ATTACHMENT__1.pdf
PDF 95 KB Posted
- Solicitation number
- W912PF-17-R-0015
About this file
Attachment 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PF-17-R-0015-0001.pdf | ||
| ATTACHMENT__3.pdf | ||
| ATTACHMENT_1_EXCEL.xlsx | XLSX spreadsheet | |
| Self_Certification_for_Antimafia_-_Enclosure__1.pdf | ||
| List_of_work_Features_-_Attachment__1.pdf | ||
| Statement_of_Work__Attachment___2.pdf | ||
| W912PF-17-R-0015.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. HB-41026-7J
IGE-DD-LGZ UXO SURV-FINAL
HARDSCAPE- LEGACY ZONE
DEL DIN - VICENZA - ITALY
28 FEB 2017
FOUO Page 1 of 11
Quantity/Quantità Material Cost/Costo MaterialeLabor Cost/Costo Manodo Total Cost/Costo T Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro
BASIC
G ZONE G BLDG 43-139 m² 3,770.69 E ZONE E BLDG 43-139 m² 2,979.93 F ZONE F BLDG 43-139 m² 797.46
I SUB TOTAL 7,548.08
OPTION
C ZONE C BLDG -139 m² 3,420.48 H ZONE H BLDG -139 m² 1,651.67
II SUB TOTAL m² 5,072.15
GRAND TOTAL WORK m² 12,620.23
RATE FY 17 € 1.0000 = $0.8990
1464736227.ln Typewritten Text
ATTACHMENT #1
Project No.HB-41026-7J
IGE-DD-LGZ-UXO SURVEY C
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 2 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 17 € 1.0000 = $0.8990
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE C BLDG -139
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area release LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,420.48
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 3,420.48
4.0 BCM Excavation including material filtering with archaeology assistance m³ 3,420.48
5.0 Excavated material disposal IAW italian rules. m³ 342.05
6.0 Existing Underground metal tank removal and disposal including related concrete structure LS
7.0 Filling back material filtered on site (gravel, soil) and compaction m³ 273.64
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³ 68.41
1464736227.ln
IGE-DD-LGZ-UXO SURVEY C
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 3 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
8.0 Assitance to Construction Excavation including archaeology monitoring. Hrs 40.00
9.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force. LS 1.00 total
1464736227.ln
IGE-DD-LGZ-UXO SURVEY E
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 4 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 17 € 1.0000 = $0.8990
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE E BLDG 43-139
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area release LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 2,979.93
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 2,979.93
4.0 BCM Excavation including material filtering with archaeology assistance m³ 2,979.93
5.0 Excavated material disposal IAW italian rules. m³ 595.99
6.0 Existing Underground metal tank removal and disposal including related concrete structure LS
7.0 Filling back material filtered on site (gravel, soil) and compaction m³ 2,383.94
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³ 595.99
1464736227.ln
IGE-DD-LGZ-UXO SURVEY E
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 5 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
8.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
9.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force. LS 1.00 total
1464736227.ln
IGE-DD-LGZ-UXO SURVEY F
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 6 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 17 € 1.0000 = $0.8990
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE F BLDG 43-139
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area release LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 797.46
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material filtering with archaeology assistance m³ 797.46
5.0 Excavated material disposal IAW italian rules. m³ 159.49
6.0 Existing Underground metal tank removal and disposal including related concrete structure LS
7.0 Filling back material filtered on site (gravel, soil) and compaction m³ 127.59
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³ 31.90
1464736227.ln
IGE-DD-LGZ-UXO SURVEY F
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 7 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
8.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
9.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force. LS 1.00 total
1464736227.ln
IGE-DD-LGZ-UXO SURVEY G
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 8 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 17 € 1.0000 = $0.8990
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE G BLDG 43-139
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area release LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 3,770.69
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m²
4.0 BCM Excavation including material filtering with archaeology assistance m³ 3,770.69
5.0 Excavated material disposal IAW italian rules. m³ 754.14
6.0 Existing Underground metal tank removal and disposal including related concrete structure LS
7.0 Filling back material filtered on site (gravel, soil) and compaction m³ 3,016.55
7.0 Filling back with new material (gravel, soil) including transpotation and compaction m³ 754.14
1464736227.ln
IGE-DD-LGZ-UXO SURVEY G
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 9 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
8.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
9.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force. LS 1.00 total
1464736227.ln Typewritten Text
1464736227.ln
IGE-DD-LGZ-UXO SURVEY H
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 10 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
B LEGACY AREA UXO SURVEY FIELD OP
Safety IAW LAW 81/2088 1.00%
GRAND TOTAL WORK
RATE FY 17 € 1.0000 = $0.8990
A LEGACY AREA UXO SURVEY 5TH COMM ADMIN
ZONE H BLDG -139
1.0 Italian 5th Command Authorization LS 1.00
2.0 Final statement and related area release LS 1.00
total
B LEGACY AREA UXO SURVEY FIELD OP
1.0 Site Preparation LS 1.00
2.0
Existing facility and utilities topographic survey with GPS method including elevation. Exposure of underground utility line will be m² 1,651.67
3.0 Mechanical UXO monitoring down to max. allowed (7.00 m from ground m² 1,651.67
4.0 BCM Excavation including material filtering with archaeology assistance m³ 1,982.00
5.0 Excavated material disposal IAW italian rules. m³ 396.40
6.0 Existing Underground metal tank removal and disposal including related concrete structure LS
7.0 Filling back material filtered on site (gravel, soil) and compaction m³ 1,585.60
7.0 Filling back with new material (gravel, soil) including transpotation and m³ 396.40
8.0 Assitance to Construction Excavation including archaeology monitoring. Hrs
1464736227.ln
IGE-DD-LGZ-UXO SURVEY H
HARDSCAPE - LEGACY ZONE
DEL DIN - VICENZA - ITALY
30 JAN 2017
FOUO Page 11 of 11
Quantity/Quantità Material Cost/Costo Materiale Labor Cost/Costo Manodopera Total Cost/Costo Totale Item DESCRIPTION Unit "K" "L" Unit "K" "L" Unit "K" "L" "K" "L" "K+L"
Unità Unità Euro Euro Unità Euro Euro Euro Euro Euro
9.0
CMR: Contractor Manpower Reporting (CMR) data must be accurate and complete and entered into CMR during the data gathering period of 1 October through October 31 for every year, or part of the year for which the contract is in force. LS 1.00 total
1464736227.ln
| IGE-DD-LGZ UXO SURV-FINAL |
| IGE-DD-LGZ-UXO SURVEY C |
| IGE-DD-LGZ-UXO SURVEY E |
| IGE-DD-LGZ-UXO SURVEY F |
| IGE-DD-LGZ-UXO SURVEY G |
| IGE-DD-LGZ-UXO SURVEY H |
File details come from the government source that posted it. Updated .