Attachment_2_-_Schedule_-_Revised_19_June_18.XLS
XLS spreadsheet 197 KB Posted
- Solicitation number
- W912PA-18-R-0002
About this file
Attachment 2 - Schedule - Revised 19 June 18
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912PA-18-R-0002-0004.pdf | ||
| W912PA-18-R-0002-0003.pdf | ||
| Attachment_1_-_Statement_of_Work_-_2_Oct_18.pdf | ||
| W912PA-18-R-0002-0002.pdf | ||
| W912PA-18-R-0002-0001.pdf | ||
| W912PA-18-R-0002.pdf | ||
| Attachment_1_-_Statement_of_Work_-_20_Jun_18.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule
| IDIQ PAVING | ||||||
| The work described below will be executed in accordance with: | ||||||
| - In the Walloon Region: Standard Specifications Qualiroutes | ||||||
| - In the Flemish Region: Standard Specifications SB 250 | ||||||
| - In the Brussels Region: Standard Specifications CCT 2015 | ||||||
| Exhibit Line Item Number (ELIN) | DESCRIPTION | ETIMATED QUANTITY | UNIT | UNIT PRICE (€) | TOTAL ESTIMATED AMOUNT (€) | |
| A | Preliminary work and demolition (Following ELINS pertain to CLIN 0001) | |||||
| A001 | Ground samplings (sounding) to determine ground resistance - provide report | 4 | EA | 0.00 | ||
| A002 | Core sampling to determine ground nature - provide report | 4 | EA | 0.00 | ||
| A003 | Topographic surveys: layout of roads - measurement of levels | 4 | EA | 0.00 | ||
| A004 | Additional cost for work during night, week ends and legal holidays | 64 | EA | 0.00 | ||
| A005 | Cutting of trees and evacuation | 4 | EA | 0.00 | ||
| A006 | Removal of stumps and evacuation | 4 | EA | 0.00 | ||
| A007 | Clearing of undergrowth and evacuation | 48 | SM | 0.00 | ||
| A008 | Removal of hedges and evacuation | 24 | LM | 0.00 | ||
| A009 | Dismounting and evacuation of fence - metallic elements | 48 | LM | 0.00 | ||
| A010 | Dismounting and evacuation of fence - concrete elements | 24 | LM | 0.00 | ||
| A011 | Dismounting and evacuation of metallic structures | 4.8 | CM | 0.00 | ||
| A012 | Dismounting and evacuation of wooden structures | 4.8 | CM | 0.00 | ||
| A013 | Move buried ducts - water | 24 | LM | 0.00 | ||
| A014 | Move buried ducts - electricity | 24 | LM | 0.00 | ||
| A015 | Move buried ducts - telephone | 24 | LM | 0.00 | ||
| A016 | Move buried ducts - sewage | 24 | LM | 0.00 | ||
| A017 | Move buried ducts - fire hydrant | 4 | EA | 0.00 | ||
| A018 | Cutting and removal of hydrocarbon covering - T = 2 cm | 1440 | SM | 0.00 | ||
| A019 | Cutting and removal of hydrocarbon covering - T = 5 cm | 1440 | SM | 0.00 | ||
| A020 | Cutting and removal of hydrocarbon covering - T = 10 cm | 1440 | SM | 0.00 | ||
| A021 | Cutting and removal of hydrocarbon covering - T = 20 cm | 1440 | SM | 0.00 | ||
| A022 | hydrocarbon covering - Additional cost for removal hydrocarbon covering with tar (polluted) + evacuation and submittal of a certificate from certified dump | 400 | CM | 0.00 | ||
| A023 | Cutting and removal of concrete covering - T = 2 cm | 1440 | SM | 0.00 | ||
| A024 | Cutting and removal of concrete covering - T = 5 cm | 1440 | SM | 0.00 | ||
| A025 | Cutting and removal of concrete covering - T = 10 cm | 1440 | SM | 0.00 | ||
| A026 | High pressure cleaning after cutting | 1440 | SM | 0.00 | ||
| A027 | Clearing of expansion joints after cutting | 96 | LM | 0.00 | ||
| A028 | Sawing of hydrocarbon covering - T <= 5 cm | 24 | LM | 0.00 | ||
| A029 | Sawing of hydrocarbon covering - 5 < T <= 10 cm | 24 | LM | 0.00 | ||
| A030 | Sawing of hydrocarbon covering - 10 < T <= 15 cm | 24 | LM | 0.00 | ||
| A031 | Sawing of hydrocarbon covering - 15 < T <= 20 cm | 24 | LM | 0.00 | ||
| A032 | Sawing of hydrocarbon covering - T > 20 cm | 24 | LM | 0.00 | ||
| A033 | Sawing of concrete covering - T <= 5 cm | 24 | LM | 0.00 | ||
| A034 | Sawing of concrete covering - 5 < T <= 10 cm | 24 | LM | 0.00 | ||
| A035 | Sawing of concrete covering - 10 < T <= 15 cm | 24 | LM | 0.00 | ||
| A036 | Sawing of concrete covering - 15 < T <= 20 cm | 24 | LM | 0.00 | ||
| A037 | Sawing of concrete covering - T > 20 cm | 24 | LM | 0.00 | ||
| A038 | Demolition and evacuation of concrete paving | 240 | SM | 0.00 | ||
| A039 | Demolition and evacuation of stone paving | 48 | SM | 0.00 | ||
| A040 | Demolition and evacuation of concrete slabs | 240 | SM | 0.00 | ||
| A041 | Demolition and evacuation of stone slabs | 48 | SM | 0.00 | ||
| A042 | Demolition and evacuation of paving covered with hydrocarbon | 48 | SM | 0.00 | ||
| A043 | Demolition and evacuation of covering made of non stabilized materials | 96 | SM | 0.00 | ||
| A044 | Demolition and evacuation of gravel covering | 96 | SM | 0.00 | ||
| A045 | Demolition of hydrocarbon covering - T <= 15 cm | 2400 | SM | 0.00 | ||
| A046 | Demolition of hydrocarbon covering - 15 < T <= 25 cm | 2400 | SM | 0.00 | ||
| A047 | Demolition of hydrocarbon covering - T > 25 cm | 480 | SM | 0.00 | ||
| A048 | Demolition and evacuation of non reinforced concrete covering - T <= 15 cm | 2400 | SM | 0.00 | ||
| A049 | Demolition and evacuation of non reinforced concrete covering - 15 < T <= 25 cm | 2400 | SM | 0.00 | ||
| A050 | Demolition and evacuation of non reinforced concrete covering - T > 25 cm | 480 | SM | 0.00 | ||
| A051 | Demolition and evacuation of reinforced concrete covering - T <= 15 cm | 480 | SM | 0.00 | ||
| A052 | Demolition and evacuation of reinforced concrete covering - 15 < T <= 25 cm | 480 | SM | 0.00 | ||
| A053 | Demolition and evacuation of reinforced concrete covering - T > 25 cm | 480 | SM | 0.00 | ||
| A054 | Demolition and evacuation of foundation/subfoudation made of unbound materials | 960 | CM | 0.00 | ||
| A055 | Demolition and evacuation of foundation/subfoudation made of non reinforced bound materials | 960 | CM | 0.00 | ||
| A056 | Demolition and evacuation of foundation/subfoudation made of bottoming treated with additives | 960 | CM | 0.00 | ||
| A057 | Demolition and evacuation of foundation/subfoudation made of lean concrete | 960 | CM | 0.00 | ||
| A058 | Demolition and evacuation of foundation/subfoudation made of sand-cement | 960 | CM | 0.00 | ||
| A059 | Demolition and evacuation of foundation/subfoudation made of reinforced lean concrete | 960 | CM | 0.00 | ||
| A060 | Demolition and evacuation of stone curbstones | 8 | LM | 0.00 | ||
| A061 | Dismounting of stone curbstones to be reused on the work site | 24 | LM | 0.00 | ||
| A062 | Demolition and evacuation of prefabricated concrete curbstones | 240 | LM | 0.00 | ||
| A063 | Demolition and evacuation of concrete curbstones cast on site | 48 | LM | 0.00 | ||
| A064 | Dismounting and evacuation of shore-up strips or road gutter made of prefabricated concrete - width : B <= 25 cm | 240 | LM | 0.00 | ||
| A065 | Dismounting and evacuation of shore-up strips or road gutter made of prefabricated concrete - 25 < width : B <= 40 cm | 240 | LM | 0.00 | ||
| A066 | Dismounting and evacuation of shore-up strips or road gutter made of prefabricated concrete - 40 < width : B <= 60 cm | 48 | LM | 0.00 | ||
| A067 | Dismounting and evacuation of shore-up strips or road gutter made of prefabricated concrete - 60 < width : B <= 80 cm | 48 | LM | 0.00 | ||
| A068 | Dismounting and evacuation of shore-up strips or road gutter made of prefabricated concrete - width : B > 80 cm | 48 | LM | 0.00 | ||
| A069 | Dismounting and evacuation of shore-up strips or road gutter made of concrete cast on site - width : B <= 25 cm | 96 | LM | 0.00 | ||
| A070 | Dismounting and evacuation of shore-up strips or road gutter made of concrete cast on site - 25 < width : B <= 40 cm | 96 | LM | 0.00 | ||
| A071 | Dismounting and evacuation of shore-up strips or road gutter made of concrete cast on site - 40 < width : B <= 60 cm | 48 | LM | 0.00 | ||
| A072 | Dismounting and evacuation of shore-up strips or road gutter made of concrete cast on site - 60 < width : B <= 80 cm | 48 | LM | 0.00 | ||
| A073 | Dismounting and evacuation of shore-up strips or road gutter made of concrete cast on site - width : B > 80 cm | 48 | LM | 0.00 | ||
| A074 | Demolition and evacuation of shore-up strips or road gutter made of paving stones | 48 | SM | 0.00 | ||
| A075 | Demolition and evacuation of shore-up strips or road gutter made of cast asphalt | 48 | SM | 0.00 | ||
| A076 | Demolition and evacuation of linear elements foundation made of bound material | 240 | CM | 0.00 | ||
| A077 | Demolition and evacuation of pipes - diameter DN <= 300 mm | 96 | LM | 0.00 | ||
| A078 | Demolition and evacuation of pipes - 300 < diameter DN <= 600 mm | 96 | LM | 0.00 | ||
| A079 | Demolition and evacuation of pipes - 600 < diameter DN <= 1000 mm | 24 | LM | 0.00 | ||
| A080 | Demolition and evacuation of pipes - 1000 < diameter DN <= 2000 mm | 24 | LM | 0.00 | ||
| A081 | Demolition and evacuation of asbestos pipes, with submittal of a certificate from certified dump | 24 | LM | 0.00 | ||
| A082 | Demolition and evacuation of drainage gutter - useful section <= 0.15 m2 | 96 | LM | 0.00 | ||
| A083 | Demolition and evacuation of drainage gutter - 0.15 < useful section <= 0.30 m2 | 96 | LM | 0.00 | ||
| A084 | Demolition and evacuation of drainage gutter - useful section > 0.30 m2 | 48 | LM | 0.00 | ||
| A085 | Demolition and evacuation of surface elements - water collector | 4 | EA | 0.00 | ||
| A086 | Demolition and evacuation of surface elements - trap and/or grill | 4 | EA | 0.00 | ||
| A087 | Demolition and evacuation of surface elements - other road fittings | 4 | EA | 0.00 | ||
| A088 | Demolition and evacuation of buried elements - masonry blocks | 4 | CM | 0.00 | ||
| A089 | Demolition and evacuation of buried elements - non reinforced cocnrete blocks | 4 | CM | 0.00 | ||
| A090 | Demolition and evacuation of buried elements - reinforced concrete blocks | 4 | CM | 0.00 | ||
| A091 | Demolition and evacuation of buried elements - manhole : height <= 2 m | 4 | CM | 0.00 | ||
| A092 | Demolition and evacuation of buried elements - manhole : height > 2 m | 4 | CM | 0.00 | ||
| A093 | Demolition and evacuation of concrete safety guide rail - high safety curbstone | 8 | LM | 0.00 | ||
| A094 | Demolition and evacuation of concrete safety guide rail - low safety curbstone | 8 | LM | 0.00 | ||
| A095 | Demolition and evacuation of vertical sign on 1 support - full dismounting, foundation included | 4 | EA | 0.00 | ||
| A096 | Demolition and evacuation of vertical sign on 2 supports - full dismounting, foundation included | 4 | EA | 0.00 | ||
| A097 | Full dismounting of vertical sign on 1 support to be reused on site | 4 | EA | 0.00 | ||
| A098 | Full dismounting of vertical sign on 2 supports to be reused on site | 4 | EA | 0.00 | ||
| Sub total | 0.00 | |||||
| B | Earthwork (Following ELINS pertain to CLIN 0002) | |||||
| B001 | Preliminary work - spotting and marking of buried installations with electronic devices | 4 | EA | 0.00 | ||
| B002 | Preliminary work - spotting and marking of buried installations through search excavations | 12 | CM | 0.00 | ||
| B003 | Earthwork- removal and evacuation of turned up earth | 28 | CM | 0.00 | ||
| B004 | Earthwork - removal and storage of turned up earth | 28 | CM | 0.00 | ||
| B005 | Earthwork - general excavation with evacuation | 56 | CM | 0.00 | ||
| B006 | Earthwork - general excavation to be reused on site | 56 | CM | 0.00 | ||
| B007 | Earthwork - Additional cost for general excavation in rocky ground + evacuation | 24 | CM | 0.00 | ||
| B008 | Earthwork - Additional cost for general excavation in compact ground + evacuation | 24 | CM | 0.00 | ||
| B009 | Earthwork - Additional cost for general excavation in improper ground (not bearing enough) + evacuation | 24 | CM | 0.00 | ||
| B010 | Earthwork - Additional cost for general excavation in improper ground (polluted with heavy metal) + evacuation and submittal of a certificate from certified dump | 24 | CM | 0.00 | ||
| B011 | Earthwork - Additional cost for general excavation in improper ground (polluted with Total Petroleum Hydrocarbon) + evacuation and submittal of a certificate from certified dump | 24 | CM | 0.00 | ||
| B012 | Earthwork - Additional cost for general excavation in improper ground (polluted with Polycyclic Aromatic hydrocarbons) + evacuation and submittal of a certificate from certified dump | 24 | CM | 0.00 | ||
| B013 | Earthwork - Additional cost for general excavation in improper ground (polluted with Heavy metal, TPH and PAHs) + storage | 24 | CM | 0.00 | ||
| B014 | General backfill - to be supplied | 56 | CM | 0.00 | ||
| B015 | General backfill - coming from work site | 56 | CM | 0.00 | ||
| B016 | Mechanical earthwork - trenches for utilities - successive sand backfills included | 72 | CM | 0.00 | ||
| B017 | Manual earthwork - trenches for utilities - successive sand backfills included | 4 | CM | 0.00 | ||
| B018 | Earthwork for pipes - D = 200 mm - Depth <= 1 m - successive sand backfills included | 96 | LM | 0.00 | ||
| B019 | Earthwork for pipes - D = 400 mm - Depth <= 1 m - successive sand backfills included | 96 | LM | 0.00 | ||
| B020 | Earthwork for pipes - D = 600 mm - Depth <= 1 m - successive sand backfills included | 96 | LM | 0.00 | ||
| B021 | Earthwork for pipes - D = 800 mm - Depth <= 1 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B022 | Earthwork for pipes - D = 1000 mm - Depth <= 1 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B023 | Earthwork for pipes - D = 200 mm - 1 m < Depth <= 2 m - successive sand backfills included | 96 | LM | 0.00 | ||
| B024 | Earthwork for pipes - D = 400 mm - 1 m < Depth <= 2 m - successive sand backfills included | 96 | LM | 0.00 | ||
| B025 | Earthwork for pipes - D = 600 mm - 1 m < Depth <= 2 m - successive sand backfills included | 96 | LM | 0.00 | ||
| B026 | Earthwork for pipes - D = 800 mm - 1 m < Depth <= 2 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B027 | Earthwork for pipes - D = 1000 mm - 1 m < Depth <= 2 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B028 | Earthwork for pipes - D = 1200 mm - 1 m < Depth <= 2 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B029 | Earthwork for pipes - D = 200 mm - 2 m < Depth <= 3 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B030 | Earthwork for pipes - D = 400 mm - 2 m < Depth <= 3 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B031 | Earthwork for pipes - D = 600 mm - 2 m < Depth <= 3 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B032 | Earthwork for pipes - D = 800 mm - 2 m < Depth <= 3 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B033 | Earthwork for pipes - D = 1000 mm - 2 m < Depth <= 3 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B034 | Earthwork for pipes - D = 1200 mm - 2 m < Depth <= 3 m - successive sand backfills included | 48 | LM | 0.00 | ||
| B035 | Earthwork for polyethylene duct and/or ringed PVC - D = 110 mm - successive sand backfills included | 96 | LM | 0.00 | ||
| B036 | Earthwork for polyethylene duct and/or ringed PVC - D = 125 mm - successive sand backfills included | 96 | LM | 0.00 | ||
| B037 | Earthwork for polyethylene duct and/or ringed PVC - D = 160 mm - successive sand backfills included | 96 | LM | 0.00 | ||
| B038 | Earthwork for polyethylene duct and/or ringed PVC - D = 200 mm - successive sand backfills included | 96 | LM | 0.00 | ||
| B039 | Earthwork - Excavation for digging of trenches - with evacuation - and submittal of certificate from certified dump | 48 | CM | 0.00 | ||
| B040 | Earthwork - Sizing of trenches (S<0.5m2) - with evacuation - and submittal of certificate from certified dump | 48 | CM | 0.00 | ||
| B041 | Earthwork - Sizing of trenches(S>0.5m2) - with evacuation - and submittal of certificate from certified dump | 48 | CM | 0.00 | ||
| B042 | Earthwork - Excavation for manholes, tanks, ... with evacuation | 48 | CM | 0.00 | ||
| B043 | Backfill for manholes, tanks,... in sand-cement | 48 | CM | 0.00 | ||
| B044 | Backfill for manholes, tanks,... in sand | 48 | CM | 0.00 | ||
| B045 | Backfill - Additional cost for special reinforcement | 28 | SM | 0.00 | ||
| B046 | Backfill - building of berm with vegetal earth - 45 degrees slope - Height = 1 m | 192 | CM | 0.00 | ||
| B047 | Backfill - building of berm with vegetal earth - 45 degrees slope - Height = 2 m | 192 | CM | 0.00 | ||
| B048 | Backfill - building of berm with vegetal earth - 45 degrees slope - Height = 3 m | 96 | CM | 0.00 | ||
| B049 | General excavation for plants and lawn - depth = 30 cm | 96 | SM | 0.00 | ||
| B050 | Backfill for lawn and plants with turned-up earth | 96 | CM | 0.00 | ||
| B051 | Backfill for lawn and plants with backfill earth - to be supplied | 96 | CM | 0.00 | ||
| B052 | Backfill for lawn and plants with substitution vegetal earth - to be supplied | 96 | CM | 0.00 | ||
| B053 | Backfill for lawn and plants with arable earth - to be supplied | 96 | CM | 0.00 | ||
| B054 | Backfill for lawn and plants with heathmould | 96 | CM | 0.00 | ||
| B055 | Levelling and profiling of ground | 48 | SM | 0.00 | ||
| B056 | Full cleaning of ground and removal of stones | 480 | SM | 0.00 | ||
| B057 | Grinding of ground surface | 480 | SM | 0.00 | ||
| B058 | Raking of ground surface | 480 | SM | 0.00 | ||
| B059 | Sowing of lawn | 480 | SM | 0.00 | ||
| B060 | Laying of lawn patches | 480 | SM | 0.00 | ||
| Sub total | 0.00 | |||||
| C | Subfoundations and foundation (Following ELINS pertain to CLIN 0003) | |||||
| C001 | Supply and installation of a geotextile membrane and/or geogrid on foundation bottom | 2400 | SM | 0.00 | ||
| C002 | Rolling of foundation bottom | 2400 | SM | 0.00 | ||
| C003 | Reprofiling and rolling of existing subfoundation or foundation | 1440 | SM | 0.00 | ||
| C004 | Subfoundation reprofiling materials | 96 | TN | 0.00 | ||
| C005 | Preliminary work - treatment of foundation bottom with lime supply | 96 | CM | 0.00 | ||
| C006 | Supply and installation of type 1 subfoundation | 96 | CM | 0.00 | ||
| C007 | Supply and installation of type 1 subfoundation - T = 10 cm | 960 | SM | 0.00 | ||
| C008 | Supply and installation of type 1 subfoundation - T = 20 cm | 960 | SM | 0.00 | ||
| C009 | Supply and installation of type 1 subfoundation - T = 30 cm | 960 | SM | 0.00 | ||
| C010 | Supply and installation of type 1 subfoundation - T = 50 cm | 960 | SM | 0.00 | ||
| C011 | Supply and installation of type 2 subfoundation | 96 | CM | 0.00 | ||
| C012 | Supply and installation of type 2 subfoundation - T = 10 cm | 960 | SM | 0.00 | ||
| C013 | Supply and installation of type 2 subfoundation - T = 20 cm | 960 | SM | 0.00 | ||
| C014 | Supply and installation of type 2 subfoundation - T = 30 cm | 960 | SM | 0.00 | ||
| C015 | Supply and installation of type 2 subfoundation - T = 50 cm | 960 | SM | 0.00 | ||
| C016 | Supply and installation of type 4 subfoundation | 96 | CM | 0.00 | ||
| C017 | Supply and installation of type 4 subfoundation - T = 10 cm | 960 | SM | 0.00 | ||
| C018 | Supply and installation of type 4 subfoundation - T = 20 cm | 960 | SM | 0.00 | ||
| C019 | Supply and installation of type 4 subfoundation - T = 30 cm | 960 | SM | 0.00 | ||
| C020 | Supply and installation of type 4 subfoundation - T = 50 cm | 960 | SM | 0.00 | ||
| C021 | Supply and installation of subfoundation: replace improper ground for foundation bottom | 48 | CM | 0.00 | ||
| C022 | Reprofiling and rolling of existing foundation | 2400 | SM | 0.00 | ||
| C023 | Foundation reprofiling materials | 96 | TN | 0.00 | ||
| C024 | Supply and installation of type I continuous bottoming foundation | 96 | CM | 0.00 | ||
| C025 | Supply and installation of type I continuous bottoming foundation - T = 10 cm | 480 | SM | 0.00 | ||
| C026 | Supply and installation of type I continuous bottoming foundation - T = 20 cm | 480 | SM | 0.00 | ||
| C027 | Supply and installation of type I continuous bottoming foundation - T = 30 cm | 480 | SM | 0.00 | ||
| C028 | Supply and installation of type II continuous bottoming foundation | 96 | CM | 0.00 | ||
| C029 | Supply and installation of type II continuous bottoming foundation - T = 10 cm | 480 | SM | 0.00 | ||
| C030 | Supply and installation of type II continuous bottoming foundation - T = 20 cm | 480 | SM | 0.00 | ||
| C031 | Supply and installation of type II continuous bottoming foundation - T = 30 cm | 480 | SM | 0.00 | ||
| C032 | Supply and installation of type III discontinuous bottoming foundation | 96 | CM | 0.00 | ||
| C033 | Supply and installation of type III discontinuous bottoming foundation - T = 10 cm | 480 | SM | 0.00 | ||
| C034 | Supply and installation of type III discontinuous bottoming foundation - T = 20 cm | 480 | SM | 0.00 | ||
| C035 | Supply and installation of type III continuous bottoming foundation - T = 30 cm | 480 | SM | 0.00 | ||
| C036 | Supply and installation of type I sand-cement foundation | 96 | CM | 0.00 | ||
| C037 | Supply and installation of type I sand-cement foundation - T = 10 cm | 480 | SM | 0.00 | ||
| C038 | Supply and installation of type I sand-cement foundation - T = 20 cm | 480 | SM | 0.00 | ||
| C039 | Supply and installation of type I sand-cement foundation - T = 30 cm | 480 | SM | 0.00 | ||
| C040 | Supply and installation of type II sand-cement foundation | 96 | CM | 0.00 | ||
| C041 | Supply and installation of type II sand-cement foundation - T = 10 cm | 480 | SM | 0.00 | ||
| C042 | Supply and installation of type II sand-cement foundation - T = 20 cm | 480 | SM | 0.00 | ||
| C043 | Supply and installation of type II sand-cement foundation - T = 30 cm | 480 | SM | 0.00 | ||
| C044 | Supply and installation of type I lean concrete foundation | 96 | CM | 0.00 | ||
| C045 | Supply and installation of type I lean concrete foundation - T = 10 cm | 480 | SM | 0.00 | ||
| C046 | Supply and installation of type I lean concrete foundation - T = 20 cm | 480 | SM | 0.00 | ||
| C047 | Supply and installation of type I lean concrete foundation - T = 30 cm | 480 | SM | 0.00 | ||
| C048 | Supply and installation of type II lean concrete foundation | 96 | CM | 0.00 | ||
| C049 | Supply and installation of type II lean concrete foundation - T = 10 cm | 480 | SM | 0.00 | ||
| C050 | Supply and installation of type II lean concrete foundation - T = 20 cm | 480 | SM | 0.00 | ||
| C051 | Supply and installation of type II lean concrete foundation - T = 30 cm | 480 | SM | 0.00 | ||
| C052 | Supply and installation of type I or type II lean concrete foundation for linear elements foundation and shore-up | 48 | CM | 0.00 | ||
| C053 | Supply and installation of rebar for lean concrete foundation - lattice 1kg/m2 minimum | 480 | SM | 0.00 | ||
| C054 | Supply and installation of rebar for lean concrete foundation - lattice 3kg/m2 minimum | 480 | SM | 0.00 | ||
| C055 | Supply and installation of concrete foundation, class C 16/20 | 48 | CM | 0.00 | ||
| C056 | Supply and installation of concrete foundation, class C 16/20 - T = 10 cm | 96 | SM | 0.00 | ||
| C057 | Supply and installation of concrete foundation, class C 16/20 - T = 20 cm | 96 | SM | 0.00 | ||
| C058 | Supply and installation of concrete foundation, class C 16/20 - T = 30 cm | 96 | SM | 0.00 | ||
| C059 | Supply and installation of pouzzolanic concrete foundation | 24 | CM | 0.00 | ||
| C060 | Supply and installation of pouzzolanic concrete foundation - T = 10 cm | 48 | SM | 0.00 | ||
| C061 | Supply and installation of pouzzolanic concrete foundation - T = 20 cm | 48 | SM | 0.00 | ||
| C062 | Supply and installation of pouzzolanic concrete foundation - T = 30 cm | 48 | SM | 0.00 | ||
| C063 | Supply and installation of porous lean concrete foundation | 48 | CM | 0.00 | ||
| C064 | Supply and installation of porous lean concrete foundation - T = 10 cm | 48 | SM | 0.00 | ||
| C065 | Supply and installation of porous lean concrete foundation - T = 20 cm | 48 | SM | 0.00 | ||
| C066 | Supply and installation of porous lean concrete foundation - T = 30 cm | 48 | SM | 0.00 | ||
| C067 | Supply and installation of rolled dry concrete foundation - BSC20 | 24 | CM | 0.00 | ||
| C068 | Supply and installation of rolled dry concrete foundation - BSC20 - T = 10 cm | 48 | SM | 0.00 | ||
| C069 | Supply and installation of rolled dry concrete foundation - BSC20 - T = 20 cm | 48 | SM | 0.00 | ||
| C070 | Supply and installation of rolled dry concrete foundation - BSC20 - T = 30 cm | 48 | SM | 0.00 | ||
| C071 | Supply and installation of rolled dry concrete foundation - BSC30 | 24 | CM | 0.00 | ||
| C072 | Supply and installation of rolled dry concrete foundation - BSC30 - T = 10 cm | 48 | SM | 0.00 | ||
| C073 | Supply and installation of rolled dry concrete foundation - BSC30 - T = 20 cm | 48 | SM | 0.00 | ||
| C074 | Supply and installation of rolled dry concrete foundation - BSC30 - T = 30 cm | 48 | SM | 0.00 | ||
| Sub total | 0.00 | |||||
| D | Coverings (Following ELINS pertain to CLIN 0004) | |||||
| D001 | Supply and installation of continuous reinforced concrete covering - T = 18 cm | 480 | SM | 0.00 | ||
| D002 | Supply and installation of continuous reinforced concrete covering - T = 20 cm | 480 | SM | 0.00 | ||
| D003 | Supply and installation of continuous reinforced concrete covering - T = 23 cm | 480 | SM | 0.00 | ||
| D004 | Supply and installation of discontinuous concrete covering - T = 18 cm | 480 | SM | 0.00 | ||
| D005 | Supply and installation of discontinuous concrete covering - T = 20 cm | 480 | SM | 0.00 | ||
| D006 | Supply and installation of discontinuous concrete covering - T = 23 cm | 480 | SM | 0.00 | ||
| D007 | Additional cost for concrete colored in the mass | 96 | CM | 0.00 | ||
| D008 | Surface treatment of concrete covering (brushing) | 96 | SM | 0.00 | ||
| D009 | Impregnation process of concrete covering: waterproof | 240 | SM | 0.00 | ||
| D010 | Execution of cross expansion joint for concrete covering | 48 | LM | 0.00 | ||
| D011 | Longitudinal joint for concrete covering | 240 | LM | 0.00 | ||
| D012 | Additional cost for reinforcements | 240 | Kg | 0.00 | ||
| D013 | Supply and install reinforced concrete slab - T = 15 cm - installation and removal of formwork included | 48 | SM | 0.00 | ||
| D014 | Supply and install reinforced concrete slab - T = 20 cm - installation and removal of formwork included | 48 | SM | 0.00 | ||
| D015 | Supply and install reinforced concrete slab - T = 25 cm - installation and removal of formwork included | 48 | SM | 0.00 | ||
| D016 | Supply and install reinforced concrete slab - T = 30 cm - installation and removal of formwork included | 48 | SM | 0.00 | ||
| D017 | Supply and install reinforced concrete slab - T = 40 cm - installation and removal of formwork included | 48 | SM | 0.00 | ||
| D018 | Surface treatment of concrete slab : smoothing | 48 | SM | 0.00 | ||
| D019 | Additional cost for additives | 240 | CM | 0.00 | ||
| D020 | Treatment of joints with hot-dip sealing product | 480 | LM | 0.00 | ||
| D021 | Treatment of joints with anti-kerosene sealing product for concrete-concrete covering | 240 | LM | 0.00 | ||
| D022 | Supply and installation of concrete covering tack coat | 960 | SM | 0.00 | ||
| D023 | Supply and installation of hydrocarbon covering tack coat | 960 | SM | 0.00 | ||
| D024 | Supply and installation of tack coat between 2 hydrocarbon coats | 960 | SM | 0.00 | ||
| D025 | Supply and installation of grill | 480 | SM | 0.00 | ||
| D026 | Supply and installation of geogrill | 480 | SM | 0.00 | ||
| D027 | High pressure cleaning of binding coat made of hydrocarbon coated material | 240 | SM | 0.00 | ||
| D028 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-1 | 96 | TN | 0.00 | ||
| D029 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-1- T = 6 cm | 960 | SM | 0.00 | ||
| D030 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-1 - T = 7 cm | 960 | SM | 0.00 | ||
| D031 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-1 - T = 8 cm | 960 | SM | 0.00 | ||
| D032 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-1 | 96 | TN | 0.00 | ||
| D033 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-1 - T = 4 cm | 960 | SM | 0.00 | ||
| D034 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-1 - T = 5 cm | 960 | SM | 0.00 | ||
| D035 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-1 - T = 6 cm | 960 | SM | 0.00 | ||
| D036 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-10base3-1 | 96 | TN | 0.00 | ||
| D037 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-10base3-1 - T = 4 cm | 960 | SM | 0.00 | ||
| D038 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-6,3base3-1 | 96 | TN | 0.00 | ||
| D039 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-6,3base3-1 - T = 3 cm | 960 | SM | 0.00 | ||
| D040 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-2 | 96 | TN | 0.00 | ||
| D041 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-2- T = 6 cm | 960 | SM | 0.00 | ||
| D042 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-2 - T = 7 cm | 960 | SM | 0.00 | ||
| D043 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-20base3-2 - T = 8 cm | 960 | SM | 0.00 | ||
| D044 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-2 | 96 | TN | 0.00 | ||
| D045 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-2 - T = 4 cm | 960 | SM | 0.00 | ||
| D046 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-2 - T = 5 cm | 960 | SM | 0.00 | ||
| D047 | Supply and installation of binding coat made of hydrocarbon coated material to road bitumen type AC-14base-3-2 - T = 6 cm | 960 | SM | 0.00 | ||
| D048 | Supply and installation of traffic coat made of hydrocarbon coated material with sand internal structure type AC14Surf1-1 | 96 | TN | 0.00 | ||
| D049 | Supply and installation of traffic coat made of hydrocarbon coated material with sand internal structure type AC14Surf1-1 - T = 4 cm | 960 | SM | 0.00 | ||
| D050 | Supply and installation of traffic coat made of hydrocarbon coated material with sand internal structure type AC10Surf4-1 | 96 | TN | 0.00 | ||
| D051 | Supply and installation of traffic coat made of hydrocarbon coated material with sand internal structure type AC10Surf4-1 - T = 4 cm | 960 | SM | 0.00 | ||
| D052 | Supply and installation of traffic coat made of hydrocarbon coated material with sand internal structure type AC6,3Surf4-1 | 96 | TN | 0.00 | ||
| D053 | Supply and installation of traffic coat made of hydrocarbon coated material with sand internal structure type AC6,3Surf4-1 - T = 3 cm | 960 | SM | 0.00 | ||
| D054 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-1 | 48 | TN | 0.00 | ||
| D055 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-1 - T = 3 cm | 960 | SM | 0.00 | ||
| D056 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-1 - T = 4 cm | 960 | SM | 0.00 | ||
| D057 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-1 made of crushed PORPHYRY stones | 48 | TN | 0.00 | ||
| D058 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-1 made of crushed PORPHYRY stones- T = 6cm | 960 | SM | 0.00 | ||
| D059 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-2 | 48 | TN | 0.00 | ||
| D060 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-2 - T = 4 cm | 960 | SM | 0.00 | ||
| D061 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-14-2 - T = 5 cm | 960 | SM | 0.00 | ||
| D062 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-10-1 | 48 | TN | 0.00 | ||
| D063 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-10-1 - T = 3 cm | 960 | SM | 0.00 | ||
| D064 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-10-1 - T = 3,5 cm | 960 | SM | 0.00 | ||
| D065 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-10-2 | 48 | TN | 0.00 | ||
| D066 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-10-2 - T = 3 cm | 960 | SM | 0.00 | ||
| D067 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-10-2 - T = 3,5 cm | 960 | SM | 0.00 | ||
| D068 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-6,3-1 | 48 | TN | 0.00 | ||
| D069 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-6,3-1 - T = 2 cm | 960 | SM | 0.00 | ||
| D070 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-6,3-1 - T = 2,5 cm | 960 | SM | 0.00 | ||
| D071 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-6,3-2 | 48 | TN | 0.00 | ||
| D072 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-6,3-2 - T = 2 cm | 960 | SM | 0.00 | ||
| D073 | Supply and installation of traffic coat made of hydrocarbon coated material with stone internal structure type SMA-6,3-2 - T = 2,5 cm | 960 | SM | 0.00 | ||
| D074 | Supply and installation of traffic coat made of draining coated material type PA-14-1 | 24 | TN | 0.00 | ||
| D075 | Supply and installation of traffic coat made of draining coated material type PA-1 4-1- T = 4 cm | 480 | SM | 0.00 | ||
| D076 | Supply and installation of traffic coat made of draining coated material type PA-14-2 | 24 | TN | 0.00 | ||
| D077 | Supply and installation of traffic coat made of draining coated material type PA-14-2- T = 4 cm | 480 | SM | 0.00 | ||
| D078 | Supply and installation of traffic coat made of draining coated material type PA-10-1 | 24 | TN | 0.00 | ||
| D079 | Supply and installation of traffic coat made of draining coated material type PA-10-1- T = 3 cm | 480 | SM | 0.00 | ||
| D080 | Provide Quality Assurance Plan for the installation of hydrocarbon coated material | 4 | EA | 0.00 | ||
| D081 | Treatment of joints with pre-shaped bituminous strip for joints | 480 | LM | 0.00 | ||
| D082 | Treatment of joints with extruded bituminous strip for joints | 480 | LM | 0.00 | ||
| D083 | Treatment of joints with hot-dip sealing product | 480 | LM | 0.00 | ||
| D084 | Treatment of non propped edges with emulsion type C60B1 | 240 | LM | 0.00 | ||
| D085 | Treatment of non propped edges with bitumen | 240 | LM | 0.00 | ||
| D086 | Anti-kerozene treatment of hydrocarbon surface | 960 | SM | 0.00 | ||
| D087 | Treatment of joints with anti-kerozene sealing product for hydrocarbon covering | 440 | LM | 0.00 | ||
| D088 | Treatment of joints with anti-kerozene sealing product for concrete-concrete covering | 440 | LM | 0.00 | ||
| D089 | Supply and installation of grey rectangular concrete paving stone covering - 22 x 11 x 8 cm - filling of joints with white sand included | 240 | SM | 0.00 | ||
| D090 | Additional cost for concrete paving stones colored in the mass | 24 | SM | 0.00 | ||
| D091 | Supply and installation of concrete slab covering - 30 x 30 x 5 cm - pointing included | 144 | SM | 0.00 | ||
| D092 | Supply and installation of bushhammer granite slab covering - 40 x 40 x 3 cm - pointing included | 48 | SM | 0.00 | ||
| D093 | Supply and installation of blue stone slab covering - 40 < T < 70 mm - pointing included | 48 | SM | 0.00 | ||
| D094 | Supply and installation of oblong paving stone covering - pointing included | 24 | SM | 0.00 | ||
| D095 | Supply and installation of concrete lawn strips covering - Thickness T = 8cm including joints | 96 | SM | 0.00 | ||
| D096 | Supply and installation of concrete lawn strips covering - Thickness T = 10cm including joints | 96 | SM | 0.00 | ||
| D097 | Supply and installation of concrete lawn strips covering - Thickness T = 12cm including joints | 96 | SM | 0.00 | ||
| D098 | Supply and installation of dolomite covering | 48 | TN | 0.00 | ||
| D099 | Supply and installation of dolomite covering - T = 5 cm | 96 | SM | 0.00 | ||
| D100 | Supply and installation of dolomite covering - T = 10 cm | 96 | SM | 0.00 | ||
| D101 | Supply and installation of porphyry gravel covering 7/14 | 48 | TN | 0.00 | ||
| D102 | Supply and installation of porphyry gravel covering 7/14 - T = 5 cm | 96 | SM | 0.00 | ||
| D103 | Supply and installation of porphyry gravel covering 7/14 - T = 10 cm | 96 | SM | 0.00 | ||
| D104 | Supply and installation of red shale covering | 48 | TN | 0.00 | ||
| D105 | Supply and installation of red shale covering - T = 5 cm | 96 | SM | 0.00 | ||
| D106 | Supply and installation of red shale covering - T = 10 cm | 96 | SM | 0.00 | ||
| D107 | Supply and installation of angular gravel, white flint 8/22 type | 48 | TN | 0.00 | ||
| D108 | Supply and installation of angular gravel, white flint 8/22 type - T = 5 cm | 96 | SM | 0.00 | ||
| D109 | Supply and installation of angular gravel, white flint 8/22 type - T = 10 cm | 96 | SM | 0.00 | ||
| D110 | Additional cost for laying coat with mortar | 96 | SM | 0.00 | ||
| D111 | Additional cost for pointing with cement mortar | 96 | SM | 0.00 | ||
| D112 | Additional cost for pointing with cement mortar grout | 96 | SM | 0.00 | ||
| D113 | Additional cost for pointing with water repellent mortar | 96 | SM | 0.00 | ||
| Sub total | 0.00 | |||||
| E | Linear elements and small constructions (Following ELINS pertain to CLIN 0005) | |||||
| E001 | Supply and installation of concrete curbstones, type IA - W = 150 mm, H = 350 mm, c = 20 mm - L = 1 m | 96 | LM | 0.00 | ||
| E002 | Supply and installation of concrete curbstones, type IA - W = 150 mm, H = 350 mm, c = 20 mm - curved element | 96 | LM | 0.00 | ||
| E003 | Supply and installation of concrete curbstones, type IB - W = 200 mm, H = 300 mm, c = 20 mm - L = 1 m | 96 | LM | 0.00 | ||
| E004 | Supply and installation of concrete curbstones, type IB - W = 200 mm, H = 300 mm, c = 20 mm - curved element | 96 | LM | 0.00 | ||
| E005 | Supply and installation of concrete curbstones, type IC1 - W = 150 mm, H = 300 mm - L = 1 m | 96 | LM | 0.00 | ||
| E006 | Supply and installation of concrete curbstones, type IC1 - W = 150 mm, H = 300 mm - L = 1 m | 96 | LM | 0.00 | ||
| E007 | Supply and installation of concrete curbstones, type IC2 - W = 150 mm, H = 300 mm, c = 20 mm - L = 1 m | 96 | LM | 0.00 | ||
| E008 | Supply and installation of concrete curbstones, type IC2 - W = 150 mm, H = 300 mm, c = 20 mm - curved element | 96 | LM | 0.00 | ||
| E009 | Supply and installation of concrete curbstones, type IE - W = 200 mm, H = 270 mm, c = 100/50 mm - L = 1 m | 96 | LM | 0.00 | ||
| E010 | Supply and installation of concrete curbstones, type IE - W = 200 mm, H = 270 mm, c = 100/50 mm - curved element | 96 | LM | 0.00 | ||
| E011 | Supply and installation of concrete curbstones, type IF1 - W = 300 mm, H = 200 mm, c = 300/30 mm - L = 1 m | 96 | LM | 0.00 | ||
| E012 | Supply and installation of concrete curbstones, type IF1 - W = 300 mm, H = 200 mm, c = 300/30 mm - curved element | 96 | LM | 0.00 | ||
| E013 | Supply and installation of concrete curbstones, type IF2 - W = 250 mm, H = 170 mm, c = 150/25 mm - L = 1 m | 96 | LM | 0.00 | ||
| E014 | Supply and installation of concrete curbstones, type IF2 - W = 250 mm, H = 170 mm, c = 150/25 mm - curved element | 96 | LM | 0.00 | ||
| E015 | Supply and installation of concrete curbstones, type ID1 - W = 100 mm, H = 300 mm, L = 1 m | 96 | LM | 0.00 | ||
| E016 | Supply and installation of concrete curbstones, type ID1 - W = 100 mm, H = 300 mm, curved element | 96 | LM | 0.00 | ||
| E017 | Supply and installation of concrete curbstones, type ID2 - W = 100 mm, H = 200 mm, L = 1 m | 96 | LM | 0.00 | ||
| E018 | Supply and installation of concrete curbstones, type ID2 - W = 100 mm, H = 200 mm, curved element | 96 | LM | 0.00 | ||
| E019 | Supply and installation of concrete curbstones, type ID3 - W = 80 mm, H = 250 mm, L = 1 m | 96 | LM | 0.00 | ||
| E020 | Supply and installation of concrete curbstones, type ID3 - W = 80 mm, H = 250 mm, curved element | 96 | LM | 0.00 | ||
| E021 | Supply and installation of concrete curbstones, type ID4 - W = 60 mm, H = 200 mm, L = 1 m | 96 | LM | 0.00 | ||
| E022 | Supply and installation of concrete curbstones, type ID4 - W = 60 mm, H = 200 mm, curved element | 96 | LM | 0.00 | ||
| E023 | Additional cost for lowered concrete curbstone for pedestrian crossing | 24 | LM | 0.00 | ||
| E024 | Supply and installation of lowered concrete curbstones for pedestrian crossing - W = 350 mm, H = 150 mm | 24 | LM | 0.00 | ||
| E025 | Supply and installation of lowered concrete curbstones for pedestrian crossing - W = 350 mm, H = 150 mm - end element | 4 | EA | 0.00 | ||
| E026 | Supply and installation of lowered concrete curbstones for pedestrian crossing - W = 500 mm, H = 150 mm | 24 | LM | 0.00 | ||
| E027 | Supply and installation of lowered concrete curbstones for pedestrian crossing - W = 500 mm, H = 150 mm - end element | 4 | EA | 0.00 | ||
| E028 | Supply and installation of concrete traffic divider curbstone type B2, glued - W = 250 mm, H = 130 mm, c = 70/200 mm - straight element | 96 | LM | 0.00 | ||
| E029 | Supply and installation of concrete traffic divider curbstone type B2, glued - W = 250 mm, H = 130 mm, c = 70/200 mm - curved element | 96 | LM | 0.00 | ||
| E030 | Supply and installation of concrete traffic divider curbstone type B2, glued - W = 250 mm, H = 130 mm, c = 70/200 mm - divider point | 4 | EA | 0.00 | ||
| E031 | Supply and installation of concrete traffic divider curbstone type B1 - W = 250 mm, H = 180 mm, c = 70/200 mm - curved element | 96 | LM | 0.00 | ||
| E032 | Supply and installation of concrete traffic divider curbstone type B1 - W = 250 mm, H = 180 mm, c = 70/200 mm - straight element | 96 | LM | 0.00 | ||
| E033 | Supply and installation of concrete traffic divider curbstone type B1 - W = 250 mm, H = 180 mm, c = 70/200 mm - divider point | 4 | EA | 0.00 | ||
| E034 | Additional cost for traffic divider curbstone made of white concrete | 24 | LM | 0.00 | ||
| E035 | Supply and installation of prefabricated concrete curbstone-road gutter, type IIIA - length = 1 m | 96 | LM | 0.00 | ||
| E036 | Supply and installation of prefabricated concrete curbstone-road gutter, type IIIB - length = 1 m | 96 | LM | 0.00 | ||
| E037 | Supply and installation of prefabricated concrete curbstone-road gutter, type IIIC - length = 1 m | 96 | LM | 0.00 | ||
| E038 | Supply and installation of prefabricated concrete curbstone-road gutter, type IIID - length = 1 m | 96 | LM | 0.00 | ||
| E039 | Supply and installation of prefabricated concrete curbstone-road gutter, type IIIE - length = 1 m | 96 | LM | 0.00 | ||
| E040 | Supply and installation of curbstone-road gutter made of concrete cast on site, type IIIA | 96 | LM | 0.00 | ||
| E041 | Supply and installation of curbstone-road gutter made of concrete cast on site, type IIIB | 96 | LM | 0.00 | ||
| E042 | Supply and installation of curbstone-road gutter made of concrete cast on site, type IIIC | 96 | LM | 0.00 | ||
| E043 | Supply and installation of curbstone-road gutter made of concrete cast on site, type IIID | 96 | LM | 0.00 | ||
| E044 | Supply and installation of curbstone-road gutter made of concrete cast on site, type IIIE | 96 | LM | 0.00 | ||
| E045 | Supply and installation of concrete prefabricated road gutter, type IIA2 - W = 500 mm - length = 1 m | 96 | LM | 0.00 | ||
| E046 | Supply and installation of concrete prefabricated road gutter, type IID2 - W = 200 mm - length = 1 m | 96 | LM | 0.00 | ||
| E047 | Supply and installation of concrete prefabricated road gutter, type IIE2 - W = 300 mm - length = 1 m | 96 | LM | 0.00 | ||
| E048 | Supply and installation of road gutter made of concrete cast on site, type IIA2 - W = 500 mm, T = 200 mm | 96 | LM | 0.00 | ||
| E049 | Supply and installation of road gutter made of concrete cast on site, type IID2 - W = 200 mm, T = 200 mm | 96 | LM | 0.00 | ||
| E050 | Supply and installation of road gutter made of concrete cast on site, type IIE2 - W = 300 mm, T = 200 mm | 96 | LM | 0.00 | ||
| E051 | Supply and installation of prefabricated concrete shore-up strips, type IIA1 - W = 500 mm - length = 1 m | 96 | LM | 0.00 | ||
| E052 | Supply and installation of prefabricated concrete shore-up strips, type IID1 - W = 200 mm - length = 1 m | 96 | LM | 0.00 | ||
| E053 | Supply and installation of prefabricated concrete shore-up strips, type IIE1 - W = 300 mm - length = 1 m | 96 | LM | 0.00 | ||
| E054 | Supply and installation of shore-up strips made of concrete cast on site, type IIA1 - W = 500 mm - T = 200 mm | 96 | LM | 0.00 | ||
| E055 | Supply and installation of shore-up strips made of concrete cast on site, type IID1 - W = 200 mm - T = 200 mm | 96 | LM | 0.00 | ||
| E056 | Supply and installation of shore-up strips made of concrete cast on site, type IIE1 - W = 300 mm - T = 200 mm | 96 | LM | 0.00 | ||
| E057 | Supply and installation of prefabricated concrete high safety curbstone, type IVB1, single - H = 800 mm | 48 | LM | 0.00 | ||
| E058 | Supply and installation of prefabricated concrete high safety curbstone, type IVB1, double - H = 800 mm | 48 | LM | 0.00 | ||
| E059 | Supply and installation of prefabricated concrete high safety curbstone, type IVB2, single - H = 700 mm | 48 | LM | 0.00 | ||
| E060 | Supply and installation of prefabricated concrete high safety curbstone, type IVB2, double - H = 800 mm | 48 | LM | 0.00 | ||
| E061 | Supply and installation of high safety curbstone made of concrete cast on site, type IVB1, single - H = 800 mm | 48 | LM | 0.00 | ||
| E062 | Supply and installation of high safety curbstone made of concrete cast on site, type IVB1, double - H = 800 mm | 48 | LM | 0.00 | ||
| E063 | Supply and installation of prefabricated concrete low safety curbstone, single profile | 48 | LM | 0.00 | ||
| E064 | Supply and installation of prefabricated concrete low safety curbstone, double profile | 48 | LM | 0.00 | ||
| E065 | Supply and installation of low safety curbstone made of concrete cast on site, single profile | 48 | LM | 0.00 | ||
| E066 | Supply and installation of low safety curbstone made of concrete cast on site, double profile | 48 | LM | 0.00 | ||
| E067 | Supply and installation of prefabricated concrete guard stone | 48 | LM | 0.00 | ||
| E068 | Removal of joint and repointing of existing linear elements (curbstone - safety curbstone - road gutter - shore-up strips) | 240 | LM | 0.00 | ||
| E069 | Supply and installation of 2-wave safety rails thickness 3mm including fastening means | 40 | LM | 0.00 | ||
| E070 | Supply and installation of 3-wave safety rails thickness 3mm including fastening means | 40 | LM | 0.00 | ||
| E071 | Supply and installation of IPE100 posts - length 1.8m for safety rails including accessories for ground anchoring | 20 | EA | 0.00 | ||
| E072 | Supply and installation of HEA100 posts - length 1.6m for safety rails including accessories for ground anchoring | 20 | EA | 0.00 | ||
| E073 | Supply and installation of HEA120 posts - length 1.6m for safety rails including accessories for ground anchoring | 20 | EA | 0.00 | ||
| E074 | Supply and installation of cable diameter D=22mm including fastening means | 40 | LM | 0.00 | ||
| E075 | Repair and waterproofing, cementing of existing concrete manhole included | 20 | SM | 0.00 | ||
| E076 | Repair and waterproofing, cementing of existing masonry manhole included | 20 | SM | 0.00 | ||
| E077 | Waterproofing of masonry and concrete through Rhine sand cementing | 20 | SM | 0.00 | ||
| E078 | Waterproofing of masonry and concrete with waterproof coating | 20 | SM | 0.00 | ||
| E079 | Relevelling of road elements (manhole covers, water collectors...) | 4 | EA | 0.00 | ||
| E080 | Supply, installation and connection of prefabricated concrete manhole - H <= 120 cm | 4 | EA | 0.00 | ||
| E081 | Supply, installation and connection of reinforced concrete manhole - H >= 120 cm | 4 | CM | 0.00 | ||
| E082 | Supply, installation and connection of manhole in masonry - H >= 120 cm | 4 | CM | 0.00 | ||
| E083 | Supply and installation of manhole ladder - H >= 120 cm | 8 | LM | 0.00 | ||
| E084 | Supply and installation of manhole covers on roads - class F900 - type 7 (rounded with square base) - with locking | 4 | EA | 0.00 | ||
| E085 | Supply and installation of manhole covers on roads - class D400 - type 1 (tripod and square) | 4 | EA | 0.00 | ||
| E086 | Supply and installation of manhole covers on roads - class D400 - type 5 (rounded) | 4 | EA | 0.00 | ||
| E087 | Supply and installation of manhole covers on roads - class D400 - type 7 (rounded with square base) | 4 | EA | 0.00 | ||
| E088 | Supply and installation of manhole covers on roads - class D400 - type 9 (square) | 4 | EA | 0.00 | ||
| E089 | Supply and installation of manhole covers out of traffic lanes - class C250 - type 4 (rounded) | 4 | EA | 0.00 | ||
| E090 | Supply and installation of manhole covers out of traffic lanes - class C250 - type 6 (rounded with square base) | 4 | EA | 0.00 | ||
| E091 | Supply and installation of manhole covers out of traffic lanes - class C250 - type 8 (square) | 4 | EA | 0.00 | ||
| E092 | Supply and installation of L-shaped prefabricated concrete elements - Height < 100 cm | 8 | LM | 0.00 | ||
| E093 | Supply and installation of L-shaped prefabricated concrete elements - 100 cm <= Height < 150 cm | 8 | LM | 0.00 | ||
| E094 | Supply and installation of L-shaped prefabricated concrete elements - 150 cm <= Height < 200 cm | 8 | LM | 0.00 | ||
| E095 | Supply and installation of concrete foundation C25/30 for L-shaped support | 12 | CM | 0.00 | ||
| E096 | Supply and installation of natural stone wall covers - single slope | 4 | SM | 0.00 | ||
| E097 | Supply and installation of natural stone wall covers - double slope | 4 | SM | 0.00 | ||
| E098 | Supply and installation of natural stone wall covers - flat | 4 | SM | 0.00 | ||
| E099 | Supply and installation of concrete wall covers - single slope | 4 | SM | 0.00 | ||
| E100 | Supply and installation of concrete wall covers - double slope | 4 | SM | 0.00 | ||
| E101 | Supply and installation of concrete wall covers - flat | 4 | SM | 0.00 | ||
| E102 | Execution of small reinforced concrete works, class C40/50 built on site with adherence reinforcement BE 500 S | 4 | CM | 0.00 | ||
| E103 | Execution of small masonry works: terra cotta facing bricks | 4 | CM | 0.00 | ||
| E104 | Execution of small masonry works made of natural stone : "small granite" facing bricks | 4 | CM | 0.00 | ||
| E105 | Supply and installation of a fence height H < 1,25 m type BETAFENCE PLASITOR mesh 50/3.7 including post and fastening means | 80 | LM | 0.00 | ||
| E106 | Supply and installation of a fence height 1,25 <= H < 2.00 m type BETAFENCE PLASITOR mesh 50/3.7 including post and fastening means | 80 | LM | 0.00 | ||
| E107 | Additional cost for outrigger for BETAFENCE PLASITOR fence | 80 | LM | 0.00 | ||
| E108 | Additional cost for burying of wiremesh | 80 | LM | 0.00 | ||
| E109 | Supply and installation of single access barrier width = 1.25 m height < 1.25 m, type BETAFENCE FORTINET | 4 | EA | 0.00 | ||
| E110 | Supply and installation of single access barrier width = 1.25 m height 1.25 m <= H < 2 m, type BETAFENCE FORTINET | 0 | 0.00 | |||
| E111 | Supply and installation of double access barrier width = 4 m height < 1.25 m, type BETAFENCE FORTINET | 4 | EA | 0.00 | ||
| E112 | Supply and installation of double access barrier width = 4 m height 1.25 m <= H < 2 m, type BETAFENCE FORTINET | 4 | EA | 0.00 | ||
| E113 | Supply and installation of a fence height H < 1.25 m, type BETAFENCE NYLOFOR 3D, including post and fastening means | 80 | LM | 0.00 | ||
| E114 | Supply and installation of a fence height 1.25 <= H < 2.00 m, type BETAFENCE NYLOFOR 3D, including post and fastening means | 80 | LM | 0.00 | ||
| E115 | Additional cost for outrigger for BETAFENCE NYLOFOR fence | 80 | LM | 0.00 | ||
| E116 | Additional cost for burying of wiremesh | 80 | LM | 0.00 | ||
| E117 | Supply and installation of single access barrier width = 1 m height < 1.25 m, type BETAFENCE NYLOFOR 3D | 4 | EA | 0.00 | ||
| E118 | Supply and installation of single access barrier width = 1 m height 1.25 m <= H < 2 m, type BETAFENCE NYLOFOR 3D | 4 | EA | 0.00 | ||
| E119 | Supply and installation of double access barrier width = 4 m height < 1.25 m, type BETAFENCE NYLOFOR 3D | 4 | EA | 0.00 | ||
| E120 | Supply and installation of double access barrier width = 4 m height 1.25 m <= H < 2 m, type BETAFENCE NYLOFOR 3D | 4 | EA | 0.00 | ||
| E121 | Supply and installation of double access barrier width = 6 m height < 1.25 m, type BETAFENCE NYLOFOR 3D | 4 | EA | 0.00 | ||
| E122 | Supply and installation of double access barrier width = 6 m height 1.25 m <= H < 2 m, type BETAFENCE NYLOFOR 3D | 4 | EA | 0.00 | ||
| E123 | Supply and installation of polyethylene ducts - diameter : DN = 110 mm | 40 | LM | 0.00 | ||
| E124 | Supply and installation of polyethylene ducts - diameter : DN = 125 mm | 40 | LM | 0.00 | ||
| E125 | Supply and installation of polyethylene ducts - diameter : DN = 160 mm | 40 | LM | 0.00 | ||
| E126 | Supply and installation of polyethylene ducts - diameter : DN = 200 mm | 40 | LM | 0.00 | ||
| E127 | Supply and installation of ringed non plasticized PVC ducts - diameter : DN = 110 mm | 40 | LM | 0.00 | ||
| E128 | Supply and installation of ringed non plasticized PVC ducts - diameter : DN = 125 mm | 40 | LM | 0.00 | ||
| E129 | Supply and installation of ringed non plasticized PVC ducts - diameter : DN = 160 mm | 40 | LM | 0.00 | ||
| E130 | Supply and installation of ringed non plasticized PVC ducts - diameter : DN = 200 mm | 40 | LM | 0.00 | ||
| E131 | Supply and installation of rectangular flower boxes, type RECTABAC XL65 with luxor ochre flint finish - L150 x W60 x H65 cm | 4 | EA | 0.00 | ||
| E132 | Supply and installation of reinforced concrete road dividers (reinforcement D 12mm and stirrups D 6mm) - L200 x W80 x H60 cm | 4 | EA | 0.00 | ||
| E133 | Supply and installation of highly resistant profiled natural rubber speed reducers for heavy traffic and heavy trucks with alternated yellow and black right modules and yellow half-rounded end modules - with cable passage D 50 mm with built-in reflectors and scratched surface - Height = 70 mm / Length = 400 mm - Type MANUTAN PACER | 20 | LM | 0.00 | ||
| E134 | Supply and installation of highly resistant vulcanized rubber speed reducers for heavy traffic and heavy trucks with right modules with yellow highly reflective elasto-plastic strips and half-rounded end modules Height = 70 mm / Length = 600 mm - Type NIEZEN Gate # 14 | 20 | LM | 0.00 | ||
| E135 | Supply and installation of highly resistant black rubber speed reducers for heavy traffic and heavy trucks with right modules with yellow 3M reflective elasto-plastic strips and half-rounded end modules Height = 50 mm / Length = 900 mm - Type NIEZEN A21012 | 20 | LM | 0.00 | ||
| E136 | Supply and installation of a used water raising pump, type GRUNDFOS AP50B (9l/s) including fastening means | 2 | EA | 0.00 | ||
| E137 | Supply and installation of a used water raising pump, type GRUNDFOS SV014C (18l/s) including fastening means | 2 | EA | 0.00 | ||
| E138 | Supply and installation of a used water raising pump, type GRUNDFOS SV024C (25l/s) including fastening means | 2 | EA | 0.00 | ||
| E139 | Supply and installation of a guillotine valve DN 150 including bolt joints backing flange | 2 | EA | 0.00 | ||
| E140 | Supply and installation of a guillotine valve DN 200 including bolt joints backing flange | 2 | EA | 0.00 | ||
| E141 | Supply and installation of a guillotine valve DN 250 including bolt joints backing flange | 2 | EA | 0.00 | ||
| Sub total | 0.00 |