DEPARTMENT OF THE ARMY

U.S. ARMY GARRISON ITALY

DMC PWO

APO AE 09613

CONTRACT No. W912GB-12-D-0001

PROJECT W.O. # MS 00372-0

“RENOVATE TRUCK SHOP , BLDG 5023”

Supply and Maintenance Area, Livorno, Italy

TECHNICAL SPECIFICATIONS

Consisting of 219 pages

Prepared by:

on April 2017

Pag. 1

TABLE OF CONTENTS

SECTION Ia

GENERAL PROVISIONS

SECTION Ib

QUALITY CONTROL BY CONTRACTOR

SECTION IIa

DESCRIPTION OF WORK

SECTION IIIa

DEMOLITION AND REMOVAL

SECTION IIIb

EXCAVATION AND BACKFILLING

SECTION IIId

EXTERIOR SANITARY SEWER SYSTEM

SECTION IIIe

EXTERIOR DRAINAGE SYSTEM

CAPITOLO IVa

REINFORCED CONCRETE WORK

SECTION IVc

STEEL WORK

SECTION IVd

MICROPILES

SECTION Va

BRICK MASONRY

SECTION Vc

GYPSUM PANEL & PREFABRICATED PARTITIONS

SECTION Vd

METAL PANELS

SECTION Ve

MISCELLANEOUS METAL WORK

SECTION VIa

FLOORING

SECTION VIb

WAINSCOTING

Pag. 2

SECTION VIIa

SURFACE PREPARATION

SECTION VIIb

PLASTERING

SECTION VIIc

PAINTING

SECTION VIIf

RUST-INHIBITIVE TREATMENT FOR METAL SURFACES

CAPITOLO VIIg

REINFORCED TILE DECKS REPAIR

SECTION VIIIb

ROOF MEMBRANE MATERIALS

SECTION VIIIc

FALL PREVENTION DEVICES

SECTION IXa

ALUMINUM DOORS AND WINDOWS

SECTION IX B

STEEL DOORS

SECTION IXc

HPL DOORS

SECTION Xa

MARBLE AND NATURAL STONE WORK

SECTION Xb

FALSE CEILING

SECTION XC

METAL RACK

SECTION XIb

SELFLOCKING BLOCKS PAVEMENTS

SECTION XIc

STEEL GRID AND WIRE-NET FENCING

SECTION XId

ROAD PAVING REPAIR WORKS

SECTION XIIa

PLUMBING

SECTION XIIb

Pag. 3

PLUMBING FIXTURES AND FIXTURE TRIMMINGS

SECTION XIIc

HEATING AND AIR CONDITIONING SYSTEM

SECTION XIIe

THERMAL INSULATION FOR MECHANICAL SYSTEMS

SECTION XIIg

AIR HANDLING SYSTEM

SECTION XIIh

FIRE PROTECTION SYSTEM, SPRINKLER

SECTION XIIm

COMPRESSED AIR SYSTEM

SECTION XIIn

SYSTEM OF DISTRIBUTION AND DISPOSAL LUBRICANTS

SECTION XIIo

PLANT OF ANTIFREEZE RECYCLING

SECTION XIIIa

ELECTRICAL SYSTEMS

SECTION XIIIb

TELECOMMUNICATION SYSTEM

SECTION XIIIc

FIRE ALARM SYSTEMS

Pag.4

SECTION Ia

GENERAL PROVISIONS

1a-01 WORK PHASING.

a. Work Schedule. Whenever the nature of the contract and the work location are such that the work is to be performed in an area assigned to activities and services that cannot be interrupted, work shall be scheduled with concurrence of COR in such a manner as to cause the least possible inconvenience to the normal operations of mentioned activities and services.

Contractor shall submit his proposed work schedule to the COR at the time of the pre-construction conference. Work start shall be contingent upon schedule approval.

b. Utilities Cut-Offs. As a rule, cut-off of power and other utilities (water, sewage, heating system, etc.) is not allowed. All temporary connections necessary to insure continuous power distribution shall be provided. If cut-offs are necessary, they shall not exceed the period of time strictly needed to make the temporary connections. Cut-off shall be scheduled with the COR not less than 15 days ahead of time.

c. Alarm, Telephone and Televisions Systems. Deenergizing of alarm, telephone and television systems is strictly prohibited. Should these systems, which may not appear on the drawing interfere with the contract work, they shall be temporarily diverted and fed by means of temporary connections to be adequately protected. Written approval must be obtained from COR prior to doing any temporary work.

d. System Reactivating. At the completion of the work, all existing systems, including water, electrical and heating systems, shall be reactivated and placed in their original locations.

e. Temporary Protections. Floors, carpets, and equipment that cannot be removed shall be adequately protected by temporary tarpaulins to be furnished and installed at no cost to the US Government. In addition, temporary protections shall be furnished and installed in some particular areas so as to allow performance of activities that cannot be interrupted or transferred. Also, the Contractor shall be responsible for removing, protecting, and reinstalling all furniture, shelves and furnishings that may interfere with the work course.

A wrong or no evaluation of all requirements specified above does not constitute grounds for a request for additional compensation.

1a-02 JOBSITE CLEAN UP AND DUST CONTROL. The contractor shall have sufficient trash/waste bins on site, and shall clean the worksite so that all discarded materials, debris and trash are placed in these bins at the end of each workday, and not left or allowed to accumulate anywhere else on the jobsite. These waste bins shall not be allowed to overflow with debris, and shall be emptied as soon as they become full. Haul roads shall be watered sufficiently to prevent excessive dust. The work area shall be swept regularly to prevent accumulation of debris. Equipment, construction materials and excavated soil shall be stored in a safe and orderly manner on the jobsite, in accordance with the contractor's approved area use plan.

1a-03 CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT. The contractor is considered the waste generator of all salvage, re-usable, re-cyclable and disposable

Pag.5 materials derived from the demolition and removal works included in this contract and shall handle these materials as hereinafter indicated.

a. Salvage Material. All salvage end items that the COR will have considered in good operating conditions shall be disassembled without damage, cleared of all dirt and scaling and then transported to the DPW Warehouse, Building 5156, Depot, where they shall be handled over undamaged.

b. Re-usable Material. End items removed during contract accomplishment which cannot be re-utilized in future construction but which still have a commercial value shall be delivered to the DRMO, through DD Form 1348-1a. This material includes, but it is not limited to, canvas, textile consisting of scrap clothing, scrap aluminum including doors, windows and frames, copper, brass, bronze, and stainless steel, cables, electric motors, light and heavy metals in different sizes and thicknesses that the DRMO contractor can handle (3-4 m long), electrical and electronic equipment, and kitchen appliances. All the above material must be free of hazardous property and need to be segregated. The scraps generated in the Supply & Maintenance Area shall be transported to the DRMO yard only on Monday and Tuesday from 08:00 am to 15:00 pm by appointment through the COR. The scraps generated from other installations must be kept in place. DRMO will arrange the removal. However, the contractor shall request a pre-inspection of the material by DRMO through the COR.

c. Recyclable Material. All construction and demolition recyclable waste material shall be delivered to authorized treatment facilities by the contractor.

d. Special Waste. All special waste, either hazardous or not hazardous, shall be delivered by the contractor to authorized disposal facilities.

e. Waste Storage. Construction and demolition waste shall be stored in waste specific containers provided by the contractor. Containers will be in good conditions, free from severe rusting, bulging, or structural defects. Containers shall be placed in area identified by COR.

Containers shall be removed once full or on COR’s decision.

f. Certificates and Authorizations.

(1) Recyclable Materials. As regards to recyclable materials, the Contractor shall submit copy of the authorization of the treatment facility which they are delivered to and will certify that waste have been removed in compliance with applicable law requirements.

(2) Disposable Materials. As regards to material delivery to disposal facilities, the contractor will provide the COR and DPW Environmental Office with copies of the following documents:

Authorization to transport construction and demolition waste;

Authorization of the landfill;

4th copy of Formulario di Identificazione del Rifiuto.

(3) Waste Manifest. All transported waste will be accompanied by the

Formulario di Identificazione del Rifiuto (waste manifest) to ensure a complete audit trail from point of origin to ultimate disposal. The waste manifest must be completed in quadruplet, all

Pag.6 dated and signed by the waste generator and countersigned by the transporter. The first copy of the manifest will remain with the waste generator; of the remaining three copies, (countersigned and dated by the receiver), the second copy will remain with the transporter, the third copy will remain with the receiver, and the fourth copy must be returned by the transporter to the waste generator within 3 months of delivery of the waste to the disposal/treatment facility.

g. Costs. All operations included in this paragraph shall be carried out by the contractor with no additional cost to the US Government.

1a-04 AUTHORIZATION FOR INSTALLATION OF MATERIAL AND EQUIPMENT.

Before installing any material or equipment mentioned in the specifications, approval shall be obtained from the COR. Contractor shall submit material samples, shop drawings, manufacturer's literature, etc., to the COR 10 days prior to installation and shall proceed with installation only after receiving written approval from the COR. All material installed without COR's approval shall be removed.

1a-05 ISPESL AND CEI STANDARDS. All work described in these specifications shall be accomplished in strict compliance with the ISPESL (Superior Institute of Prevention and Assurance of Work) and CEI (Italian Electrotechnical Committee) standards. In particular, if the work under contract, such as roof repairs, building painting, etc., may cause Contractor's personnel or other individuals to come in contact with non insulated electric lines, these shall be temporarily protected by use of appropriate spiral plastic tubes available on the market.

1a-06 TRANSLATION AND TITLE ABBREVIATION. The terms COR and "Direzione dei Lavori" used in the Italian version of these specifications are equivalent to the American term "Contracting Officer's Representative," which in the English version is indicated by the letters COR.

1a-07 DIGGING PERMIT. The Contractor shall obtain a digging permit for all work areas affected by this contract (to insure that all the as-built information for underground services is received). This permit and related drawings must be received by the Contractor prior to starting any work. After receipt of the digging permit, the Contractor shall immediately notify, in writing the Contracting Officer of the permit receipt. The Contractor will be held responsible for any damages caused to existing services, as indicated on the digging permit and related drawings, and will repair such damages at his own expense.

1a-08 ASBESTOS. No handling of asbestos containing material is included in this project.

Use of asbestos containing materials is forbidden.

1a-09 PARTICULAR REQUIREMENT FOR WORK IN HEATING PLANTS. When the contract requires the work to be performed inside heating plants, the contractor shall provide a new cylinder in the door lock and shall deliver two keys of the new cylinder and the removed cylinder to the personnel in charge of the maintenance. At the work end the contractor shall restore the lock to the original conditions and the temporary cylinder will remain his own property.

1a-10 ANTI-TERRORISM TRAINING. The Contractor shall comply with the following security requirements:

Pag.7

a. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access Army installations, facilities and controlled access areas shall complete AT Level I awareness training within 30 calendar days after contract start date. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR within 10 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: httQ://jko.jten.mil.

b. OPSEC Training. According to AR 530-1, new contractor employees must complete Level I OPSEC training within 30 calendar days after they report for duty. All contractor employees must complete annual OPSEC awareness training.

The contractor will develop an OPSEC standing operating procedure (SOP)/plan within 90 calendar days after the contract is awarded, to be reviewed and approved by the responsible Government OPSEC officer, according to AR 530-1. This SOP/plan will include the Government’s critical information, why it needs to be protected, where it is located, who is responsible for it, and how to protect it. The contractor will ensure this individual becomes OPSEC Level II certified according to AR 530-1.

c. Access and general protection/security policy and procedures. Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.

d. iWATCH Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity ATO).This local developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 40 calendar days after contract award.

1a-11 ENVIRONMENTAL PROTECTION SYSTEM. The contractor will provide the following information semi-annually to be used by the Government to address environmental performance relative to the goals of the USAG Vicenza Environmental Management System.

Please note that the amounts reported are those used/generated by the contractor regardless of source (private purchase or government furnished). Reports for January – June will be submitted by 15 July and reports for July-December will be submitted by 15 January each year.

Pag.8

Media Report Element #1 Report Element #2

Non-Hazardous Solid Waste

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Construction Debris/Demolition Materials

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Compostable/Organic Material

Total Waste Generated (Kg)

Amount of Waste Diverted from Landfill (Kg)

Hazardous Materials Total Used (Kg) Hazardous Waste Total Generated (Kg) Total Recycled (Kg) Energy Consumption - Electricity

Total Energy Consumed (MBtu)

Energy Consumption - Fuel

Total Fuel Consumed (L)

Renewable/Alternative Energy

Total Consumed

(MW)

Facility Construction/Renovation

Number of Buildings LEED Certified Silver or Higher

SqFt of buildings LEED Certified

Pag.9

SECTION Ib

QUALITY CONTROL BY CONTRACTOR

1b-01 GENERAL. The Contractor shall establish and maintain an effective quality control system to implement the requirements of contract clause entitled "Inspection of Construction (July 1986)". The quality control system shall comprise plans, schedules, and organization necessary to provide materials, equipment, workmanship, manufacture, construction, and operations which comply with contract requirements and shall identify personnel and forms to be used. The system shall cover construction operations, both indoors and outdoors, and shall be in accordance with the proposed construction sequence.

1b-02 COORDINATION MEETING. As soon as practicable after receipt of Notice to Proceed and before start of construction, the Contractor shall meet with the Contracting Officer's Representative (COR) and discuss the Contractor's quality control (CQC) system.

During the meeting a mutual understanding of the system details shall be developed including the forms for recording the CQC operations, control activities, testing, administration of the system for both indoors and outdoors construction, and the interrelationship of Contractor's inspection and control with the Government's inspection. Minutes of the meeting will be prepared by the COR and forwarded to the Contracting Officer who will make them a part of the contract file. There may also be other subsequent meetings will be called to reconfirm understandings. Minutes of these meetings will also be forwarded to the Contracting Officer.

1b-03 QUALITY CONTROL PLAN.

a. Prior to starting the construction, the Contractor shall furnish his CQC plan through the COR to the Contracting Officer for acceptance. Construction will be permitted to begin only after acceptance of the CQC plan or approval of that portion of the plan applicable to the particular feature of the work to be started. The QC plan proposed by the Contractor shall identify personnel, procedures, instructions, records and forms, and, as a minimum, shall include:

(1) A description of the quality management organization.

(2) The names, qualifications, duties, responsibilities, and authorities of each person assigned a quality control (QC) function.

(3) A copy of the letter to the QC manager, signed by an authorized official of the firm, which describes the responsibilities and delegates the authorities of the QC manager.

(4) Procedures to perform QC over other activities including subcontractors, manufacturers, and suppliers.

(5) Control testing procedures for each specific test.

Pag.10

(6) Reporting procedures for QC including proposed reporting formats.

b. After approval of the QC plan the Contractor shall notify the Contracting Officer in writing of any proposed change to his QC plan. Proposed changes are subject to acceptance by Contracting Officer.

c. The acceptance of the QC plan is conditional and will be predicated on a satisfactory performance during the construction. If it is determined that the QC plan, personnel, instructions, controls, tests or records are not providing a construction conforming to contract requirements, the Government will reserve the right to require the Contractor to make changes in his QC plan and operations, as deemed necessary to obtain the specified quality. Any changes required to the plan will be made at no cost to the Government.

1b-04 QUALITY CONTROL ORGANIZATION.

a. The Contractor shall identify an individual within his organization at the site of the work who shall be responsible for overall management of CQC and have the authority to act in all CQC matters for the Contractor.

b. A staff shall be maintained under the direction of the system manager to perform all QC activities. The actual strength of the staff during any specific work period may vary to cover work phase needs, shifts and rates of placement. The personnel of his staff shall be fully qualified by experience and technical training to perform their assigned tasks, and shall be directly hired by and work for the prime Contractor.

1b-05 SUBMITTALS.

a. The Contractor shall develop procedures for purchasing materials and equipment, subcontracting, and processing shop drawings, samples, certificates, and other submittals. This procedure shall include the establishment of responsibilities to assure, at each level, adequate review and approval, timely delivery including verification procedures, and proper storage.

Submittals of the shop drawings and/or manufacturer's data shall be, as specified, in accordance with contract clauses entitled "Material and Workmanship (Apr 1984)" and "Specifications and Drawings for Construction (Apr 1984) - Alternate I (Apr 1984)".

b. Actions shall be taken to ensure that only materials and equipment which comply with contract requirements are purchased and delivered to the job site or used in off site fabrication, unless specific deviations are approved, as specified hereinafter. The COR may request a copy of the document of transportation of the provided material.

c. The Contractor shall review the contract requirements and verify that submittals are confirming to contract compliance. Within 10 days after receipt of notice to proceed, the Contractor shall submit a submittal control document listing and scheduling all submittal items required in the contract. This document shall be in duplicate and shall be addressed through the COR to the Contracting Officer. The control document shall include such items as construction schedules, monthly progress reports, shop drawings, manufacturer's literature, certificates of compliance, material samples, and guarantees. The

Pag.11 document shall schedule for each item the dates of submittals. The scheduling of submittals shall be coordinated with the approved progress schedule; the information contained therein shall be reviewed and updated at each schedule update. Adequate time shall be allowed to the US Government for approval of submittals. The Contractor shall review the listing at each progress schedule update and copies of updated documents shall be submitted through the COR to the Contracting Officer in the specified quantity. Payments to the Contractor will not be made for material or equipment which does not comply with the Contract requirements.

d. The CQC organization shall be responsible for certifying that all submittals are in compliance with the contract requirements. Submittals to the Contracting Officer without evidence of the certification will be returned for resubmission.

e. The Contractor shall submit copies of all submittals through the COR to the Contracting Officer.

f. Delays in the approval process shall not be the basis for consideration of a time extension when such delay is the result of the Contractor's failure to make proper and timely submittal, or make corrections in accordance with the specifications or the Contracting Officer's comments, or is a result of a resubmittal which is required because of an unsatisfactory original submittal. Approval action by the Contracting Officer will not relieve the Contractor of his responsibility for compliance with the contract but will indicate only that the general method of construction and detailing is satisfactory.

g. All proposed deviations from contract requirements shall be submitted in writing for approval by the Contracting Officer.

1b-06 CONTROL. Quality control is the means by which the Contractor assures himself that his construction complies with the requirements of the contract plans and specifications.

The QC system shall include at least the following three phases of control and management for all definitive features of work:

(1) Preparatory. This control phase shall be performed before beginning work on each definable feature of work. It shall include a review of contract requirements to assure that materials, sample, and equipment conform to contract requirements and that control testing procedures are finalized. The control shall also include examination of the work area to verify that structures over which new work is to be placed conform to contract requirements; Contractor shall also verify that the required materials be on hand and properly stored. The COR shall be notified at least 24 hours in advance of each preparatory activity.

(2) Initial. This phase of control must be accomplished as soon as a representative portion of the particular feature of work has been accomplished and shall include examination of the quality of workmanship and a review of control testing for compliance with contract requirements, identification of defective or damaged materials, omission, and dimensional requirements. The COR shall be notified at least 24 hours in advance of the initial inspection and such inspection shall be made a matter of record in the CQC documentation.

Pag.12

(3) Follow-Up. The follow-up phase shall be performed continuously to verify that control procedures are providing an end product which complies with contract requirements. Adjustments to control procedures may be required based upon the results of this phase.

(4) Completion. At the completion of all work or any increment, the CQC representative shall conduct a joint review with the COR. During this review the work shall be examined, quality control shall be examined, and a list shall be developed of work not properly completed or not conforming to plans and specifications. This list shall be included in the quality control documentation with an estimated date for correction of each deficiency.

The Contractor shall make sure that deficiencies be corrected prior to the contract completion date. Payment will be withheld for defective or deficient features until they are satisfactorily corrected except as otherwise provided in the contract.

1b-07 TESTS.

a. The Contractor shall perform tests specified or required to verify that control measures are adequate to provide a product which conforms to contract requirements. The Contractor shall procure the services of an industry recognized testing laboratory or he may establish an approved testing laboratory at the project site. A list of tests which Contractor believes necessary shall be furnished to the COR. The list shall give the test name, specification paragraph containing the test requirements, and the personnel and laboratory responsible for each type of test. The Contractor shall perform the following activities and provide the following data:

(1) Verify that the testing procedures comply with contract requirements.

(2) Verify that facilities and testing equipment are available and comply with testing standards.

(3) Check test instrument calibration data against certified data.

(4) Verify that recording forms including all pertaining documentation have been prepared.

b. Testing.

(1) The Contracting Officer reserves the right to check laboratory equipment in the proposed laboratory for compliance with the standards set forth in the contract specifications and to check the laboratory technician's testing procedures and techniques.

(2) The Contracting Officer reserves the right to utilize the Contractor's control testing laboratory and equipment to make assurance tests and to check Contractor's testing procedures, techniques, and test results at no additional cost to the Government.

(3) Cost incidental to the transportation of samples or materials will be borne by the Contractor.

Pag.13

1b-08 DEFECTIVE WORK. The Contractor shall not build upon or conceal a defective work.

1b-09 DOCUMENTATION.

a. The Contractor shall maintain current records, on an appropriate form, of quality control operations, activities and tests performed including the work of suppliers and subcontractors. These records shall include factual evidence that the required activities or tests have been performed, including but not limited to the following:

(1) Type and number of control activities and tests involved.

(2) Results of control activities or tests.

(3) Nature of defects, causes for rejection, etc.

(4) Proposed remedial action.

(5) Corrective actions taken.

b. These records shall cover both conforming and defective or deficient features and shall include a statement saying that supplies and materials incorporated in the work comply with the contract. Legible copies of these records shall be furnished to the COR weekly. The records shall cover work performed during the time period for which the records are furnished and shall be verified by persons designated by the Contractor.

Pag.14

SECTION IIa

DESCRIPTION OF WORK

2a-01 STATEMENT OF WORK. Contractor shall furnish all plants, labor, equipment, material and transportation necessary for the accomplishment of the work described in these specifications and shown on drawings, both of which are an integral and binding part of the contract.

2a-02 DESCRIPTION OF THE WORK. Work included in this project will consist to renovate the existing vehicle repair shop building 5023, located on Montgomery Avenue, to accommodate the minimum requirements for the repair mission that must be accomplished.

Bldg#5023 currently provides vehicle maintenance as well as administrative functions. The project is required to perform a general repair of the existing building, including both the administrative and vehicles shop areas, to assure building code and life safety conditions.

Furthermore, the external fenced area will be upgraded considering the presence of POL areas preserving the existing fence.

Architectural and civil The existing POV parking is outside on the opposite side of the road, not far from the building:

this area, presently covered with steel plates to dismantle, shall be completely paved with self-locking pavement, suitable for parking requirements, correcting also the site slope where necessary.

On the South side the existing covered elevated vehicle wash-rack will be renovated to make it fully functional, considering also the environmental aspect of the drainage system.

A new metal shed will be provided on the South side of the building to permit some minor maintenance operations on to the vehicles (it’s not only a covered parking area) so hose bibs shall be provided together with some electrical outlets and lights: the exterior drainage system shall be implemented.

The building 5025, located on the N-W corner of the external fenced area, will be replaced with a metal shed for the forklift battery charging station.

On the West side of the building two new steel canopies will be installed together with their concrete slabs: the bigger one is designed to accommodate the three tanks of the oil system + the antifreeze regenerating system while the smallest is designed to accommodate the waste oil tank (directly connected with the interior of the building) and an area equipped with electrical outlets suitable for the contemporary charging of vehicles gel batteries.

The existing fuel tank will be replaced with a new one CONVAULT type and the existing waste oil tank will be dismantled.

The building consists of a shop area, to accommodate and repair the MRAP vehicles, and an administrative area with offices, toilets, locker room: these two areas are nor separated and neither well identified, so the main scope of the work is to separate them to make fully functional creating also separate accesses.

The project will involve the demolition of some internal partitions and some other interior changes, especially regarding the layout and the materials used for floors and false ceilings plus the necessary refurbishment to comply with safety & fire requirements, considering also the minimal accessibility requirements especially for the employee’s areas as bathrooms, lockers rooms and administrative areas. The offices space will be renovated considering floors, Pag.15 windows, doors, false ceilings etc. and the stair leading to the second floor, presently not code compliant, will be redesigned.

The roof waterproofing membrane will be removed and replaced with new waterproofing layers. New flashings will be installed, while the gutters and downspouts, recently replaced, while be temporarily removed and reinstalled: some fall prevention devices will be installed for the future roof maintenance operations.

The external surfaces of the building, that are currently rough, will be plastered and painted The bays area will be renovated making it as much open as possible, the industrial floor will be repaired to make it suitable for the building use, the existent drainage floor will be restored/implemented, all the inspection pits will be closed and the crane of 3 tons will be demolished, while the bigger one (5 tons) will be revised. Warehouse ceilings, columns and beams are open to the exposed structure, and plastering and painting will be provided. The shop doors will be replaced with new ones provided with electrical control and safety devices and some of them will be provided with pedestrian doors for emergency egress.

The emergency exits system will be revised and all the support areas (as Tool room, storage room, conference room, break room, communication room,electrical room…..) will be redesigned.

Structural The structural works to be performed for the Bldg. #5023 are very little interventions.

They are “Local modifications” according to § 8.4 of D.M. 14 January 2008.

The project provides expecially for the demolition and reconstruction of the interior reinforced concrete stairs that connect the ground floor to the mezzanine used for the workshop administrative and control activities.

Now they have only one access through the workshop area but the access must be external to the workshop to be in compliance with the safety codes.

The new stairs will be supported by new load bearing masonry walls (first ramp and intermediate landing) or connected to the existing structures (second ramp and last landing).

The new load bearing wall will be realized with special bricks type “Poroton P800 MA”, suitable to the reinforced masonry (25 cm tick) and cementitious mortar M10 class and they will have continuous foundation beams, section 60x117 cm, lying on a lean concrete layer 10 cm thick.

In addition, with the same masonry typology will be realized a new load bearing wall in the Nord-Ovest portion.

It will have a different thickness (30 cm) and no new foundations will be necessary for it because it will be realized in the exact same position as an original existing partition, so in that position there is already a suitable foundation (see the original drawings).

All new load bearing walls will have horizontal steel reinforcements/truss embedded in the mortar beds (spacing < 50 cm) and vertical bars (1 φ12, spacing 90-100 cm) to improve their load bearing capacity out-of-plan.

These new elements will be connected to the existing structures (columns, beams or masonry walls) by means of mechanical connectors or transverse bricks.

All new openings in the new load-bearing walls will have prefabricated lintels (Type “B”), while some modified openings in the existing partitions will have steel lintels (Type “A”).

The project provides also for the realization of two new openings into existing load bearing walls and in this case two steel frames and a structural plaster on both sides will be realized to restore the previous stiffness of the wall.

The structural plaster will be a “traditional” realized by means of a cementitious mortar (s= 6 cm per side) with steel welded mesh for the wall of the addition on the western side; a very thin

Pag.16 special plaster reinforced by a GFRP mesh for the wall in the original building (to reduce the final thickness).

The existing pits of the workshop will be eliminated by filling the hole with gravel and by restoring the continuity of the existing reinforced concrete slab by means of chemical anchorages.

All the main ducts (electrical, mechanical, fire system) and the new racks to be installed into the North- West portion will be fixed to the structures by means of seismic resistant supports.

The project for the renovation of the Bldg. #5023 provides also for the realization of four new steel structures.

1) Canopy “A” - The main structure out of four is a “Y”-shaped shelter to be realized in front of the southern access, to the workshop to cover the workers during the open air works. It has dimensions in plan equal to 9.10 m x 35.80 m and it is 5.00 m height and has deep foundations consisting in special micropiles realized by multiple, repeated, high pressure injections (IRS technology), type Tubfix.

2) Canopy “B” - The second new steel structure is a new oil and antifreeze storage. It will be built near the building, on the western side. It has a L-shaped plan with dimensions

12.80 m x 5.50 m and it is 3.00 m height. Its foundation is a shallow reinforced concrete slab 20 cm thick.

3) Canopy “C” - The third new steel structure is a canopy as forklift storage. It will be built in the North-West corner of the large square, near the existing perimeter fence. It will have a rectangular shape in plan, dimensions 4.50 m x 4.50 m and it is 3.60 m height. Its foundation is a reinforced concrete slab 30 cm thick.

4) Canopy “D” - The last steel structure is waste oil storage to be realized near the western side of the building. It will have a rectangular shape, dimensions 6.20 m x 4.20 m and it is 2.70 m height. Its foundation will be a reinforced concrete slab 20 cm thick.

All these structures will have as roof deck a sandwich panel constituted by a insulated material infill into two galvanized and painted steel corrugated sheets.

A similar panel will be used also as cladding of the Canopy “C”, the new forklift storage canopy is the only structure out of four that has a vertical cladding along the perimeter, all the other, except the main canopy “A” will be protected by means of a perimeter steel fence to avoid the free access.

Finally two new reinforced concrete ramps will be realized to make accessible the new building entrances on the eastern side and a reinforced concrete slab as support of the new chiller group.

Furthermore Some additional works will be performed to restore the masonry walls, internal and external concrete pavement damaged during the work to be performed (see the external pavement were the Canopy “A” will be built or some portion of the pavement near the washrack; the restoring of the external concrete pavement will be executed by means of special concrete with particular mechanical characteristics.

Mechanical system The diesel tank, the pipes that feed the boiler, mechanical systems inside the building will be

Pag.17 removed and dismantled, while the heating system will be changed. A partial update of the system of heating including the restructuring of the local boiler and the installation of radiant panels in work areas have been recently carried out (in 2011); the recently installed system will be substantially maintained as much as possible except for some changes and will be completed by replacing the old system with a new heating system in all regions not affected by the renewal.

The new system will include new piping, valves, instruments, accessories, fan coils, radiators and other radiant panels.

The fuel tank will be replaced with one of equal capacity and will be of the type "convault". It will be dual-chamber and the interspace will be monitored by a control unit, placed within the boiler room, which will detect any leaks.

The existing boiler will be maintained and will be used to heat the workshop and toilets in the office area. The existing heating plant, an open vessel, it will be transformed closed vessel and on the primary circuit will be installed all safety devices required by Inail.

Inside the boiler room they are installed the following devices that will be reused:

- Two distribution hot collectors (Supply/Return) from which will depart:

- S/R primary circuit - by boiler

- S/R secondary circuit - to the existing radiant stripes

- S/R secondary circuit – to the new radiant stripes and to radiators

- Circulation pumps a constant flow rate

- Connecting pipes in black steel, insulated as per law

- Control instruments (thermometers, manometers, counters) A heat pump, high efficiency, will be installed outside the building on a concrete pad complete con fence and it will be used for heating / cooling of the offices. Circulation pumps a variable flow rate.

The heating and cooling plant will be realized as follows:

- closed vessel

- forced circulation

- two tubes

- water/air type which will feed into the primary air units and fan coil units The offices will be heated and conditioned by fan coils “cassette” type or by split type installed high a wall or by vertical fan-coils installed a wall, sized to medium speed.

Toilets will be heated by cast iron radiators.

The temperature control in the offices will be realized by the room thermostat wall mounted, while in the bathrooms will be realized by the thermostatic valves installed on the radiators.

The network that will distribute the heat transfer fluid to the terminals will be built with steel pipes running in the false ceiling. All pipes will be complete insulation as per law.

The condensate distribution network will be built with welded rigid polyethylene pipes running in the false ceiling and it will be conveyed to outside siphon wells.

The outside air spare parts needed will be provided by primary air unit, while the exhaust air will be expelled through the air extraction systems and overpressure.

The primary air unit will be installed in the false ceiling of the building and will have the task of providing the necessary air to guarantee the necessary spare parts of the rooms.

It will be sized to the average speed and will consist of:

- section of outdoor air intake, with opposed fins damper, complete with insect mesh

- cell filter, regenerated with G4 efficiency

- a hot/cold coil

- fan of "plug flow fan" single inlet The unit’s operation control will be realized automatically through a centralized digital control system that will allow, among other things, the following operations:

Pag.18

- The possibility of operating in ventilation only

- Temperature control

- Daily programming In any case the following electrical protection will be provided for:

- Differential pressure switch to reporting the presence airflow

- Frost thermostat (automatic reset) to the fan interlock, to the heating coil protection The air distribution will be realized by galvanized sheet metal ducting with quadrangular section with false ceiling installation. The supply ducts are complete coating of insulating and sound absorbing, mounted externally to the ducts, consisting of material self-extinguishing in closed cell. The air supply will be implemented through square diffusers with plenum and control damper.

In the various rooms, will also feature a forced air intake system for the expulsion of exhaust air by the environments. It will be composed as follows:

- Centrifugal fan, in line, installed in the false ceiling of the building.

- Quadrangular duct network

- Metal grilles, with fixed fins and regulation damper, for the extraction of air from the various room

- Transit grilles, installed on the doors of several rooms to allow the air flow to the air extraction equipment.

The existing digital control system, installed in 2011, will be integrated with new sensors, new components according to the heating / air conditioning system that will be installed.

All elements of the HVAC system will be connected to a control and supervision system, arranged to be interfaced with the communication network connection.

The local TELECOM and ELECTRICAL ROOM will be cooled by direct expansion unit, mono-split type, to prevent malfunction due to overheating of the equipment. Outdoor unit of mono-split will be installed on the external wall.

It will be installed a new solar system in integration with the current domestic hot water system.

The new solar system will be connected to the heaters of the existing hot water tanks.

The workshop will be heated by the existing radiant and restored zone will be integrated with new panels.

A new compressed air system will be installed: the new system will be designed in accordance with the US and Italian regulations, in particular with the norms pertaining pressure vessels (ex ISPESL and “Direttiva PED”).

The compressed air system will be realized with anodized aluminium pipes positioned to ceiling and it will consist of:

- two oil-injected screw compressors with belt driven (one existing and one new)

- one vertical tank having a capacity of 1000 liters and provided with drainage valve

- one adsorption heatless dryer

- Pressure reducer-regulator

- oil-water separator

- filter-regulator

- air quick coupling outlets

- hose reel with hoses

- ball valves The operation of the compressors will be alternating and it will be managed in automatic manner by the system. The presso-static regulation will be on-off type. The engine starting will be foreseen directed in line.

It will be installed a new lubricant dispensing system for three different types of oil, will be

Pag.19 realized with anodized aluminium or galvanized steel pipes positioned to ceiling and it will consist of:

- three tank aboveground, double-skin (one for each type of oil), of cylindrical type, at horizontal axis, positioned outside the building. A control unit, positioned in a special compartment in the wall, will installed for monitoring space between skins with a leak detector.

- three oil pumps for low/medium viscosity oil, of type pneumatic, fixed installation at the wall, positioned inside the building, each of which will be complete of:

Steel wall bracket

Ball valves shut-off

Pressure regulator with condensate discharge filter and pressure gauge

Pressure relief valve with pressure gauge

Flexible tube

- Oil nozzle complete of digital meter with a wide LCD screen

- Hose reel with hoses

- Drip-tray modular Inside the workshop, a point disposal will be installed for the lubricant used, which will be connected to a used oil tank. The oil exhausted tank will be positioned outside the building, aboveground, double-skin, of cylindrical type, at horizontal axis. A control unit, positioned in a special compartment in the wall, will installed for monitoring space between skins with a leak detector.

It will be installed a new antifreeze system, will be realized with anodized aluminium positioned to ceiling and it will consist of:

- two tank aboveground of type cubical by 1 mc, positioned outside the building

- antifreeze pumps, of type pneumatic, fixed installation at the wall, positioned inside the building, complete of:

Steel wall bracket

Ball valves shut-off

Pressure regulator with condensate discharge filter and pressure gauge

Pressure relief valve with pressure gauge

Flexible tube

- Oil nozzle complete of digital meter with a wide LCD screen

- Hose reel with hoses

- Drip-tray modular The used antifreeze will be picked up by a mobile system.

The vehicle exhaust evacuation system will be installed a ceiling and will be composed from a reel, made of sheet steel epoxy coated, with flexible hoses and a extractor. The Unwinding and rewinding of the hose will be driven by an electric motor. The operator may manage the up/down of the hose by a push-button. The expulsion will be made of galvanized steel ducts.

In the workshop, it will be installed a new ventilation system/extraction inside the building that will meet D.Lgs. 81/08 and US laws: they will be installed two new extractors and one new roof extractor unit for the air to escape which will complement existing extractors.

The air distribution will be made by galvanized sheet metal ducting with quadrangular section with ceiling installation. The air return will be implemented through grids with plenum and control damper.

Plumbing system

Pag.20

All plumbing system in the building will be removed, except for some parts that are being renovated with another contract for the new toilets.

In particular, it will be removed completely the restroom 17 (numbering refers to the existing drawing table) including supply pipes, discharge pipes and electric water heaters.

In the restructuring of the administrative part will be designed a new restroom that will be fed from the existing plumbing and will be made up of sink, shower and WC for the disabled. The fittings will have with flow limiter so as to have a water and energy savings associated with lower water consumption.

At the entrance of restroom, shut-off valves will be provided to allow localized maintenance without stopping the water supply in the entire building.

The new restroom drains will be made underfloor and will be connected to existing exhaust pipes. The column of primary ventilation will be made under track.

Inside the workshop, will be provided two combined Emergency shower with eyewash to respect UFC3-420-01 Appendix D where it says: “Locate Emergency Shower as close to the hazard as possible but not more than 10 seconds or 30 meters of unobstructed travel away, whichever is lesser.”

The quantity of water delivered by the emergency system will correspond to the norm most shrinking between the Italian standard (EN 15154) and American (ANSI / ISEA Z358.1).

The release will continue for at least 15 minutes and the water temperature will be delivered to 27 °C (average between 16-38 °C recommended)

Fire protection system The building will be equipped with a new type of extinguishing automatic sprinkler system.

The system will be dimensioned hydraulic level according to what indicated in the UFC 3- 600-01 2016, point 4-41. The plant operates in place inside, it will be of the wet type. There will be various types of sprinkler heads according to their location. In Precise of door overhead areas it will be protected by the sprinkler heads of the type sidewall while in the remaining part of the building will be placed in work of the sprinkler heads pendent and upright type, with and without shield, at the points indicated in the project drawings.

The external canopy (south side) will be protected by an automatic extinguishing system of the dry-type sprinkler as in the winter period the temperature falls below 4 ° C. the dry alarm valve will be positioned in the local 17B and will be complete with a compressor installed directly on the downstream piping of the alarm valve, which is necessary to constantly maintain the system at the design pressure, and a second compressor which only serves for filling plant. The dry installation will be completed with connection the Fire Department, hydraulic alarm bell, switch, post-indicator valve wall provided with microswitch.

The wet alarm valve will be positioned in the technical room (room 07) and the installation will be completed with: connection the Fire Department, hydraulic alarm bell, switch, post-indicator valve wall provided with microswitch.

All pipes used for the distribution of water (riser, cross main, branch line etc.) will be in black API 5L Gr B steel in schedule 10 and 40 as required in section 9 to 7.6 UFC 3-600-01 dell 'August 8, 2016.

The union of…