ATTACHMENT_1_EXCEL.xlsx

XLSX spreadsheet 82 KB Posted

Attached to
Legacy Area UXO Monitoring for Safety, Del Din installation, Vicenza Italy.
Solicitation number
W912PF-17-R-0015
Issued by

About this file

Attachment 1 in Excel

View the file

Other files

File Type Posted
ATTACHMENT__1.pdf PDF
W912PF-17-R-0015-0001.pdf PDF
ATTACHMENT__3.pdf PDF
Self_Certification_for_Antimafia_-_Enclosure__1.pdf PDF
List_of_work_Features_-_Attachment__1.pdf PDF
Statement_of_Work__Attachment___2.pdf PDF
W912PF-17-R-0015.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

IGE-DD-LGZ UXO SURV-FINAL

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuroSur m²UXO €/m²UXO $/m²
BASIC€ 0.00
AZONE A BLDG 4m²€ 0.00
BZONE B BLDG 93-94m²€ 0.00
GZONE G BLDG 43-139m²3,770.69€ 0.00€ 0.00€ 0.00ERROR:#DIV/0!
DZONE D BLDG 3m²€ 0.00ERROR:#DIV/0!
EZONE E BLDG 43-139m²2,979.93€ 0.00€ 0.00€ 0.00ERROR:#DIV/0!
FZONE F BLDG 43-139m²797.46€ 0.00€ 0.00€ 0.00ERROR:#DIV/0!7
I SUB TOTAL7,548.08€ 0.00€ 0.00€ 0.00ERROR:#DIV/0!
OPTION
CZONE C BLDG -139m²3,420.48€ 0.00€ 0.00€ 0.00ERROR:#DIV/0!
HZONE H BLDG -139m²1,651.67€ 0.00€ 0.00€ 0.00ERROR:#DIV/0!
II SUB TOTALm²5,072.15€ 0.00€ 0.00€ 0.00ERROR:#DIV/0!
GRAND TOTAL WORKm²12,620.23€ 0.00€ 0.00€ 0.00
ERROR:#DIV/0!

Project No. HB-41026-7J

&A HARDSCAPE- LEGACY ZONE

DEL DIN - VICENZA - ITALY

28 FEB 2017

&16FOUO Page &P of &N

IGE-DD-LGZ UXO SURV-rev3 COVER

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuroSur m²UXO €/m²UXO $/m²
€ 380,441.007,877.27€ 48.30$ 53.72
AZONE A BLDG 4m²4,320.94€ 0.00
BZONE B BLDG 93-94m²3,556.33€ 0.00WO 428316,602.22€ 801,821.80$ 891,904.11
CZONE C BLDG -139m²3,420.48€ 0.00€ 0.00€ 0.00
DZONE D BLDG 3m²3,981.99€ 0.00TOT Sur m²24,479.49€ 48.30
EZONE E BLDG 43-139m²2,979.93€ 0.00€ 0.00€ 0.00
FZONE F BLDG 43-139m²797.46€ 0.00€ 0.00€ 0.007
GZONE G BLDG 43-139m²3,770.69€ 0.00€ 0.00€ 0.00
HZONE H BLDG -139m²1,651.67€ 0.00€ 0.00€ 0.00
TOTm²24,479.49
Safety IAW LAW 81/20881.00%1.00%€ 0.00€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00€ 0.00TOT Sur m²€ 48.30
$0.00$0.00$0.00

RATE FY 17 € 1.0000 = $0.8990

This Indipendent Government Estimate is based on the task elements and site conditions set forth in the official Performance Work Statement (PWS). Labor rates were used set by the contract. Lodging and meals were based on a weighted average of the JTR for travel at the locations involved.
The numer of hours were based on the work elements of the task and the schedule as described in the PWS. Other Direct Cost rates and items numbers are based what is considered reasonable to support travel, delivery or deliverables, and other Indirect items necessary to meet the SOW.
Specifics costs of PWS elements of this IGE have not been discussed with the offer or offers in advance of preparation of this IGE. There are no additional assumptions apart from the SOW and the other items are self-explanatory in this estimate.
This is an original prepared IGE pending signature's shown above. WE, the undersigned, verified that this IGE was been indendently prepared, reviewed , and approved in advance of receiving the contractor's proposal.

PREPARED BY: DATE: APPROVED BY:

Mr. Loris MarcatoMr. Charles B. Kruse, PE
Civ. Eng. Tech.USAG Italy Directorate of Public Work
USAG Italy DPW Engineering DivisionChief Engineering Division
Vicenza, ItalyVicenza, Italy
DSN 6378092DSN 6378206
Email: loris.marcato2.ln@mail.milEmail: charles.b.kruse2.civ@mail.mil

Project No. HB-41026-7J

&A HARDSCAPE- LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

&16FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY A

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 5,300.00€ 0.00€ 5,300.00
BLEGACY AREA UXO SURVEY FIELD OP€ 190,499.58€ 0.00€ 190,499.58
Safety IAW LAW 81/20881.00%€ 1,958.00€ 0.00€ 1,958.00
GRAND TOTAL WORK€ 197,757.57€ 0.00€ 197,757.57
$219,975.05$0.00$219,975.05

RATE FY 17 € 1.0000 = $0.8990

ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE A BLDG 4
1.0Italian 5th Command AuthorizationLS1.00€ 1,000.00€ 1,000.00€ 0.00€ 1,300.00€ 1,300.00€ 0.00€ 2,300.00€ 0.00€ 2,300.00
2.0Final statement and related area releaseLS1.00€ 1,000.00€ 1,000.00€ 0.00€ 2,000.00€ 2,000.00€ 0.00€ 3,000.00€ 0.00€ 3,000.00
total€ 5,300.00€ 0.00€ 5,300.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 1,000.00€ 1,000.00€ 0.00€ 1,000.00€ 1,000.00€ 0.00€ 2,000.00€ 0.00€ 2,000.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²4,320.94€ 2.00€ 8,641.87€ 0.00€ 1.00€ 4,320.94€ 0.00€ 12,962.81€ 0.00€ 12,962.81
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²2,592.56€ 3.00€ 7,777.68€ 0.00€ 1.00€ 2,592.56€ 0.00€ 10,370.24€ 0.00€ 10,370.24
4.0BCM Excavation including material filtering with archaeology assistancem³2,851.82€ 5.00€ 14,259.09€ 0.00€ 15.00€ 42,777.26€ 0.00€ 57,036.34€ 0.00€ 57,036.34
4.0Excavated material disposal IAW italian rules.m³855.55€ 5.00€ 4,277.73€ 0.00€ 8.00€ 6,844.36€ 0.00€ 11,122.09€ 0.00€ 11,122.09
4.0Filling back material filtered on site (gravel, soil) and compactionm³3,279.59€ 15.00€ 49,193.84€ 0.00€ 5.00€ 16,397.95€ 0.00€ 65,591.79€ 0.00€ 65,591.79
4.0Filling back with new material (gravel, soil) including transpotation and compactionm³983.88€ 25.00€ 24,596.92€ 0.00€ 5.00€ 4,919.38€ 0.00€ 29,516.31€ 0.00€ 29,516.31
5.0Assitance to Construction Excavation including archaeology monitoring.Hrs40.00€ 5.00€ 200.00€ 0.00€ 40.00€ 1,600.00€ 0.00€ 1,800.00€ 0.00€ 1,800.00
6.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 100.00€ 100.00€ 0.00€ 100.00€ 0.00€ 100.00
total€ 190,499.58€ 0.00€ 190,499.58

Project No.HB-41060-5J

&A HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

11 JAN 2017

&14FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY B

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 5,300.00€ 0.00€ 5,300.00
BLEGACY AREA UXO SURVEY FIELD OP€ 173,476.52€ 0.00€ 173,476.52
Safety IAW LAW 81/20881.00%€ 1,787.77€ 0.00€ 1,787.77
GRAND TOTAL WORK€ 180,564.29€ 0.00€ 180,564.29
$200,850.16$0.00$200,850.16

RATE FY 17 € 1.0000 = $0.8990

ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE B BLDG 93-94
1.0Italian 5th Command AuthorizationLS1.00€ 1,000.00€ 1,000.00€ 0.00€ 1,300.00€ 1,300.00€ 0.00€ 2,300.00€ 0.00€ 2,300.00
2.0Final statement and related area releaseLS1.00€ 1,000.00€ 1,000.00€ 0.00€ 2,000.00€ 2,000.00€ 0.00€ 3,000.00€ 0.00€ 3,000.00
total€ 5,300.00€ 0.00€ 5,300.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 1,000.00€ 1,000.00€ 0.00€ 1,000.00€ 1,000.00€ 0.00€ 2,000.00€ 0.00€ 2,000.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²3,556.33€ 2.00€ 7,112.67€ 0.00€ 1.00€ 3,556.33€ 0.00€ 10,669.00€ 0.00€ 10,669.00
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²2,133.80€ 3.00€ 6,401.40€ 0.00€ 1.00€ 2,133.80€ 0.00€ 8,535.20€ 0.00€ 8,535.20
4.0BCM Excavation including material filtering with archaeology assistancem³2,987.32€ 5.00€ 14,936.60€ 0.00€ 15.00€ 44,809.80€ 0.00€ 59,746.39€ 0.00€ 59,746.39
5.0Excavated material disposal IAW italian rules.m³896.20€ 5.00€ 4,480.98€ 0.00€ 5.00€ 4,480.98€ 0.00€ 8,961.96€ 0.00€ 8,961.96
6.0Existing Underground metal tank removal and disposal including related concrete structureLS1.00€ 500.00€ 500.00€ 0.00€ 2,000.00€ 2,000.00€ 0.00€ 2,500.00€ 0.00€ 2,500.00
7.0Filling back material filtered on site (gravel, soil) and compactionm³2,091.12€ 20.00€ 41,822.48€ 0.00€ 5.00€ 10,455.62€ 0.00€ 52,278.10€ 0.00€ 52,278.10
7.0Filling back with new material (gravel, soil) including transpotation and compactionm³896.20€ 25.00€ 22,404.90€ 0.00€ 5.00€ 4,480.98€ 0.00€ 26,885.88€ 0.00€ 26,885.88
8.0Assitance to Construction Excavation including archaeology monitoring.Hrs40.00€ 5.00€ 200.00€ 0.00€ 40.00€ 1,600.00€ 0.00€ 1,800.00€ 0.00€ 1,800.00
9.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 100.00€ 100.00€ 0.00€ 100.00€ 0.00€ 100.00
total€ 173,476.52€ 0.00€ 173,476.52

Project No.HB-41060-5J

&A HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

11 JAN 2017

&14FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY C

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP€ 0.00€ 0.00€ 0.00
Safety IAW LAW 81/20881.00%€ 0.00€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00€ 0.00
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE C BLDG -139
1.0Italian 5th Command AuthorizationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Final statement and related area releaseLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²3,420.48€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²3,420.48€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
4.0BCM Excavation including material filtering with archaeology assistancem³3,420.48€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
5.0Excavated material disposal IAW italian rules.m³342.05€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
6.0Existing Underground metal tank removal and disposal including related concrete structureLS0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back material filtered on site (gravel, soil) and compactionm³273.64€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back with new material (gravel, soil) including transpotation and compactionm³68.41€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
8.0Assitance to Construction Excavation including archaeology monitoring.Hrs40.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
9.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00

Project No.HB-41026-7J

&A HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

&14FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY D

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 4,300.00€ 0.00€ 4,300.00
BLEGACY AREA UXO SURVEY FIELD OP€ 138,284.06€ 0.00€ 138,284.06
Safety IAW LAW 81/20881.00%€ 1,425.84€ 0.00€ 1,425.84
GRAND TOTAL WORK€ 144,009.90€ 0.00€ 144,009.90
$160,188.99$0.00$160,188.99

RATE FY 17 € 1.0000 = $0.8990

ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE D BLDG 3
1.0Italian 5th Command AuthorizationLS1.00€ 500.00€ 500.00€ 0.00€ 1,300.00€ 1,300.00€ 0.00€ 1,800.00€ 0.00€ 1,800.00
2.0Final statement and related area releaseLS1.00€ 500.00€ 500.00€ 0.00€ 2,000.00€ 2,000.00€ 0.00€ 2,500.00€ 0.00€ 2,500.00
total€ 4,300.00€ 0.00€ 4,300.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 1,000.00€ 1,000.00€ 0.00€ 1,000.00€ 1,000.00€ 0.00€ 2,000.00€ 0.00€ 2,000.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²3,981.99€ 2.00€ 7,963.98€ 0.00€ 1.00€ 3,981.99€ 0.00€ 11,945.97€ 0.00€ 11,945.97
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²3,185.59€ 5.00€ 15,927.96€ 0.00€ 5.00€ 15,927.96€ 0.00€ 31,855.92€ 0.00€ 31,855.92
4.0BCM Excavation including material filtering with archaeology assistancem³3,822.71€ 5.00€ 19,113.55€ 0.00€ 15.00€ 57,340.66€ 0.00€ 76,454.21€ 0.00€ 76,454.21
5.0Excavated material disposal IAW italian rules.m³637.12€ 5.00€ 3,185.59€ 0.00€ 5.00€ 3,185.59€ 0.00€ 6,371.18€ 0.00€ 6,371.18
6.0Existing Underground metal tank removal and disposal including related concrete structureLS0.00€ 500.00€ 0.00€ 0.00€ 2,000.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back material filtered on site (gravel, soil) and compactionm³637.12€ 10.00€ 6,371.18€ 0.00€ 5.00€ 3,185.59€ 0.00€ 9,556.78€ 0.00€ 9,556.78
7.0Filling back with new material (gravel, soil) including transpotation and compactionm³0.00€ 25.00€ 0.00€ 0.00€ 5.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
8.0Assitance to Construction Excavation including archaeology monitoring.Hrs0.00€ 5.00€ 0.00€ 0.00€ 40.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
9.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 100.00€ 100.00€ 0.00€ 100.00€ 0.00€ 100.00
total€ 138,284.06€ 0.00€ 138,284.06

&A HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

&14FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY E

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP€ 0.00€ 0.00€ 0.00
Safety IAW LAW 81/20881.00%€ 0.00€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00€ 0.00
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE E BLDG 43-139
1.0Italian 5th Command AuthorizationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Final statement and related area releaseLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²2,979.93€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²2,979.93€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
4.0BCM Excavation including material filtering with archaeology assistancem³2,979.93€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
5.0Excavated material disposal IAW italian rules.m³595.99€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
6.0Existing Underground metal tank removal and disposal including related concrete structureLS0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back material filtered on site (gravel, soil) and compactionm³2,383.94€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back with new material (gravel, soil) including transpotation and compactionm³595.99€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
8.0Assitance to Construction Excavation including archaeology monitoring.Hrs0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
9.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00

&A HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

&14FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY F

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP€ 0.00€ 0.00€ 0.00
Safety IAW LAW 81/20881.00%€ 0.00€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00

RATE FY 17 € 1.0000 = $0.8990

ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE F BLDG 43-139
1.0Italian 5th Command AuthorizationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Final statement and related area releaseLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²797.46€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
4.0BCM Excavation including material filtering with archaeology assistancem³797.46€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
5.0Excavated material disposal IAW italian rules.m³159.49€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
6.0Existing Underground metal tank removal and disposal including related concrete structureLS0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back material filtered on site (gravel, soil) and compactionm³127.59€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back with new material (gravel, soil) including transpotation and compactionm³31.90€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
8.0Assitance to Construction Excavation including archaeology monitoring.Hrs0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
9.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00

&A HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

&14FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY G

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP€ 0.00€ 0.00€ 0.00
Safety IAW LAW 81/20881.00%€ 0.00€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00

RATE FY 17 € 1.0000 = $0.8990

ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE G BLDG 43-139
1.0Italian 5th Command AuthorizationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Final statement and related area releaseLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²3,770.69€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
4.0BCM Excavation including material filtering with archaeology assistancem³3,770.69€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
5.0Excavated material disposal IAW italian rules.m³754.14€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
6.0Existing Underground metal tank removal and disposal including related concrete structureLS0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back material filtered on site (gravel, soil) and compactionm³3,016.55€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back with new material (gravel, soil) including transpotation and compactionm³754.14€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
8.0Assitance to Construction Excavation including archaeology monitoring.Hrs0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
9.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00

&A HARDSCAPE - LEGACY ZONE

DEL DIN - VICENZA - ITALY

30 JAN 2017

&14FOUO Page &P of &N

IGE-DD-LGZ-UXO SURVEY H

Quantity/QuantitàMaterial Cost/Costo MaterialeLabor Cost/Costo ManodoperaTotal Cost/Costo Totale
ItemDESCRIPTIONUnit"K""L"Unit"K""L"Unit"K""L""K""L""K+L"
UnitàUnitàEuroEuroUnitàEuroEuroEuroEuroEuro
ALEGACY AREA UXO SURVEY 5TH COMM ADMIN€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP€ 0.00€ 0.00€ 0.00
Safety IAW LAW 81/20881.00%€ 0.00€ 0.00€ 0.00
GRAND TOTAL WORK€ 0.00€ 0.00€ 0.00
$0.00$0.00$0.00

RATE FY 17 € 1.0000 = $0.8990

ALEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE H BLDG -139
1.0Italian 5th Command AuthorizationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Final statement and related area releaseLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00
BLEGACY AREA UXO SURVEY FIELD OP
1.0Site PreparationLS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
2.0Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be includedm²1,651.67€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
3.0Mechanical UXO monitoring down to max. allowed (7.00 m from ground level)m²1,651.67€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
4.0BCM Excavation including material filtering with archaeology assistancem³1,982.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
5.0Excavated material disposal IAW italian rules.m³396.40€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
6.0Existing Underground metal tank removal and disposal including related concrete structureLS0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back material filtered on site (gravel, soil) and compactionm³1,585.60€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
7.0Filling back with new material (gravel, soil) including transpotation and compactionm³396.40€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
8.0Assitance to Construction Excavation including archaeology monitoring.Hrs0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
9.0CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force.
LS1.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00€ 0.00
total€ 0.00€ 0.00€ 0.00