W912PA-18-R-0003
ATTACHMENT I
PRICE SCHEDULE
Item Description QTY U U.P. T.P.
TP-1-01 Preparation and protection of work site 1 LS
TP-1-02 Dismounting 1 LS
TP-1-03 Removal of old watertight layer and insulation 930 M2
TP-2-01 Substrate 930 M2
TP-2-02 Vapor barrier 930 M2
TP-2-03 Insulation 930 M2
TP-2-04 Sub layer (vapor spread) 930 M2
TP-2-05 Watertightness layer 930 M2
TP-3-01 Wall cover 114 LM
TP-3-02 Zinc work along the hangar wall 80 LM
TP-3-03 Reinstallation of lightning system 1 LS
TP-3-04 Repair weather fillets with seal around metal frame 12 EA
TP-3-05 Provide and install rainwater inlets 26 EA
TP-3-06 Replace water downspouts of the hangar 205 LM
TP-3-07 Replace water downspouts of the annexes 13 EA
TP-3-08 Replace manhole 13 EA
TP-3-09 Replace the lighting above entrance doors 6 EA
TP-3-10 Remove and reinstall the satellite antenna 1 EA
G-10 Coordination in matter of safety and health 1 LS