W912PA-19-Q-0009 REMOVAL OF ASBESTOS ROOF

ATTACHMENT I

BID SCHEDULE

The contractor will submit his bid according to the following bid schedule:

Item

Description

QTY
U
U.P.(€)
T.P.(€)

Building # 20001

Area # 1 (South side offices)

1
Inventory of fixtures, In accordance with (IAW) Para 3.1. of the statement of work (SOW)
1
LS
2
Installation of work site, IAW Para 3.2. of the SOW
1
LS
3
Installation of personnel and equipment airlocks, IAW Para 3.3. of the SOW
1
LS
4
Plasticizing and protection, IAW Para 3.4. of the SOW
1
LS
5
Stable: Dismounting of the roof and edges, IAW Para 3.5 and 3.6. of the SOW + construction debris
1
LS
6
Removal of 10 sheaths diameter 120mm and 250mm length IAW Para 3.5 and 3.6. of the SOW + construction debris
1
LS
7
Removal of dust and fixation, IAW Para 3.7. of the SOW
1
LS
8
Measurements and dismounting of the work site, IAW Para 3.8. of the SOW
1
LS
9
Evacuation of ACM, IAW Para 3.9 of the SOW
1
LS
10
Dismounting of stable IAW Para 3.10 of the SOW
1
LS

TOTAL:

Units:

LS – Lump sum EA – Each LM – Linear meter M2 – Square meter