List_of_work_Features_-_Attachment__1.pdf

PDF 62 KB Posted

Attached to
Legacy Area UXO Monitoring for Safety, Del Din installation, Vicenza Italy.
Solicitation number
W912PF-17-R-0015
Issued by

About this file

List of Work Features - Attachment #1

View the file

Other files

File Type Posted
ATTACHMENT__1.pdf PDF
W912PF-17-R-0015-0001.pdf PDF
ATTACHMENT__3.pdf PDF
ATTACHMENT_1_EXCEL.xlsx XLSX spreadsheet
Self_Certification_for_Antimafia_-_Enclosure__1.pdf PDF
Statement_of_Work__Attachment___2.pdf PDF
W912PF-17-R-0015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No. HB-41026-7J

BID-DD-LGZ UXO SURV-FINAL

HARDSCAPE- LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 1 of 8

Quantity/Quantità Material Cost/Costo MaterialeLabor Cost/Costo Manodo Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

C ZONE C BLDG -139 m² E ZONE E BLDG 43-139 m² F ZONE F BLDG 43-139 m² G ZONE G BLDG 43-139 m² H ZONE H BLDG -139 m²

TOT m²

SAFETEY PLAN 1.00% 1.00%

GRAND TOTAL WORK

RATE FY 17 € 1.0000 = $0.8990

Project No.HB-41026-7J

BID-DD-LGZ-UXO SURVEY C

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 2 of 8

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

#REF! #REF! #REF!

#REF! € 1.0000 = #REF!

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

ZONE C BLDG -139

1.0 Italian 5th Command Authorization LS

2.0 Final statement and related area release LS

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material filtering with archaeology assistance m³

5.0 Excavated material disposal IAW italian rules. m³

7.0 Filling back material filtered on site (gravel, soil) and compaction m³

7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³

8.0 Assitance to Construction Excavation including archaeology monitoring. Hrs total

BID-DD-LGZ-UXO SURVEY E

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 3 of 8

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

#REF! #REF! #REF!

#REF! € 1.0000 = #REF!

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

ZONE E BLDG 43-139

1.0 Italian 5th Command Authorization LS

2.0 Final statement and related area release LS

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material filtering with archaeology assistance m³

5.0 Excavated material disposal IAW italian rules. m³

7.0 Filling back material filtered on site (gravel, soil) and compaction m³

7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³

8.0 Assitance to Construction Excavation

BID-DD-LGZ-UXO SURVEY F

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 4 of 8

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

#REF! #REF! #REF!

#REF! € 1.0000 = #REF!

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

ZONE F BLDG 43-139

1.0 Italian 5th Command Authorization LS

2.0 Final statement and related area release LS

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material filtering with archaeology assistance m³

5.0 Excavated material disposal IAW italian rules. m³

6.0 Existing Underground metal tank removal and disposal including related concrete structure LS

7.0 Filling back material filtered on site (gravel, soil) and compaction m³

7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³

BID-DD-LGZ-UXO SURVEY F

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 5 of 8

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

8.0 Assitance to Construction Excavation

BID-DD-LGZ-UXO SURVEY G

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 6 of 8

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

#REF! #REF! #REF!

#REF! € 1.0000 = #REF!

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

ZONE G BLDG 43-139

1.0 Italian 5th Command Authorization LS

2.0 Final statement and related area release LS

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²

3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material filtering with archaeology assistance m³

5.0 Excavated material disposal IAW italian rules. m³

6.0 Existing Underground metal tank removal and disposal including related concrete structure LS

7.0 Filling back material filtered on site (gravel, soil) and compaction m³

7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³

BID-DD-LGZ-UXO SURVEY G

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 7 of 8

Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

8.0 Assitance to Construction Excavation

BID-DD-LGZ-UXO SURVEY H

HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

FOUO Page 8 of 8

Quantity/Quantit Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"

Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

B LEGACY AREA UXO SURVEY FIELD OP

Safety IAW LAW 81/2088 1.00%

GRAND TOTAL WORK

#REF! #REF! #REF!

#REF! € 1.0000 = #REF!

A LEGACY AREA UXO SURVEY 5TH COMM ADMIN

ZONE H BLDG -139

1.0 Italian 5th Command Authorization LS

2.0 Final statement and related area release LS

total

B LEGACY AREA UXO SURVEY FIELD OP

1.0 Site Preparation LS

2.0

Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m²

3.0 Mechanical UXO monitoring down to

max. allowed (7.00 m from ground m²

4.0 BCM Excavation including material

filtering with archaeology assistance m³

5.0 Excavated material disposal IAW

italian rules. m³

7.0 Filling back material filtered on site

(gravel, soil) and compaction m³

7.0 Filling back with new material (gravel, soil) including transpotation and m³

8.0 Assitance to Construction Excavation

BID-DD-LGZ UXO SURV-FINAL
BID-DD-LGZ-UXO SURVEY C
BID-DD-LGZ-UXO SURVEY E
BID-DD-LGZ-UXO SURVEY F
BID-DD-LGZ-UXO SURVEY G