W912PA-19-Q-0009_ATTACHMENT_V_-_LIST_OF_DELIVERABLES.docx

DOCX document 24 KB Posted

Attached to
REMOVAL OF ASBESTOS ROOF
Solicitation number
W912PA-19-Q-0009
Issued by

About this file

W912PA-19-Q-0009 ATTACHMENT V - LIST OF DELIVERABLES

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

0.3.

W912PA-19-Q-0009

ATTACHMENT V

LIST OF DELIVERABLES

Item
Ref.
Deliverable
Completion date
Submit To
Check Delivered
1
G-03;

Inventory list with safety data sheet; “Material Safety Data Sheet” (M.S.D.S.)

Within 30 days after contract award

POC

2
G-04:
Scheduling of work
Prior to start of work
POC
3
G-08
Safety and Health Plan
Prior to start of work
POC
4
G-08
AT Level I Training
Within 30 days after contract award
POC
5
G-08
iWatch/iSalute Training
Within 30 days after contract award
POC
6
G-08
Opsec Training
Within 30 days after contract award
POC
7
1.1.3
Certificate of General Liability Insurance for personal injury, occupational disease and sickness or death and property damage
Within 30 days after contract

POC

8
1.2
Copy of notification to the “Ministère de l’Emploi et du Travail”
Within 30 days after contract

POC

9
2.3
Certificate certifying that asbestos waste will be handed over to a recognized hazardous waste disposal firm, and transported to the dump by a

recognized transporter

Prior to start of Work
POC
10
2.3
Documentation from physician that all employees or agents who may be exposed to airborne asbestos in excess of background level have been provided with an opportunity to be medically monitored to determine whether they are physically capable of working while wearing the respirator required

without suffering adverse health effects

Prior to start of Work
POC
11
2.3
Shop drawings for layout and construction of decontamination enclosure systems and barriers for isolation of the work area as detailed in this

specification and required by applicable regulations

Prior to start of Work
POC
12
2.3
Manufacturer’s certification that vacuums, negative pressure ventilation units and other local exhaust
Prior to start of Work
POC

W912PA-19-Q-0009 REMOVAL OF ASBESTOS ROOF

ventilation equipment conform to the Code of Well-being

13
2.3
Weekly job progress reports detailing abatement

activities

Weekly During execution of the work
POC
14
2.3
Copies of all transport manifests, trip tickets and disposal receipts for all asbestos waste materials removed from the work area during the abatement

process

During execution of the work
POC
15
2.3
Daily copies of work site entry logbooks with

information on worker and visitor access

During execution of the work
POC
16
2.3
Logs documenting filter changes on respirators, vacuums, negative pressure ventilation units, and

other engineering controls

During execution of the work
POC
17
2.3
Results pre-abatement air sampling (if conducted) including location of samples, Names of the Air Sampling Professional, equipment utilized and method of analysis
Prior to commencement of work
POC
18
2.3
Submit results of bulk material analysis and air sampling data collected during the course of the abatement
During abatement
POC
19
2.6.3
Documentation related to the masks test
Prior to the commencement of work
POC
20
3.9
Copy of the receipt and the authorization of exporting the wastes in the country or region of

destination

During evacuation of asbestos waste
POC

File details come from the government source that posted it.