor regardless of source (private purchase or Government furnished). Reports for January – June will be submitted by 15 July and reports for July-December will be submitted by 15 January each year.

Media Report Element #1 Report Element #2

Non-Hazardous Solid Waste

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Construction Debris/Demolition Materials

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Compostable/Organic Material

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Hazardous Materials Total Used (Kg) Hazardous Waste Total Generated (Kg) Total Recycled (Kg) Energy Consumption - Electricity

Total Energy Consumed (MBtu)

Energy Consumption - Fuel Total Fuel Consumed (L) Renewable/Alternative Energy

Total Consumed (MW)

Facility Construction/Renovation

Number of Buildings LEED Certified Silver or Higher

SqFt of buildings LEED Certified

PART 5

SPECIFIC TASKS

5. SPECIFIC TASKS:

5.1. Basic Services. The contractor shall provide maintenance of the chillers, absorbers, cooling towers and cleaning of ducts at USAG-Italy, Vicenza.

5.2 Maintenance of “Chillers”:

5.2.1 Service: The purpose of this service is the execution of scheduled maintenance on refrigeration units installed on Caserma Ederle, Caserma Del Din, and Villaggio della Pace in Vicenza, Italy.

Chillers (Caserma Ederle)

Bldg. Brand Model Roll list Year

10 McQuay WHS 196,2 XE ST 504301 2005

29 McQuay ECOPLUS 120.2 504300 2005

170 McQuay ALR 200.2 ST 404263 2005

206 Clivet WDH HE 2.340 AA3LA23B0001 2013

206 Clivet WDH HE 2.340 AA3LA23B0002 2013

345 Climaveneta FOCS-XL/S 2402 1087010 2008

345 Clivet WSAT-XSC 85D 2010

345 Clivet WSAT-XSC 80D 2010

2309 Clivet WSAT-XEE 802 2019

2309 Clivet WSAT-XEE 802 2019

181 TRANE RTAF 205SE LNSB 2019

Chillers (Caserma Del Din)

Chillers (Villaggio della Pace)

5.2.2 Service Performance: The provision of technical assistance will be carried out as follows:

Visit in April at the beginning of the warm season;

Visit in October for the set-aside units at the end of summer season.

Bldg. Brand Model Roll list Year

55 TRANE CVGF1000 G10H01622 2013

55 TRANE CVGF1000 G10H01623 2013

55 TRANE CVGF1000 2019

Bldg. Brand Model Roll list Year

710 TRANE RTAC250 EKR4829 2008

710 TRANE RTAC250 EKR4827 2008

710 TRANE RTAC250 EKU0536 2011

702 TRANE CGAM100R41 U957933 2012

5.2.3 The following is a list of the minimum operations the Contractor shall perform during the scheduled maintenance. All maintenance shall be performed in accordance with the instructions prescribed by the manufacturing handbook, and certified by authorized personnel.

Refrigerant gas leak test (DPR 43/2012);

Verification and control acidity level lubricating oil;

Control gas filters;

Calibration of security equipment and control;

Tightening electrical connections;

Check normal operation of relays and contactors;

Absorptions and checking electrical parameters;

Control pressure and temperature refrigerant circuit;

Inspection and cleaning of surface air batteries;

Print the alarm log (if provided by the microprocessor);

Compilation report and booklet intervention system (DPR 43/2012).

5.3 Maintenance of Absorber:

5.3.1. Service: The maintenance of one (1) Carrier-Absorber model 16LJ32, roll list 81787559 installed at BLD 206 located on CASERMA EDERLE and one (1) Absorber brand TRANE model CHL000024 roll list SD50BTCU/26 located at Del Din CEP, requires three maintenances per year:

April Maintenance of the absorbers using steam and hot water: Maintenance of the absorbers shall include: starting the absorbers, addition of inhibitors and octal alcohol as needed, cleaning of the Electric absorption refrigerating pump, cleaning of the Electric absorption solution pump and checking of the Concentration of the solution BR/LI Control pneumatic/electric Cycle guard, Delta P capacitor-absorber, Delta P evaporator, Density cooling, Distillation refrigerant, condensing extraction by pump, checking proper operating function flow switches movement capacity valve, “splitting/shuttering” ,survey data operation with dedicated program type Carrier, chilled water thermostat calibration, frost thermostat calibration, thermostat calibration type TSW1-TSW2, thermostat fan calibration type “Torre”, calibration capacity valve.

August Maintenance of seasonal steam and hot water absorbers: Maintenance of the absorbers shall include inspection of the, absorption cooling pump, absorption solution pump, Delta P capacitor-absorber, Delta P evaporator, Density cooling, condensing extraction by pump, checking the pressure of the refrigerating pump, checking the pressure steam in generator, checking the pressure steam valve, checking the refrigerant quantity, survey data operation of dedicated program type Carrier, safety software water temperature condensation in/out, refrigerating water temperature in/out, checking of the entry/exit superheated water temperature, checking of the exit generator concentrated solution temperature, checking of the exit exchanger concentrated solution temperature, checking of the exit diluted solution temperature of the absorber.

November Analysis solution BR/LI absorbers steam and hot water: analysis of the solution BR/LI of the absorber steam and of the hot water to be done in November, merger control, collection of samples and delivery of these samples to a certified laboratory.

5.4 Maintenance of Cooling Towers:

5.4.1 Service: To provide maintenance of three (3) cooling towers, model TMA 29-436S, roll list 10/00847 located at Del Din and two (2) cooling towers, model AT-28-721, roll list 13-523643/44 located at Ederle.

Three services required per year: February, May, and October:

Check fan drive belts for tightness and wear, check gear reducer and associated lube lines for leakage. Inspect air inlet louvers and clean accumulated debris. Check for the proper operation of the makeup valve, full open to full close. Remove any debris that may have accumulated at the pump section screen, monitor the rate of silt buildup in the cold water collection basin. Observe the operation of the cooling tower and check any unusual sound related to the rotating equipment. Lubricate motor bearings and fan shaft bearings in accordance with the cooling tower manufacturer’s recommendation. Check the gear reducer oil level with the fan motor off. Add oil, as required, to the full mark. Check the tightness of all bolts in the fan assembly and mechanical equipment support. Tighten fan shroud and fan guard bolts. Inspect drift eliminators inside the cooling tower. Remove any debris or scale buildup.

Conduct a thorough inspection of the complete cooling tower. Clean debris from the collection points in the cooling tower. Check the hot water distribution system for algae and silt buildup. Clean and flush with water and disinfect.

Lubricate the motor and fan shaft bearings. Change the drive belt if excessive wear or cracking of belt is observed.

Replace gear reducer lubricant. Follow the manufacturer’s recommendations.

5.5 Cleaning of ductworks:

5.5.1 Scope of work and general fulfillments

Manpower, materials, equipment, tools and services necessary to perform as per “regola dell’arte” the cleaning and sanification of hvac air ductworks, using the technology “COLLOM” or similar, using compressed air at 8bar and using self-propelled endoscopic probes and following the related executive procedures.

Activities shall be performed during or after duty hours, while rooms are vacant/with no users.

Activities are performed by the Contractor/Subcontractor, based on the technical documentation of the system provided by USAG Italy DPW. The correspondence of the diagrams/drawings with the real situation on site shall be checked in contradictory between Contractor and COR, during site walkthrough to be performed before the submission of the quote. If no diagrams/drawings are available, Contractor shall perform a visual inspection of the systems during the preliminar walkthrough, with the purpose of define as much as possible the ductworks configuration.

5.5.2 Cleaning

Cleaning activities are referred to the following components of the system:

A. All air handling units B. All supply and return ductworks, including plenums, branches, ascendants, descendants C. All fixtures like supply diffusers, return grills, air valves, etc.

D. Balancing dampers E. Pre/Post heating coils (electrical and/or water coils) F. Sound attenuators G. Exhaust/Return fans and related dampers H. Fire Dampers

5.5.2.1 Contractor shall provide all manpower, materials, tools and services to access to the air handling units and to related components, including:

A. Removal of false ceiling, if easily removable.

B. Removal, reinstallation and/or replacement of access panels, where necessary.

5.5.3 Preliminar walkthrough/inspection

Contractor shall perform a preliminary walkthrough and schedule a meeting on site with DPW maintenance personnel and/or COR prior developing of activities plan and the related quote, in order to verify the correspondence of the systems with diagrams/drawings, when available, and to examine the real conditions of the system and of the work area, in order to check for any anomalies that could affect the execution of the activities.

The preliminar walkthrough has to be scheduled with adequate advance, in any case minimum one week prior activities beginning on that specific building.

5.5.4 Main Contractor’s fulfillments

A) It is Contractor’s responsibility to verify the conditions of the work area and of the system to be cleaned.

B) It is Contractor’s responsibility to repairand/or replace all the parts necessaries to restore the original conditions of all system’s locations where an access have been opened on walls or ceilings, and repair any damage caused, including but not limited to:

1. Ductworks and components

2. Insulation

3. Regulating equipment (electrical, mechanical, pneumatic)

C) Perform the activities as per “regola d’arte” also involves:

1. Contractor, based on the preliminary inspection, shall determine the most appropriate work plan considering the system and its components, in order to prevent any damage to the system and to its regular functioning. After the preliminary inspection, Contractor shall notify to COR the work schedule and the activitied that will be performed.

2. Contractor shall restore the original set-up of air valves, registers and dampers (if they have been modified during the cleaning activities) for the correct balancing of the system, in order to ensure the correspondence to the efficiency requirements as per original design. For this purpose, Contractor shall mark the original position of these fixtures, so that their correct position is easily visible during the final inspection.

3. Contractor shall notify to COR any defect of the system or of its components, found during the preliminary inspection or during the cleaning activities, if it requires repair and/or replacement.\

5.5.5 Quality Standars

5.5.5.1 The ductworks cleaning activity shall be performed in compliance with the following procedures, in order to ensure levels of cleanliness as per most restrictive specifications, with levels of deposit of residual dust and contaminants within the limits, detected with the method of “VACUUM TEST NADCA”, (maximum limit of 0,075 g/mq of deposited particulate after the cleaning) in contact to the surfaces and at air suction on agar plates “Petri” type or equivalent and within the limits foreseen by the document of the Ministero del Lavoro e Politiche sociali, dated 7 Febbraio 2013 titled “Procedura Operativa per la valutazione e gestione dei rischi correlati all’igiene degli impianti di trattamento aria”.

5.5.5.2 The airtight metal closing bulkheads used by the Contractor shall be of the tin type produced in accordance with UNI ENV 12097 norms dated April 1999 by specialized manufacturers and will be available, if required, for the preliminary inspection of COR.

5.5.5.3 If there are no reference standards, all materials used by Contractor shall comply with specifications foreseen by execution as per “regola d’arte”.

5.5.6 Documentation and materials to be approved by COR

5.5.6.1 Drawings showing the access doors on the ductworks and accesses in the ceilings.

5.5.6.2 Data sheets and safety sheets of all solvents, detergents, disinfectants, encapsulants, paints to be used during the activities.

5.5.6.3 Any tool, equipment and/or material to be used during the activities and during the restoration of per-existing situation, including diffusers, flexible ducts, fire dampers, etc.

5.5.7 Products and materials

5.5.7.1 Ductworks access doors

A. they shall be manufactured in compliance with specifications by “Associazione dei Produttori di Condotte Metalliche” standars and UNI ENV 12097 dated 2007 norms.

B. they shall be made of rigid material perfectly airtight or with zinc coated metal and provided with gaskets and fast closing mechanism. For ductworks internally insulated, access doors shall be provided with insulation having minimum thickness of 25mm.

5.5.8 Disinfectants

The contractor shall use a product sufficient in nature to sanitize the interior surface of the ductworks and equipment. To include but not limited to mold, fungus and bacteria. The shall contain chlorine bioxide or quaternary ammonium salts or halogenated compounds. The product data sheet and safety data sheet shall be approved by COR prior their usage.

5.5.9 Encapsulants

For ductworks internally insulated, the contractor shall use a product specifically intended for applications on rock whool insulations or for ductworks with internal cardboard fiber insulation. The product shall dry fast and create an air corrosion resistant layer and have sealant and reinforcement properties. It shall also be fire resistant, water resistant, oil resistant, grease resistant, bacteria and molds resistant. The product data sheet and safety data sheet shall be approved by COR prior their usage.

5.5.10 Paints for plenums

A. For porous surfaces. The contractor shall use a proper paint containing an antimicrobic element that hinibits the growth of bacteria, molds and fungus. The product shall be registered and approved by EPA. The product data sheet and safety data sheet shall be approved by COR prior their usage.

B. For nonporous sufraces. The contractor shall use a product specifically intended for applications on rock whool insulations or for ductworks with internal cardboard fiber insulation. The product shall dry fast and create an air corrosion resistant layer and have sealant and reinforcement properties. It shall also be fire resistant, water resistant, oil resistant, grease resistant, bacteria and molds resistant. The product data sheet and safety data sheet shall be approved by COR prior their usage.

5.5.12 Gaskets

Contractor shall use gaskets similar to the existing ones.

5.5.13 Cleaning activities

5.5.13.1 Preliminary actions: Prior the beginning of cleaning activity, the system shall be inspected and checked accurately, in order to identify eventual abnormal conditions that could be an obstacle to the cleaning activity or could void the effectiveness. Eventual anomalies shall be reported to COR in written (email) and cleaning activities shall not begin until approval is received by COR. The beginning of cleaning without following this procedure implies the acceptance of any anomalies and their restoration/repair will be Contractor’s responsibility and at Contractor’s expense. Particular attention shall be used for the Air Handling Unit outside air intake inspection in order to verify that there are no obstructions or any contaminants and verify that the anti-birds net (if present) is in good shape. The cleaning activity shall not be performed in internal insulated ducts that, for particularly degraded conditions (excessive exfoliation, collapse, etc.), could be even more damaged by the cleaning action; in this case, Contractor shall completely remove the degraded insulation and proceed with internal coating with encapsulant product. Any different decision shall be authorized by COR, after visual verification of the conditions of the system.

5.5.13.2 Proceed with removal of all removable material/furniture that could eventually obstruct the access to the work area or that could be damaged during cleaning execution and store them in an appropriate area indicated by maintenance personnel, until the completion of the cleaning.

5.5.13.3 The firefight fixtures (like smoke detectors, fire dampers, etc.) shall be properly protected prior beginning of cleaning and they shall be inspected by Contractor at the end, in order to ensure the proper functioning.

5.5.13.4 Contractor shall coordinate with COR the disable and the following enable of the fire alarm, in order to avoid accidental false alarms during cleaning of ductworks.

5.5.13.5 Contractor shall coordinate with COR the turn off of the ventilation equipment prior beginning of cleaning and diligently follow local safety procedures, in particular to turn off fans automatic switches.

5.5.13.6 Contractor shall take microbiological samples of deposits on the internal ducts sufaces at least in three different locations per each building’s floor, for each system composed by AHU and its ducts, before and after the cleaning/disinfection activities. Sampling shall be performed by using medical gloves, placing the “agar” plates “Petri” type to count the total bacteria load and the fungus load on the internal ducts surface, using the appropriate timed pressure positioner “Rodac-Weight” and placing the samples in appropriate containers provided by Contractor at his expenses; alternatively, the use of sterile sampling swabs is allowed on appropriate supports (for example made by Copan Italia). For the analysis of the bacteria and fungus load of the air supplied by the system Contactor shall use an appropriate “SAS” type analyzer by collecting two air samples (one for total bacteria load and one for fungus load on agar plates “Petri” type) for each floor and each system composed by AHU and its ducts, before and after the cleaning/disinfection activities, and plasing them into appropriate containers. Containers shall be properly identified and have a label with the following info:

A) System identificiation B) Sample location C) Date and time of the sample D) Name of the operator who took the sample E) COR signature (COR shall witness the sampling)

The quantity of bacteria (and/or molds and/or fungus) shall be determined by performing analysis made by independent lab having Accredia Certification, and analysis will be Contractor’s responsibility and expense. The measure of the dust residual contaminant present in the ducts after the cleaning shall be performed using the “Vacuum Test” NADCA system and analyzed by Accredia Certified lab. COR and Contractor shall make sure that sampling locations respond to general conditions representation of the duct. Sampling locations have to be foreseen for each system composed by AHU and ducts, before and after cleaning:

Monitoring on surfaces: total bacteria load; fungus load.

AHU’s fan section AHU’s coil Supply air ducts (3 samples per floor) Return air ducts (3 samples per floor)

Monitoring of supply air using SAS analysis Measure of residual contaminant after cleaning 2 measures of residual dust by using the “Vacuum test” NADCA system in the supply air duct at each floor 2 measures of residual dust by using the “Vacuum test” NADCA system in the return air duct at each floor Measurment of Legionella presence (only for AHUs having adiabatic humidification): 1 sample of water used for humidification collected from the drip pan of each AHU

5.5.15 Cleaning activity and removal of deposits

The execution of the cleaning shall be done considering that Contractor, with the approval of COR, has the responsibility to determine the best way to perform the cleaning on each system and, if requested, Contractor has to give a detailed description of the procedures that he wants to follow. Any deviation from the techniques or from the methods of cleaning shall be approved by COR.

Cleaning and disinfection of the system shall be done starting from the AHU and proceeding downstream the ductworks.

5.5.15.1 Methodology:

Reclaim, cleaning and disinfection of Air Handling Units (AHUs):

AHUs shall be manually vacuum cleaned using equipment in compliance with actual norms, degreased, cleaned and washed with pressure jet water or by using steam for the coils showing hard dirt attached on the fins, then AHUs have to be disinfected by high pressure spraying products approved by Ministero della Salute.

Once the residual water has been dried, visual inspection of the AHU shall be performed in order to highlight any mechanical issue (such as belt low tension, water leaks). In particular, the following activities shall be done taking care of protecting the equipment or the electrical system inside the AHU:

Removal of exterior case panels Filters removal Vacuum cleaning of the dirt Descaling cleaning with appropriate product Removal of limestone with proper product Emptying of water from condensate drip pans Usage of anti-bacteria and detergents Washing of all surfaces by using water jet Disinfection by using disinfectants registered by Ministero della Sanità of the drip pans Air blowing cleaning of filters (if in good conditions) and reinstallation Cleaning of coils by using water jet or steam Disinfection of coils by sprayingdisinfectant product Final wash with water Eventual parts showing rust signs shall be covered by using atoxic epossidic resin Riassemble of the AHU parts Restart of the unit

5.5.15.2 Cleaning and disinfection of ductworks:

A. Ductworks without internal insulation

1. Cleaning of internal surface of ductworks shall be performed by using the compressed air system COLOM type or similar, to be introduced into ductworks through adequate access points. Access points shall be prepared following the procedure described at par.5.5.7.1. Contractor shall remove any deposit on the square ductworks internal surfaces along their entire length and sides (top, bottom and sides), especially taking care of the corners where dirt accumulates easier, and along the whole circumference on the round ductworks. Also, particulare care has to be taken while cleaning branches from main duct to the single rooms where diffusers/grills are installed. Spiral flexible ducts shall be replaced with new ones or cleaned one by one with appropriate nozzle.

2. The selection of the equipment shall be done considering the following prescriptions: a) the only usage of the exhaust fan, even if having high flow rate and power, is not considered sufficient by itself;

b) The equipment prescribed is the compressed air type that uses the COLLOM technology or similar;

c) Similar equipment are considered acceptable only if:

c.1) the compressed air equipment can be used also to wash the ducts by controlled spraying of disinfectant solutions or encapsulants or paints, sprayed inside the ducts, only after the compressed dry air cleaning, in order to ensure that the disinfectant solution gets attached completely and uniformly on all internal surface, avoiding any liquid leak on the outside of the ducts and avoiding the creation of other openings on the ducts. The distribution of the sprayed solutions shall occur on the internal surfaces of the ducts and along their entire extension in order to perform a real wash and complete sanification of the whole ductwork.

c.2) the compressed air equipment has to perform the same efficiency along main ducts, ascendant/descendant curves, vertical ducts, avoiding the creation of additional openings and ensuring to maintain the integrity of the system.

c.3) where the dimentions of the ducts are so big that don’t allow the usage of the described technology…