This document is an architectural/engineering drawing for a construction project at a U.S. Army installation. The drawing depicts the ground plan, elevations, and cross-sections for the replacement of Transformer Station Building #643 at Grafenwoehr Military Community - Rose Barracks, USAG Bavaria. The project number is 42A-08764-5J, with a drawing date of February 17, 2026.
The transformer station design includes two transformers (one 614 kVA and one 630 kVA reserve unit) with associated medium-voltage (HS-Feld) and low-voltage (NS) distribution equipment. The facility encompasses eight measurement stations (MS1-MS8) connected to eight distribution fields (JO1-JO8), an EMCS battery unit, and grounding infrastructure consisting of V4A stainless steel conductor rails (30x3.5 dimensions) with a measured grounding resistance of 0.9 ohm. The building structure measures approximately 12.66 meters in width with detailed sectional elevations showing the roof configuration and interior layout. Technical notes indicate that dimensions and cross-sections are non-binding and subject to modification based on local site conditions. The drawing was prepared by the Design Branch under the U.S. Army Corps of Engineers and approved by the Engineering Division and Master Planning Branch.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grafenwoehr Military Community - Rose Barracks
USAG BAVARIA
V NORE
INSTALLATION
PROJECT TITLE
DATE DESCRIPTION DRAWN BY APPROVED
ENGR DIV
SIGNATURE
NAME (PRINT)
DATE USING UNIT DATE
NAME (PRINT)
SIGNATURE
DATE
NAME (PRINT)
SIGNATURE
DESIGN / PROJ MGMT BR DATE
NAME (PRINT)
SIGNATURE
MASTER PLANNER
JULIANA FUCHS-HOECHT
DRAWN BY PROJECT ENGR CHECKED BY SHEET
OF
PROJECT NOCALEDATE S
17.02.2026
Peter Lehner, C/Design Branch Vilseck
REPLACE TRANSFORMER STATION - BLDG # 643
EDUARDO AVILA DIAZ EDUARDO AVILA DIAZ
42A-08764-5J 4
Richard M. Green C/Engr Div
Craig A. Booth, C/ Master Planning Branch
Ground Plan
Ground Plan of New Transformer Station 24 Building #643
NS
RTRT
C E
E
RV
EMCS
.3
Trennstelle
Blitzschutz
03 02
Trafo 1 gleichsschiene
Potentialaus-
Trafo 2 gleichsschiene
Potentialaus-gleichsschiene
Potentialaus-
Trennstück isoliert eingeführt isolierte Leitung 1x70
Schritterder
Trennstelle
Blitzschutz
V4A 30x3,5
V4A 30x3,5
0,9 Ohm an Meßstelle
Erdungswiderstand
Potischiene Trafo 2
Potischiene Trafo 1 alle metallische Teile
NS Niederspannungsverteilung
HS-Feld J01 - J08
Verbindungen zu
NIRO Bandeisen V4A 30x3,5
MS5 MS4 MS3 MS2 MS1
Reserve Reserve
Trafo 2
630kVA
Trafo1
St.25
St.11
1:25 / 1:50 bindend und können sich auf Grund örtlicher Gegebenheiten ändern.
Lage der vorhandenen und geplanten baulichen Anlagen sind nicht
Dieser Plan dient nur als Kalkulationshilfe. Maße, Querschnitte und structures are not binding and can change due to local conditions.
cross sections and location of existing and planned physical
The purpose of this drawing is to ease calculation. Dimensions, Section / Schnitt
11.07.2024 Ansichten und Schnitt ergänzt
.0
12.66
121.94101.94268.1812
531.10
981.108.95
T ra fo k V
A
T ra fo
R e s e rv e z e ll e
Elevations / Ansichten o3O
MS6
St.39
MS7
204-16
St.22
MS8
St.15
Batterie UnitEMCS
NS NS NS
JO1JO2JO3JO4JO5JO6JO7JO8
.1
.2
File details come from the government source that posted it. Updated .