03_3 Attachment III Drawing 2 of 4.pdf
PDF 191 KB Posted
- Attached to
- Repair Transformer Station 24, Bldg. 643, USAG Bavaria, Grafenwöhr Military Community, Rose Barracks
- Solicitation number
- W912PB26BA009
About this file
This document is an engineering drawing and design plan for a military construction project. The drawing details the replacement of Transformer Station Building #643 at Grafenwoehr Military Community – Rose Barracks under USAG Bavaria. The project is identified with project number 42A-08764-5J and was drawn by Peter Lehner of the Design Branch in Vilseck, with approvals from Eduardo Avila Diaz, Richard M. Green, and Craig A. Booth. The drawing is dated 17.02.2026 and includes revisions as of 11.07.2024.
The ground plan shows a new transformer station facility containing two transformers (Trafo 1 rated 614 kVA and Trafo 2 rated 630 kVA) along with associated electrical infrastructure including medium and low-voltage distribution components (MS1-MS8 measurement stations, JO1-JO8 distribution fields, EMCS battery unit, and NS low-voltage distribution). The design incorporates grounding systems with V4A stainless steel bus bars (30x3.5), lightning protection (Blitzschutz), isolated conductor entries, and potential equalization components. The facility layout includes elevation views and cross-sectional details with precise measurements. The drawing explicitly notes that dimensions, cross-sections, and structure locations are not binding and may change due to local conditions, and serves primarily as a calculation aid for project planning purposes.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Grafenwoehr Military Community - Rose Barracks
USAG BAVARIA
V NORE
INSTALLATION
PROJECT TITLE
DATE DESCRIPTION DRAWN BY APPROVED
ENGR DIV
SIGNATURE
NAME (PRINT)
DATE USING UNIT DATE
NAME (PRINT)
SIGNATURE
DATE
NAME (PRINT)
SIGNATURE
DESIGN / PROJ MGMT BR DATE
NAME (PRINT)
SIGNATURE
MASTER PLANNER
JULIANA FUCHS-HOECHT
DRAWN BY PROJECT ENGR CHECKED BY SHEET
OF
PROJECT NOCALEDATE S
17.02.2026
Peter Lehner, C/Design Branch Vilseck
REPLACE TRANSFORMER STATION - BLDG # 643
EDUARDO AVILA DIAZ EDUARDO AVILA DIAZ
42A-08764-5J 4
Richard M. Green C/Engr Div
Craig A. Booth, C/ Master Planning Branch
Ground Plan
Ground Plan of New Transformer Station 24 Building #643
NS
RTRT
C E
E
RV
EMCS
.3
Trennstelle
Blitzschutz
03 02
Trafo 1 gleichsschiene
Potentialaus-
Trafo 2 gleichsschiene
Potentialaus-gleichsschiene
Potentialaus-
Trennstück isoliert eingeführt isolierte Leitung 1x70
Schritterder
Trennstelle
Blitzschutz
V4A 30x3,5
V4A 30x3,5
0,9 Ohm an Meßstelle
Erdungswiderstand
Potischiene Trafo 2
Potischiene Trafo 1 alle metallische Teile
NS Niederspannungsverteilung
HS-Feld J01 - J08
Verbindungen zu
NIRO Bandeisen V4A 30x3,5
MS5 MS4 MS3 MS2 MS1
Reserve Reserve
Trafo 2
630kVA
Trafo1
St.25
St.11
1:25 / 1:50 bindend und können sich auf Grund örtlicher Gegebenheiten ändern.
Lage der vorhandenen und geplanten baulichen Anlagen sind nicht
Dieser Plan dient nur als Kalkulationshilfe. Maße, Querschnitte und structures are not binding and can change due to local conditions.
cross sections and location of existing and planned physical
The purpose of this drawing is to ease calculation. Dimensions, Section / Schnitt
11.07.2024 Ansichten und Schnitt ergänzt
.0
12.66
121.94101.94268.1812
531.10
981.108.95
T ra fo k V
A
T ra fo
R e s e rv e z e ll e
Elevations / Ansichten o3O
.1
.2
.9
MS6
St.39
MS7
204-16
St.22
MS8
St.15
Batterie UnitEMCS
NS NS NS
JO1JO2JO3JO4JO5JO6JO7JO8
File details come from the government source that posted it. Updated .