List_of_work_Features_-_Attachment__1.pdf
PDF 62 KB Posted
- Solicitation number
- W912PF-17-R-0015
About this file
List of Work Features - Attachment #1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ATTACHMENT__1.pdf | ||
| W912PF-17-R-0015-0001.pdf | ||
| ATTACHMENT__3.pdf | ||
| ATTACHMENT_1_EXCEL.xlsx | XLSX spreadsheet | |
| Self_Certification_for_Antimafia_-_Enclosure__1.pdf | ||
| Statement_of_Work__Attachment___2.pdf | ||
| W912PF-17-R-0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. HB-41026-7J
BID-DD-LGZ UXO SURV-FINAL
HARDSCAPE- LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 1 of 8
Quantity/Quantità Material Cost/Costo MaterialeLabor Cost/Costo Manodo Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
C ZONE C BLDG -139 m² E ZONE E BLDG 43-139 m² F ZONE F BLDG 43-139 m² G ZONE G BLDG 43-139 m² H ZONE H BLDG -139 m²
TOT m²
SAFETEY PLAN 1.00% 1.00%
GRAND TOTAL WORK
RATE FY 17 € 1.0000 = $0.8990
Project No.HB-41026-7J
BID-DD-LGZ-UXO SURVEY C
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 2 of 8
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
#REF! #REF! #REF!
#REF! € 1.0000 = #REF!
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE C BLDG -139
1.0 Italian 5th Command Authorization LS
2.0 Final statement and related area release LS
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material filtering with archaeology assistance m³
5.0 Excavated material disposal IAW italian rules. m³
7.0 Filling back material filtered on site (gravel, soil) and compaction m³
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³
8.0 Assitance to Construction Excavation including archaeology monitoring. Hrs total
BID-DD-LGZ-UXO SURVEY E
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 3 of 8
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
#REF! #REF! #REF!
#REF! € 1.0000 = #REF!
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE E BLDG 43-139
1.0 Italian 5th Command Authorization LS
2.0 Final statement and related area release LS
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material filtering with archaeology assistance m³
5.0 Excavated material disposal IAW italian rules. m³
7.0 Filling back material filtered on site (gravel, soil) and compaction m³
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³
8.0 Assitance to Construction Excavation
BID-DD-LGZ-UXO SURVEY F
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 4 of 8
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
#REF! #REF! #REF!
#REF! € 1.0000 = #REF!
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE F BLDG 43-139
1.0 Italian 5th Command Authorization LS
2.0 Final statement and related area release LS
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material filtering with archaeology assistance m³
5.0 Excavated material disposal IAW italian rules. m³
6.0 Existing Underground metal tank removal and disposal including related concrete structure LS
7.0 Filling back material filtered on site (gravel, soil) and compaction m³
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³
BID-DD-LGZ-UXO SURVEY F
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 5 of 8
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
8.0 Assitance to Construction Excavation
BID-DD-LGZ-UXO SURVEY G
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 6 of 8
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
#REF! #REF! #REF!
#REF! € 1.0000 = #REF!
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE G BLDG 43-139
1.0 Italian 5th Command Authorization LS
2.0 Final statement and related area release LS
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material filtering with archaeology assistance m³
5.0 Excavated material disposal IAW italian rules. m³
6.0 Existing Underground metal tank removal and disposal including related concrete structure LS
7.0 Filling back material filtered on site (gravel, soil) and compaction m³
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³
BID-DD-LGZ-UXO SURVEY G
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 7 of 8
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
8.0 Assitance to Construction Excavation
BID-DD-LGZ-UXO SURVEY H
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 8 of 8
Quantity/Quantit Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
#REF! #REF! #REF!
#REF! € 1.0000 = #REF!
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE H BLDG -139
1.0 Italian 5th Command Authorization LS
2.0 Final statement and related area release LS
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²
3.0 Mechanical UXO monitoring down to
max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material
filtering with archaeology assistance m³
5.0 Excavated material disposal IAW
italian rules. m³
7.0 Filling back material filtered on site
(gravel, soil) and compaction m³
7.0 Filling back with new material (gravel, soil) including transpotation and m³
8.0 Assitance to Construction Excavation
| BID-DD-LGZ UXO SURV-FINAL |
| BID-DD-LGZ-UXO SURVEY C |
| BID-DD-LGZ-UXO SURVEY E |
| BID-DD-LGZ-UXO SURVEY F |
| BID-DD-LGZ-UXO SURVEY G |
| BID-DD-LGZ-UXO SURVEY H |
File details come from the government source that posted it. Updated .