03_1 Attachment III Drawing 2 of 4 Revised.pdf

PDF 192 KB Posted

Attached to
Repair Transformer Station 24, Bldg. 643, USAG Bavaria, Grafenwöhr Military Community, Rose Barracks
Solicitation number
W912PB26BA009
Issued by

About this file

This document is an architectural/engineering drawing for a construction project at a U.S. Army installation. The drawing depicts the ground plan, elevations, and cross-sections for the replacement of Transformer Station Building #643 at Grafenwoehr Military Community - Rose Barracks, USAG Bavaria. The project number is 42A-08764-5J, with a drawing date of February 17, 2026.

The transformer station design includes two transformers (one 614 kVA and one 630 kVA reserve unit) with associated medium-voltage (HS-Feld) and low-voltage (NS) distribution equipment. The facility encompasses eight measurement stations (MS1-MS8) connected to eight distribution fields (JO1-JO8), an EMCS battery unit, and grounding infrastructure consisting of V4A stainless steel conductor rails (30x3.5 dimensions) with a measured grounding resistance of 0.9 ohm. The building structure measures approximately 12.66 meters in width with detailed sectional elevations showing the roof configuration and interior layout. Technical notes indicate that dimensions and cross-sections are non-binding and subject to modification based on local site conditions. The drawing was prepared by the Design Branch under the U.S. Army Corps of Engineers and approved by the Engineering Division and Master Planning Branch.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grafenwoehr Military Community - Rose Barracks

USAG BAVARIA

V NORE

INSTALLATION

PROJECT TITLE

DATE DESCRIPTION DRAWN BY APPROVED

ENGR DIV

SIGNATURE

NAME (PRINT)

DATE USING UNIT DATE

NAME (PRINT)

SIGNATURE

DATE

NAME (PRINT)

SIGNATURE

DESIGN / PROJ MGMT BR DATE

NAME (PRINT)

SIGNATURE

MASTER PLANNER

JULIANA FUCHS-HOECHT

DRAWN BY PROJECT ENGR CHECKED BY SHEET

OF

PROJECT NOCALEDATE S

17.02.2026

Peter Lehner, C/Design Branch Vilseck

REPLACE TRANSFORMER STATION - BLDG # 643

EDUARDO AVILA DIAZ EDUARDO AVILA DIAZ

42A-08764-5J 4

Richard M. Green C/Engr Div

Craig A. Booth, C/ Master Planning Branch

Ground Plan

Ground Plan of New Transformer Station 24 Building #643

NS

RTRT

C E

E

RV

EMCS

.3

Trennstelle

Blitzschutz

03 02

Trafo 1 gleichsschiene

Potentialaus-

Trafo 2 gleichsschiene

Potentialaus-gleichsschiene

Potentialaus-

Trennstück isoliert eingeführt isolierte Leitung 1x70

Schritterder

Trennstelle

Blitzschutz

V4A 30x3,5

V4A 30x3,5

0,9 Ohm an Meßstelle

Erdungswiderstand

Potischiene Trafo 2

Potischiene Trafo 1 alle metallische Teile

NS Niederspannungsverteilung

HS-Feld J01 - J08

Verbindungen zu

NIRO Bandeisen V4A 30x3,5

MS5 MS4 MS3 MS2 MS1

Reserve Reserve

Trafo 2

630kVA

Trafo1

St.25

St.11

1:25 / 1:50 bindend und können sich auf Grund örtlicher Gegebenheiten ändern.

Lage der vorhandenen und geplanten baulichen Anlagen sind nicht

Dieser Plan dient nur als Kalkulationshilfe. Maße, Querschnitte und structures are not binding and can change due to local conditions.

cross sections and location of existing and planned physical

The purpose of this drawing is to ease calculation. Dimensions, Section / Schnitt

11.07.2024 Ansichten und Schnitt ergänzt

.0

12.66

121.94101.94268.1812

531.10

981.108.95

T ra fo k V

A

T ra fo

R e s e rv e z e ll e

Elevations / Ansichten o3O

MS6

St.39

MS7

204-16

St.22

MS8

St.15

Batterie UnitEMCS

NS NS NS

JO1JO2JO3JO4JO5JO6JO7JO8

.1

.2